15-0806_GRIFFIN STRUCTURES_Fee ProposalGRIFFIN STRUCTURES FEE PROPOSAL CITY OF SAN JUAN CAPISTRANO: CITY HALL RELOCATION FEASIBILITY STUDY FEE PROPOSAL 08/06/15 Griffin Structures' Fee Proposai is based on aii reasonabie costs necessary to perform professionai program management services for the city of San Juan Capistrano. For these requisite services, Griffin Structures proposes the foilowing: Total Services: $8,750 (eight thousand seven hundred fifty doiiars) Reimbursabies: $200 (two hundred dollars) The proposed lump-sum fee is fully burdened and include overhead, profit, taxes, and benefits. We reserve the right to reallocate hours between staff members and tasks in order to accomplish the overall objectives and requirements for the project. SCOPE OF SERVICES The Griffin team will engage in a week long assessment to determine the feasibility of relocating city hall into an existing building identified as the Cavalry Chapel located at 3162 Ei Camino Real, San Juan Capistrano, CA, 92675. The nature of this feasibility study wiii fall into the following categories: Capacitv: Griffin will review the former needs assessment document produced in 2005 and update staffing with City. Using modern, industry standards for government space planning. Griffin will compare future needs produced in 2005 with adjusted staffing levels. The Griffin team wiii then review the existing Cavalry Chapel for its capacity to be repurposed as the new San Juan Capistrano City Hail from a spatial, access, security, and parking perspective. Cost: Based on a detailed walk through of the Cavalry Chapel, the Griffin team will provide its best judgment on the renovation costs required to develop this building into the City Hall. Given the nature of this exercise, a number of assumptions regarding structural systems, mechanical systems, electrical systems, and plumbing wiii be made to determine a rough order of magnitude cost. The Griffin team wiii provide this as a total project budget, inclusive of construction costs and soft costs for architecture / engineering fees, materials testing / inspection, construction management services, and related costs. Schedule: The Griffin team will produce a project schedule based on discussions with the City on anticipated / potential purchase of the Cavalry Chapel. This wiii include time for procurement of design and construction professionals, the design phase, demolition periods, construction periods, cioseout, and other relevant information. Griffin will package this information into an executive report for the City's review by EOD Thursday, August 13, 2015. Signed: Keith Till Interim City Manager City of San Juan Capistrano Date: %_ J_ Signed: Roger Torriero President * Griffin Structures, Inc. Date: August 06, 2015_