Loading...
ZA Resolution-05-09-29-01ZA RESOLUTION NO. 05-09-29-1 DEVELOPMENT STANDARDS ADJUSTMENT (DSA) 05-05 A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF SAN JUAN CAPISTRANO CONFIRMING ISSUANCE OF CATEGORICAL EXEMPTION AND APPROVING A DEVELOPMENT STANDARDS ADJUSTMENT TO CONSTRUCT AN ADDITION THAT WILL HAVE A 1 I- IO” ENCROACHMENT FOR A TOTAL OF 16.5 SQUARE-FEET INTO A REQUIRED 20’-0” REAR YARD SETBACK AT 32652 ALTA PINE DRIVE AND MORE PRECISELY REFERRED TO AS ASSESSOR’S PARCEL NUMBER 121-442-14 (AHERN RESIDENCE). Whereas, Thomas & Angela Ahern request approval of a Development Standards Adjustment (DSA) to allow the construction of an addition/remodeI that includes a bay window that which has a 1’-I 0” encroachment for a total of 16.5 square feet into a required 20’-0” rear yard setback. The proposed project is located at 32652 Alta Pine Drive. The project site is General Plan-designated Medium Density (MD) and classified as RS- 7,000 on the Official Zoning Map; and, Whereas, the proposed project has been processed pursuant to Section 9- 2.301, General Review Procedures of the Title 9, Land Use Code; and, v Whereas, the Environmental Administrator has reviewed the project pursuant to Section 15061 of the California Environmental Quality Act (CEQA), and has issued a Class I (e) (Section 15301) (Existing Facilities) Categorical Exemption, and caused a Notice of Exemption to posted pursuant to Section 15062 of the CEQA Guidelines; and, Whereas, the Zoning Administrator conducted a duly-noticed public meeting on September 29,2005 pursuant to Section 9-2.339 of Title 9, Land Use Code to consider public testimony on the proposed project and has considered all relevant public comment. NOW, THEREFORE, BE IT RESOLVED, that the Zoning Administrator of the City of San Juan Capistrano hereby makes the following findings: 1. The requested adjustment is the most practical solution to the proposed project because it will allow the applicant to construct the addition while still working within the intent of the DSA process. The addition is being constructed for greater disability access for the applicant. Due to a degenerative condition, the applicant is constructing the addition to incorporate greater wheelchair accessibility to the existing sing le-fa m i I y residence. The existing house is situated horizontally on the lot, which is located on a cul-de- sac. The most practical solution to incorporate a handicap facility was to expand the room to the north section of the subject property. The room is being designed so that the applicant can arrange the room so that disabled accessibility is maximized. u ZA Resolution 05-09-29-1 2 September 29,2005 - The DSA will allow the applicant to maximize a floor plan designed for his needs and still have access to an outside view, via the bay window located at the rear of the lot overlooking the back yard. The approval of the requested DSA allows the maximization of a disabled floor plan design and still be in conformance with the 10% deviation allowed by Section 9-2.301. 2. The proposed project does not adversely affect the adjoining properties because the bay window is located in the rear portion of the lot and will not be viewed by anybody but the applicant. Due to the location of the lot on a cul-de-sac and the existing topography of the lot, the surrounding neighbors will not be able to see the bay window. The adjacent neighbors on both sides will not see the proposed window, due to their lots situation as the existing street curves and it follows the cul- de-sac. Additionally, the rear yard neighbor will not be able to view the window because their dwelling unit is located approximately 60’-0” down a steep landscaped grade. Therefore, the encroachment will not cause an adverse effect on any adjoining properties within the vicinity. NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Zoning Administrator hereby approves the project subject to those conditions contained in Exhibit A attached hereto and incorporated herein the project, subject to the following conditions of approval: EFFECTIVE DATE & FINAL APPROVAL: Pursuant to Section 9-2.31 1 of Title 9, Land Use Code, this project approval shall become effective following expiration of the fifteen (15) day appeal period without filing of a valid appeal application. The fifteen (1 5) day appeal period shall expire at 5:OO p.m. on Friday, October 14,2005. This project approval shall be valid for a period of two (2) years from the date of approval of this resolution and shall expire on October, 14, and 2007 unless a time extension request has been submitted to the City; or a building/grading permit application has been submitted to the City; or in the case of a conditional use permit, the use has been established prior to the approval expiration date. u PASSED, APPROVED AND ADOPTED this 29th day of September, 2005. - William A. Ramsey, AICP, xning Adqdnistrdtor u P \PlanningWrchive\DSA-LUA PROJECTS\DSA0505-Ahem\DSA05-05- Reso-29-Sep-2005.doc L RESOLUTION #: 05-09-29-1 Exhibit A CONDITIONS OF APPROVAL Project #: DSA 05-03 APPROVAL DATE: September 29,2005 EFFECTIVE DATE: October 14,2005 EXPIRATION DATE: October 14,2007 Project Name: Ahern Residence These conditions of approval apply to Development Standards Adjustment # 05-05, consideration of a Development Standards Adjustment to allow construct an additionhemodel that includes a bay window, which has a 1’-10” encroachment for a total of 16.5 square-feet into the required 20’-0” rear yard setback. Any proposed change of use or expansion of the area or modifications to the site plan or structures shall be submitted to the City Planning Department along with the required application and fee, for review. For the purpose of these conditions, the term “applicant” shall also mean the developer, the owner or any successor(s) in interest to the terms of this a p p rova I. Genera I C o nd i tions : DSA 05-05 is granted to allow construct an additionhemodel that includes a bay window which has a 1’-10” encroachment for a total of 16.5 square- feet into the required 20’-0” rear yard setback on a .I8 acre parcel located at 32652 Aka Pine Drive (APN: 121-442-14). This approval is granted based on the application materials submitted by Thomas Ahern on August 15, 2005, prepared by Buchan Engineering Structures on July 25, 2005 including site plan, elevations, and floor plan. These plans and the proposed use of the site are approved as submitted and conditioned herein, and shall not be further altered unless reviewed and approved by the affected city departments. Minor modifications to this approval which are determined by the Planning Director to be in substantial conformance with the approved site plan, and which do not intensify or change the use or require any deviations from adopted standards, may be approved by the Planning Director upon submittal of an application and the required fee. If not appealed, this approval shall become effective on the first business day following the fifteenth day after the date of the Zoning Administrators approval and shall expire October 14, 2007 (24) months after the effective date of the approval unless the use or occupancy which is the subject of this action has taken place and all conditions of approval have been met, or a time extension has been granted by the City. Any application for an extension of time shall be submitted to the Planning Department, along with the required fee, at least ninety (90) days prior to the expiration date of this approval, except as otherwise approved by the Planning Director. Zoning Administrator Resolution 05-09-29- 7 Final Conditions of Approval Page 2 of 3 .- DSA 05-05 September 29, 2005 L 2. 3. 4. 5. 6. 7. a. - Approval of this application does not relieve the applicant from complying with other applicable Federal, State, County or City regulations or requirements. - All plans, specifications, studies, reports, calculations, maps, notes, legal documents, and designs shall be prepared, signed, and stamped (when required) only by those individuals legally authorized to do so. The applicant shall defend, indemnify, and hold harmless the City of San Juan Capistrano and its officers, employees, and agents from and against any claim, action, or proceeding against the City of San Juan Capistrano, its officers, employees, or agents to attack, set aside, void, or annul any approval or condition of approval of the City of San Juan Capistrano concerning this project, including but not limited to any approval or condition of approval of the City Council, Planning Commission, or City Planner. The City shall promptly notify the applicant of any claim, action, or proceeding concerning the project and the City shall cooperate fully in the defense of the matter. The City reserves the right, at its own option, to choose its own attorney to represent the City, its officers, employees, and agents in the defense of the matter. - The applicant shall be responsible for informing all subcontractors, consultants, engineers, or other business entities providing services related to the project of their responsibilities to comply with these conditions of approval and all pertinent requirements in the San Juan Capistrano Municipal Code, including the requirement that a business license be obtained by all entities doing business in the City. - In the event that exhibits and written conditions are inconsistent, the written conditions shall prevail. If there are any disparities between these conditions and the plans or final revised plans that are approved for any subsequent phase, the conditions and/or plans as stipulated in the later approval shall prevail. - The use shall meet the standards and shall be developed within the limits established by the Municipal Code as related to emissions of noise, odor, dust, vibration, wastes, fumes, or any public nuisances arising or occurring incidental to the establishment or operation. - The applicant shall pay all fees at the time fees are determined payable and comply with all requirements of the applicable federal, state, and local Zoning Administrator Resolution 05-09-29- I Final Conditions of Approval Page 3 of 3 L DSA 05-05 September 29, 2005 agencies. The duty of inquiry as to such requirements shall be upon the applicant . 9. - All applicable approvals and clearance from other departments and agencies shall be on file with the Building and Safety Department prior to issuance of any permits, final inspections, utility releases and/or release of securities, as specified in these conditions. (B&S) IO. - Pursuant to Section 8-1.03 of the Land Use Code, the project shall comply with all construction activities which includes the delivery and/or recovery of materials, supplies or construction equipment shall be conducted in accordance with the prescribed hours of operation. Monday through Friday 7:OO a.m. to 6:OO p.m. Saturday 8:30 a.m. to 4:30 p.m. Construction activity is prohibited on Sundays and on any federal holiday unless waived by the Building Official. 11. - Oranse Countv Fire Authoritv (OCFA) Approval. The applicant shall secure OCFA approval prior to commencement to any building construction. L Responsible Agencies: B&S Building and Safety ENG = Engineering Department PLN = Planning Department PW = Public Works Department OCFA = Orange County Fire Authority APPROVAL DATE: September 29,2005 EXPIRATION DATE: October 14,2007 RESOLUTION NO.: 05-09-29-1 A Conditions of Approval: By: Date P \Planning\Archive\DSA-LUA PROJECTS\DSA0505Ahern\SJC City-Standard Conditions of Approval-2005-6 doc v