GRADING SURETY AGREEMENT
THIS AGREEMENT is made by and between the CITY OF SAN JUAN CAPISTRANO, a
municipal corporation, hereinafter referred to as the "City," and Pacific Point
Development Partners L.L.C, hereinafter referred to as "Developer."
WITNESSETH
WHEREAS, City will issue Precise Grading Permit No B16-0113 to Developer to
construct certain designated improvements upon a portion of that real property located at
Tract 16747, Lot H, San Juan Capistrano, CA, such work being commonly referred to as
Pacific Point RV Parking Lot, Tract 16747 Lot H ("Project").
WHEREAS, San Juan Capistrano Municipal Code Section 8-2.08 requires the
posting of financial security to secure the faithful performance for the grading and
installation of related improvements connected with issuance of grading permits including
the construction of drainage and protection devices and any other corrective work to
remove and eliminate engineering and geological hazards.
WHEREAS, San Juan Capistrano Municipal Code Section 8-2.09 authorizes the
Building Official to require additional bonding as security to ensure against adverse
aesthetic impacts arising from incomplete grading and/or improvements from development
projects which have not been completed.
WHEREAS, the Building Official finds that the proposed Project site is highly
prominent and visible to the community, has unique topographic features or involves
substantial grading of slope areas.
NOW, THEREFORE, in consideration of the premises and promises hereinafter
contained, City and Developer agree as follows:
1. Developer's Improvements Obligations. Developer shall, at its sole cost and
expense, provide and furnish all labor, materials and equipment for the Project depicted on
the plans entitled "PRECISE GRADING PLAN, Tract 16747, Lot H, Pacific Point R.V.
Parking Lot" as approved by the City Engineer, on JVI.Y :7, 2004 )2016.
The grading permit and plans, which describe all the work to be constructed pursuant to
this Agreement, are on file in the office of the City's Building Official.
Grading Surety Agreement, Permit #B16-0113 Page 1 of 10
61147.02100\2483 5741.2
2-j oq/ ,
�► s-i'L
2. Developer's Security. Developer shall provide a cash deposit, irrevocable
letter of credit, certificate of deposit or a bond by a duly authorized corporate surety subject
to the approval of the City Attorney, or as approved by the City Engineer, to secure
Developer's improvement obligations required under this Agreement ("Security").
The amount of the Security shall be $218,128.73 for all onsite grading
improvements as approved by the City Engineer. This Security shall also serve as security
for restoration of the Project site. A copy of the performance bond form, as approved by
the City Attorney, is attached hereto as Exhibit "C" and incorporated herein by this
reference. Copies of approved irrevocable letter of credit forms and certificate of deposit
form are available upon request.
3. Completion of Improvements. To ensure the protection of the public safety,
health and welfare, Developer shall construct the Project in accordance with the schedule
as set forth in Exhibit "A", and the estimate as set forth in Exhibit "B". Exhibits "A" and "B"
are attached hereto and incorporated herein by this reference.
4. Developer Default. In the event Developer does not complete the required
improvements, including erosion and silt control measures within the time required, using
Best Management Practices (BMP) in implementing a Water Quality Management Plan in
full compliance with Orange County National Pollutant Discharge Elimination System
(NPDES) Storm Water Implementation Agreement and San Juan Capistrano Municipal
Code Section 8-14, or abandons the Project site, or suspends work for more than twenty
(20) working days without written approval of the City, City shall have the right to
immediately declare a default and to make demand on Developer's surety for performance
of all obligations under this Agreement.
5. Restoration of Site. San Juan Capistrano Municipal Code Section 8-2.09
allows the City to require bonding as security to ensure against adverse aesthetic impacts
arising from incomplete grading, drainage and/or improvements which includes illicit non -
storm drain water discharge. The purpose of this security shall be to restore the property to
a safe and acceptable condition in the event the Developer defaults. This restoration shall
include but not be limited to the following:
A. Dismantle and/or demolish improvements;
B. Grade property to its original contours as shown on the approved
grading plans.
C. Remove all debris and construction materials from the site; and
Grading Surety Agreement, Permit #B16-0113 Page 2 of 10
61147.02100\2483 5741.2
D. Install erosion and silt control devices, including hydroseeding, to
insure a uniform vegetative cover, or equivalent stabilization
measures which include the use of such Best Management Practices
as blankets, fiber matrices, catch basin filters, or other erosion
resistant soil coverings or treatments to satisfaction of the Director of
Engineering and Building.
6. Attorney's Fees. Developer agrees to pay City such sum as the court may
judge as reasonable for the legal services of an attorney representing the City in an action
brought to enforce or interpret the obligations of this agreement, and such sum shall be
made a part of any judgment in such action against Developer if such action is determined
in favor of the City.
7. Developer's Work in Safe Condition. Developer shall perform all work in a
safe workmanlike manner and shall take such precautions as may be necessary to warn
and protect the public from any dangerous condition caused by the Project.
8. Liability. City, its officials, officers, employees, agents, and volunteers shall
not be liable for any injury to persons or property occasioned by reason of the acts or
omissions of Developer, its agents or employees in the performance of this Agreement.
Developer further agrees to protect, indemnify, and hold harmless City, its officials, officers,
employees, agents, and volunteers from any and all claims, demands, causes of action,
liability or loss of any sort, because of, or arising out of, the alleged acts or omissions of
Developer, its agents or employees in the performance of this Agreement, including all
claims, demands, causes of action, liability, or loss because of, or arising out of, in whole or
in part, the design or construction of the Project. This indemnification and agreement to
hold harmless shall extend to injuries to persons and damages or taking of property
resulting from the design or construction of said Project, and in addition, to adjacent
property owners as a consequence of the diversion of waters from the design or
construction of drainage systems, streets and other improvements.
SIGNATURES ON FOLLOWING PAGE
Grading Surety Agreement, Permit #B16-0113 Page 3 of 10
61147.02100\24835741.2
SCANNED
SIGNATURE PAGE TO GRADING SURETY AGREEMENT
BETWEEN
THE CITY OF SAN JUAN CAPISTRANO AND
Pacific Point Development Partners L.L.0
IN WITNESS WHEREOF, the parties have executed this Agreement as of
-S-, \ ,,\ .2016
ClTRANO Pacl Point Development Partners L.L.0
cial By: 'Philip S. BodeenPrinted Name
ri
Approve
By:
far- Jeff Ballinger, City Attorney By:
Printed Mame
Title
-Grading Su—WAgraement, Permit-MI15-0113- P"e-4WAG-
61147.02100\24835741.2
SIGNATURE PAGE TO GRADING SURETY AGREEMENT
BETWEEN
THE CITY OF SAN JUAN CAPISTRANO AND
Pacific Point Development Partners L.L.0
IN WITNESS WHEREOF, the parties have executed this Agreement as of
CITY
By:__.�
Dated
::K,V \ �r
JU CAPISTRANO
3uilding Official
Approved as to Form:
By:
Jeff Ballinger, City Attorney
, 2016
Pacif' Point Development Partners L.L.0
By. -
Philip S. Badenl
Printed Name
Title
By:
Printed Name
Title
Aurlw&W SiORA"
Grading Surety Agreement, Permit #B16-0113 Page 4 of 10
61147.02100\24835741.2
Task
EXHIBIT"A"
SCHEDULE FOR COMPLETION OF IMPROVEMENTS
1. Complete rough grading
Completion Date
*106
2. Start installation of onsite Storm drain work 1!v14 1, " F;,;T
3. Start & Finish Soil Stabilization work C0VWI/ V'T
4. Curb & Gutter work 1/ is It iP
5. Walks, Railings & Fences PIA
6. A/C Paving t () / V 16
Grading Surety Agreement, Permit #B16-0113 Page 5 of 10
61147.02100\24835741.2
EXHIBIT"B"
CONDITIONS FOR COMPLETION OF IMPROVEMENTS
1. The grading for this project shall be in strict conformance with the grading plans as
well as the San Juan Capistrano Municipal Code.
2. Grading operations shall commence within fourteen (14) calendar days after
issuance of Grading Permit.
Winter grading will be conducted in strict accordance with the dynamic erosion and
silt control plan submitted by the Developer, and approved by the City. This erosion
and silt control plan reflects erosion and silt mitigation measures for expected
grading conditions as the work progresses through the winter season and shall not
be amended except with the permission of the City.
In the event Developer does not wish to implement winter grading, or permission for
winter grading is rescinded, static erosion and silt control plans reflecting current
conditions of grading shall be submitted within ten (10) days of cessation of work.
These plans shall:
1. Identify all pollutant sources including sources of sediment that may affect
the quality of storm water discharges associated with the construction
activity.
2. Include the erosion and sediment control planting and hydroseeding to
insure a uniform vegetative cover or equivalent stabilization measures which
include the use of such Best Management Practices as blankets, fiber
matrices, catch basin filters or other erosion resistant soil covering or
treatments to the satisfaction of the City Engineer.
3. Suspension in excess of twenty (20) working days of work authorized by approved
grading plans and grading permit for subject property, including erosion and
sediment control measures and landscaping and irrigation, shall constitute default of
this agreement.
4. The supervising civil engineer and soils engineer shall file biweekly progress reports
of all grading operations with the Building Official. An interim compaction report, for
that work completed at the time work is suspended for the rainy season, shall be
filed with the Building Official. This interim report shall conform to the grading code
requirements for final compaction reports.
Grading Surety Agreement, Permit #B16-0113 Page 6 of 10
61147.02100\24835741.2
5. Contractor shall control dust to the satisfaction of the Building Official or his deputy.
During grading, Contractor shall keep water truck on site and dampen work area,
grounds, and loaded trucks.
6. Grading operations suspended during the rainy season shall be resumed no later
than 15 days from date of suspension termination.
7. Installation of interim erosion and sediment control devices and systems shall
commence within seven (7) days after rough grade certification has been approved
by the Building Official and must be completed within fifteen (15) days of rough grad
certification. Final erosion and sediment controls devices, planting, landscaping and
irrigation systems shall be installed prior to final inspection of the grading permit.
8. All work shall be performed in strict observation of the Hours of Operation in
accordance with San Juan Capistrano Municipal Code Section 8-1.03.
9. Contractor shall adhere to conditions of haul route permit and encroachment permit
issued by the City Engineer.
10. Parking for construction crew is to be on-site.
11. Exoneration of Security: Developer's security shall be reduced to 90% upon signoff
of precise grading permit. No security given by Developer shall be released until the
expiration of the warranty period and until any claims filed during the warranty
period have been settled. Nothing herein shall limit the City's rights or the
Developer or surety's obligations under this Agreement.
12. Warranty Period: 1 year from permit signoff by City.
Grading Surety Agreement, Permit #B16-0113 Page 7 of 10
61147.02100\24835741.2
4DOq/GlNQL
HUNSAKER
& ASSOCIATES
IRVINE, INC.
Preliminary Budget for Bonding Purposes
Project Name: Tract 16747 Lot 2, Pacific Point R.V. Parking Lot
Location: City of San Juan Capistrano, California
Type of plan: Precise Grading Plan
UNIT
ITEM DESCRIPTION QUANTITY UNIT PRICE TOTAL COST
EARTHWORK
STRAW WATTLE
364
LF
$2.00
CUT
2,040
CY
$1.00
$2,040.00
FILL
2,040
CY
$1.00
$2,040.00
LF
TOTAL EARTHWORK
$2,500.00
D.
CONCRETE WASH AREA
$4,080.00
PRECISE GRADING
$2,610.00
$2,610.00
E.
SIABILIZED G:ONST. ENTRANCE
A. 4 " ASPHALT CONCRETE
45,976
SF
$2.471
$113,591.37
A. 8 "AGGREGATE BASE
45,976
SF
$1.111
$51,100.16
B, 6" CURB ONLY
805
LF
$10.00
$8,050.00
C. 6" CURB & GUTTER
632
LF
$13.00
$8,216.00
D. LOCAL DEPRESSION
2
EA
$0.00
INCLUDED BELOW
E. STALL PAINTING
2,614
LF
$1.00
$2,614.00
F. INLET TYPE 11(L=21') W/ L.D.
1
EA
$10,041.00
$10,041.00
F. INLET TYPE 11 (L=7') W/ L.D.
1
EA
$7,647.00
$7,647.00
G. REMOVE PLUG AND JOIN EX. SD
1
EA
$278.00
$278.00
H. T TRANSITION CF 0" TO 6"
2
EA
$48.00
$96.00
I. DRIVE APPROACH TYPE II
1
EA
$1,666.00
$1,666.00
J. 42" HIGH 4" BOLLARD
1
EA
$2,050.00
$2,050.00
TOTAL PRECISE GRADING
EROSION CONTROL
$205,349.53
A.
STRAW WATTLE
364
LF
$2.00
$728.00
B.
INLET PROTECTION
2
EA
$87.60
$175.20
C.
STRAW WATTLE TOP OF SLOPE
1,250
LF
$2.00
$2,500.00
D.
CONCRETE WASH AREA
1
EA
$2,610.00
$2,610.00
E.
SIABILIZED G:ONST. ENTRANCE
'I
FA
$2,686,00
$2,0813.00
TOTAL EROSION CONTROL
CONTINGENCY
OVERALL CONTINGENCY 10% LS $218,128.73
Prepared by: Khang Tleu, Jim Tsutsul
(949) 458-5477 3868-1 Tr 16747 PG RV Parking Bond.xlsx Bond Estimate
on 01-05.16 page 2 of 2
$8,699.20
$21,812.87
Date of Plan Plot: 12-22-15
Printed on: 116!2016 - 11:34 AM