Loading...
15-0421_SOUTHERN CALIFORNIA GAS COMPANY_Attachment Agreement ATTACHMENT AGREEMENT BY AND BETWEEN THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA AND SOUTHERN CALIFORNIA GAS COMPANY This Attachment Agreement ("Agreement") is entered into this 21st day of April, 2015, by and between the City of San Juan Capistrano, a California municipal corporation, hereinafter referred to as the ("City") and Southern California Gas Company, a California corporation hereinafter referred to as the ("Gas Company"). Hereinafter the term "Parties" shall refer collectively to all the foregoing named Parties. The effective date of this Agreement shall be the date indicated hereinabove (the "Effective Date"). RECITALS WHEREAS, Gas Company is an investor-owned public utility that provides gas utility services to residents of City. WHEREAS, on July 17, 1961, City granted to Gas Company a franchise to use and lay pipes and appurtenances necessary and convenient for the operation of a gas utility under, along, across or upon public streets, ways, alleys and places (collectively, "Rights-of-Way") in the City for transmitting and distributing gas (the "Franchise"). WHEREAS, Gas Company has been authorized by the California Public Utilities Commission to implement its Advanced Meter Program, which consists of, among other things, the installation of advanced meter equipment, network communications devices, including but not limited to data collector units ("DCU's), antennas, gas repeaters and/or radio frequency local area network range extenders, and other advanced meter facilities, in connection with and necessary for Gas Company's operation, transmission and distribution of gas in the City ("Advanced Meter Facilities"). WHEREAS, the installation of Advanced Meter Facilities requires the use of existing or new infrastructure, such as poles, towers, streetlights or buildings of sufficient height and at appropriate locations in order to be effective. WHEREAS, In order to reduce the number of new Advanced Meter Facility installations with the City Rights-of-Way, City desires to allow the Gas Company to install its Advanced Meter Facilities, which are further described herein, within property owned by City at 12 sites identified on "Attachment A" and incorporated herein by this reference ("Installation Sites"). WHEREAS, City and Gas Company have agreed to enter into this Agreement regarding Gas Company's use and attachment of Advanced Meter Facilities at the Installation Sites upon the terms, conditions and other considerations set forth herein. 1 AGREEMENT NOW THEREFORE, in consideration thereof and for other valuable consideration as set forth herein below the parties hereto do mutually agree as follows: I Effective Date. This Agreement shall become effective as of the date of its execution by or on behalf of all the Parties hereto ("Effective Date"). 2. Tera. The term shall be for 20 years from the Effective Date. 3. Authorization. Subject to the terms and conditions contained herein, City hereby authorizes Gas Company to install Advanced Meter Facilities upon Installation Sites as described and illustrated in those certain improvement drawings to be provided by the Gas Company (the "Improvement Drawings") as reviewed by and on file as a public record with the City Engineer of the City of San Juan Capistrano ("City Engineer"), and to operate, use, maintain, repair, replace, improve, alter, inspect, test and remove such Advanced Meter Facilities on the terms and conditions set forth herein. City shall deliver to Gas Company written notice approving or disapproving the improvement Drawings within thirty (30) days after submittal of the Improvement Drawings, provided that City shall not unreasonably withhold, condition or delay its approval. 4. Scope of Agreement. This Agreement authorizes the Gas Company to attach the Advanced Meter Facilities in the locations identified on Exhibit "A" attached hereto, and to undertake all activities related to the installation, maintenance, operation, use, repair, replacement, improvement, alteration, inspection, testing and removal of the Advanced Meter Facilities, as identified in said Improvement Drawings and any Additional Improvement Drawings. Nothing contained in this Agreement shall be deemed or construed to create the relationship of principal and agent or of partnership or of joint- venture or of any association whatsoever between City and Gas Company, it being expressly understood and agreed that neither the computation of fees nor any other provisions contained in this Agreement nor any act or acts of the parties hereto shall be deemed to create any relationship between City and Gas Company other than the relationship of City and Gas Company. Gas Company hereby acknowledges, agrees and covenants that this Agreement does not authorize or bestow any rights to Gas Company to provide cable television service or commercial telecommunications services. 2 5. Compensation. The Gas Company shall pay to the City a one-time fee of $780 ($39 x 20 years) per Installation Site. The fee shall be due within thirty (30) days of the Effective Date. 6. Authority to Allow Attachments. The City hereby represents and warrants to keep the Gas Company that it has all rights necessary to allow for the installation of the Advanced Meter Facilities at the Installation Sites. 7. Workmanship and Res onsibili of Gas Com an . All of Gas Company's construction and installation work shall be performed at Gas Company's sole cost and expense and in a good and workmanlike manner and in accordance with the rules and regulation of the CPUC and the Improvement Plans reviewed by the City Engineer, and in compliance with all applicable ordinances, regulations or law (to the extent not inconsistent with or preempted by the jurisdiction of the CPUC). Gas Company shall remove all of the Advanced Meter Facilities at its sole expense within one hundred eighty (180) days after the termination of the Agreement, unless an agreement is otherwise reached between the City and Gas Company to abandon the Advanced Meter Facilities in place. Gas Company shall bear full responsibility for repairs to any damage to the Rights-of-Way caused by Gas Company's or its employees', contractors', subcontractors' or agents' installation, construction, maintenance, repair, operation and removal of the Advanced Meter Facilities. 8. Gas Company to Bear All Costs. The Gas Company, or any successor or authorized assign, shall bear all costs incurred in connection with Gas Company's or its employees', contractors', subcontractors' or agents' planning, design, installation, construction, maintenance, repair, operation and removal of the Advanced Meter Facilities. City shall not be responsible or bear any cost for repair of any damage or movement of Advanced Meter Facilities due to repair, maintenance and/or failure/collapse of any existing gas, or any other improvements or works approximate to Advanced Meter Facilities, except for the active negligence or willful misconduct of the City, its officers, agents, employees, contractors or subcontractors. Gas Company will be responsible for all costs associated with energizing the Advanced Meter Facilities at Installation Sites. 9. Interference. The Gas Company installation and use of the Advanced Meter Facilities under this Agreement shall not damage or interfere in any way with City's operations. The City at all times during this Agreement, reserves the right to take any action it deems necessary, in its sole discretion, to repair, maintain, alter, or improve the Installation Sites, which may temporarily interfere with the Advanced Meter Facilities. The City 3 agrees to give 30 day advance notice of such interference to the Gas Company and to reasonably cooperate with the Gas Company to carry out such activities with a minimum amount of interference with the Gas Company's operations. 10. Gas Company to Secure Approval and Permits. Not less than thirty (30) days prior to commencement of construction and installation of the Advanced Meter Facilities, Gas Company shall, at its sole cost and expense, prepare and submit the Improvement Drawings to the City Engineer for review as described in Section 1 above. Gas Company shall, at its sole cost and expense, submit traffic control plans for approval by City Engineer. All work within the Rights-of-Way shall be performed in compliance with the Improvement Plans and reviewed by the City Engineer and non-discretionary administrative permits obtain by Gas Company. 11. Indemnification of City. Gas Company shall defend, indemnify and hold harmless the City and its council members, officers, agents and employees against all claims, losses, damages, costs, expenses, liabilities, causes of action, fines or penalties, including but not limited to reasonable attorney's fees (collectively, "Claims"), for injury to or death of persons or damage to property incurred by City arising from the Advanced Meter Facilities being located on the street light poles, except to the extent such Claim arise from the sole negligence or willful misconduct of the City, its officers, agents, or employees, provided, however, that Gas Company's indemnification obligations shall not include any punitive, consequential or special damages, except to the extent asserted by a third party against the City arising from a Claim for which Gas Company is obligated to indemnify the City under this paragraph. 12. Governing Law; Jurisdiction. This Agreement shall be governed and construed by and in accordance with the Laws of the State of California. Nothing in this section shall be interpreted to preclude either party's right to seek redress from the CPUC. 13. Amendment of Agreement. This Agreement may not be amended except pursuant to a written instrument signed by both parties. (Notices. All notices, demands, requests, consents or other communications that this Agreement contemplates or authorizes, or requires or permits either party to give to the other, shall be in writing and shall be personally delivered or mailed or sent by reputable overnight courier, such as FedEx, to the respective party as follows: .... .. ... 4 TO CITY: City of San Juan Capistrano Address: 32400 Paseo Adelanto Attn: George Alvarez Tel: 949-443-6351 TO THE GAS COMPANY: Southern California Gas Company 555 West Fifth Street Los Angeles, CA 90013 Attn: David Mercer Network Technology Manager Tel: (213) 244-5415 Either party may change its address by notice to the other party as provided herein. Communications shall be deemed to have been given and received on the first to occur of (i) actual receipt at the offices of the party to whom the communication is to be sent, as designated above, or (ii) three working days following the deposit in the United States Mail of registered or certified mail, postage prepaid, return receipt requested, or with reputable overnight courier, such as FedEx, addressed to the offices of the party to whom the communication is to be sent, as designated above. 14. Other Regulations. All Gas Company's use of the Rights-of-Way under this Agreement shall be in accordance with the laws of the Unified States of America, the State of California and in accordance with all applicable rules and regulations and ordinances of the City now in force, or hereinafter prescribed or promulgated by resolution or ordinance or by State or Federal law (to the extent that the same are not inconsistent with or preempted by the jurisdiction of the CPUC). 15. Powers to Enter into Agreement. The individuals executing this Agreement represent and warrant that they have the right, power, legal capacity and authority to enter into and to execute this Agreement on behalf of the respective legal entities of the Gas Company and the City. 16. Assignment or Transfer of Authorization. This Agreement may be assigned or transferred to any qualified person or entity subject to the prior written approval of the City, which shall not be unreasonably withheld, conditioned or delayed. Notwithstanding the foregoing, City's prior written consent shall not be required for any of the following: (a) the transfer of any shares or stock in or change in control of Gas Company's parent company, or (b) any merger, consolidation or reorganization of, by or with Gas Company or transfer of all or substantially all of the stock or shares in 5 Gas Company or assets of Gas Company_ 17. Entire Agreement; Successors and Assigns. This Agreement contains , ,Sup:G the entire understanding between the parties with respect to the subject matter herein. There are no representations, agreements, or understandings, whether oral or written, between or among the parties relating to the subject matter of this Agreement which are not fully expressed herein. Each party has relied on advice from its own attorneys, and the warranties, representations, and covenants of this Agreement itself. This Agreement shall inure to the benefit of and be binding upon the parties hereto and their respective successors and assigns. ........ .. .. ...... ...... 6 IN WITNESS WHEREOF the parties hereto for themselves; their heirs, executors, administrators, successors, and assigns do hereby agree to the full performance of the covenants herein contained and have caused this Agreement to be executed by setting hereunto their signatures on the day and year respectively written herein below. CITY OF SAN JUAN CAPISTRANO Cys Derek Reeve, Mayor SOUTHERN CALIFORNIA GAS COMPANY By: David Mercer Network Technology Manager Advanced Meter Project ATTEST: } aria Morris C# Cle k APPROVED AS TO FORM, Haps Van Ligten, City Attorney 7 Attachment : Installation Sites Site ID Pole'Type Street Latitude Longitude Attachment Address LGO07-D Street light La Novia 33.494072 -117.648538 pole Avenue LGO08-F Street light Calle 33.467949 -117.654743 pole Andalugia LGO12-F Street light Calle Miramar 33.475324 -117.656474 pole LH496-D Street light Highland 33.52964444 -117.6561388 . pole Drive LG030-C Street light Camino La 33.497819 -117.638073 pole Ronda LG031-1 Street light Camino Del 33.487291 -117.680473 pole Avon LGAdd1-C Street light Via Entrada 33.489712 -117.637929 pole LH171-D Street light San Juan 33.51213 -117.629103 pole Creek Road LH174-E Street light Monarch 33.533375 -117.662906 pole Drive LH181-F Street light Camino 33.52411 -117.667978 pole Capistrano LH211-H Street light Alipaz Street 33.499983 -117.666991 pole ( LH210-F Street light Calle Del 33.50713 -117.644752 pole Campo 4/21/2015 SPP •, z 37 F13 ......... 61.. City of San Jinn Capistrano a Report TO: Karen P. Bst, /fig r 9 t FROM: Keith Van Der Maaten, P.E., Public Works and Utilities Directorz z& Prepared by: George Alvarez, P.E., T.E., City Engineer / Traffic Engineer DATE: April 21, 2015 SUBJECT: Consideration to Approve an Agreement with the Southern California Gas Company to Install Advanced Meter Facilities Throughout the City RECOMMENDATION: By motion, approve an Agreement with the Southern California Gas Company to install Advanced Meter Facilities throughout the City. EXECUTIVE SUMMARY: The Southern California Gas Company is requesting the City to approve an agreement to install the Advanced Communication Facilities throughout the City for a 20-year term (Attachment 2). The advanced meters will be installed by Southern California Gas Company. The technology will automatically read and securely transmit the tenants/properties owner gas usage information to the Southern California Gas Company's customer service and Milling center. This new technology requires data collection equipment to be positioned on City-owned street light poles at 12 locations. The network equipment will be mounted 24 feet above the ground and the data collector's will be solar powered. City staff visited each of the 12 locations (Attachment 1) to make certain the data equipment results in the least visual impact to the community. The Agreement (Attachment 2) with Southern California Gas Company allows them to install their equipment on City-owned street light poles. In return, the City will receive $39 per location for 20 years or $780 per pole upfront, for all 12 locations, which totals $9,360. The amount of compensation is the same for all cities in Southern California. If the City Council does not approve the use of City-owned poles, the Southern California Gas Company would install 12 new poles in the City right-of-way. The City Attorney has reviewed and approved the Agreement with the Southern California Gas Company. if the City Council approves the Agreement, the Public Works and Utilities Department will monitor the installation of the equipment to make certain it complies with all the City regulations. City Council Agenda Report April 21, 2015 Page 2 of 3 DISCUSSION/ANALYSIS: In 2010, the California Public Utilities Commission approved the Southern California Gas Company's request to upgrade its metering system by adding communication devices. The new monitoring system requires data collectors to be positioned on City- owned street light poles throughout the service area. This will enable the advanced meter communication devices to provide information to the Southern California Gas Company's customer service center. The Public Works and Utilities Department staff and the Southern California Gas Company representatives have been working jointly to find the best location for installation of the data collectors. Attachment 1 illustrates a typical data collector mounted on a street light pole. The mounted data collector and their antennas will meet all state and local requirements for wind and seismic safety. The data collectors must comply with all safety standards set by the Federal Communications Commission (FCC), producing radio frequency emissions at levels far below FCC limits. These advanced meters are being installed in cities serviced by the Southern California Gas Company. At the June 3, 2014, and January 20, 2015, City Council meetings, the City Council received a presentation of the Advanced Meter Facility installation. Also, the advanced meter was on display for public review in the City Hall lobby on February 17, 2015, prior to the City Council meeting. The Southern California Gas Company contacted the residents affected by the Advanced Meter Facility to determine if there are any objections to the locations. No objections were received from the adjacent land owners. The specific locations are shown on Attachment 1. All affected poles have been tagged. FISCAL IMPACT: Pursuant to the Agreement, the City will receive a one-time fee upfront of $9,360 to provide compensation for a 20-year period. These funds will be deposited in the City's General Fund. ENVIRONMENTAL IMPACT: This project is categorically exempt from the requirements of California Environmental Quality Act (CEQA) pursuant to Title 14, Chapter 3 of the California Code of Regulations, Section 15308 (Class 8) — Actions by Regulatory Agencies for Protection of the Environment, which includes actions taken to assure the maintenance, restoration, enhancement, or protection of the environment. City Council Agenda Report April 21, 2015 Page 3 of 3 PRIOR CITY COUNCIL REVIEW: ® On June 3, 2014, the City Council received a presentation on the Advanced Meter Facility Installation. ® On January 20, 2015, the City Council received a presentation on the Advanced Meter Facility Installation. COMM ISSIONICOMMITTEEIBOARD REVIEW AND RECOMMENDATIONS: Not applicable. NOTIFICATION: Southern California Gas Company ATTACHMENTS: Attachment 1 — Vicinity map of the Advanced Meter locations Attachment 2 —Agreement ass camp" Ai Sempla Energy uwity" ADVANCEDMeter SAN JUAN CAPISTRANO JANUARY 2016 .. ... . ...... .. . . .. Attachment 1 th � � y � ..... .. ........ iI.Pr , � r en f, lu Solar T = W4 h DCU g. �% fir . and R cc�m n � its t� three NCE .... FO 'DIS S I(�N i� R��3SE ONLY ........ .. ...... . ..... . .. .. .. .__. . .. .. .... . ..... ........ ....... .. . ... AfH p �x7 w LHI 7 A ti LHS 1 I` r GO3an \ > r � Jt p rano a , ��. J _ � � GO 12'° y"" �.. �. LGOO L 017 3 3 La lila as Ave,!l~�st cif X7587 Paseo Al rodra ' 33,49447 117.1i4$S3 LGO08-P On Calle Andalugia;South of 27301 Paseo 33.46794 Peregrino -117.55474 1012 F 43n Calf Mrar,est tf 271 Pte;lie# 33.47532 Este 117.6567 LG02�3-1 On Oceana Del Mar South of 28241 Oceana Del Mar 33.47209 -117.64443 t Gt30_C ...on Cn?mo La Rrda,South of:.2...82...,3.. Jpseo Corral 33.4 7 1 Y�17.6380 LG031-I On Camino Del Avon;South of 25591 Camino Del Avon 33.48729 -117.68047 LH171~l3 3h Sia .luau creek Rd East of 8 1 Sar�;3uan Creek ftrl 3351213 LH 174-E On Monarch Dr;East of 29581 Monarch Dr 33.53337 -117.66290 l H183 F Oh C rrs ro C pt trap s,6-::a and,acros from 30313 Carr�nor. lstrao 33.5411 . ' 17,6G77 LH210-1 On Calle Del Campo;South of 31351 Calle Del Campo 33.50713 -117.54475 11 l {3n lip St,t t rth sof 2. 561 Calle l ug as 33.49 98 -117.66CS 9 LH496-D On Highland Dr.;South of 27152 Highland Dr. 33.52964 -117.65613 ATTACHMENT AGREEMENT BY AND BETWEEN THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA AND SOUTHERN CALIFORNIA GAS COMPANY This Attachment Agreement ("Agreement") is entered into this 21 st day of April, 2015, by and between the City of San Juan Capistrano, a California municipal corporation, hereinafter referred to as the ("City") and Southern California Gas Company, a California corporation hereinafter referred to as the ("Gas Company"). Hereinafter the term "Parties" shall refer collectively to all the foregoing named Parties. The effective date of this Agreement shall be the date indicated hereinabove (the "Effective Date"). RECITALS WHEREAS, Gas Company is an investor-owned public utility that provides gas utility services to residents of City. WHEREAS, on April 21, 2015, City granted to Gas Company a franchise to use and lay pipes and appurtenances necessary and convenient for the operation of a gas utility under, along, across or upon public streets, ways, alleys and places (collectively, "Rights-of-Way") in the City for transmitting and distributing gas (the "Franchise"). WHEREAS, Gas Company has been authorized by the California Public Utilities Commission to implement its Advanced Meter Program, which consists of, among other things, the installation of advanced meter equipment, network communications devices, including but not limited to data collector units ("DCU's), antennas, gas repeaters and/or radio frequency local area network range extenders, and other advanced meter facilities, in connection witht and necessary �1O. Gas Company's ompan rs opera ion, transmission and distribution of gas in the City ("Advanced Meter Facilities"). WHEREAS, the installation of Advanced Meter Facilities requires the use of existing or new infrastructure, such as poles, towers, streetlights or buildings of sufficient height and at appropriate locations in order to be effective. WHEREAS, In order to reduce the number of new Advanced Meter Facility installations with the City Rights-of-Way, City desires to allow the Gas Company to install its Advanced Meter Facilities, which are further described herein, within property owned by City at 12 sites identified on "Attachment A" and incorporated herein by this reference ("Installation Sites"). WHEREAS, City and Gas Company have agreed to enter into this Agreement regarding Gas Company's use and attachment of Advanced Meter Facilities at the Installation Sites upon the terms, conditions and other considerations set forth herein. 1 ATTACHMENT 2 AGREEMENT NOW THEREFORE, in consideration thereof and for other valuable consideration as set forth herein below the parties hereto do mutually agree as follows: I Effective Date. This Agreement shall become effective as of the date of its execution by or on behalf of all the Parties hereto ("Effective Date"). 2. Term. The term shall be for 20 years from the Effective Date. 3. Authorization. Subject to the terms and conditions contained herein, City hereby authorizes Gas Company to install Advanced Meter Facilities upon Installation Sites as described and illustrated in those certain improvement drawings to be provided by the Gas Company (the "Improvement Drawings") as reviewed by and on file as a public record with the City Engineer of the City of San Juan Capistrano ("City Engineer"), and to operate, use, maintain, repair, replace, improve, alter, inspects test: and remove such Advanced Meter Facilities on the terms and conditions set forth herein. City shall deliver to Gas Company written notice approving or disapproving: the Improvement Drawings within thirty (30) days after submittal of the Improvement Drawings, provided that City shall not unreasonably withhold, condition or delay its approval. 4.. Scope of Agreement. This Agreement authorizes the Gas Company to attach the Advanced Meter Facilities in the locations identified on Exhibit "A" attached hereto, and to undertake all activities related to the installation, maintenance, operation, use, repair, replacement, improvement, alteration, inspection, testing and removal of the Advanced Meter Facilities, as identified in said Improvement Drawings and any Additional Improvement Drawings. Nothing contained in this Agreement shall be deemed or construed to create the relationship of principal and agent or of partnership or of joint- venture or of any association whatsoever between City and Gas Company, it being expressly understood and agreed that neither the computation of fees nor any other provisions contained in this Agreement nor any act or acts of the parties hereto shall be deemed to create any relationship between City and Gas Company other than the relationship of City and Gas Company, Gas Company hereby acknowledges, agrees and covenants that this Agreement does not authorize or bestow any rights to Gas Company to provide cable television service or commercial telecommunications services. 2 5. Compensation. The Gas Company shall pay to the City a one-time fee of $780 ($39 x 20 years) per Installation Site. The fee shall be due within thirty (30) days of the Effective Date. 6. Authority to Allow Attachments. The City hereby represents and warrants to keep the Gas Company that it has all rights necessary to allow for the installation of the Advanced Meter Facilities at the Installation Sites. 7. Workmanship and Responsibility of Gas Company. All of Gas Company's construction and installation work shall be performed at Gas Company's sole cost and expense and in a good and workmanlike manner and in accordance with the rules and regulation of the CPUC and the Improvement Plans reviewed by the City Engineer, and in compliance with all applicable ordinances, regulations or law (to the extent not inconsistent with or preempted by the jurisdiction of the CPUC). Gas Company shall remove all of the Advanced Meter Facilities at its sole expense within one hundred eighty (180) days after the termination of the Agreement, unless: an agreement is otherwise reached between the City and Gas Company to abandon the Advanced Meter Facilities in place. Gas Company shall bear full responsibility for repairs to any damage to the Rights-of-Way caused by Gas Company's or its employees', contractors', subcontractors' or agents' installation, construction, maintenance, repair, operation and removal of the Advanced Meter Facilities. 8. Gas Company to Bear All Costs. The Gas Company, or any successor or authorized assign, shall bear all costs incurred in connection with Gas Company's or its employees', contractors', subcontractors' or agents' planning, design, installation, construction, maintenance, repair, operation and removal of the Advanced Meter Facilities. City shall not be responsible or bear any cost for repair of any damage or movement of Advanced Meter Facilities due to repair, maintenance and/or failure/collapse of any existing gas, or any other improvements or works approximate to Advanced Meter Facilities, except for the active negligence or willful misconduct of the City, its officers, agents, employees, contractors or subcontractors. Gas Company will be responsible for all costs associated with energizing the Advanced Meter Facilities at Installation Sites. 9. Interference. The Gas Company installation and use of the Advanced Meter Facilities under this Agreement shall not damage or interfere in any way with City's operations. The City at all times during this Agreement, reserves the right to take any action it deems necessary, in its sole discretion, to repair, maintain, alter, or improve the Installation Sites, which may temporarily interfere with the Advanced Meter Facilities. The City 3 agrees to give 30 day advance notice of such interference to the Gas Company and to reasonably cooperate with the Gas Company to carry out such activities with a minimum amount of interference with the Gas Company's operations. 10. Gas Company to Secure Approval and Permits. Not less than thirty (30) days prior to commencement of construction and installation of the Advanced Meter Facilities, Gas Company shall, at its sole cost and expense, prepare and submit the Improvement Drawings to the City Engineer for review as described in Section 1 above. Gas Company shall, at its sole cost and expense, submit traffic control plans for approval by City Engineer. All work within the Rights-of-Way shall be performed in compliance with the Improvement Plans and reviewed by the City Engineer and non-discretionary administrative permits obtain by Gas Company. 11. Indemnification of City. Gas Company skull defend, indemnify and hold harmless the City and its council members, officers, agents and employees against all claims, losses, damages, costs, expenses, liabilities, causes of action, fines or penalties, including but not limited to reasonable attorney's fees (collectively, "Claims"), for injury to or death of persons or' damage to property incurred by City arising from the Advanced Meter Facilities being located on the street light poles, except to the extent such Claim arise from the sole negligence or willful misconduct of the City, its officers, agents, or employees, provided, however, that Gas Company's indemnification obligations shall not include any punitive, consequential or special damages, except to the extent asserted by a third party against the City arising from a Claim for which Gas Company is obligated to indemnify the City under this paragraph. 12. Governing Law, Jurisdiction. This Agreement shall be governed and construed by and in accordance with the Laws of the State of California. Nothing in this section shall be interpreted to preclude either party's right to seek redress from the CPUC. 13. Amendment of Agreement, This Agreement may not be amended except pursuant to a written instrument signed by both parties. Notices. All notices, demands, requests, consents or other communications that this Agreement contemplates or authorizes, or requires or permits either party to give to the other, shall be in writing and shall be personally delivered or mailed or sent by reputable overnight courier, such as FedEx, to the respective party as follows: 4 TO CITY: City of San Juan Capistrano Address: 32400 Paseo Adelanto Attn: George Alvarez Tei: 949-443-6351 TO THE GAS COMPANY- Southern California Gas Company 555 West Fifth Street Los Angeles, CA 90013 Attn: David Mercer Network Technology Manager Tel: (213) 244-5415 Either party may change its address by notice to the other party as provided herein. Communications shall be deemed to have been given and received on the first to occur of (i) actual receipt at the offices of the party to whom the communication is to be sent, as designated above, or (ii) three working days following the deposit in the United States Mail of registered or certified mail, postage prepaid, return receipt requested, or with reputable overnight courier, such as FedEx, addressed to the offices of the party to whom the communication is to be sent, as designated above. 14. Other Regulations. All Gas Company's use of the Rights-of-Way under this Agreement shall be in accordance with the laws of the United States of America, the State of California and in accordance with all applicable rules and regulations and ordinances of the City now in force, or hereinafter prescribed or promulgated by resolution or ordinance or by State or Federal law (to the extent that the same are not inconsistent with or preempted by the jurisdiction of the CPUC). 15. Powers to Enter Into Agreement. The individuals executing this Agreement represent and warrant that they have the right, power, legal capacity and authority to enter into and to execute this Agreement on behalf of the respective legal entities of the Gas Company and the City. 16. Assignment or Transfer of Authorization. This Agreement may be assigned or transferred to any qualified person or entity subject to the prior written approval of the City, which shall not be unreasonably withheld, conditioned or delayed. Notwithstanding the foregoing, City's prior written consent shall not be required for any of the following: (a) the transfer of any shares or stock in or change in control of Gas Company's parent company, or (b) any merger, consolidation or reorganization of, by or with Gas Company or transfer of all or-substantially-all of the stock or shares in - 5 Gas Company or assets of Gas Company. 17. Entire Agreement, Successors and Assigns. This Agreement contains the entire understanding between the parties with respect to the subject matter herein. There are no representations, agreements, or understandings, whether oral or written, between or among the parties relating to the subject matter of this Agreement which are not fully expressed herein. Each party has relied on advice from its own attorneys, and the warranties, representations, and covenants of this Agreement itself. This Agreement shall inure to the benefit of and be binding upon the parties hereto and their respective successors and assigns. 6 IN WITNESS WHEREOF the parties hereto for themselves, their heirs, executors, administrators, successors, and assigns do hereby agree to the full performance of the covenants herein contained and have caused this Agreement to be executed by setting hereunto their signatures on the day and year respectively written herein below. CITY OF SAN .DUAN CAPISTRANO By Derek Reeve, Mayor SOUTHERN CALIFORNIA GAS COMPANY By: David Mercer Network Technology Manager Advanced Meter Project ATTEST; Maria Morris, City Clerk APPROVED AS TO FORM Hans Van Ligten, City Attorney 7 Attachment A: Installation Sites FSite 10 Pole Type Street I Latitude Longitude Attachment Address LG007-1) Street fight La Novia 33.494072 117.648538 pole Avenue LGO08-F Street light Calle 1 33.467949 -117.654743 E pole Andalugia I � l LGO12-F Street light { Calle Miramar 33.475324 -117.656474 �' _ pole LH496-D Street light Highland 33.52964444 -117,6561388 p ole Drive LG030-C Street light Camino La 33.497819 -117,638073 MblNpole Ronda LG031-1 __ Street light I Camino Del ; 33.487291 117.680473 pole Avon Wd d 1 Street light ilia Entrada 33,489712 -117.637929 pole LH171-D Street light San Juan 33.51213 ; -117.629103 Pole Creek Road LH174-E Street light Monarch 33.533375 -117.662906 pole Drive i LH181-F _ ! Street light Camino 33.52411 -117.667978 pole Capistrano LH211-H Street light Alipaz Street 33.499983 -117.666991 pole LH210-F Street light Calle Del 33.50713 -117.644752 pole Campo