Loading...
03-0107_ST. PIERRE, PAUL AND NANCY_Agenda Report_D106/18/2013 010 City of San Juan Capistrano Agen eport TO: FROM: James ~. , terim Public Works Director Prepar d by· Nisha A Patel, P.E., Senior Civil Engineer vtf DATE: SUBJECT: Consideration of Acceptance of St. Pierre Storm Drain Improvements (CIP 13501) RECOMMENDATION: By motion, 1. Accept the St. Pierre Storm Drain Improvements constructed in the City of San Juan Capistrano Storm Drain Easement located at 31982 Paseo Sagrado; Lot 21, Tract 11826; and, 2. Authorize staff to reimburse $35,000, to the St. Pierre Family Trust per the Reimbursement Agreement for Drainage Facilities (CIP 13501 ). EXECUTIVE SUMMARY: Staff is recommending accepting the St. Pierre Storm Drain Improvements, which corrected the drainage situation that existed between Hidden Mountain (Tract 11826) and Los Corrales (Tract 9343), and reimburse Mr. and Mrs. Paul St. Pierre $35,000 per the Reimbursement Agreement for Drainage Facilities between the City and the St. Pierre Family Trust dated January 7, 2003 (Attachment 1). DISCUSSION/ANALYSIS: Los Corrales (Tract 9373) was constructed in 1977. One of the project's public improvements was a 54-inch diameter public storm drain which collects run-off from east of Paseo Establo. Hidden Mountain (Tract 11826) was constructed in 1986. One of the project's public improvements was a 24-inch diameter public storm drain which collects run-off from the Hidden Mountain Development and runs into an easement across the St. Pierre's property, 31982 Paseo Sagrado, and discharges across an access road to the 54-inch diameter public storm drain inlet in the Los Corrales tract. City Council Agenda Report June 18, 2013 Page 2 of 3 In 2002, Mr. St. Pierre brought the problem of runoff water flowing across the access road into the 54-inch drainage inlet to the City's attention. A City project to address this situation was included in the Fiscal Years 2000-2007 seven-year Capital Improvement Program, but was subsequently deleted from the program in 2001 due to lack of funding and developer participation. In 2003, Mr. and Mrs. St. Pierre agreed to fund the design and construction of this drainage project in the amount of $35,000 subject to a Reimbursement Agreement. The terms of the agreement were to reimburse the St. Pierre's costs ten years after completion. City project records show the drainage improvements were completed in 2003 and bonds were released pertaining to the permits. However, there are no records indicating the City has accepted these improvements. Staff has recently verified the improvements were constructed and attached photographs of the improvements (Attachment 2). Staff is recommending acceptance of the improvements, and requesting authorization to reimburse $35,000 to the St. Pierre Family Trust pursuant to the Reimbursement Agreement. FISCAL IMPACT: The Fiscal Year 2012-2013 Capital Improvement Program includes $35,000 for the St. Pierre Storm Drain Reimbursement Agreement (CIP 13501 ). ENVIRONMENTAL IMPACT: Not applicable. PRIOR CITY COUNCIL REVIEW: • On January 7, 2003, the City Council approved a Reimbursement Agreement for Hidden Hills/ Los Corrales Drainage Facility between the City, and Mr. and Mrs. Paul St. Pierre. • On July 15, 2003, the City Council approved a Drainage Acceptance and Storm Drain Access Agreement; Paul St. Pierre (Lot 21, Tract 11826; 31982 Paseo Sagrado). COMMISSION/COMMITTEE/BOARD REVIEW AND RECOMMENDATIONS: Not applicable. City Council Agenda Report June 18, 2013 Page 3 of 3 NOTIFICATION: Mr. and Mrs. Paul St. Pierre Hidden Mountain Estates Homeowners Association c/o Darren Mundell, Keystone Pacific Property Management ATTACHMENT(S): Attachment 1-Reimbursement Agreement Attachment 2-Photos of Drainage Improvements Enclosure 1 -St. Pierre Grading Plan • REIMBURSEMENT AGREEMENT DRAINAGE FACILITIE;§ THISAGREEMENT,datedthe ]~ dayof ~2003lsbyand between Paul R. St. Pierre and Nancy E. St. Pierre, as co-trUSteeSUDTOl the St. Pierre Family Trust dated March 31, 1999, owners of property located at 31982 Paseo Sagrado also know as Lot 21. of Tract 11826 hereinafter referred to as "DEVELOPER" and the City of San Juan Capistrano, hereinafter referred to as "CITY". WHEREAS, in connection with development of its property at 31982 Paseo Sagrado in the City of San Juan Capistrano, DEVELOPER wishes to construct public storm drain improvements; and, WHEREAS, such improvements shall consist of extending existing 24" dia Storm Drain Line A from Its terminal headwall at Sta 1 + 7 4.06 shown on "Storm Drain Plans for Tract No. 11826", Sheet No. 10 of 11 within the 20 feet wide City storm drain easement dedicated on Tract Map No. 11826. Such storm drain extension shall terminate in a new headwall within the existing inlet rip-rap to existing 54" dia Storm Drain Line A shown on "Improvement Plans for Tract No. 9373, Drain Line A", Sheet No. 18 of 18. All plans are on record In the Engineering and Building Department of CITY. WHEREAS, CITY has previously bUdgeted such improvements in the 2000-2007 Capital Improvement Program; and, WHEREAS, such improvements were removed from the Capital Improvement Program in 2001 due to lack of funding, as well as anticipated developer participation; and, WHEREAS, such funding is still not availabte and such developer participation is not now anticipated; and WHEREAS. DEVELOPER ~grees to design at its sole cost and expense of an estimated amount of $7,50.0 and construct at its sole cost and expense of an estimated amount of $27,500, a total of $35,000 a storm drain system; and WHEREAS, DEVELOPER desires to enter into this agreement to provide means for allowing the construction of such storm drain system and related appurtenances and to provide a mechanism for crediting the DEVELOPER, for the reimbursable costs incurred in constructing such facilities against available drainage funds collected for Drainage Assessments; and WHEREAS, the proposed storm drain system provides a benefit to the CITY, the CITY is, therefore, willing to reimburse the costs for areas of benefit to CITY. ATTACHMENT I -I • • Reimbursement Aareement Paae2 NOW, THEREFORE, in consideration of the premises hereinafter set forth, CITY agrees to reimburse DEVELOPER an aforesaid sum of $35,000 from drainage fees collected from Drainage Assessment under the following terms and conditions: 1. :r erm of Reimbursement b}! the Citv: Upon expiration of the ten (10) year term from the date of completion and acceptance of the work, CITY shall reimburse to DEVELOPER $35,000. 2. Alterations: The City Engineer of the CITY may make such changes, alterations or additions to the plans and specifications for said work and Improvements which do not exceed ten percent ( 1 0%) of the total estimated cost as may be determined necessary and desirable by him for the proper completion of said work and improvement or as required for the safety and welfare of the public and no such changes, alterations or additions shall relieve the DEVELOPER from the faithful performance of this agreement. All such additions shall be at the written direction of the City Engineer. 3. Completion Date: DEVELOPER agrees to complete aU of said work and improvements within a period of one year from the execution date of this agreement. If additional time is needed, an extension may be granted by the City Engineer on the showing of good cause. Any such extension shall, however, be subject to an ofthe terms and conditions of this agreement, and any surety or other security shall continue in full force until the work and improvement has been accepted by the CITY. 4. Liability/Insurance A. DEVELOPER agrees to pay CITY such sum as the court may adjudge as reasonable for the legal services of any attorney represenUng the CITY in any action brought to enforce or interpret the obligations of this instrument, and such sum shall be made a part of any judgment in such action against the DEVELOPER if such action is determined in favor of the said CITY. B. CITY, its officers and employees, except for their own acts, shall not be liable or responsible for any accident, loss or damage happening or occurring to the improvements specified in this agreement prior to the completion and acceptance of said improvements by the CITY. C. DEVELOPER shall perform all work in a safe, workmanlike manner and shall take such precautions as may be necessary to warn and protect the public from any dangerous condition caused by the construction of said improvements. ,., ... • • Reimbursement Agreement Page3 D. DEVELOPER shall hold CITY, its officers and employees harmless from any and all claims, demands, causes of action, liability or Joss of any sort because of, or arising out of, the acts or omissions of the DEVELOPER, his contractor, subcontractors, agents or employees in the performance of this agreement. E. DEVELOPER agrees to maintain liability insurance during the construction of the storm drain system in the following amounts: I. Cgmorehensive General Liability. DEVELOPER shall maintain in full force and effect comprehensive general liability coverage, including premises operations. products/completed operations, broad form property· damage, and blanket contractual liability in the following minimum amounts: $1 ,000,000 property damage; $1,000,000 injury to one person/any one occurrence/ not limited to contractual period; $1,000,000 injury to more than one person/ any one occurrence/ not limited to contractual period. II Worker's ComQensatiQQ. If DEVELOPER employs employees or subcontractors to perform services under this agreement, DEVELOPER shall obtain and maintain, during the life of this agreement, Worker's Compensation Employer's liability Insurance in the statutory amount as required by state law. These above stated policies shall not terminate, nor shall they be cancelled, nor the coverage reduced, until after 30 days written notice is given to the CITY. DEVELOPER shall provide an endorsement to CITY establishing that CITY has been legally added as an additional insured to the liability policy required under this agreement. 5. Surety Bonds The DEVELOPER shall post Labor and Material and Performance surety bonds each in an amount equal to CITY approved Engineer's construction estimate prior to commencement of any construction work or issuance of permits on standard form approved by the City Attorney to insure all of the DEVELOPER's obligations as noted in this agreement. ,. . . . • Reimbursement Agreement Page4 6. Guarantee aod Warranty of Work DEVELOPER guarantees that said work shall be free from defects in material or workmanship and shall perform satisfactorily for a period. of one year from and after the CITY's acceptance of the work as completed in accordance with the Municipal Code. DEVELOPER agrees to correct, repair or replace at his expense any defects in said work. 7. Force Majeure None of the parties hereto shall be deemed to be in default if performance of the obligations required by this agreement is delayed or becomes impossible because of any act of God, earthquake, fire, strike, sickness, accident, civil commotion, epidemic, act of government, its agencies or officers, or any legitimate cause beyond the control of the parties. 8. Notices All notices, requests, demands, consents and other communications under this agreement shall be in writing, including telex and facsimile transmission, and shall be deemed to have been duly given on the date of service if served personally, be telex, or facsimile transmission, or 48 hours after mailing if mailed by first-class mail, registered or certified, postage prepaid, return receipt requested, and properly addressed as follows: To: Mr. Paul R. St. Pierre and Nancy E. St. Pierre 31982 Paseo Sagrado San Juan Capistrano, CA 92675 To: City of San Juan Capistrano Attention: City Clerk 32400 Paseo Adelanto San Juan Capistrano, CA 92675 9. Assignment This agreement shall be binding upon and inure to the benefit of the parties hereto and their respective representatives, assigns and successors in interest. 10. L;otire Agreement This agreement contains the entire agreement ~tween the parties hereto and supersedes any prior or concurrent written or oral agreement between said parties concerning the subject matter cOntained herein. There are no representations, agreements, arrangements or undertakings, oral or written, between or among the parties hereto relating to the subject matter contained in this agreement, which have not been fully expressed herein. Reimbursement Agreement Page5 1N WITNESS THEREOF, the parties hereto have executed this agreement on the date first above written. ATTEST: 1-t{-03 DATE: AS TO FORM: JOHN ~TTORNEY DATE: DEVEL ER RRE CO-RUSTEE ST. PIERRE FAMILY TRUST DATED MARCH 31, 1999 DATE: .· NANCY T. PIERRE CO-TRUSTEE ST. PIERRE FAMILY TRUST DATED MARCH 31,1999 DATE: 1-( -0 3 DATE: ATTACHMENT 2 A-A S£CDBfi C C HOI(: WAtlSI'(R.S(P.\Ro\l'[ $l.o9YlUlAAOP£RtMf GEO-FIR~ &QIGlEHNE"I'RrST. ....... , I.AGIJHA HillS. CA 92651 (049)494-2122 CC.WTACT: HfWNCS RICHTHl -- PAUl a: NANCY ST.PIERRE 31~2 PASEO SAGRADO SAN JJAN CAPISTRANO, 2J4 00 ~~cues (PRI~~rcJ (!) caosmuct •· ORAJH4(;( PIPf (SOR »J Q) CONSTRUCT 5" DRNHACC PlK (!.OR .35) @ (i) @ @ Ql {!) CONSJRtJCT 6" II'OU CVfle • GVTJ£R. ; - @ CONSrRUCT 24"~24" CATCH BASil W/ GRAT[ FOR OI('Rft.OW CJRAINAC£. @ CONSTRUCT COHH(CTIQN or NO' 8" PIP! TO [XIST 24" SfOfn.l OR~ PER APW-4 STD {j) AD.AJST EXIST. SCII£H I.IAHHc:t.C TO AN £L£VATIOH I' o\80~ PROPOSCD CR.4D£. (CNCROACHIIENT PCRWtt Rf:~J @ COHSmt.k:'T NCW 6' S('M{"R lAJ'DlAL PfR CITY Of S..C $rtl S-J (£HCROACHilCNT PfRMT R'f~D). ~~,;,~~~~NO:JHS.:~Af!ON AJH 2:...u£rr.rt:Pflf-·CAPI'SYJI'MOW..W.CY / ENCLOSURE 1