16-0816_PACIFIC POINT DEVELOPMENT PARTNERS LLC_Grading Surety AgreementGRADING SURETY AGRE ~ii4£ THIS AGREEMENT is made by and between the CITY OF SAN JUAN CAPISTRANO, a municipal corporation, hereinafter referred to as the "City," and Pacific Point Development Partners L.L.C, hereinafter referred to as "Developer." WITNESSETH WHEREAS, City will issue Precise Grading Permit No 816-0528 to Developer to construct certain designated improvements upon a portion of that real property located at Tract 16751, San Juan Capistrano, CA, such work being commonly referred to as Crystal downs, Lots 1-5 ("Project"). WHEREAS, San Juan Capistrano Municipal Code Section 8-2.08 requires the posting of financial security to secure the faithful performance for the grading and installation of related improvements connected with issuance of grading permits including the construction of drainage and protection devices and any other corrective work to remove and eliminate engineering and geological hazards. WHEREAS, San Juan Capistrano Municipal Code Section 8-2.09 authorizes the Building Official to require additional bonding as security to ensure against adverse aesthetic impacts arising from incomplete grading and/or improvements from development projects which have not been completed. WHEREAS, the Building Official finds that the proposed Project site is highly prominent and visible to the community, has unique topographic features or involves substantial grading of slope areas. NOW, THEREFORE, in consideration of the premises and promises hereinafter contained, City and Developer agree as follows: 1. Developer's Improvements Obligations. Developer shall, at its sole cost and expense, provide and furnish all labor, materials and equipment for the Project depicted on the plans entitled "MODEL PRECISE GRADING CRYSTAL DOWNS NORTH, TRACT 16751 -MODELS AND BUILDOUT" as approved by the City Engineer, on 0;1 . / {; , 2016. The grading permit and plans, which describe all the work to b constructed pursuant to th1s Agreement, are on f1le 1n the off1ce of the C1ty's Building Official. Grading Surety Agreement, Permit #816-0528 61147.02100\24835741.2 Page 1 of 10 2. Developer's Security. Developer shall provide a cash deposit, irrevocable letter of credit, certificate of deposit or a bond by a duly authorized corporate surety subject to the approval of the City Attorney, or as approved by the City Engineer, to secure Developer's improvement obligations required under this Agreement ("Security"). The amount of the Security shall be $89,776 for all onsite grading improvements as approved by the City Engineer. This Security shall also serve as security for restoration of the Project site. A copy of the performance bond form, as approved by the City Attorney, is attached hereto as Exhibit "C" and incorporated herein by this reference. Copies of approved irrevocable letter of credit forms and certificate of deposit form are available upon request. 3. Completion of Improvements. To ensure the protection of the public safety, health and welfare, Developer shall construct the Project in accordance with the schedule as set forth in Exhibit "A", and the estimate as set forth in Exhibit "B". Exhibits "A" and "B" are attached hereto and incorporated herein by this reference. 4. Developer Default. In the event Developer does not complete the required improvements, including erosion and silt control measures within the time required, using Best Management Practices (BMP) in implementing a Water Quality Management Plan in full compliance with Orange County National Pollutant Discharge Elimination System (NPDES) Storm Water Implementation Agreement and San Juan Capistrano Municipal Code Section 8-14, or abandons the Project site, or suspends work for more than twenty (20) working days without written approval of the City, City shall have the right to immediately declare a default and to make demand on Developer's surety for performance of all obligations under this Agreement. 5. Restoration of Site. San Juan Capistrano Municipal Code Section 8-2.09 allows the City to require bonding as security to ensure against adverse aesthetic impacts arising from incomplete grading, drainage and/or improvements which includes illicit non- storm drain water discharge. The purpose of this security shall be to restore the property to a safe and acceptable condition in the event the Developer defaults. This restoration shall include but not be limited to the following: A. Dismantle and/or demolish improvements; B. Grade property to its original contours as shown on the approved grading plans. C. Remove all debris and construction materials from the site; and Grading Surety Agreement, Permit #816-0528 61147.02100\24835741.2 Page 2 of 10 D . Install erosion and silt control devices, including hydroseeding, to insure a uniform vegetative cover, or equivalent stabilization measures which include the use of such Best Management Practices as blankets, fiber matrices, catch basin filters, or other erosion resistant soil coverings or treatments to satisfaction of the Director of Engineering and Building. 6. Attorney's Fees. Developer agrees to pay City such sum as the court may judge as reasonable for the legal services of an attorney representing the City in an action brought to enforce or interpret the obligations of this agreement, and such sum shall be made a part of any judgment in such action against Developer if such action is determined in favor of the City. 7. Developer's Work in Safe Condition. Developer shall perform all work in a safe workmanlike manner and shall take such precautions as may be necessary to warn and protect the public from any dangerous condition caused by the Project. 8. Liability. City, its officials, officers, employees, agents, and volunteers shall not be liable for any injury to persons or property occasioned by reason of the acts or omissions of Developer, its agents or employees in the performance of this Agreement. Developer further agrees to protect, indemnify, and hold harmless City, its officials, officers, employees, agents, and volunteers from any and all claims, demands, causes of action, liability or loss of any sort, because of, or arising out of, the alleged acts or omissions of Developer, its agents or employees in the performance of this Agreement, including all claims, demands, causes of action, liability, or loss because of, or arising out of, in whole or in part, the design or construction of the Project. This indemnification and agreement to hold harmless shall extend to injuries to persons and damages or taking of property resulting from the design or construction of said Project, and in addition, to adjacent property owners as a consequence of the diversion of waters from the design or construction of drainage systems, streets and other improvements. SIGNATURES ON FOLLOWING PAGE Grading Surety Agreement, Permit #816-0528 61147.02100\24835741.2 Page 3 of 10 SIGNATURE PAGE TO GRADING SURETY AGREEMENT BETWEEN THE CITY OF SAN JUAN CAPISTRANO AND Pacific Point Development Partners L.L.C IN WITNESS WHEREOF, the parties have executed this Agreement as of ------~~------------------------------------·2016 Approved as to Form : By: _____________ _ Jeff Ballinger, City Attorney Grading Surety Agreement, Permit #816-0528 61147.02100\24835741.2 Pacific Point Development Partners L.L.C By: __ ---'~:...____-__ _ Printed Name ·roM fAI~ By : ____________ _ Printed Name ________ _ Title ________________________ _ Page 4 of 10 SIGNATURE PAGE TO GRADING SURETY AGREEMENT BETWEEN THE CITY OF SAN JUAN CAPISTRANO AND Pacific Point Development Partners L.L.C IN WITNESS WHEREOF, the parties have executed this Agreement as of _________________________________________ ,2016 Cl Grading Surety Agreement, Permit #816-0528 61147.02100\24835741.2 Pacific Point Development Partners L.L.C By:. __ ______:.~_..;_ __ ~ Printed Name ·roM. '"' ''VE. By: ____________________ _ Printed Name ______________ _ Title ___________________ _ Page 4 of 10 EX H I BIT "A" SCHEDULE FOR COMPLETION OF IMPROVEMENTS 1. Complete rough grading 2. Start installation of onsite Storm drain work 3. Start & Finish Soil Stabilization work 4. Curb & Gutter work 5. Walks, Railings & Fences 6. A/C Paving Grading Surety Agreement, Permit #816-0528 61147.02100\24835741.2 Completion Date ~ \/31/17 t/st/17 Page 5 of 10 PROJECT OR TRACT NUMBeR OIIIINER I SUBOMOER f}l~ -06'2.3 l c..a~ oa.na Nolllt -lR 11751 -l...oB 1 tllrv ~ IWs Tavlor Morrison ENGDEER CALCULATED BY ADAIIS S I REElER C1VL ENGINEERS. INC. DAlE: 7/ZT/2016 JOB No.: 15-2092 PREUMINARY CONSlRUCnON COST ESTIMATE No. DESCRIPTION UNIT PRICE TOTAL MODEL PRECISE GRADING 1 CONSTRUCT CONCRETE DRIVEWAY PER LANDSCAPE PLANS 1.766 SF@ $ 7.00 $ 12.362 2 CONSTRUCT 3" A.C. PAVEMENT OVER NATIVE 4.645 SF ca! $ 2.50 $ 11 .613 3 INSTALL REDWOOD HEADER 226 LF@ $ 3.00 $ 678 4 CONSTRUCT 4-INCH THICK CONCRETE WAJ.J<WAY PER LANDSCAPE PLANS 872 SF@ $ 5.00 $ 4 .360 5 INSTALL VI/HEEL STOP 8EA@ $ 75.00 $ 600 6 CONSTRUCT DRIVEWAY APPROACH PER CITY OF SAN JUAN CAPISTRANO STD. 401 470 SF@ $ 7.00 $ 3 .290 7 INSTALL TEMPORARY HANDICAP & CUSTOMER PARKING SIGNAGE AND STRIPING 1 I.S@ $ 1.500.00 $ 1.500 8 INSTALL 12" SQUARE NOS 1212 AREA DRAIN INLET 1MTH ADAPTER & OUTlET 75 EA@ $ 100.00 $ 7.500 9 INSTALL 4" NOS ATRIUM DRAIN INLET SEA@ s 50.00 $ 300 10 INSTALL4" NOS 13 ROUND GRATE INLET 10 EA@ $ 50.00 s 500 10 INSTALL 4" NOS 9108 BRASS GRATE INL.ET SEA@ s 75.00 s 600 10 INSTALL 4" PVC SCH 40 PIPE 2340 LF!Bl s 12.00 s 28.080 11 CONSTRUCT JUNCTION STUCTURE TYPE VI 2EA@ $ 350.00 $ 700 11 INSTALL CURB DRAIN 9EA@ $ 200.00 s 1.800 12 SAW-CUT AND REMOVE EXISTING CURB AND GUTTER AND AC, REPLACE AC WITH 12" FUll. l.Fliil 100.00 $ 2.400 DEPTl-1 24 $ 13 EARTHWORK SPOILS FROM FOUNDATIONS, SIDEWAI..KS, SWALES, AND SIDEYARD GRADING 500.00 s 2 .500 I (50 r;:y PER LOT X 5 LOTS = 250 r;:y TOT AU 5 LOTS $ 14 EROSION CONlROL _,/p~p'~c 15 GRAVEL BAG VELOCITY REDUCER 40 lF@ $ 4.00 s 160 16 DRAIN II.ET GRAVEL BAG PROTECTION 68 EA@ s 4.00 $ 272 17 CATCH BASIN PROTECTION 2EA@ s 100.00 s 200 18 SIGLE ROW OF GRAVEL BAGS 1.100 lF@ $ 2.00 s 2.200 SUB-TOTAL IMPROVEMENTS $ 81 .615 10% CONTINGENCY $ 8.161 TOTAL IMPROVEIENTS $ 89,776 PAGE 1 OF1 E X H I B I T "8" CONDITIONS FOR COMPLETION OF IMPROVEMENTS 1. The grading for this project shall be in strict conformance with the grading plans as well as the San Juan Capistrano Municipal Code. 2 . Grading operations shall commence within fourteen (14) calendar days after issuance of Grading Permit. Winter grading will be conducted in strict accordance with the dynamic erosion and silt control plan submitted by the Developer, and approved by the City. This erosion and silt control plan reflects erosion and silt mitigation measures for expected grading conditions as the work progresses through the winter season and shall not be amended except with the permission of the City. In the event Developer does not wish to implement winter grading, or permission for winter grading is rescinded, static erosion and silt control plans reflecting current conditions of grading shall be submitted within ten (1 0) days of cessation of work. These plans shall: 1. Identify all pollutant sources including sources of sediment that may affect the quality of storm water discharges associated with the construction activity. 2. Include the erosion and sediment control planting and hydroseeding to insure a uniform vegetative cover or equivalent stabilization measures which include the use of such Best Management Practices as blankets, fiber matrices, catch basin filters or other erosion resistant soil covering or treatments to the satisfaction of the City Engineer. 3. Suspension in excess of twenty (20) working days of work authorized by approved grading plans and grading permit for subject property, including erosion and sediment control measures and landscaping and irrigation, shall constitute default of this agreement. 4. The supervising civil engineer and soils engineer shall file biweekly progress reports of all grading operations with the Building Official. An interim compaction report, for that work completed at the time work is suspended for the rainy season, shall be filed with the Building Official. This interim report shall conform to the grading code requirements for final compaction reports. Grading Surety Agreement, Permit #816-0528 61147.02100\24835741.2 Page 6 of 10 5 . Contractor shall control dust to the satisfaction of the Building Official or his deputy. During grading, Contractor shall keep water truck on site and dampen work area, grounds, and loaded trucks. 6. Grading operations suspended during the rainy season shall be resumed no later than 15 days from date of suspension termination. 7. Installation of interim erosion and sediment control devices and systems shall commence within seven (7) days after rough grade certification has been approved by the Building Official and must be completed within fifteen (15) days of rough grad certification. Final erosion and sediment controls devices, planting, landscaping and irrigation systems shall be installed prior to final inspection of the grading permit. 8. All work shall be performed in strict observation of the Hours of Operation in accordance with San Juan Capistrano Municipal Code Section 8-1.03. 9 . Contractor shall adhere to conditions of haul route permit and encroachment permit issued by the City Engineer. 10. Parking for construction crew is to be on-site . 11 . Exoneration of Security : Developer's security shall be reduced to 90% upon signoff of precise grading permit. No security given by Developer shall be released until the expiration of the warranty period and until any claims filed during the warranty period have been settled. Nothing herein shall limit the City's rights or the Developer or surety's obligations under this Agreement. 12. Warranty Period: 1 year from permit signoff by City. Grading Surety Agreement, Permit #816-0528 6 1147 .02100\24835741.2 Page 7 of 10