Loading...
PC Resolution-09-07-28-01PC RESOLUTION NO. 09-07-28-01 CONDITIONAL USE PERMIT 09-004 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SAN JUAN CAPISTRANO CONFIRMING ISSUANCE OF A CATEGORICAL EXEMPTION AND APPROVING THE INSTALLATION AND OPERATION OFA 40'0" TALL SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) ANTENNA. THE SUBJECT SITE IS LOCATED AT 32600 VIA CERRO REBAL APPROXIMATELY 1100 FEET EAST OF AVENIDA PLACIDIA AND 1200 SOUTH WEST OF VIA CERRO REBAL, MORE SPECIFICALLY REFERRED TO AS (APN 666-012-07) WHEREAS, The City of San Juan Capistrano is owner of real property described as Assessor's Parcel Number 666-012-07 located at 32600 VIA CERRO REBAL, San Juan Capistrano; and, WHEREAS, The City of San Juan Capistrano, proposes to install and operate a 40'0" tall SCADA (Supervisory Control And Data Acquisition) antenna, and, WHEREAS, the proposed project has been processed pursuant to Section 9-2.301, Development Review of the Land Use Code and reviewed for compliance with the City's General Plan and the City's adopted Architectural Design Guidelines; and, WHEREAS, the Environmental Administrator has reviewed the project pursuant to Section 15303 of the California Environmental Quality Act (CEQA) and issued a Class 3 Categorical Exemption; WHEREAS, On July 28, 2009 the Planning Commission conducted a duly noticed public hearing pursuant to Section 9-2.313 of the Municipal Code to consider public testimony on the proposed project. NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of the City of San Juan Capistrano does hereby make the following findings: The proposed Conditional Use is not specifically discussed in the General Plan. Policy 6.1 of the Public Services and Utility Element states "Provide sufficient levels of water and sewer service to meet the needs of the Community" While the proposed installation and operation of a SCADA antenna system does not directly impact the sufficient levels of water and sewer service, it does indirectly impact the services levels by creating more efficient monitoring of water and sewer facilities, and allows for a more effective manner to provide water and sewer services. Because the proposed SCADA system provides a more efficient means to the providing of water and sewer services it is found to be consistent with the General Plan; and, 2. The proposed facility is located in Comprehensive Development Plan 81-02; however said Comprehensive Development Plan is silent on this specific use. In such circumstances it is City policy tofall back to the base Municipal Code. Section 9-3.507 Antennas_ establishes the criteria for _approval -of _antennas. The proposed 40'0"_has _been determined necessary by a radio study. Further the proposed facility meets or exceeds PC Resolution 09-07-28-01 2 July 28, 2009 all setback and placement requirements. Therefore through the approval of a Conditional Use Permit, the proposed 40'-0" tall SCADA antenna has been demonstrated necessary to meet the signal requirements, additionally it meets all setback and placement requirements, and is consistent with the zone district in which the use will be located; and, 3. The proposed facility is to be located at an existing well station. The well station has restricted access to both vehicular traffic as well as pedestrian/hiking traffic. The proposed facility is setback considerably from all residences, and the nearest residence is approximately 900'-0". The proposed facility does not visually detract from the surrounding communities nor does it present a safety concern, therefore it is found to be compatible with existing and surrounding land uses; and, 4. The proposed facility does not propose lighting, signage, fencing, or uses demonstrating significant increase in parking demand. Section 9-3.507 Antennas establishes the criteria for approval of antennas. The proposed 40'0" has been determined necessary by a radio study. Further the proposed facility meets or exceeds all setback and placement requirements. Therefore through the approval of a Conditional Use Permit, the proposed 40'-0" tall SCADA antenna has been demonstrated necessary to meet the signal requirements; additionally it meets all setback and placement requirements, and is consistent with the applicable provisions of Title 9, Land Use Code NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Planning Commission of the City of San Juan Capistrano does hereby confirm issuance of a categorical exemption and approves the project subject to conditions of approval set forth in Exhibit A, attached hereto and incorporated herein. EFFECTIVE DATE & FINAL APPROVAL: This project approval shall become effective following expiration of the fifteen (15) day appeal period without filing of an appeal application. The appeal period shall expire at 5:00 PM, August 12, 2009. This project approval shall be valid for a period of 1 year from the date of approval of this resolution, and shall expire on July 28, 2009 unless a time extension request or building permit application related to this discretionary approval is submitted to the City prior to that date. PASSED, APPROVED AND ADOPTED this 28th day of July, 2009, by the following vote: AYES: Chairman Cohen, Vice Chairwoman Ratcliffe, Commissioners Kerr, Neely, Mocalis and Williams NOES: ABSTAIN: ABSENT: Commissioner Tartarian Sheldon Cohen, Chajxman rant I aylor, Asslsta,M Manning Uirector RESOLUTION #: 09-07-28-01 Exhibit A CONDITIONS OF APPROVAL Project #: CUP 09-004 Project Name: Krum Reservoir SCADA Antenna APPROVAL DATE: July 28, 2009 EFFECTIVE DATE: August 12, 2009 EXPIRATION DATE: July 28, 2011 These conditions of approval apply to Conditional Use Permit # 09-004 to install and operate a 40'0" tall SCADA (Supervisory Control And Data Acquisition) antenna located at 32600 Via Cerro Rebal approximately 1100 feet east of Avenida Placidia and 1200 south west of Via Cerro Rebal, more specifically referred to as (APN 666-012-07) Any proposed change of use or expansion of the area or modifications to the site plan or structures shall be submitted to the City Planning Department along with the required application and fee, for review. For the purpose of these conditions, the term "applicant" shall also mean the developer, the owner or any successor(s) in interest to the terms of this approval. General Conditions: Conditional Use Permit # 09-004 to install and operate a 40'0" tall SCADA (Supervisory Control And Data Acquisition) antenna located at 32600 Via Cerro Rebal approximately 1100 feet east of Avenida Placidia and 1200 south west of Via Cerro Rebal, more specifically referred to as (APN 666- 012-07). This approval is granted based on the application materials submitted by Glenn Garrett, representative for the City of San Juan Capistrano including a site plan and elevations. These plans and the proposed use of the site are approved as submitted and conditioned herein, and shall not be further altered unless reviewed and.approved by the affected city departments. Minor modifications to this approval which are determined by the Planning Director to be in substantial conformance with the approved site plan, and which do not intensify or change the use or require any deviations from adopted standards, may be approved by the Planning Director upon submittal of an application and the required fee. If not appealed, this approval shall become effective on the first business day following the fifteenth (15th) day after the date of the Planning Commission's approval and shall expire July 28, 2009 (24) months after the effective date of the approval unless the use or occupancy which is the subject of this action has taken place and all conditions of approval have been met, or a time extension has been granted by the City. Any application for an extension of time shall be submitted to the Planning Department, along with the required fee, at least Planning Commission Resolution 09-07-28-01 Final Conditions of Approval CUP 09-004 SCADA Antenna July 28, 2009 Page 2 of 4 ninety (90) days prior to the expiration date of this approval, except as otherwise approved by the Planning Director. 2. Approval of this application does not relieve the applicant from complying with other applicable Federal, State, County or City regulations or requirements. 3.. All plans, specifications, studies, reports, calculations, maps, notes, legal documents, and designs shall be prepared, signed, and stamped (when required) only by those individuals legally authorized to do so. 4. The applicant shall defend, indemnify, and hold harmless the City of San Juan Capistrano and its officers, employees, and agents from and against any claim, action, or proceeding against the City of San Juan Capistrano, its officers, employees, or agents to attack, set aside, void, or annul any approval or condition of approval of the City of San Juan Capistrano concerning this project, including but not limited to any approval or condition of approval of the City Council, Planning Commission, or City Planner. The City shall promptly notify the applicant of any claim, action, or proceeding concerning the project and the City shall cooperate fully in the defense of the matter. The City reserves the right, at its own option, to choose its own attorney to represent the City, its officers, employees, and agents in the defense of the matter. 5. The applicant shall be responsible for informing all subcontractors, consultants, engineers, or other business entities providing services related to the project of their responsibilities to comply with these conditions of approval and all pertinent requirements in the San Juan Capistrano Municipal Code, including the requirement that 'a business license be obtained by all entities doing business in the City. 6. In the event that exhibits and written conditions are inconsistent, the written conditions shall prevail. If there are any disparities between these conditions and the plans or final revised plans that are approved for any subsequent phase, the conditions and/or plans as stipulated in the later approval shall prevail. 7. The use shall meet the standards and shall be developed within the limits established by the Municipal Code as related to emissions of noise, odor, dust, vibration, wastes, fumes, or any public nuisances arising or occurring incidental to the establishment or operation. Planning Commission Resolution 09-07-28-01 Final Conditions of Approval CUP 09-004 SCADA Antenna July 28, 2009 Page 3 of 4 8. The applicant shall pay all fees at the time fees are determined payable and comply with all requirements of the applicable federal, state, and local agencies. The duty of inquiry as to such requirements shall be upon the applicant. 9. All applicable approvals and clearance from other departments and agencies shall be on file with the Building and Safety Department prior to issuance of any permits, final inspections, utility releases and/or release of securities, as specified in these conditions. (B&S) 10. In the event that future technology renders the approved antenna obsolete due to performance or aesthetic considerations, the antenna may be replaced at the expense of the applicant, subject to review by the Planning Commission. 11. The approved facility shall be exclusively limited to the City of San Juan Capistrano, no private collocation shall be permitted. Any expansion of the proposed facility shall be required to be reviewed and approved by the Community Development Director or their designee at their discretion who may referre to the Planning Commission for review and approval. The following conditions shall be completed prior to or in conjunction with the issuance of building permits: 12. Applicable Codes. Prior to issuance of building permits, plans for this project shall be submitted to the Building and Safety Department for review and approval, and shall comply with the latest City -adopted edition of the applicable building codes. (B&S) 13. Building Construction Plans. Prior to issuance of building permits, the applicant shall submit final construction plans, building elevations and floor plans to the Planning Department for final review. and approval. Such plans shall be fully dimensioned and in substantial conformance with those plans approved by the Planning Commission, Design Review Committee, and/or Planning Director (as applicable). (PLN) 14. OCFA Review of Hazardous Materials (Service Code 2.50). Prior to the issuance of a building permit, the applicant shall submit to the Fire Chief a plan for review and approval of the battery system. The plans shall be in accordance with the California Fire Article 64. Please contact the OCFA at (714) 573-6133 for a copy of the Guidelines and Informational Bulletins. (OCFA) Planning Commission Resolution 09-07-28-01 Final Conditions of Approval CUP 09-004 SCADA Antenna July 28, 2009 Page 4 of 4 The following conditions and requirements shall be met during construction, from the beginning of the first ground -disturbing activity until the use has been released for occupancy. 15. Waste Disposal and Sanitation. At all times during construction, the applicant shall maintain adequate sanitary disposal facilities and solid waste disposal containers on site. The accumulation of refuse and debris constituting a public nuisance isnot permitted. (ENG) 16. Construction hours. Construction hours shall be limited to 7:00 a.m. to 6:00 p.m., Monday through Friday and between 8:30 a.m. and 4:30 p.m. on Saturday. Construction activity shall not be permitted on Sundays or any Federal holiday.(PLN) The following conditions shall be met prior to acceptance of improvements and release of bonds and/or surety, final utility clearances, or granting permission to use or occupy the project site, as specified below: 17. Consistency with Approved Plans and Elevations. The project shall be constructed in accordance with all the approved plans and conditions of approval, including but not limited to site plans, grading plans, wall plans, landscape/irrigation plans, lighting plans, and elevations. If all improvements cannot be installed prior to occupancy, the City may approve a Deferred Improvement Agreement to defer the completion of the improvements provided that a bond, cash deposit, or other surety in a form and substance approved by the City Attorney, is submitted to the City in lieu of installation of the improvements, that application and required fees are submitted, and that the incomplete improvements will not create an unsafe condition on the site. The term of the deferral shall be as determined by the City Planner. (PLN) Responsible Agencies: B&S Building and Safety ENG = Engineering Department PLN = Planning Department PW = Public Works Department OCFA = Orange County Fire Authority Date of Approval: July 28, 2009 Resolution No 09-07-28-01 Effective Date: August 12, 2009