Loading...
PC Resolution-08-05-27-03PC RESOLUTION NO. 08-05-27-03 GATES BUILDING SIGN PROGRAM MODIFICATION (AC) 08-12 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SAN JUAN CAPISTRANO APPROVING A MODIFICATION TO AN EXISTING SIGN PROGRAM (AC) 04-08 TO INCREASE THE SIZE OF TENANT IDENTIFICATION SIGNS ON AN EXISTING MONUMENT SIGN AT 31601 AVENIDA LOS CERRITOS. (APN 650-151-17) (GATES BUILDING). WHEREAS, Brad Gates of Cerritos Land Partners is proposing two (2)12" x 36" anchor tenant identification signs, and two (2) 4" x 36" tenant identification signs on an existing monument sign. The total tenant identification sign area remains unchanged. The existing monument sign is located at 31601 Avenida Los Cerritos. (APN 650-151-17)The proposed project site is General Plan designated as Office Research Park (4.4) and classified as Office Commercial (OC) on the Official Zoning Map; and, WHEREAS, Architectural Control (AC) 04-08 and adopting Planning Commission Resolution #05-09-13-05 established approval for an entry monument sign with eight (8) 4" x 36" individual tenant identifiers; and WHEREAS, the proposed project has been processed pursuant to Section 9- 2.343, Sign Permit Review of the Land Use Code; and, WHEREAS, The Environmental Administrator has reviewed the project pursuant to Section 15061 of the California Environmental Quality Act (CEQA), and has determined that the project qualifies for a Class 11(a) Categorical Exemption and caused a Notice of Exemption to be posted pursuant to Section 15062 of the CEQA Guidelines; and, WHEREAS, the Planning Commission has considered the Environmental Administrator's determination pursuant to Section 15074 of the California Environmental Quality Act (CEQA); and, WHEREAS, the Planning Commission conducted a duly noticed public meeting on May 27, 2008 pursuant to Section 9-2.313 of the Municipal Code to consider public testimony on the proposed project. NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of the City of San Juan Capistrano does hereby make the following findings: 1. The applicant proposed a design consistent with the existing sign program, and modified the number of tenant identifying sign on the existing monument sign to accommodate for a fewer number of tenants; and, PC Resolution 08-05-27-03 2 May 27, 2008 2. The applicant did not propose an increase to signage area of the existing sign program. NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Planning Commission of the City of San Juan Capistrano hereby approves the project subject to the conditions of approval established by Exhibit A, attached hereto and incorporated herein. EFFECTIVE DATE & FINAL APPROVAL: This project approval shall become effective following expiration of the fifteen (15) day appeal period without filing of an appeal application. The appeal period shall expire at 5:00 p.m; Wednesday, June 11, 2008. This project approval shall be valid from the date of approval of this resolution, and shall expire two (2) years after, unless a time extension request or building/grading permit application related to this discretionary approval is submitted to the City prior to that date. Failure to comply with the conditions of this permit constitutes a violation of Section 9-2.349 of the San Juan Capistrano Municipal Code. PASSED, APPROVED AND ADOPTED this 27th day of May, by the following vote, to wit: AYES: Chairperson Cohen, Vice Chairperson Ratcliffe, Comissioners Neely, Cardoza, Kerr NOES: ABSTAIN: ABSENT: Shel on Cohen, Chairman Grant Taylor, S retary These conditions of approval apply to Sign Permit (AC) 08-012, a a modification to AC 04-08, a sign program for the Gates Professional Building, 31601 Avenida Los Cerritos (APN 650-151-17). Any proposed change of use or expansion of the area or modifications to the site plan or monument sign shall be submitted to the City Planning Department along with the required application and fee, for review. For the purpose of these conditions, the term "applicant" shall also mean the developer, the owner or any successor(s) in interest to the terms of this approval. General Conditions: (AC) 08-012 appoval is granted to modify the tenant identification signs on the existing monument sign. The. sign is located at 31601 Avenida Los Cerritos. (APN 650-151-17). This approval is granted based on the application materials submitted by Brad Gates, including the elevation. These plans are approved as submitted and conditioned herein, and shall not be further altered unless reviewed and approved by the affected city departments. Minor modifications to this approval which are determined by the Planning Director to be in substantial conformance with the approved sign plan, and which do not increase the size, add illumination, or otherwise intensify or change the sign use or require any deviations from adopted standards, may be approved by the Planning Director upon submittal of an application and the required fee. If not appealed, this approval shall become effective on the first business day following the fifteenth (15th) day after the date of the Planning Commission's approval and shall expire May 27, 2010 (24) months after the effective date of the approval unless the sign which is the subject of this action has been installed and approved and all conditions of approval have been met, or a time extension has been granted by the City. Any application for an extension of time shall be submitted to the Planning Department, along with the required fee, at least ninety (90) days prior to the expiration date of this approval, except as otherwise approved by the Planning Director. 2. Approval of this application does not relieve the applicant from complying with other applicable Federal, State, County or City regulations or requirements. 3. All plans, specifications, studies, reports, calculations, maps, notes, legal documents, and designs shall be prepared, signed, and stamped (when required) only by those individuals legally authorized to do so. RESOLUTION #: 08-05-27-03 Exhibit A CONDITIONS OF APPROVAL Project #: AC 08-012 Project Name: Gates Building APPROVAL DATE: May 27, 2008 EFFECTIVE DATE: June 12, 2008 EXPIRATION DATE: May 27, 2010 These conditions of approval apply to Sign Permit (AC) 08-012, a a modification to AC 04-08, a sign program for the Gates Professional Building, 31601 Avenida Los Cerritos (APN 650-151-17). Any proposed change of use or expansion of the area or modifications to the site plan or monument sign shall be submitted to the City Planning Department along with the required application and fee, for review. For the purpose of these conditions, the term "applicant" shall also mean the developer, the owner or any successor(s) in interest to the terms of this approval. General Conditions: (AC) 08-012 appoval is granted to modify the tenant identification signs on the existing monument sign. The. sign is located at 31601 Avenida Los Cerritos. (APN 650-151-17). This approval is granted based on the application materials submitted by Brad Gates, including the elevation. These plans are approved as submitted and conditioned herein, and shall not be further altered unless reviewed and approved by the affected city departments. Minor modifications to this approval which are determined by the Planning Director to be in substantial conformance with the approved sign plan, and which do not increase the size, add illumination, or otherwise intensify or change the sign use or require any deviations from adopted standards, may be approved by the Planning Director upon submittal of an application and the required fee. If not appealed, this approval shall become effective on the first business day following the fifteenth (15th) day after the date of the Planning Commission's approval and shall expire May 27, 2010 (24) months after the effective date of the approval unless the sign which is the subject of this action has been installed and approved and all conditions of approval have been met, or a time extension has been granted by the City. Any application for an extension of time shall be submitted to the Planning Department, along with the required fee, at least ninety (90) days prior to the expiration date of this approval, except as otherwise approved by the Planning Director. 2. Approval of this application does not relieve the applicant from complying with other applicable Federal, State, County or City regulations or requirements. 3. All plans, specifications, studies, reports, calculations, maps, notes, legal documents, and designs shall be prepared, signed, and stamped (when required) only by those individuals legally authorized to do so. Planning Commission Resolution 08-05-27-03 Final Conditions of Approval AC 08-018 Date: May 27, 2008 Page 2 of 4 4. The applicant shall defend, indemnify, and hold harmless the City of San Juan Capistrano and its officers, employees, and agents from and against any claim, action, or proceeding against the City of San Juan Capistrano, its officers, employees, or agents to attack, set aside, void, or annul any approval or condition of approval of the City of San Juan Capistrano concerning this project, including but not limited to any approval or condition of approval of the City Council, Planning Commission, or City Planner. The City shall promptly notify the applicant of any claim, action, or proceeding concerning the project and the City shall cooperate fully in the defense of the matter. The City reserves the right, at its own option, to choose its own attorney to represent the City, its officers, employees, and agents in the defense of the matter. 5. The applicant shall be responsible for informing all subcontractors, consultants, engineers, or other business entities providing services related to the project of their responsibilities to comply with these conditions of approval and all pertinent requirements in the San Juan Capistrano Municipal Code, including the requirement that a business license be obtained by all entities doing business in the City. 6. In the event that exhibits and written conditions are inconsistent, the written conditions shall prevail. If there are any disparities between these conditions and the plans or final revised plans that are approved for any subsequent phase, the conditions and/or plans as stipulated in the later approval shall prevail. 7. The applicant shall pay all fees at the time fees are determined payable and comply with all requirements of the applicable federal, state, and local agencies. The duty of inquiry as to such requirements shall be upon the applicant. 8. All applicable approvals and clearance from other departments and agencies shall be on file with the Building and Safety Department prior to issuance of any permits, final inspections, utility releases and/or release of securities, as specified in these conditions. (B&S) The following conditions shall be completed prior to or in conjunction with the issuance of building permits: 9. Building Construction Plans. Prior to issuance of building permits, the applicant shall submit a Sign Permit Application to the Planning Department. Such plans shall be fully dimensioned, in substantial Planning Commission Resolution 08-05-27-03 AC 08-018 Final Conditions of Approval Date: May 27, 2008 Page 3 of 4 conformance with those plans approved and modified by the Planning Commission and Design Review Committee in the following manner: (PLN) 10. Construction hours. Construction hours shall be limited to 7:00 a.m. to 6.30 p.m., Monday through Friday and between 8:30 a.m. and 4:30 p.m. on Saturday. Construction activity shall not be permitted on Sundays or any Federal holiday.(PLN) 11. Applicable Codes. Prior to issuance of building permits, plans for this project shall be submitted to the Building and Safety Department for review and approval, and shall comply with the latest City -adopted edition of the applicable building codes. (B&S) 12. Consistency with Approved Plans and Elevations. The project shall be constructed in accordance with all the approved plans and conditions of approval, including but not limited to site plans, landscape/irrigation plans, and sign elevations. (PLN) The following ongoing conditions shall be complied with at all times after completion of the project. 13. Site Maintenance. The applicant shall maintain all portions of the site, including undeveloped areas, pursuant to Municipal Code requirements for property maintenance. The site maintenance should ensure that the landscaping directly in front of the sign copy does not impair the visibility of the sign. (PLN) Responsible Agencies: B&S Building and Safety ENG = Engineering Department PLN = Planning Department Date of Approval: May 27, 2008 Resolution No.: 08-05-27-03 Effective Date: June 11, 2008 Planning Commission Resolution 08-05-27-03 AC 08-018 Applicant Acceptance of Conditions of Approval,: By: Applicant Signature Applicant Name Final Conditions of Approval Date: May 27, 2008 Page 4 of 4 Date Title