16-0622_LAMMING, SCOTT_Grading Surety AgreementGRADING SURETY AGREEMEq,��
THIS AGREEMENT is made by and between the CITY OF SAN JUAN CAPISTRANO, a
municipal corporation, hereinafter referred to as the "City," and
I -Am M i m G NAME of DEVELOPER, hereinafter
referred to as "Developer."
WITNESSETH
WHEREAS, City will issue Precise Grading Permit No B15-1473 to Developer to
construct certain designated improvements upon a portion of that real property located at 3
Strawberry Lane, San Juan Capistrano, CA, such work being commonly referred to as
"GRADING PLAN FOR 3 STRAWBERRY LANE" ("Project").
WHEREAS, San Juan Capistrano Municipal Code Section 8-2.08 requires the
posting of a bond to secure the faithful performance for the grading and installation of
related improvements connected with issuance of grading permits including - the
construction of drainage and protection devices and any other corrective work to remove
and eliminate engineering and geological hazards.
WHEREAS, San Juan Capistrano Municipal Code Section 8-2.09 authorizes the
Building Official to require additional bonding as security to ensure against adverse
aesthetic impacts arising from incomplete grading and/or improvements from development
projects which have not been completed.
WHEREAS, the Building Official finds that the proposed Project site is highly
prominent and visible to the community, has unique topographic features or involves
substantial grading of slope areas.
NOW, THEREFORE, in consideration of the premises and promises hereinafter
contained, City and Developer agree as follows:
1. Developer's Improvements Obligations. Developer shall, at its sole cost and
expense, provide and furnish all labor, materials and equipment for the Project depicted on
the plans entitled "GRADING PLAN FOR 3 STRAWBERRY LANE" as approved by the City
Engineer, on (0!2 --Ale ,2016. The grading permit and plans,
which describe all the work to be constructed pursuant to this Agreement, are on file in the
office of the City's Building Official.
Grading Surety Agreement, Permit #B15-1473 Page 1 of 7
61147.02100\24835741.1
2. Developer's Security. Developer shall provide a bond by a duly authorized
corporate surety subject to the approval of the City Attorney, or as approved by the City
Engineer, on City approved forms to secure Developer's improvement obligations required
under this Agreement. Copies of approved irrevocable letter of credit forms and certificate
of deposit form are available upon request.
The amount of the bond shall be $25,858 for all onsite grading improvements as
approved by the City Engineer. This security shall also serve as security for restoration of
the Project site. A copy of the performance bond form, as approved by the City Attorney, is
attached hereto as Exhibit "C" and incorporated herein by this reference.
3. Completion of Improvements. To ensure the protection of the public safety,
health and welfare, Developer shall construct the Project in accordance with the schedule
as set forth in Exhibit "A", and the conditions as set forth in Exhibit "B". Exhibits "A" and "B"
are attached hereto and incorporated herein by this reference.
4. Developer Default. In the event Developer does not complete the required
improvements, including erosion and silt control measures within the time required, using
Best Management Practices (BMP) in implementing a Water Quality Management Plan in
full compliance with Orange County National Pollutant Discharge Elimination System
(NPDES) Storm Water Implementation Agreement and San Juan Capistrano Municipal
Code Section 8-14, or abandons the Project site, or suspends work for more than twenty
(20) working days without written approval of the City, City shall have the right to
immediately declare a default and to make demand on Developer's surety for performance
of all obligations under this Agreement.
5. Restoration of Site. San Juan Capistrano Municipal Code Section 8-2.09
allows the City to require bonding as security to ensure against adverse aesthetic impacts
arising from incomplete grading, drainage and/or improvements which includes illicit non -
storm drain water discharge. The purpose of this security shall be to restore the property to
a safe and acceptable condition in the event the Developer defaults. This restoration shall
include but not be limited to the following.-
A,
ollowing:
A. Dismantle and/or demolish improvements;
B. Grade property to its original contours as shown on the approved
grading plans.
C. Remove all debris and construction materials from the site; and
Grading Surety Agreement, Permit #B15-1473 Page 2 of 7
61147.02100\24835741.1
D. Install erosion and silt control devices, including hydroseeding, to
insure a uniform vegetative cover, or equivalent stabilization
measures which include the use of such Best Management Practices
as blankets, fiber matrices, catch basin filters, or other erosion
resistant soil coverings or treatments to satisfaction of the Director of
Engineering and Building.
6. Attorney's Fees. Developer agrees to pay City such sum as the court may
judge as reasonable for the legal services of an attorney representing the City in an action
brought to enforce or interpret the obligations of this agreement, and such sum shall be
made a part of any judgment in such action against Developer if such action is determined
in favor of the City.
7. Developer's Work in Safe Condition. Developer shall perform all work in a
safe workmanlike manner and shall take such precautions as may be necessary to warn
and protect the public from any dangerous condition caused by the Project.
8. Liability. City, its officials, officers, employees, agents, and volunteers shall
not be liable for any injury to persons or property occasioned by reason of the acts or
omissions of Developer, its agents or employees in the performance of this Agreement.
Developer further agrees to protect, indemnify, and hold harmless City, its officials, officers,
employees, agents, and volunteers from any and all claims, demands, causes of action,
liability or loss of any sort, because of, or arising out of, the alleged acts or omissions of
Developer, its agents or employees in the performance of this Agreement, including all
claims, demands, causes of action, liability, or loss because of, or arising out of, in whole or
in part, the design or construction of the Project. This indemnification and agreement to
hold harmless shall extend to injuries to persons and damages or taking of property
resulting from the design or construction of said Project, and in addition, to adjacent
property owners as a consequence of the diversion of waters from the design or
construction of drainage systems, streets and other improvements.
SIGNATURES ON FOLLOWING PAGE
Grading Surety Agreement, Permit #B15-1473 Page 3 of 7
61147.02100\24835741.1
SIGNATURE PAGE TO GRADING SURETY AGREEMENT
BETWEEN
THE CITY OF SAN JUAN CAPISTRANO AND
SCIIIAT ) MM 1N(a NAME OF DEVELOPER
IN WITNESS WHEREOF, the parties have executed this Agreement as of
CITY OF SAN JUAN CAPISTRANO
By:
A�� otcuc--
Paul Melby, Building Official
Dated- 6 -30 _l6
Approv "
By:
,,C-of'Ballinger, ty Atte
Grading Surety Agreement, Permit #B15-1473
61147.02100\2483574 1.1
, 2016
a.cnr 1-A►MM_%Nca
NAME OF DEVELOPER
L
Printed Name scir> r LAA VA iwjGj
Title n weiFy. / 6olt nc.'-
Printed Name
Title
Page 4 of 7
SIGNATURE PAGE TO GRADING SURETY AGREEMENT
BETWEEN
THE CITY OF SAN JUAN CAPISTRANO AND
SC071 L.AfAmkNG NAME OF DEVELOPER
IN WITNESS WHEREOF, the parties have executed this Agreement as of
CITY OF SAN JUAN CAPISTRANO
By: VY,14AL, - (�L�
Paul Melby, Building Official
Dated: 6-3o-tr.
Approved as to Form:
By:
2016
rrr SAM N
NAME OF DEVELOPER
By:
Printed Name scrrir
Title n wom I (wit-OF.Q2
Jeff Ballinger, City Attorney By.
Printed Name
Title
Grading Surety Agreement, Permit #B15-1473 Page 4 of 7
61147.02100\24835741.1
EXHIBIT"A"
SCHEDULE FOR COMPLETION OF IMPROVEMENTS
Task
Completion Date
1. Complete Erosion Control Installation
7 tit -5-%l
2. Start & Finish Soil Stabilization work
C,D
3. Complete Rough Grade Pads
4. Complete Onsite Driveways & Sidewalks
5. Curb & Gutter work
��lI
6. Complete Onsite Drainage
I
7. Complete Finish Pads
8. Complete Onsite Drainage
10 `
9. A/C Paving
�- 2
Grading Surety Agreement, Permit #B15-1473
61147.02100\24835741.1
Page 5 of 7
EXHIBIT"B"
CONDITIONS FOR COMPLETION OF IMPROVEMENTS
1. The grading for this project shall be in strict conformance with the grading plans as
well as the San Juan Capistrano Municipal Code.
2. Grading operations shall commence within fourteen (14) calendar days after
issuance of Grading Permit.
Winter grading will be conducted in strict accordance with the dynamic erosion and
silt control plan submitted by the Developer, and approved by the City. This erosion
and silt control plan reflects erosion and silt mitigation measures for expected
grading conditions as the work progresses through the winter season and shall not
be amended except with the permission of the City.
In the event Developer does not wish to implement winter grading, or permission for
winter grading is rescinded, static erosion and silt control plans reflecting current
conditions of grading shall be submitted within ten (10) days of cessation of work.
These plans shall:
1. Identify all pollutant sources including sources of sediment that may affect
the quality of storm water discharges associated with the construction
activity.
2. Include the erosion and sediment control planting and hydroseeding to
insure a uniform vegetative cover or equivalent stabilization measures which
include the use of such Best Management Practices as blankets, fiber
matrices, catch basin filters or other erosion resistant soil covering or
treatments to the satisfaction of the City Engineer.
3. Suspension in excess of twenty (20) working days of work authorized by approved
grading plans and grading permit for subject property, including erosion and
sediment control measures and landscaping and irrigation, shall constitute default of
this agreement.
4. The supervising civil engineer and soils engineer shall file biweekly progress reports
of all grading operations with the Building Official. An interim compaction report, for
that work completed at the time work is suspended for the rainy season, shall be
filed with the Building Official. This interim report shall conform to the grading code
requirements for final compaction reports.
Grading Surety Agreement, Permit #B15-1473 Page 6 of 7
61147.02100\24835741.1
5. Contractor shall control dust to the satisfaction of the Building Official or his deputy.
During grading, Contractor shall keep water truck on site and dampen work area,
grounds, and loaded trucks.
& Grading operations suspended during the rainy season shall be resumed no later
than 15 days from date of suspension termination.
7. Installation of interim erosion and sediment control devices and systems shall
commence within seven (7) days after rough grade certification has been approved
by the Building Official and must be completed within fifteen (15) days of rough grad
certification. Final erosion and sediment controls devices, planting, landscaping and
irrigation systems shall be installed prior to final inspection of the grading permit.
8. All work shall be performed in strict observation of the Hours of Operation in
accordance with San Juan Capistrano Municipal Code Section 8-1.03.
9. Contractor shall adhere to conditions of haul route permit and encroachment permit
issued by the City Engineer.
10. Parking for construction crew is to be on-site.
11. Exoneration of Security: Developer's security shall be reduced to 90% upon signoff
of precise grading permit. No security given by Developer shall be released until the
expiration of the warranty period and until any claims filed during the warranty
period have been settled. Nothing herein shall limit the City's rights or the
Developer or surety's obligations under this Agreement.
12. Warranty Period: 1 year from permit signoff by City.
Grading Surety Agreement, Permit #B15-1473 Page 7 of 7
61147.02100\24835741.1
��n J
TOAL ENGINEERING, INC.
CIVIL ENGINEERS. LAND PLANNERS AND LAND SURVEYORS
139 AVENIDA NAVARRO • SAN CLEMENTE, CA 92672
(949)492-8586 . FAX (949)498-8625
RAYMOND R TOAL, RCE 16889 MAILING ADDRESS
OLAV S. MEUM. LS 4384 P.O. BOX 3878
MICHAEL A. ROTH, IS 6211 SAN CLEMENTE. CA 92674
Preliminary Construction Cost Estimate
1/4/2016
Job Description - Precise Grading Plan
Scott Lamming Residence
Job Address - No.3 Strawberry Ln., San Juan Capistrano, California
Job Number - 15522
Estimated Unit
Item Description Quantity 'Unit Price Amount
Grading
Excavation & Embankment
Subtotal
Site Improvements
1
Construct concrete hardscape
2
4" pipe drain system
3
force main pipe
4
12" atrium drain
5
Construct concrete pipe slope anchors
6
Construct retaining wall
7
Install 4" subdrain
8
install sump pump
9
Construct 18" wide concrete v -ditch
10
Stabilized constrcution entrance/exit
11
Material Storage Area
12
Concrete washout area
13
Silt fence
14
Gravelbags
Subtotal
Estimated Construction Cost
10% Contingency
Total Estimated Construction Cost
170
86
255
25
4
90
90
1
1
250
160
Cy
sf
if
ea
ea
1
ea
if
ea
ea
ea
If
ea
I Dr; 5Q rr
$12.00
$4.90
$12.00 ✓
$100.00
HCl ;zed
$--460
$16.00
$2;9 - 3y00
,$,L5 VD
$1,000.00
$300.00
j5a" /SAD
$1.60
$1.10
$2,040.00 /
$2,040.00
$421.40
$3,060.00
442"0 y40
S4 . ft T
6 *Z)
$14$ ,H;eB- 4-j
$.i YA-& f
$1,000.00
$300.00
150
$400.00 --
$176.00
$3a'Pr'
$14,511.40 X it l0
$1,451.14
$15,962.54