15-1026_PROJECT PARTNERS, INC_Professional Services Agreement 1st Amd FIRST AMENDMENT TO
PERSONAL SERVICES AGREEMENT
PROFESSIONAL TEMPORARY STAFFING SERVICES
THIS FIRST AMENDMENT TO THE PERSONAL SERVICES AGREEMENT between
the CITY OF SAN JUAN CAPISTRANO�';City") and Project Partners ("Consultant") is made
and entered into, to be effective the .'" `day of T , 2015, as follows:
f_
RECITALS
WHEREAS, the City and Consultant have entered into that Personal Services
Agreement dated August 27, 2015, for Professional Temporary Staffing services (the
"Agreement"); and
WHEREAS, the City and Consultant desire to amend the terms of the Agreement as
provided hereunder.
AMENDMENT
NOW, THEREFORE, in consideration of the promises and mutual covenants contained
therein, City and Consultant agree to the amend Section 3.1 and 3.2 of the Agreement as
follows.
Section 3.1, Compensation Amount, is amended to add $20,000 to the Compensation Amount
for a total Agreement Compensation Amount not to exceed $45,000;
Section 3.2, Rate Schedule, is amended to include hourly billing rate for a Senior Water
System Operator described in Exhibit A, attached and incorporated herein for reference.
All other provisions of the Agreement not amended hereunder shall remain in full force
and effect.
[SIGNATURE PAGE FOLLOWS]
-1-
IN WITNESS WHEREOF, the parties hereto have executed this Agreement.
CITY OF SAN JUAN CAPISTRANO
By: _
David Ott, nterim Assistant City Manager
PROJECT PARTNERS, (CONSULTANT)
By: y
� imo L e Prsncipal
ATTESC.
I i 6rris,City CIe
t�
APPROVED AS TO FORM:
BY:
J2
e f allinger�City Attorney
-2-
Exhibit=. A
"Partners in Building Engineering Careers and Teams'
www.projectportners.com
Project
Partners
October 7, 2015
Noreen Swiontek
City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
I SUBJECT: Proposal for Water Systems Operations Services
I Dear Ms. Swiontek,
I
Project Partners is pleased to submit this proposal to provide augmented staffing services for
I the Engineering Department of San Juan Capistrano (City).
Project Partners understands that the City seeks part-time assistance in its Water Operations
1 Department. The proposed senior operator will work with the City's Chief Plant Operator to
i
assist in the daily operations of the Desalter.
The senior water system operator we are proposing is Mr. Casey Quinn. Mr. Quinn is an
F
experienced operator with over 23 years of overall experience in water system operations. He
has a D4 Water Distribution and T3 Water Treatment Plant Operator certification.
Project Partners' billing rates for the proposed staff are as follows:
Classification Hourly Billing Rate
Senior Water System Operator $70.00
Again, I would like to thank you for considering our services and should you have any
questions or desire additional information, please do not hesitate to call at any time. We look
forward to working with you and your staff.
Sincerely,
Kimo Look, P.E.
Project Partners
1
i
23195 La cadSra Or. i
Suite 10 t � �� € �thane 949.852.B3C)1J 1
tax 94
Laguna Hflha, 6A 9265 ,852.9322
}
Project Summary of Qualifications
Partners in Brill O� g Fngineeriiag Gar€ers aIxI Teams
Casey Quinn
Project Level
Senior Water System Operator
Qualifications
• Over 23+ Years of Water Operation Experience
• Worked As Water Operation Worker to Supervisor at The City of Signal Hill
• AWWA Cross Connection Control Specialist(Certification #00937)
• AWWA Water Use Efficiency Practitioner Grade
• D4 & T3 Water Distribution and Treatment Certification
• Strong Communication Skills (Written And Oral)
• Good Team Player
Relevant Experience
City of Signal hill, CA (December 9991— September 2094)
Water Operations Supervisor(January 2008— September 2090
Under general direction, organizes, monitors and supervises the City's potable water system
operations, including water supply,distribution,treatment, and telemetry systems; performs a
variety of technical tasks relative to the water system.
• Plan, prioritize, assign, supervise, review, and participate in the work of nine crew
members responsible for water maintenance, treatment, and distribution.
• Participate in the preparation and administration of the division budget; submit budget
recommendations; monitor expenditures.
• Monitor and control supplies and equipment;order supplies and tools as necessary;
prepare documents for equipment procurement.
• Submit required reports to regulatory bodies; monitor water quality.
• Answer questions and provide information to the public; investigate complaints and
recommend corrective action as necessary to resolve complaints.
Project Partners
Casey Quinn
Summary of Qualifications
Page 2
• Oversee water sample collection;verify samples are current; accompany regulatory
agencies on field inspections.
• Coordinate with contractors in providing contract services, solicit and collect bids for new
equipment and contracted maintenance work.
Senior Water Systems Operator(January 2000—January 2008)
Under general supervision, leads and performs a variety of skilled work related to the
installation, operation, maintenance and repair of the City's water system and facilities.
• Operates the City's water system.
• Monitors and water levels in storage facilities
• Maintains water levels in storage facilities.
• Prepares operation and maintenance reports,
• Identifies areas in need of maintenance and repair,
• Responds to public service calls.
• Installs mains, hydrants,valves and meters.
Water Maintenance Worker/I (August 1994—January 2000)
Under direct supervision, perform a variety of semi-skilled and skilled tasks in the construction
operation, maintenance, repair and/or cleaning of the water facilities in the City.
• Operated heavy equipment,
• Located and excavate and repair leaks in water lines and mains.
• Installed, maintain and repair hydrants, valves, meters, and Read meters
• Assisted in repairs of pumps, booster stations and other water facilities.
• Customer service requests and issues.
Building Maintenance Worker(December 1991-August 1994)
Under direct supervision, perform a variety of semi-skilled and skilled tasks in the construction.
• Operation, maintenance, repair and cleaning of all city facilities.
• Basic janitorial duties, some electrical, plumbing.
• Concrete work, asphalt, painting sign maintenance and repair
Temporary Maintenance Worker(August 1991 — December 199 1)
Under direct supervision, perform a variety of semi-skilled and skilled tasks in the construction.
• Operation, maintenance, repair and cleaning of all city facilities.
• Basic janitorial duties, some electrical, plumbing.
Project Partners
Casey Quinn
Summary of Qualifications
Page 3
• Concrete work, asphalt, painting sign maintenance and repair
Education
Mt. San Antonio College Walnut, CA
• Introduction to Water Spring 2001
• Water treatment Fall 2001
Rancho Santiago Community College Orange, CA
• Pumps and Pumping Spring 1998
• Back Flow Spring 1995
• Water Math Fall 1994
Henniniger High school Syracuse , NY
• High School Diploma June 1987
License & Certification
AWWA Cross Connection Control Specialist 400937 - July 2016
AWWA Water Use Efficiency Practitioner Grade 1 #1569 - July 2016
State Water Resource Control Board—
Water Treatment Operator Grade 3 -#24145-June 2018
Water Distribution Operator Grade 4 -#8692 -June 2017
Hazwoper Certification -24 hrs. #141887 October 2015