Loading...
PC Resolution-13-11-12-02F: � 0011 U W*Yi, I Ll LON FM I N A • • • • A A ..• 1 7. A A A A W�= • W611,11 W1,191 N" M :10 IN VA 11 WHEREAS, JF Shea Therapeutic Riding Center is the owner of real property at 26284 Oso Road, described as Assessor's Parcel Number 121-070-64, in the City of San Juan Capistrano; and, WHEREAS, Alexander Lew of Core Development Services, on behalf of AT&T, requests to construct a 72'-0" tall, mono -eucalyptus, wireless telecommunications facility; and, WHEREAS, the proposed project has been processed pursuant to Section 9- 2.301, Development Review of the Land Use Code and reviewed for compliance with the City's General Plan and the City's adopted Architectural Design Guidelines; and, WHEREAS, the Environmental Administrator has reviewed the project pursuant to Section 15303 of the California Environmental Quality Act (CEQA) and issued a Class 3 Categorical Exemption; WHEREAS, On November 12, 2013 the Planning Commission conducted a duly noticed public hearing pursuant to Section 9-2.313 of the Municipal Code to consider public testimony on the proposed project. NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of the City of San Juan Capistrano does hereby make the following findings: 1 The proposed project is consistent with the General Plan policies and objectives, in particular the Community Design Element because that element implements the City's design objectives through the adopted Architectural Design Guidelines. The proposed project has been designed to blend with the existing surroundings and have minimal impact on public views. Further all proposed equipment shall be screened by the proposed structure and would not be discernable from public areas. Therefore, the proposed project is consistent with the General Plan; and, 2. The proposed project is located within the Open Space Recreation (OSR) zone district. The OSR zone district specifically allows cellular antennas, subject to approval of a Conditional Use Permit. The design of the proposed project has eliminated the visual impacts of the wireless facility. The proposed project is consistent with applicable development standards. Therefore, the proposed project is consistent the Municipal Code; and, 3. The proposed wireless facility is located at an existing equestrian facility near the terminus of a road that does receive a, high volume of vehicular traffic. The proposed design does not impact vehicular, pedestrian, or other forms of traffic, nor any parking and loading areas. Since the proposed project does not create adverse impacts on existing uses, and meets all Municipal Code requirements it is found to accommodate all yards, open spaces, setbacks, walls and fences, parking and loading areas, fire and building code considerations, trash and recycling enclosures. 4. The proposed project would not create any additional impacts that would be in conflict with the existing use. The proposed use would not generate excessive noise, light, vibration or odors. Further the proposed use would not create significant increases in vehicle trips. Therefore the proposed use is found to be consistent and complimentary to the existing equestrian use; and, 5. The proposed use does not create significant vehicular trips which would create significant demands for parking. Occasionally support personnel need to visit the site for repairs or maintenance, otherwise the site is unmanned. Due to the limited visitation to the site the proposed project will not impact access or parking. NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of the City of San Juan Capistrano does hereby make the following additional findings: The approval of this project does not constitute a precedent whereby 72'-0" is a standard maximum height for wireless communications structures. This approval is based solely on the merits of this project including, but not limited to, the site elevation in comparison with surrounding topography, the rustic design and its applicability to the project setting, the opportunity to provide additional landscaping, and the unique location of the property. NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Planning Commission of the City of San Juan Capistrano does hereby approve the project subject to conditions of approval set forth in Exhibit A, attached hereto and incorporated herein, EFFECTIVE DATE & FINAL APPROVAL: This project approval shall become effective following expiration of the fifteen (15) day appeal period without filing of an appeal application. The appeal period shall expire at 5:00 PM November 27, 2013. This project approval shall be valid for a period of 2 years from the date of approval of this resolution, and shall expire on November 12, 2015 unless a time extension request or building permit application related to this discretionary approval is submitted to the City prior to that date. • 1• r., • - •- 1 RESOLUTION #: 13-11-12-02 CONDITIONS OF APPROVAL Project#: CUP1 0-013 Project Name: AT&T JF Shea Therapeutic Riding Center November 12, 2013 November 27, 2013 November 12, 2015 These conditions of approval apply to Conditional Use Permit (CUP) 13-011 for approval of a 72'-0" tall, mono -eucalyptus, wireless telecommunications facility. The site is located 26284 Oso Road and more specifically referred to as Assessor Parcel (APN) 121-070-64. Any proposed change of use or expansion of the area or modifications to the site plan or structures shall be submitted to the City Development Services Department along with the required application and fee, for review. For the purpose of these conditions, the term "applicant" shall also mean the developer, the owner or any successor(s) in interest to the terms of this approval. General Conditions: 1. Conditional Use Permit 13-011 is granted to allow the construction of a 72'-0" tall, mono -eucalyptus, wireless telecommunications facility and equipment structure. The site is generally located on the south side of Oso Road approximately 500 -feet west of Camino Capistrano, more specifically referred to as Assessor Parcel (APN) 121-070-64.This approval is granted based on the application materials submitted by Alexander Lew on October 25, 2013, including site plans and photo simulations. These plans and the proposed use of the site are approved as submitted and conditioned herein, and shall not be further altered unless reviewed and approved by the affected city departments. Minor modifications to this approval which are determined by the Development Services Director to be in substantial conformance with the approved site plan, and which do not intensify or change the use or require any deviations from adopted standards, may be approved by the Development Services Director upon submittal of an application and the required fee. Any proposal to expand the cellular facility beyond the area illustrated on the project plans shall be subject to new discretionary approval. If not appealed, this approval shall become effective on the first business day following the fifteenth (15th) day after the date of the Planning Commission's approval and shall expire November 12, 2015, unless the use or occupancy which is the subject of this action has taken place and all conditions of approval have been met, or a time extension has been granted by the City. Any application for an extension of time shall be Resolution No. 13-11-12-02 Final Conditions of Approval Project No. CUP 13-011 November 12, 2013 AT&T JF Shea Therapeutic Riding Center page 2 of 5 submitted to the Development Services Department, along with the required fee, at least ninety (90) days prior to the expiration date of this approval, except as otherwise approved by the Development Services Director. 2. The applicant shall submit final landscape plans to the Development Services Department for review and approval. The landscape plan shall provide four (4) trees within a 100 -foot radius of the faux eucalyptus, so that adequate planting is provided to achieve appropriate context for the faux eucalyptus upon maturation of the additional trees. The landscape plans shall include details for sufficient irrigation. 3. Approval of this application does not relieve the applicant from complying with other applicable Federal, State, County or City regulations or requirements. 4. All plans, specifications, studies, reports, calculations, maps, notes, legal documents, and designs shall be prepared, signed, and stamped (when required) only by those individuals legally authorized to do so. 5. The applicant shall defend, indemnify, and hold harmless the City of San Juan Capistrano and its officers, employees, and agents from and against any claim, action, or proceeding against the City of San Juan Capistrano, its officers, employees, or agents to attack, set aside, void, or annul any approval or condition of approval of the City of San Juan Capistrano concerning this project, including but not limited to any approval or condition of approval of the City Council, Planning Commission, or City Planner. The City shall promptly notify the applicant of any claim, action, or proceeding concerning the project and the City shall cooperate fully in the defense of the matter, The City reserves the right, at its own option, to choose its own attorney to represent the City, its officers, employees, and agents in the defense of the matter. 6. The applicant shall be responsible for informing all subcontractors, consultants, engineers, or other business entities providing services related to the project of their responsibilities to comply with these conditions of approval and all pertinent requirements in the San Juan Capistrano Municipal Code, including the requirement that a business license be obtained by all entities doing business in the City. 7. In the event that exhibits and written conditions are inconsistent, the written conditions shall prevail. If there are any disparities between these conditions and the plans or final revised plans that are approved for any subsequent phase, the conditions and/or plans as stipulated in the later approval shall prevail. Resolution No. 13-11-12-02 Final Conditions of Approval Project No. CUP 13-011 November 12, 2013 AT&T JF Shea Therapeutic Riding Center page 3 of 5 8. The use shall meet the standards and shall be developed within the limits established by the Municipal Code as related to emissions of noise, odor, dust, vibration, wastes, fumes, traffic safety or any public nuisances arising or occurring incidental to the establishment or operation and shall meet the requirements of these conditions of approval on a continuing basis. Failure to meet these requirements may be grounds for revocation of this Conditional Use Permit. 9. The applicant shall pay all fees at the time fees are determined payable and comply with all requirements of the applicable federal, state, and local agencies. The duty of inquiry as to such requirements shall be upon the applicant. 10. All applicable approvals and clearance from other departments and agencies shall be on file with the Building and Safety Department prior to issuance of any permits, final inspections, utility releases and/or release of securities, as specified in these conditions. (B&S) 11. The applicant shall allow the Business License Administrator or designated City staff to inspect the business premises at any time for compliance with the provisions of these conditions of approval and Title 9, Land Use Code. Failure of the business owner or his/her employees to allow inspection by City staff shall be grounds for revocation of the business license and may be grounds for the revocation of this Conditional Use Permit. The following conditions shall be completed prior to or in conjunction with the issuance of building permits: 12. Applicable Codes. Prior to issuance of building permits, plans for this project shall be submitted to the Building and Safety Department for review and approval, and shall comply with the latest City -adopted edition of the applicable building codes. (B&S) 13. Building Construction Plans. Prior to issuance of building permits, the applicant shall submit final improvement construction plans to the Building and Safety Department for review and approval by all applicable departments. Such plans shall be fully dimensioned and in substantial conformance with those plans approved by the Planning Commission, and/or Development Services Director (as applicable). Plans shall address the following: (PLN) 2. The final conditions of approva[ shall be incorporated into the construction plans and shall be reproduced on the front page of the construction plans. Resolution No. 13-11-12-02 Final Conditions of Approval Project No. CUP 13-011 November 12, 2013 AT&T JF Shea Therapeutic Riding Center page 4 of 5 14. OCFA Review of Architectural Buildinq Plans. Prior to the issuance of a building • the .•• shall submit site and •• plans for the review and approval of the Fire Chief if required per the "Orange County Fire Authority Plan Submittal Criteria Form." Please contact the OCFA al (714) 573-6100 • a •• • the Site/Architectural Notes to •^ placed • the plans prior to submittal. (OCFA) The following conditions shall be met prior to acceptance of improvements and release of bonds and/or surety, final utility clearances, or granting permission to use or occupy the project site, as specified below: 15. Consistency with Approved Plans and Elevations. The project shall be constructed in accordance with all the approved plans and conditions of approval, including but not limited to site plans, and floor plans. (PLN) 16. Final Planning Inspection. A minimum of one week prior to final inspection by the Building and Safety Department, the applicant shall schedule a final inspection by the Development Services Department, and shall pay any outstanding balance in the Developer Deposit Account assigned to this application. (PLN) 17. Lessees • • Users. AT&T shall ensure that the lessee • • user(s) shall comply with the terms and conditions of this permit, and shall be responsible for the future of any lessee or other user(s) under the control of AT&T. (PLN) 18. Future technologies. In the event that future technologies are made available and are feasible, the applicant shall modify or remove the facility at the applicant's expense. Said technologies may require the removal of the facility •' a reduction in panels. The Planning Commission reserves the right to review and modify the subject use in the future. (PLN) The following ongoing conditions shall • complied with at all times after completion •: the project. 19. Site Maintenance and Tree Removal. The applicant shall maintain all portions of the site, including undeveloped areas, pursuant to Municipal Code requirements for property maintenance. The .•d shall ensure that all trees are maintained in their present condition. Should staff determine the condition of the trees has deteriorated to cause increased bility • structures, the CUP entitlement may be referred to the Planning Commission to address the deficiencies • the landscaping. Any request for tree removal on the subject site may also be referred to the Planning Commission for review to ensure that adequate screening of the cellular facility is maintained and replacement trees are applicable. (PLN) Resolution No. 13-11-12-02 Final Conditions of Approval Project No. CUP 13-011 November 12, 2013 AT&T JF Shea Therapeutic Riding Center page 5 of 5 20, Carrier Merger/Co-location. In the event that T -Mobile merges with another carrier, the entity responsible for the subject cellular facility shall notify the Development Services Department of the merger and shall submit documentation regarding the possibility of combining or eliminating nearby cellular facilities due to an overlap in coverage. This documentation may be reviewed by the Planning Commission to determine the necessity of the subject cellular facility and make applicable recommendations. (PLN) 21. Any future proposed wireless communications projects on this site shall be co -located on the existing antenna structure, if feasible. Responsible Agencies: B&S = Building and Safety ENG = Engineering Department PLN = Development Services Department PW = Public Works Department OCFA = Orange County Fire Authority By: Applicant Name Its: Title M Resolution No. 13-11-12-02 Final Conditions of Approval Project No. CUP 13-011 November 12, 2013 AT&T JF Shea Therapeutic Riding Center paw 5 of 5 20, Carrier Merger/Co-location. In the event that T -Mobile merges with another carrier, the entity responsible for the subject cellular facility shall notify the Development Services Department of the merger and shall submit documentation regarding the possibility of combining or eliminating nearby cellular facilities due to an overlap in coverage. This documentation may be reviewed by the Planning Commission to determine the necessity of the subject cellular facility and make applicable recommendations. (PLN) 21 Any future proposed wireless communications projects on this site shall be co -located on the existing antenna structure, if feasible. Responsible Agencies: B&S = Building and Safety ENG Engineering Department PLN = Development Services Department PW = Public Works Department OCFA = Orange County Fire Authority Applicant Acceptance of Conditions of Approval: By: Applicant Name'—;V,' Jo Its: Title Date