Loading...
PC Resolution-11-07-26-01PC RESOLUTION NO. 11-07-26-01 CONDITIONAL USE PERMIT CUP 11-004 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SAN JUAN CAPISTRANO APPROVING AN UNMANNED WIRELESS TELECOMMUNICATION FACILITY TO BE LOCATED WITHIN THE CITY'S SPORTS PARK AND TO INCLUDE A STEALTH LIGHT STANDARD (POLE) WHICH STANDS EIGHTY THREE FEET THREE INCHES (83'-3"), WHICH CONSISTS OF 6 (SIX) PANEL ANTENNAS FULLY ENCLOSED WITHIN THE POLE, AND AN EQUIPMENT SHELTER (APPLICANT: MICHELLE FELTEN FOR VERIZON WIRELESS). WHEREAS, Michelle Felten representing Verizon Wireless proposes to install an unmanned wireless telecommunications facility that consists of installing 6 (six) panel antennas located inside the top of an 83'-3" tall light pole with a 44 -inch diameter base, which will also provide field lighting. Also proposed is the construction of 1 (one) 400 square foot CMU antenna equipment shelter; and, . WHEREAS, the proposed project has been processed pursuant to Section 9-2.301, Development Review of the Land Use Code and reviewed for compliance with the City's General Plan and the City's adopted Architectural Design Guidelines; and, WHEREAS, the Environmental Administrator has reviewed the project pursuant to Section 15303 of the California Environmental Quality Act (CEQA) and issued a Class 3 Categorical Exemption; WHEREAS, On July 26, 2011 the Planning Commission conducted a duly noticed public hearing pursuant to Section 9-2.302 of the Municipal Code to consider public testimony on the proposed project. WHEREAS, On June 20, 2009 the Parks, Recreation and Senior Services Commission conducted a duly noticed public meeting pursuant to Section 9-2.302 of the Municipal Code to consider public testimony on the proposed project. NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of the City of San Juan Capistrano does hereby make the following findings: The proposed project is consistent with the General Plan maps and policies, in particular the Community Design Element because that element implements the City's design objectives through the adopted Architectural Design Guidelines. The proposed location of the antennas will be consistent with the City's Architectural Design Guidelines, and specifically: Section 2(a) which states that, "facilities should not be discernible from public fight -of -ways or open space areas;" and, PC Resolution 11-07-26-01 2 July 26 2011 Section 2(c) which states that, "cellular and wireless facilities should be screened by structures and or landscaping;" and, The proposed wireless facility is to be located on the inside the top portion of a stealth light standard (pole) that will measure 83'-3" in height when measured from finish grade. The pole will contain 6 panels and electrical coax cables. The equipment will be located in an equipment shelter that will match the design of the existing trash enclosure. The antenna panels have been designed inside the pole and will therefore be invisible from surrounding views, and because the pole will contain sports field's lights it is found to be consistent with the General Plan; and, 2. The proposed project is consistent with the Land Use Code because it is. located within the Community Park (CP) Zone District, which lists wireless facilities uses as conditionally permitted uses. The CP district specifically allows cellular antennas subject to approval of a Conditional Use Permit. The purpose of the CUP is to provide the City with the legal authority to impose conditions to mitigate the adverse aesthetic effects of cellular antennae. To the extent the design of the project has eliminated the visual impacts of the proposed project; the proposed use is consistent with the purpose and intent of the "CP" zone district. In addition, all the supplemental district standards are either met or exceeded. Therefore the project is consistent with the "CP" Zone District; and, 3. The proposed site is more than three hundred feet (300'-0") away from residential properties. The proposed use will not be visible because the antennae will be located within stealth light standard (pole) and the equipment shelter will be designed to aesthetically match the existing trash enclosure; and, 4. The proposed project does not create any additional impacts that would be in conflict with the existing use. The proposed use does not generate excessive noise, light, vibration or odors. Further the proposed use does not create significant increases in vehicle trips. Therefore the proposed use is found to be consistent and complimentary to the existing park lighting uses; and, 5. The proposed use does not create significant vehicular trips which would create significant demands for parking. Occasionally support personnel need to visit the site for repairs maintenance, otherwise the site is unmanned. Due to the limited visitation to the site the proposed project is consistent with this finding. NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Planning Commission of the City of San Juan Capistrano does hereby approve the project subject to conditions of approval set forth in Exhibit A, attached hereto and incorporated herein. EFFECTIVE DATE & FINAL APPROVAL: This project approval shall become effective following expiration of the fifteen (15) day appeal period without filing of an appeal application and City Council approval of a license agreement to allow the proposed private utility use on City -owned public property. The appeal period shall expire at 5:00 PM, Wednesday, August 10, 2011. This project approval shall be valid for a period PC Resolution 11-07-26-01 3 July 26, 2011 of two (2) years from the date of approval of this resolution, and shall expire on July 26, 2013 unless a time extension request or building permit application related to this discretionary approval is submitted to the City prior to that date. PASSED, APPROVED AND ADOPTED this 26th day of July, 2011, by the following vote» AYES: Chairman Cohen, Vice -Chair Ratcliffe, Commissioners Williams, Kerr, Neely, and Parkhurst NOES: Commissioner Nunn ABSTAIN: Sheldon Cohen, Chairman Wlllam A. Ramsey, AICP, Principal Planner, Secretary EXHIBIT A RESOLUTION #: 11-07-26-01, CONDITIONS OF APPROVAL Project #: CUP 11-004 Project Name. Verizon Wireless - Community Center APPROVAL DATE: July 26, 2011 EFFECTIVE DATE: August 10, 2011 EXPIRATION DATE: July 26, 2013 These conditions of approval apply to Conditional Use Permit # 11-004 to construct an unmanned, wireless, telecommunications facility that consists of installing six (6) panel antennas located inside the top of an 83'-3" tall light pole with a 44 -inch diameter base located at the City's Sports Park, which will also provide field lighting. Also proposed is the construction of one (1) 400 square foot antenna equipment shelter. General Conditions: Conditional Use Permit # 11-004 to construct an unmanned wireless telecommunications facility that consists of installing 6 (six) panel antennas located inside the top of an 83'-3" tall light pole, which will also provide field lighting. Also proposed is the construction of 1 (one) 400 square foot antenna equipment shelter. This approval is granted based on the application materials submitted by Michelle Felten on April 28, 2011, prepared by Fulsang Architecture including site plan, elevations, and floor plans. These plans and the proposed use of the site are approved as submitted and conditioned herein, and shall not be further altered unless reviewed and approved by the affected city departments. Minor modifications to this approval which are determined by the Development Services Director to be in substantial conformance with the approved site plan, and which do not intensify or change the use or require any deviations from adopted standards, may be approved by the Development Services Director upon submittal of an application and the required fee. If not appealed, this approval shall become effective on the first business day following the fifteenth (15th) day after the date of the Planning Commission's approval and shall expire July 26, 2013 two (2) years after the approval date of the approval unless the use or occupancy which is the subject of this action has taken place and all conditions of approval have been met, or a time extension has been granted by the City. Any application for an extension of time shall be submitted to the Development Services Department, along with the required fee, at least Planning Commission Resolution 11-07-26-01 Final Conditions of approval CUP 11-004 Verizon Wireless 2 of 4 July 26 2011 ninety (90) days prior to the expiration date of this approval, except as otherwise approved by the Development Services Director. 2. Approval of this application does not relieve the applicant from complying with other applicable Federal, State, County or City regulations or requirements. 3. All plans, specifications, studies, reports, calculations, maps, notes, legal documents, and designs shall be prepared, signed, and stamped (when required) only by those individuals legally authorized to do so. 4. The applicant shall defend, indemnify, and hold harmless the City of San Juan Capistrano and its officers, employees, and agents from and against any claim, action, or proceeding against the City of San Juan Capistrano, its officers, employees, or agents to attack, set aside, void, or annul any approval or condition of approval of the City of San Juan Capistrano concerning this project, including but not limited to any approval or condition of approval of the City Council, Planning Commission, or City Planner. The City shall promptly notify the applicant of any claim, action, or proceeding concerning the project and the City shall cooperate fully in the defense of the matter. The City reserves the right, at its own option, to choose its own attorney to represent the City, its officers, employees, and agents in the defense of the matter. 5. The applicant shall be responsible for informing all subcontractors, consultants, engineers, or other business entities providing services related to the project of their responsibilities to comply with these conditions of approval and all pertinent requirements in the San Juan Capistrano Municipal Code, including the requirement that a business license be obtained by all entities doing business in the City. 6. In the event that exhibits and written conditions are inconsistent, the written conditions shall prevail. If there are any disparities between these conditions and the plans or final revised plans that are approved for any subsequent phase, the conditions and/or plans as stipulated in the later approval shall prevail. 7. The use shall meet the standards and shall be developed within the limits established by the Municipal Code as related to emissions of noise, odor, dust, vibration, wastes, fumes, or any public nuisances arising or occurring incidental to the establishment or. operation. 8. The applicant shall pay all fees at the time fees are determined payable and comply with all requirements of the applicable federal, state, and local agencies. The duty of inquiry as to such requirements shall be upon the applicant. 9. All applicable approvals and clearance from other departments and agencies shall be on file with the Building and Safety Department prior to Planning Commission Resolution 11-07-26-01 Final Conditions of Approval CUP 11-004 Verizon Wireless 3 of 4 July 26 2011 issuance of any permits, final inspections, utility releases and/or release of securities, as specified in these conditions. (B&S) 10. This Conditional Use Permit (CUP) shall only be valid and in effect upon City Council approval of a license agreement for the proposed use of City - owned, public property. Furthermore, in the event the City Council declines to enter into a license agreement for the proposed project, this Conditional Use Permit (CUP) shall be void. The following conditions shall be completed prior to or in conjunction with the issuance of building permits. 11. Applicable Codes. Prior to issuance of building permits, plans for this project shall be submitted to the Building and Safety Department for review and approval, and shall comply with the latest City -adopted edition of the applicable building codes. (B&S) 12. Building Construction Plans. Prior to issuance of building permits, the applicant shall submit final construction plans, building elevations and floor plans to the Planning Department for final review and approval. Such plans shall be fully dimensioned and in substantial conformance with those plans approved by the Planning Commission, Design Review Committee, and/or Development Services Director (as applicable). (PLN) 13. OCFA Review of Hazardous Materials fService Code 2.50. Prior to the issuance of a building permit, the applicant shall submit to the Fire Chief a plan for review and approval of the battery system. The plans shall be in accordance with the California Fire Article 64. Please contact the OCFA at (714) 573-6133 for a copy of the Guidelines and Informational Bulletins. (OCFA) The following conditions and requirements shall be met during construction, from the beginning of the first ground -disturbing activity until the use has been released for occupancy. 14. Waste Disposal and Sanitation. At all times during construction, the applicant shall maintain adequate sanitary disposal facilities and solid waste disposal containers on site. The accumulation of refuse and debris constituting a public nuisance is not permitted. (ENG) 15. Construction hours. Construction hours shall be limited to 7:00 a.m. to 6:00 p.m., Monday through Friday and between 8:30 a.m. and 4:30 p.m. on Saturday. Construction activity shall not be permitted on Sundays or any Federal holiday.(PLN) The following conditions shall be met prior to acceptance of improvements and release of bonds and/or surety, final utility clearances, or granting permission to use or occupy the project site, as specified below: Planning Commission Resolution 11-07 26-01 Final Conditions of Approval CUP 11-004 Verizon Wireless 4 of 4 Jul 26 2011 16. Consistengy with A j2proved Plans and Elevations. The project shall be constructed in accordance with all the approved plans and conditions of approval, including but not limited. to site plans, grading plans, wall plans, landscape/irrigation plans, lighting plans, and elevations. If all improvements cannot be installed prior to occupancy, the City may . approve a Deferred Improvement Agreement to defer the completion of the improvements provided that a bond, cash deposit, or other surety in a form and substance approved by the City Attorney, is submitted to the .City in lieu of installation of the improvements, that application and required fees are submitted, and that the incomplete improvements will not create an unsafe condition on the site. The term of the deferral shall be as determined by the City Planner. (PLN) 17. Final fanning .." Ins § pectionA minimm of one week prior to final inspection by and SafetyDepartment, the applicant shall schedule a final inspection by the Planning Division, and shall pay any outstanding balance in the Developer Deposit Account assigned to this application. (PLN) 18. Lessees or Other Users. Verizon Wireless shall ensure that the lessee or other user(s) shall comply with the terms and conditions of this permit, and. shall be responsible for the future of any lessee or other user(s) under the control of Verizon Wireless. (PLN) 19, Future Technologies. In the event that future wireless technologies are .made available and are feasible, the applicant shall modify or remove the facility at -the applicant's expense. Said technologies may require the removal of the facility or a reduction in the quantity of panels. The Planning Commission reserves the right to review and modify the subject use in the future. (PLN) Responsible Agencies: B&S = Building and Safety ENG = Engineering Division PLN = Planning Division PW = Public Works Department OCFA = Orange County Fire Authority . Applicant Acceptance of Conditions of Approval: By: Signature Nameffltle Date: //-- / -0//