Loading...
16-1101_INTERNATIONAL LINE BUILDERS, INC_Agenda Report_D811/1/2016 DB TO : City of San Juan Capistrano Agenda Report FROM: Honorable Mayor and Members of the City Council ~n Siegel, City Manager SUBMITED BY : Steve May, Director of Public Works & Utilities ~ Ken Al-lmam, Chief Financial Officer #- PREPARED BY : George Alvarez, City Engineer Jl ()./ DATE : SUBJECT: November 1, 2016 Consideration of Approval of Change Order No. 1 for the Traffic Signal Construction Project at Rancho Viejo Road and Paseo Espada and Appropriation of Funds (CIP 15101) (International Line Builders, Inc.) RECOMMENDATION: By motion, 1. Approve and authorize the City Manager to execute Change Order No. 1 in the amount of $98,650 to install electrical conduit by trenching for the traffic signal installation at Rancho Viejo Road and Paseo Espada; and, 2. Approve an appropriation of $80,680 from the Capistrano Circulation Fee Program to increase the budget for CIP 15101 from $378,970 to $459,650 with International Line Builders, Inc . EXECUTIVE SUMMARY: The Traffic Signal Construction Project at Rancho Viejo Road and Paseo Espada includes the installation of approximately 1 ,200 lineal feet of underground electrical conduit. During construction, the conduit installation component of the project encountered difficulty due to unforeseen soil conditions in the area created by many large rocks beneath the pavement. As a result, rather than directional drilling for the conduit installation as planned by the contractor, it is necessary to open cut and re-pave .· City Council Agenda Report November 1, 2016 Page 2 of 3 trenches in order to complete the work. The cost increase for open cut and repaving the trench is $98,650. Since this amount exceeds the City Manager's signing authority, City Council approval is required for Change Order No. 1 (Attachment 1 ). Pending City Council approval of the change order, the traffic signal is expected to be operational in early December 2016. FISCAL IMPACT : On April 19, 2016, the City Council awarded a Construction Contract to International Line Builders, Inc. in the amount of $289,000 plus a 10% contingency for the construction of a traffic signal at Rancho Viejo Road and Paseo Espada (CIP 15101 ). The table below is a summary of the project costs, funding, and additional funding needed: Original Contract Amount $289,000 Contingency (1 0%) $ 29,000 Contract Administration & Inspection (15%) $ 43,000 Total Original Cost $361,000 Change Order No. 1 $ 98,650 Estimated Project Cost $459 ,650 Remaining Budget (CIP 15101) $378,970 Additional Funds Needed (CCFP) $ 80,680 Additional funds in the amount of $80,680 are available from the Capistrano Circulation Fee Program. ENVIRONMENTAL REVIEW The project was previously determined to be categorically exempt under provisions of California Environmental Quality Act (CEQA) Guidelines, Section 15061 (b )(3). The recommended action to approve a change order is not subject to CEQA pursuant to section 15060(c)(3) of CEQA Guidelines because the action is not a project as defined in Section 15378 of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, and the action has no potential for resulting in physical change to the environment, directly or indirectly. PRIOR CITY COUNCIL REVIEW: • On April 7, 2015, the City Council directed staff to bring back for further consideration the installation of a marked crosswalk at the intersection of Rancho Viejo Road and Paseo Espada. City Council Agenda Report November 1, 2016 Page 3 of 3 • On April 21, 2015, the City Council approved the installation of a new Traffic Signal, pedestrian crosswalk and ADA ramps at Ranch Viejo Road and Paseo Espada. • On February 16, 2016, the City Council rejected the bid and authorized staff to re-advertise and receive construction bids. • On April 19, 2016, the City Council awarded a contract for the construction of a Traffic Signal at Rancho Viejo Road and Paseo Espada to International Line Builders for $289,000. COMMISSION/COMMITTEE/R EVI EW AND RECOMMENDATIONS : No prior commission or committee reviews were conducted . NOTIFICATION: International Line Builders, Inc. ATTACHMEN T (S): Attachment 1-CIP 15101 Change Order No .1 CITY OF SAN JUAN CAPISTRANO Contract Change Order# 1 Project: Traffic Signal Rancho Viejo Rd & Change Order No.: Paseo Espada Orig. Contract Amt.: Contract No.: 1 Contractor: International Line Builders, Inc. Prev. Approved Changes: Owner: City of San Juan Capistrano This Change: Revised Contract Amt.: 32400 Paseo Adelanto San Juan Capistrano, CA 92675 (949) 493-ll71 $289,000.00 Days 90 $0 Days 0 $98,650.00 Days 40 $387,650.00 Days 130 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and City of San Juan Capistrano, otherwise referred to as Owner. Increase Contract Item in Contract Time No . Description of Changes Amount Extension , Days Open cut 1200 lineal ft of trench instead of directional bore. $98,650.00 1 40 Totals $98,650.00 This Contract Change Order consists of 2 pages and any exhibits attached to this Contract Change Order shall not be part of the Contract Change Order unless specifically initialed by or on behalf of both the Contractor and the City of San Juan Capistrano . Contract Change Order# 1 Page 1 of 2 Attachment 1 The amount of the contract will be increased by the sum of $ 98,650 .00 and the contract time shall be extended by forty (40) calendar days or the calendar days between the submittal of the change order request by the contractor and the change order approval date by the City, whichever is greater. The undersigned Contractor approves the foregoing Change Order #1 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order #1. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension , required to complete the Change order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Contractor accepts the terms and conditions stated above as full and final settlement of any and all claims arising out of or related to the subject of this Change Order and acknowledges that the compensation (time and cost) set forth herein comprises the total compensation due for the work or change defined in the Change Order, including all impact on any unchanged work. By signing this Change Order, the Contractor acknowledges and agrees that the stipulated compensation includes payment for all Work contained in the Change Order, plus all payment for any acceleration or interruption of schedules, extended overhead costs, delay, and all impact or cumulative impact on all Work under this Contract. The signing of this Change Order acknowledges full mutual accord and satisfaction for the change and that the stated time and/or cost constitute the total equitable adjustment owed the Contractor as a result of the change. The Contractor hereby releases and agrees to waive all rights, without exception or reservation of any kind whatsoever, to file any further claim or request for equitable adjustment of any type, for any reasonably foreseeable cause that shall arise out of, or as a result of, this Change Order and/or its impact on the remainder of the Work under the Contract. Accepted : (Signature) Contractor's Authorized Representative Date Recommended: Steve May, Public Works Director Date Approved: Ben Siegel, City Manager Date Item Justification for Change(s) No. The soil conditions at the job location do not allow directional boring. The soil contains too many rocks 1 and cobbles. Therefore, the conduits need to be installed with an open trench. This Contract Change Order consists of 2 pages and any exhibits attached to this Contract Change Order shall not be part of the Contract Change Order unless specifically initialed by or on behalf of both the Contractor and the City of San Juan Capistrano. Contract Change Order #1 Page 2 of 2 Attachment 1