Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
11-0301_PETERSON-CHASE GEN ENG CONST.,INC_Agenda Report_D10
611712014. . 2 ) uAr� D 1 0 ,77z City of San Juan Capistrano Agend porgy TO: Karen P. Brust, City FROM. Keith Van Der Maaten, E., Public Works and Utilities Director @r Prepared by: George Al arez, P.E., T.E., City Engineer/ Traffic ngineer DATE: June 17, 2014 SUBJECT: Consideration for Ratification of Change Orders Nos. 3 and 4 and Approval of Change Order No. 6 for the Del Obispo Street Widening from Alipaz Street to Paseo Adelanto Project STP -5372 (011) (CIP 07107) (Peterson-Chase General Engineering Construction, Inc.) RECOMMENDATION: By motion, ratify Change Order Nos. 3 and 4 in the amounts of $227,349, and approve Change Order No. 6 in the amount of $109,140 for a total amount of $336,489 for the Del Obispo Street Widening from Alipaz Street to Paseo Adelanto Project with Peterson-Chase General Engineering Construction, Inc. EXECUTIVE SUMMARY: On March 1, 2011, the City Council awarded a Construction Contract in the amount of $3,453,842.46 to Peterson-Chase General Engineering Construction, Inc. for the Del Obispo Street Widening Project. During construction of the bridge, numerous change orders were required to complete the project due to differing existing site conditions from the design plans. On April 3, 2012, the City Council approved a contingency to the budget in the amount of $270,000 for Change Order Nos. 1 and 2 (Attachment 1). On November 12, 2012, the City Council approved a second contingency to the budget in the amount of $63,525 for Change Order No. 5 (Attachment 2), which related to the Trabuco Creels Bridge Approach Repair Project (CIP 07109). To date, a total of $333,525 has been authorized for contingencies on this project. City Council Agenda Report June 17, 2014 Page 2 of 4 The actual cost of Change Order Nos. 1, 2 and 5 is $150,213. Only $150,213 of the $333,525 in authorized contingency has been used for Change Order Nos. 1, 2 and 5, leaving a contingency balance of $183,312. This contingency fund balance is insufficient to cover Change Order Nos. 3, 4 and 6 in the amount of $336,489. An additional $153,177 of contingency is needed to approve Change Order Nos. 3, 4 and 6. Staff recommends that the City Council ratify Change Order Nos. 3 and 4. Change Orders No. 3 and 4 (Attachment 3) were required to provide bridge structural reinforcement for the sidewalk totaling $227,349. Furthermore, various work order changes were required to complete the contract work, which has been summarized within Change Order No. 6 (Attachment 4) in the total amount of $109,140. Staff also recommends that the City Council approve Change Order No. 6 in the amount of $109,140. The bid line item reduction in the amount of $306,053 is due to the fact that the Change Order Nos. 1-6 eliminate or reduce the work shown in the original bid item. The summary of the Contract Change Orders and the status along with the reduction are included in the Table below: Change Order Status Amount Contract Amount NO./Line Item Contract Redaction $3,453,842 1 Approved $6,713 $3,460,555 2 Approved $85,750 $3,546,305 5 App roved $57,750 $3,604,055 3 Unap roved/Rati $193,173 $3,797,228 4 Unapproved/Ratify $34,176 $3,831,404 6 Una roved $109,140 $3,940,544 Line Item Reduction Unapproved (Notice ($306,053) $3,634,491 �of Completion) Final Contract Amount $3,634,491 DISCUSSION/ANALYSIS: The Del Obispo Street Bridge Widening from Alipaz Street to Paseo Adelanto STPL- 5372 (011) (CIP 07107) project consists of widening between Alipaz Street and Paseo Adelanto and widening the west side of Paseo Adelanto south of Del Obispo Street. Construction work includes bridge widening, concrete railing, Trabuco Creek Channel reconstruction, utility construction, landscaping and irrigation, and traffic signal modification. The Del Obispo Bridge over Trabuco Creek was originally built in the 1930s with some additional modifications. The lack of record drawings from the County of Orange and Caltrans who were involved in the design, resulted in various unforeseen conditions that were discovered during construction, which resulted in the following Contract Change Orders: City Council Agenda Report June 17, 2014 Page 3 of 4 1. Change Orders Nos. 1 and 2, in the amount of $92,463, increased the number of strands of the bridge girders and added coating for the sheet piles. 2. Change 'Orders Nos. 3 and 4, in the amount of $277,349, demolished and constructed the existing bridge north overhang to support vehicle live load and extended the width of the new bridge by 10 inches. 3. Change Order No. 5, in the amount of $67,750, repaired the erosion under the cantilever ends of the existing bridge. 4. Change Order No. 6 in the amount of $109,140, completed potholing of various underground utility lines to verify their location, revised several construction items .to accommodate field condition, provided night labor for construction of the new waterline, and other items of work in order to conduct work during non-peak traffic hours, and provides a new bridge joint seal between the existing and new bridge deck FISCAL IMPACT: The Fiscal Year 2013-2014 budget for CIP 07107 is $1,640,140. Current funding and expenditures are summarized as follows: Expenditures Project Budget Current Fiscal Year 2013-2014 Budget $1,640,140 Expenditure as ofV Ay 31, 2014 507,913) Amount Remaining $1,132,227 Total Amount for Change Orders 1-6 ($486,702) A roved Contract Contin jency To Date $333,525 Remaining Contingency Amount to be Approved to ($153,1 Fund Chan e Orders 3, 4, and 6 Project Budget Remainin $979 050 As shown above, the fund balance is adequate to cover the shortfall of $153,177 to ratify Change Order Nos. 3 and 4 and to approve the Change Order No. 6. Therefore, staff is requesting ratification of Change Order Nos. 3 and 4 in the amounts of $227,349, and approval of Change Order No. 6 in the amount of $109,140, for a total amount of $336,489. The remaining fund balance of $979,050 will fund the additional contingency of$153,177. ENVIRONMENTAL IMPACT: The City's Environmental Administrator completed a preliminary review of this project in accordance with Section 15061 of the California Environmental Quality Act Guidelines. Based on the review, the Environmental Administrator has Prepared Mitigated Negative Declaration for the project. City Council Agenda Report June 17, 2014 Page 4 of 4 PRIOR CITY COUNCIL REVIEW: • On August 18, 2009, the City Council approved the plans and specifications for the Fiscal Years 2012-2013 and 2013-2014 for the Del Obispo Street Widening and authorization to receive Bids. • On March 1, 2011, the City Council awarded a Construction Contract to Peterson-Chase General Engineering Construction, Inc. for the Del Obispo Street Widening (CIP 07107). • On April 3, 2012, the City Council approved Contract Changes with Peterson- Chase General Engineering Construction, Inc. not to exceed $270,000. • On November 13, 2012, the City Council approved a change order in the amount of $57,750 plus a 10% contingency for a total amount of $63,525 with Peterson- Chase General Engineering Construction, Inc. COMMISSION/COMMITTEE/REVIEW AND RECOMMENDATIONS: Not applicable. NOTIFICATION: Peterson-Chase General Engineering Construction, Inc. ATTACHMENT(S): Attachment 1 — Change Orders Nos.1 and 2 Attachment 2 — Change Order No. 5 Attachment 3 — Change Order Nos. 3 and 4 Attachment 4 — Change Order No. 6 STATE OF CALIFORNIA-DEPARTMENT OF TRANSPORTATION CONTRACT CHANGE ORDER Sheet t of $__ CEM-4900(REV 05!2001)CT#7549-3501-0 Change Requested by: E engineer contractor CCD NUMBER i8UP L NUMBER jCONTRACT NUMBER ROAD – FEDERAL NUMBERS) — 1 E ECIP 071D7 tjei Obis a St.Bridge Widening STPL-5372(011) TO Peterson/Chase contractor You are directed to make the following changes from the plans and specifications or do the following described work not included in the plans and specifications for this contract. NOTE: This change order is not effective until approved by the engineer. Description of work to be done, estimate of quantities and pries to be paid. (Segregate between additional work at contract price, agreed price and form account.) Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle tithe.The last percentage shown is the net accumulated increase or decrease from the original quantity in the engineer's estimate The working farces of the proposed girders changed per construction revision no. 5 on revised plan street no.28 issued on August 1, 2011. As a result,the number of strands of"tate girders increased.Attached is the contractor request for additional compensation for the cost associated with the City plan changes,We agree to the grand total additional lump sum cost(including contractor 15%mark- up on materials)of$6,713.2? Estimated Cost: Increase ❑'Decrease $6,71 x.22 By reason of this order the time of completion will be adjusted as follows: SUBMITTED BY SIG RE (PRINT NAME&TITLE; DATE Nisha A. Patel, PE,.Associate Engineer,CE 10/18/2011 APPROVAL.RECOMMENDED BY SEGNAT JrZ � (PRINT NAME&TITLE) DATE '"yj0 ,� Nish� Nisha A. Patel,P ,Associate Engineer,CE 110138I2(}11 ENGINEER APPROVAL BY SIGNATURE (PRINT NAME&T9LE) flDATE on rNasserAbbaszadeh,PE,Public Works Director,RE (1-0!1$12011 We the undersigned contractor, have given careful consideration to the change proposed and agree, if this proposal is approved,that we will provide all equipment, furnish the materials,except as may otherwise be noted above,and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. NOTE: If you,the contractor,do not sign acceptance of this order,your attention Is directed to the requirements of the specification as to proceeding with the ordered work and filing a written protest within the time therein specified. CONTRACTOR ACCEPTANCE BY (PRINT NAME&T{TLE) DATE Dick Vogels,Project Manager 10!18/2011 For individt+als with sensory disabi s,this document is available in alternate formats. For inf©rmaflon call(99 E)654-64^,4 or'700(918)654-3680 or A �'N `� wrhe Records and Forms lvanag ,rtt,11,20 N Street,W-16-89,Sacramento,CA 95814. Attachment 1 STATE OF CALIFORNIA•IDEPARTMENT OF TRANSPORTATION CONTRACT CHANGE ORDER sheet 1 of CENT-4900(REV 0512001)CT*7541-350'5.0 Change Requested by. ® engineer contractor CCO Numar=RSUPPL.NUMBER CONTRACT NUMBER ]ROAD FEDERAL NUMBERM Ir` )- ICIP 07107 Del Obispo 5t,Bridge W3denin$ STPL-5372(011) TO Peterson/Chase contractor You are directed to make the following changes from the plans and spermcations or do the following described work not included in the plans and specifications for this contract, NOTE. This change ender is not effectfve until ap roved by the engineer. Description of work to be done,estimate of quantities and prices to be paid. (Segregate between additional work at contract price, agreed price and force account.) Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for Idle time.The last percentage shown is the net accumulated Increase or decrease from the original quantity in the engineer's estimate. The construction contract specified the sheet piles be galvanized.On August 23,2D]I the City issued a change to the sheet pile design specifying the they be coated with a Carboline Polibrid 705 and a Carboline Carboguard 691 coating.On August 31',2011, Peterson-Chase responded that cost for galvanizing was$35,000.00,and the cost for applying the coating per the speciieation(issued on August 23rd)would cost$120,750.00(including the contractor mark-up).See the attached email.The City agrees that the total additional cost to the city is$85,750.00, Estimated Cost $85,750.00 By reason of this order the time of completion will be adjusted as follows: SUBMITT B SIGNATURE (PRINT NAME&TITLE) DATE .... . James Prather,Constr. Inspector/Assista APPR0V. _-RE ,ENDED'BY, nt RE 10l18l2Q11 (3 IiE (PRINT NAME 8 TITLE} 'DATE Nisha A.Patel,PE,Associate Engineer,CE 10/16/2011 SIGNATURE (PRINT NAME&TITLE) JDATE asses Abbaszadeh,PE,Public Works Director,RE 10/18/2011 We the undersigne contractor, have given careful consideration to the change proposed and agree,if this proposal is approved,that we will provide all equipment,fumish the materials,except as may otherwise be noted above,and perform all services necessary for the work above specified,and will accept as full payment therefor the prices shown above. NOTE: if you,the contractor,do not sign acceptance of this order,your attention Is directed to the requirements of the specification as to proceeding with the ordered work and filing a written protest within the time therein specified. CONTRACTOR ACCEPTANCE BY;5171- ) J r '4�k �a / (PRINT NAME 8 TITLE) DATE Dick Vogels,Project Manager 1 0/1 81201 1 ADA ND CB or IndIvIO"is with sensory disabll'e ,this document Is avallsble M alternate tormats. For tnforrmitlon call(916)65+6410 or TDD(996)654.3890 or write Records and Forms Manag t,1120 N Street,MS-89,Sacramento,CA 95814- STATE OF CAUFORN1A-DEPARTMENT OF TRANSPORTATION CONTRACT CHANGE ORDERSheet ! of 5 CEM-4909(REV 65/2001)CTO 7541-3501-0 Change Requested by: engineer ❑ contractor -_..0 ,SCO NUMQER SUPPL NUMBER CONTRACT NUMBER ROAD FEftERAE.NU49ER(S) CIP 07107 Bei Obispo St Bridge Widening non partici)Sltting„work” _. — — ,. w� �r o Peterson-Chase General En .ineerin f Construction,Inc,Irvine CA contractor _ _ _ m ._.._ _ ..._ ..__ __ ._ __ ,_�__ _....._.. You are directed to masa the faitowing changes from the plans and specifications or do the following described work not included in the plans and specifications for this contract. NOTE. This change order is rfvt effective until tip npved by the engineer. Description of work to be done,estimate of quantities and prices to be paid, (Segregate between additional worts at contract price, agreed price and force account.) Unless otherwise stated,rates yr rental of equipment coveronly such time as equipment}s actually used and no allowance wiil be made for idle time.The last percentage shown is the net accumulated increase or decrease from the original quantlty in the engineers estimate. The work will repair the erosion under the cantilever ends of the existing bridge section constructed in 1945.It will also construct a . treatment to the slope lining between the column bents and the side wall.The existing conditions are depicted in the photos and sketch in Exhibits A and B. The proposed work is as detailed in the attached sketch(Exhibit C),It involves lining the sloped area under the cantilever ends with shoterete,installing concrete slurry beyond the bridge end cantilever under the pavement,and excavating and backfilling the bridge adjacent area with a new roadway section.'I'he total cost of the work is$57,750 as detailed in the contractor proposal(Exhibit D).With a 10%contingency added in,the total contract change is$63,525,00, Estimated Cost- Inatease ❑ Decrease $63,525.40 -... ......__ ,......_._ _ . By reason of this order the time of completion will be adjusted as follows: SUBMITTE :13Y SIGNATURE (PRIM i NAME&TITLE) t?ATE James Prather,Construction Ins edor„Assistant RE / d YA PPRt3V rellomm BY SIGNA !(PRINT NAME&TITLE) DATE 9James Prather,Construction Inspector,Assistant RE I EPdCIhI 'POAPR --AL Y SiGNA E (PRINT NAM &E T/TLE) DATE �t NiSha A. Patel PE,Associate Ettginccr We the undersigned contractor,have given careful consideration to the change proposed and agree,jr this proposal is approved,that we will provide all equipment, furnish the materials,except as may otherwise be noted above,and perform all services necessary for the work alcove specified, and will accept as frill payment therefor the prices shown above NOTE: if you,the contractor,do not sign acceptance of this order,your attention is directed to the requirements of the specification as to proceeding with the ordered work and filing a written protest within the time therein specified. CONTRACTOR-ACCEPTANCE BV ------..__..._....... For Individuals with sanao.Wdle$t�h, -...®A�� �e ryls dowmant Is available in alternate formats. For Informallon cath(9161 064.0410 or TDD(`-6)854.38 or w ite Records and Forma Mana ,1120 N Street,MS-89,Sacramento,CA 95614 ATTACHMENT 2 C-Co STATE OF CALIFORNIA-DEPARTMENT OF TRANSPORTATION CONTRACT CHANGE ORDER Sheet ?_. of CEM-2800(REV 0512©011 CT#7541-3501-0 Change Requested by: z engineer cont€ataor CCC}NiSMBER 5UPPL.NUMSER CONTRACT NUMBER ROAO FEDERAL NUMBERS) _ � .. CIP 07107 Del Obispo St.Brid a Wldening STPL 5372 _._. TO Peterson-Chase _ contractor You aro directed to make the following changes from the plans and specifications or do the following described work notlnctuded!n the plans and speciftcations for this contract, NOTE. This change order is not effective until approved bX the eniineer. Description of work to be done,estimate of quantities and prices to be paid, (Segregate between additional work at contract price, . agreed price and force account.) Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time,The last percentage shown is ttte net accumulated Increase or decrease from the original quantity in the engineer's estimate. During demolition of the north existing bridge sidewalk some of the existing deck overhang steel reinforcement was exposed. Reinforcement was found to be insufficient for the increased live load load it will experience from the traffic once the bridge is completed.Plans for the northern portion of the existing bridge were never located at the County of Orange or Caltrans o fflces.The contractor will demolish the existing north overhang concrete to expose the existing steel reinforcemerit.Steel reinforcement to handle current traffic load was designed to Caltrans standards,and will then be constructed.All improvements were performed according to drawings prepared by RBF Consulting dated May 22,2012,the traffic control plans prepared by Right of Way Eng€neering dated June 18,2012,and per the costs quoted by Peterson-Chase dated July 17,2012 in the amount of$193,173,00. Estimated Cost: ® tnereeae © Decrease $193,173.00 By reason of this ordqrAu�flme,5tpmptelion will be adjusted as follows: SUBMITTED Bff SIGNATURE _, (PRINT NAME&TITLE) Te James Prather,Construction ins actor/Assistant RE f07119f2012 A "L ND q (PRINT tdANIE&TITLE) RATE Nisha A.Patel,PE,Associate Engineer/CE 07/19/2012 ENGINEER A PR SIG ��BBBY � (PRINT NAME 6 TITLE)Nisha A.Patel,PE,Associate Engineer,RE 07/19/2012 We the undersigned con tactor,have given careful consideration to the change proposed and agree,if this proposal is approved,that we will provide all equipment,furnish the materials,except as may otherwise be noted strove,and perforin all services.necessary for the work above specified,and will accept as full payment therefor the prices shown above. NOTE, If you,the contractor,do not sign acceptance of this order,your attention to directed to the requirements of the specification as to proceeding with the ordered work and filing s written protest wit In the time therein specified. CONTRACTOR AG EP'TANCE B (PRINT NAME a TITLE) DATE Dick Vogels,Vice President 07/19012 For Individuals wtsh sensory dlF� W,,ttls document le available In altemate formate. For informetlon cast(810)65"410 or TOO(918)064.3600 or DA a wrlfe Recorda and Forme flit ns112o N Street,M849,Sacramento,CA 95674. ATTACHMENT 3 STATE OF CALIFORNIA•DEPARTMENT OF TRANSPORTATION CONTRACT CHANGE ORDER Sheet ._.!,..,. of CERA-4900(REV 0512001)CT#7549-3501-0 Changs Requested by: 9angtn9sr contractorCCa Nt1MaEF2 NUMBER CQNTRACT NUMBER ROAD _ SUPPL 1FEDERAL NUMBER(S) 4CIP 07107 ^v Det Obispo St l3rtdge W idenin STPL 5372 011 TO Peterson-Chase contractor You are dlrected to make the following changes from the plans and specifications or do the following described work not Included in the plans and specifications for this contract. NATE: This change order is not effective Until approved by the en sneer Description of wui fi to be done,astirnate of quantnisa a^w prlwa to be paid. (Segregate between addltiona€work at contract prig, agreed price and force account.) Unless otherwise stated,rates for rental of equipment cover only such time as equipment Is actually used and no allowance will be made for Idle time,The last percentage shown is the net accumulated increase or decrease from the original quantity In the engineer's estimate. The concrete end of the existing overhang shown to be removed on sheet 19,detail 3 did not exist in the field.The overhang ended 10" from the end of the outside wall of the existing bridge northern sidewalk barrier.The 10"was added to new bridge South end overhang through the length of the approach slabs.However,no approach was to be constructed under the additional 10"of the south new bridge overhang per the original contract plans.The City's structural engineering consultant recommended an additional closure wall be constructed.The improvements will be constructed per the drawings prepared by RBF Consulting dated May 22,2012,the traffic control plans dated June 18,2012,and per the costs quoted by Peterson-Chase dated July 17,2012.in the amount of $34,176.00. Estimated Cost ® Iwaoso ❑ Docreaae S 34,176.00 fi.reason of this order the time of completion\4111 be adjusted as f,:,,..,, . .�_,_ By 1 allaws� SUBMITTE Y 84NATURE (PRINT NAME&TITLE) DATt :James Prather,Construeti€rn Ins actor/Assistant RE 97119/2012 Al�`PR®VA CC31VIll�l,"N D�Y TORE I (POINT NAME&TITLE) DATE Nisha A.Patel,PE,Associate Engineer/RE 07/1912012 -k itdl=ER A P R0 L BY... si y ffl"T NAME&TtT(.El t]ATE bs A Patel PE,Associate Engineer/RE /19/2012 ., We the undersigneniractor,have given careful consideration to the change proposed and agree,if this proposal is approved,that we will provide all equipment,furnish the materials,except as may otherwise be noted above,and perform all services necessary for the work above specified,and will accept as full payment therefor the prices shown above. NOTE, if you,the contractor,do not sign acceptance of thle order,your attention is directed to the requirements of the speelficatlon as to proceeding with the ordered work and tiling a written protest within the time therein specified. CON RA R ACCEPTANC if (PRINT NAME&TITLE) DATE Dick Vogels,Vice President 07119/12 A8 For 1ndiWduaia wMh aenanry sloe ie®,Ihla docsamant Is available In a16amato formats, For Information pall(918)854-600 or TG3D(916)0&4-3000 or writo RoCprdad Fomsw Mans ent,112G N Stroe§,NSS•89,5ocraEnanlo,CA 96814. STA'T'E OF CAl.1FORNIA•DEPARTMENT OF TRANSPORTATION CONTRACT CHANGE ORDER Sheet 2 of 2 CEM-4800(REV MOW)CT#7541-3501-0 CCO NUMBER SUPPI.,NUMBER CONTRACT NUMBER ROAD FEDERAL NUMBER(S) 6 CIP x7107 Del Obispo St,Bridge Widening STPL»5372(011) 6.16 Drill and install additional rebar at bridge overhang per detail and PCO#30. Final Cost=6,797 6.17 Install additional rebar around utility vaults per detail and FCO#31. Final Cost=979 6,18 Install"No Ped"signs per county of orange detail and PCO#32. Final Cast=950 6.19 install CMS sign for one month per PCO#34. Final Cost=3,550 6.20 Install additional rebar and concrete to reduce gap between old and new bridges per detail and PCO#35. Final Cost=6,276 6.21 Credit the City for payment for"Longitudinal Joint Seal"made as additional work but it is included as part of the contract per letter dated July 17,2012. Credit=-13,875 6.22 Credit the City for deletion of formliner pattern on parapet wall per e-mail dated September 8,2011. Credit=-2,699 6.23 Install improvements for joint seal per detail of PCO#33. Final Cost= 16,100 Estimated Cost: ® Ina0850 ❑ oecmase $909,140.00 By reason of this order the time of completion will be adjusted as follows: Deferred. SUBMITTED BY SIG NR (PRINT NAME&T3T4I) DATE APPRO AL RECDflA ENC?ED Y SIGNATURE (PRINT NAME S TITI E} DATE ENGINEER APPROVAL BY SIGNATURE (PRINT NAME&TITLE) tSATE We the undersigned contractor,have given careful consideration to the change proposed and agree,if this proposal is approved,that we will provide all equipment,furnish the materials,except as may otherwise be noted above,and perform all services necessary for the work above specified,and Wit accept as full payment therefor the prices shown above. NOTE: If you,the contractor,do not sign acceptance of thls order,your attention Is directed to the requirements of the specification as to proceeding with the ordered work and filing a written protest within the time therein specified. CONTRACTPR ACCEPTANCE.BY ir ),&,� f tPRINT WAME 8 TIT E) YOZO- ` QL _..j