Loading...
15-0602_DUDEK_F20_Agenda ReportCity of San Juan Capistrano Agenda Report TO: Honorable Mayor and Members of the City Council 6/2/2015 F20 FROM: Keith Van Der Maaten, Public Works and Utilities Director ~ Prepared by: Mike Marquis P.E., Associate Civil Engineer W\~1 DATE: June 2, 2015 SUBJECT: Consideration of a Professional Services Agreement and a Construction Agreement for the Annual Sewer Rehabilitation Program (CIP 15701) (Dudek) (Nu-Line Technologies LLC) RECOMMENDATION: By motion: 1. Reject Bid Protest submitted by Sancon regarding Nu-Line Technologies , LLC bid for the Annual Sewer Rehabilitation Program, CIP 15701, as advised by legal counsel; and, 2. Approve a Professional Services Agreement with Dudek for Construction Management and Inspection Services for the Annual Sewer Rehabilitation Program, CIP 15701 in the amount of $21 0,000; and, 3. Approve a Construction Agreement with Nu-Line Technologies LLC for the Annual Sewer Rehabilitation Program, CIP 15701 in the amount of $1 ,181,467.10, and reject all other bids . EXECUTIVE SUMMARY : Video inspections of the sanitary sewer collection system have revealed several locations that are in need of repair to maintain the integrity of the sewer trunk and collection pipelines . The scope of the sewer rehabilitation program is to install structural lining inside approximately 13,000 lineal feet of existing pipes at various locations throughout the City as identified in Appendix F of the contract documents. Contract documents were purchased by 10 firms, and the City received bids from 3 firms . A bid protest letter was received by staff several days after the bid opening requesting that the City reject the low bid as non-responsive and non-responsible. After conferring with legal counsel, staff recommends rejection of the bid protest. Staff further recommends the approval of a Construction Agreement with Nu-Line Technologies, LLC for the annual sewer rehabilitation program in the amount of $1 ,181 ,467 .10 . City Council Agenda Report June 2, 2015 Page 2 of 5 Construction projects of this magnitude require close monitoring and inspection of the contractor to verify that the materials, equipment and techniques utilized during construction are in accordance with the contract documents and the manufacturer's installation instructions. This project involves the use of specialized materials and equipment to install a pipe within a pipe utilizing trenchless construction methods and therefore, staff has solicited proposals for construction management and inspection services during construction. The Request For Proposal (RFP) was sent to five (5) consultants and the City received bids from three (3) firms. Staff recommends approval of a Professional Services Agreement with Dudek in the amount of $210,000. DISCUSSION/ANALYSIS: The City is under contract with Municipal Underground Services, Inc. (MUSI) to provide closed circuit television video (CCTV) inspection, cleaning and maintenance services of the sanitary sewer and storm drain collection systems. The condition of each manhole to manhole segment of the sewer collection system may be ascertained by reviewing these CCTV video inspections and corresponding reports of structural deficiencies. Staff has identified approximately 13,000 lineal feet of sewer pipeline, ranging in diameter from 6 inches to 21 inches that are deficient and require rehabilitation as part of the Annual Sewer Rehabilitation Program (CIP's 13701, 14701 and 15701). The project also includes, but is not limited to, rehabilitation of deficient manholes by cleaning away roots and other debris, filling holes and cracks and sealing with a spray applied waterproof grout. Badly corroded and/or cracked manhole frames and covers will be replaced and buried manholes will be raised to grade. Staff utilized the Coastal Blue plan room to administer bidding, and contract documents were purchased by 10 firms. The City received bids from 3 firms as follows: Firm Bid Amount 10% Contingency Contract Amount Nu-Line Technologies LLC $1,074,061.00 $107,406.10 $1 ' 1 81 ,46 7. 1 0 Sa neon $1,102,374.50 $110,237.45 $1,212,611.95 In-Situ Form $1,480,118.00 $148,011.80 $1 ,628,129.80 Staff recommends award of a Construction Agreement to Nu-Line Technologies LLC for the Annual Sewer Rehabilitation Program in the amount of $1,181 ,467 .1 0. A 1 0% contingency has been included to account for conditions that could not have been foreseen during design. As part of the Construction Agreement, Nu-Line Technologies LLC will be providing the following services: • Perform bypass pumping of existing mainline pipe flows, when needed • Perform cleaning and closed caption television inspection of the host pipe in preparation for the cured-in-place pipe (CIPP) installation with copies of videos and logs to the City • Remove protruding laterals, gaskets and other obstructions • Perform installation of CIPP per specifications • Perform internal reinstatement of lateral connections after CIPP installation, as directed by the City • Perform testing of samples of the installed CIPP for thickness and short-term flexural properties City Council Agenda Report June 2, 2015 Page 3 of 5 • Perform closed caption television video inspection of CIPP after installation with copies of videos and logs to the City • Perform manhole rehabilitation per specifications • Perform lateral connection rehabilitation per specifications • Perform other work in accordance with the contract documents The rehabilitation of structural deficient portions of the City's sanitary sewer collection system will be accomplished using specialized trenchless technology materials, equipment and construction techniques. Staff has therefore issued an RFP to solicit construction management and inspection services during construction. Successful proposals must demonstrate a management and inspection team with prior knowledge, understanding, and experience with similar projects in accordance with the requirements of the RFP. Staff received proposals from three (3) firms and reviewed them for demonstrated experience in managing construction projects of this nature and magnitude, understanding of project requirements, qualifications of the construction manager and inspector, reference checks, and level of effort in hours required to complete the work. Bidding results are as follows: Firm Level of Effort (Hours) Corresponding Fee Dudek 1,682 $210,000 Anderson Penna 1,710 $197,940 RBF 1,332 $196,860 After careful review of the proposals, staff determined that the most qualified firm to provide construction management and inspection services for this project is Dudek. Of all the proposals received, Dudek best demonstrated a clear understanding of the project components. They were also the only firm who assigned a project team that demonstrated recent experience on similar projects and hold respected industry certifications from the National Association of Sewer Service Companies. These certifications include Pipeline Assessment Certification Program (PACP), Manhole Assessment Certification Program (MACP) and most importantly Cured in Place Pipe Inspector Training Certification Program (ITCP). The ITCP is a two day seminar that provides training of the Cured In Place Pipe material, proper installation techniques, how to recognize defects in the installed liner and proper corrective action to ensure structural compliance with the contract documents. For these reasons, staff recommends approving a Professional Services Agreement with Dudek for construction management and inspection services associated with the Annual Sewer Rehabilitation Program in the amount of $210,000. The Dudek construction management and inspection team will help ensure the following: • Work is performed in accordance with the contract documents • Quality materials are delivered, handled and installed properly • Material samples are prepared and tested for compliance • Construction work is closely monitored for compliance with permitting agencies • Change orders requests are minimized • Community outreach is performed to keep residents informed of the work City Council Agenda Report June 2, 2015 Page 4 of 5 FISCAL IMPACT: As of May 6, 2015, CIP 15701 has an available budget of $1,577,181.98 inclusive of carryover from previous years as follows: Fiscal Year CIP Project Number Available Funds 2012/2013 13701 $ 671,769.88 2013/2014 14701 $ 430,845.10 2014/2015 15701 $ 474,567.00 Total $1,577,181.98 The cost of the work provided by Nu-Line Technologies LLC is $1,074,061; a 10% contingency will be included in the construction contract for unforeseen conditions for a total of $1 , 181 ,467 .1 0. The cost for construction management and inspection services to be provided by Dudek is $210,000, for a total cost of $1,391,467.1 0. Therefore, there is sufficient funding for this project in CIP 15701. The City is in the process of evaluating a reorganization of the water, sewer and storm drain utilities which may change how these utilities are managed in the future. Since, this sewer rehabilitation work is necessary to avoid potential sewage spills and to ensure the sewer system continues to function properly, staff recommends proceeding with this sewer project even as the evaluation of reorganizing the water, sewer and storm drain utilities is underway. ENVIRONMENTAL IMPACT: On April 3, 2015, a Notice of Exemption for the Annual Sewer Rehabilitation Program, CIP 15701, was filed with the County Clerk stating that the project constitutes a Categorical Exemption per Class 1, Section 15301 (b) Existing Facilities and Class 2, Section 15302(c) Replacement or Reconstruction in accordance with Section 15061 of the California Environmental Quality Act (CEQA) guidelines. PRIOR CITY COUNCIL REVIEW: Not applicable. COMMISSION/COMMITTEE/BOARD REVIEW AND RECOMMENDATIONS: • This item was originally scheduled for the regular May 19, 2015, Utilities Commission meeting. That meeting subsequently was rescheduled as a joint meeting of the City Council and Utilities Commission to discuss drought related items. The Utilities Commission will review this item at the special meeting on June 2, 2015. If the Utilities Commission has a recommendation different than staff's recommendation, a supplemental agenda report will be provided. City Council Agenda Report June 2, 2015 Page 5 of 5 NOTIFICATION: Anderson Penna Dudek RBF Consulting Nu-Line Technologies, LLC Sancon lnsituform ATTACHMENT(S): Attachment 1 -Professional Services Agreement, Dudek Attachment 2-Construction Agreement, Nu-Line Technologies, LLC ENCLOSURE(S): Enclosure 1 -Contract Documents for the Annual Sewer Rehabilitation Program are on file and available for review at the City Clerk's office. PROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT is made, entered into, and shall become effective this_ day of_, 2015, by and between the City of San Juan Capistrano (hereinafter referred to as the "City") and Dudek (hereinafter referred to as the "Consultant"). RECITALS: WHEREAS, City desires to retain the services of Consultant regarding Construction Management and Inspection Services associated with the Annual Sewer Rehabilitation Program, CIP 15701 and WHEREAS, Consultant is qualified by virtue of experience, training, education and expertise to accomplish such services. NOW, THEREFORE, City and Consultant mutually agree as follows: Section 1. Scope of Work. The scope of work to be performed by the Consultant shall consist of those tasks as set forth in Exhibit 1, attached and incorporated herein by reference. To the extent that there are any conflicts between the provisions described in Exhibit "1" and those provisions contained within this Agreement, the provisions in this Agreement shall control. Section 2. Term. This Agreement shall commence on the effective date and shall terminate, and all services required hereunder shall be completed, no later than ten ( 1 0) months after the notice to proceed. Section 3. Compensation. 3.1 Amount. Total compensation for the services hereunder shall not exceed $210,000 as set forth in Exhibit 2, attached and incorporated herein by reference. 3.2 Method of Payment. Subject to Section 3.1, Consultant shall submit monthly invoices based on total services which have been satisfactorily completed for such monthly period. The City will pay monthly progress payments based on approved invoices in accordance with this Section. 1 Attachment 1 3.3 Records of Expenses. Consultant shall keep complete and accurate records of all costs and expenses incidental to services covered by this Agreement. These records will be made available at reasonable times to the City. Invoices shall be addressed as provided for in Section 16 below. Section 4. Independent Contractor. It is agreed that Consultant shall act and be an independent contractor and not an agent or employee of the City, and shall obtain no rights to any benefits which accrue to Agency's employees. Section 5. Limitations Upon Subcontracting and Assignment. The experience, knowledge, capability and reputation of Consultant, its principals and employees were a substantial inducement for the City to enter into this Agreement. Consultant shall not contract with any other entity to perform the services required without written approval of the City. This Agreement may not be assigned, voluntarily or by operation of law, without the prior written approval of the City. If Consultant is permitted to subcontract any part of this Agreement by City, Consultant shall be responsible to the City for the acts and omissions of its subcontractor as it is for persons directly employed. Nothing contained in this Agreement shall create any contractual relationships between any subcontractor and City. All persons engaged in the work will be considered employees of Consultant. City will deal directly with and will make all payments to Consultant. Section 6. Changes to Scope of Work. For extra work not part of this Agreement, a written authorization from City is required prior to Consultant undertaking any extra work. In the event of a change in the Scope of Work provided for in the contract documents as requested by the City, the Parties hereto shall execute an addendum to this Agreement setting forth with particularity all terms of the new agreement, including but not limited to any additional Consultant's fees. Section 7. Familiarity with Work and/or Construction Site. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) if applicable, it has investigated the work site(s), and is aware of all conditions there; and (3) it understands the facilities, difficulties and restrictions of the work to be performed under this Agreement. Should Consultant discover any latent or unknown conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform the City of this and shall not proceed with further work under this Agreement until written instructions are received from the City. Standard of Care. Consultant's services will be performed in accordance with generally accepted professional practices and principles and in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently 2 practicing under similar conditions. Section 8. Time of Essence. Time is of the essence in the performance of this Agreement. Section 9. Compliance with Law. Consultant shall comply with all applicable laws, ordinances, codes and regulations of federal, state and local government. Section 10. Conflicts of Interest. Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of the services contemplated by this Agreement. No person having such interest shall be employed by or associated with Consultant. Section 11. Copies of Work Product. At the completion of the work, Consultant shall have delivered to City at least one (1) copy of any final reports and/or notes or drawings containing Consultant's findings, conclusions, and recommendations with any supporting documentation. All reports submitted to the City shall be in reproducible format, or in the format otherwise approved by the City in writing. Section 12. Ownership of Documents. All reports, information, data and exhibits prepared or assembled by Consultant in connection with the performance of its services pursuant to this Agreement are confidential to the extent permitted by law, and Consultant agrees that they shall not be made available to any individual or organization without prior written consent of the City. All such reports, information, data, and exhibits shall be the property of the City and shall be delivered to the City upon demand without additional costs or expense to the City. The City acknowledges such documents are instruments of Consultant's professional services. Section 13. Indemnity. To the fullest extent permitted by law, Consultant agrees to protect, and hold harmless the City and its elective and appointive boards, officers, agents, and employees from any and all claims, liabilities, expenses, or damages of any nature, including reasonable attorneys' fees, for injury or death of any person, or damages of any nature, including interference with use of property, arising out of, pertain to or relate to the negligence, recklessness and/or intentional wrongful conduct of Consultant, Consultant's agents, officers, employees, subcontractors, or independent contractors hired by Consultant in the performance of the Agreement. The only exception to Consultant's 3 responsibility to protect, defend, and hold harmless the City, is due to the negligence , recklessness and/or wrongful conduct of the C ity , or any of its elective or appointive boards, officers , agents , or employees . This hold harmless agreement shall apply to all liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Consultant. Section 14. Insurance. On or before beginning any of the services or work called for by any term of this Agreement , Consultant, at its own cost and expense , shall carry, maintain for the duration of the agreement , and provide proof thereof that is acceptable to the City , the insurance specified below with insurers and under forms of insurance satisfactory in all respects to the City. Consultant shall not allow any subcontractor to commence work on any subcontract until all insurance required of the Consultant has also been obtained for the subcontractor. Insurance required herein shall be provided by Insurers in good standing with the State of California and having a minimum Best's Guide Rating of A-Class VII or better. 14.1 Comprehensive General Liability. Throughout the term of this Agreement, Consultant shall maintain in full force and effect Comprehensive General Liability coverage in an amount not less than one million dollars per occurrence ($1 ,000,000.00), combined single limit coverage for risks associated with the work contemplated by this agreement. If a Commercial General Liability Insurance form or other form with a general aggregate limit is used , either the general aggregate limit shall apply separately to the work to be performed under this agreement or the general aggregate limit shall be at least twice the required occurrence limit. 14.2 Comprehensive Automobile Liability. Throughout the term of this Agreement, Consultant shall maintain in full force and effect Comprehensive Automobile Liability coverage , including owned , hired and non- owned vehicles in an amount not less than one million dollars per occurrence ($1 ,000 ,000.00). 14.3 Workers' Compensation . If Consultant intends to employ employees to perform services under this Agreement , Consultant shall obtain and maintain , during the term of this Agreement , Workers ' Compensation Employer's Liability Insurance in the statutory amount as required by state law. 14.4 Proof of Insurance Requirements/Endorsement. Prior to beginning any work under this Agreement, Consultant shall submit the insurance certificates , including the deductible or self-retention amount, and an additional insured endorsement naming City, its officers, employees , agents , and volunteers as additional insured as respects each of the following: Liability arising out of 4 activities performed by or on behalf of Consultant , including the insured 's general supervision of Consultant; products and completed operations of Consultant; premises owned , occupied or used by Consultant; or automobiles owned , leased , hired , or borrowed by Consultant. The coverage shall contain no special limitations on the scope of protection afforded City , its officers , employees , agents , or volunteers. 14.5 Errors and Omissions Coverage Throughout the term of this agreement, Consultant shall maintain Errors and Omissions coverage (professional liability coverage) in an amount of not less than One Million Dollars ($1 ,000,000). Prior to beginning any work under this agreement, Consultant shall submit an insurance certificate to the City's General Counsel for certification that the insurance requirements of this agreement have been satisfied . 14.6 Notice of Cancellation/Termination of Insurance . The above policy/policies shall not terminate , nor shall they be cancelled , nor the coverages reduced , until after thirty (30) days' written notice is given to City , except that ten (1 0) days' notice shall be given if there is a cancellation due to failure to pay a premium. 14.7 Terms of Compensation. Consultant shall not receive any compensation until all insurance provisions have been satisfied . 14.8 Notice to Proceed . Consultant shall not proceed with any work under this Agreement until the City has issued a written "Notice to Proceed" verifying that Consultant has complied with all insurance requirements of this Agreement. Section 15. Termination. City shall have the right to terminate this Agreement without cause by giving thirty (30) days' advance written notice of termination to Consultant. In addition , this Agreement may be terminated by any party for cause by providing ten (1 0) days' notice to the other party of a material breach of contract. If the other party does not cure the breach of contract , then the agreement may be terminated subsequent to the ten (1 0) day cure period . Section 16. Notice. All notices shall be personally delivered or mailed to the below listed addresses , or to such other addresses as may be designated by written notice . These addresses shall be used for delivery of service of process : To City: City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Attn : Keith Van Der Maaten Public Works & Utilities Director 5 To Consultant: Dudek 1645 S. Rancho Santa Fe Road, Suite 201 San Marcos, CA 92078 Attn: George Litzinger, P.E. Section 17. Prevailing Wages. The City has been advised that the Prevailing Wages Law applies to the work. CONTRACTOR shall be responsible for CONTRACTOR's compliance in all respects with the prevailing wage rates to all the laborers involved, and with California Labor Code Section 1770 et seq., including the keeping of all records required by the provisions of Labor Code Section 1776 and the implementing administrative regulations. The CITY shall be a third party beneficiary of the forgoing covenant with rights to enforce the same as against the CONTRACTOR. Effective March 1, 2015, if the services are being performed as part of an applicable "public works" or "maintenance" project, in addition to the foregoing, then pursuant to Labor Code sections 1725.5 and 1771.1, the Consultant and all subconsultants must be registered with the Department of Industrial Relations ("DIR"). Consultant shall maintain registration for the duration of the project and require the same of any subconsultants. This project may also be subject to compliance monitoring and enforcement by the DIR. It shall be Consultant's sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of payroll records directly to the DIR. Section 18. Dispute Resolution. In the event of a dispute arising between the parties regarding performance or interpretation of this Agreement, the dispute shall be resolved by binding arbitration under the auspices of the Judicial Arbitration and Mediation Service ("JAMS"). Section 19. Entire Agreement. This Agreement constitutes the entire understanding and agreement between the parties and supersedes all previous negotiations between them pertaining to the subject matter thereof. Section 20. Counterparts. This agreement may be executed by the Parties in counterparts, which counterparts shall be construed together and have the same effect as if all the Parties had executed the same instrument. Counterpart signatures may be transmitted by facsimile, email, or other electronic means and has the same force and effect as if they were original signatures. [SIGNATURE PAGE FOLLOWS] 6 IN WITNESS WHEREOF, the parties hereto have executed this Agreement ATTEST: Maria Morris, City Clerk APPROVED AS TO FORM: Jeff Ballinger, City Attorney CITY OF SAN JUAN CAPISTRANO By: ________________________ _ Derek Reeve, Mayor DUDEK By:~~~~~~~~~~-4~~,1~ u e 7 Frank Dudek President 1 Scope of Services 1.1 Project Understanding CIPP Pre-and post-CCTV quality has been found to be the most critical aspect of concern on previous CJPP construction projects . Most simply, if there is not a clear picture, you cannot identify what is wrong with the sewer line . We will enforce that all CCTV submissions meet the quality and intent of the specification for visual quality. It is also critical that a final CCTV is done once all repairs-in situ repairs, lateral connections, or CIPP repairs-are comp leted . Many CIPP contractors will try to submit final CCTV after initial CJPP lining and not once all work is completed with the lining and repair process. Managing public concerns and complaints is a critical issue to all municipalities and Dudek is committed to mitigating all resident concerns, questions, and comp laints prior to a resident elevating these issues to the City Management or C!PP liner is inserted into the existing host pipe; water is used to inflate the liner, molding it to the existing host pipe. Heating the water cures the liner to the pipe. Council level. Dudek successfully handled over 250 resident calls on our previous project for the City of Culver. Early coordination with residents and businesses is essential. Dudek will also insure the contractor is providing the proper notifications to the residents and businesses on a timely basis; successfully informing the public will reduce the amount of complaints and issues. The key to a successful CIPP project is to inform residents in a timely manner, and perform the work as rapidly as possible with a well-trained inspector on site at all times to respond to resident complaints and concerns. Dudek maintained a response time of less than 1 hour for all ca ll s received . In addition to the similar public affairs concerns listed above, successfully managing traffic control and mitigating unknown conditions will be important issues. Dudek will pre-review all traffic control plans prior to submitting them to the City for approval and will diligently inspect all traffic contro l installations (including inspecting trench plates) on a daily basis, when they are set up and throughout the day. We will make suggestions to the City if modifications are needed to improve safety or minimize impacts to traffic. 1.2 Project Approach Dudek will provide inspection and construction management serv ices during the lining of the City's sewer main lining rehabilitation program. 1. Project Familiarity The inspector and CM will have a comprehensive know ledge of the contractor's work for this project, will be familiar with the contract documents, and will walk all of the affected streets and easements so that we have a full understanding of project elements. We will work close ly with the City and contractor to complete a successful project. DUDEK CM & Inspection Services for the Annual Sewer Rehabilitation Program, CIP 15701 1 Exhibit 1 We understand the sensitive nature of the project, including working in easements and busy multi-lane streets with heavy traffic. We will work closely with the residents and contractor to minimize impacts . We also understand the technical nature of this project and the importance of quality assurance/quality control (QA/QC) of the installed work . Dudek will develop a QA/QC program that will make certain all testing and inspection activities are performed with quality materials and state-of-the-art workmanship, and will ensure the project is completed on-schedule and within budget. The QA/QC personnel will strictly enforce the technical specifications, construction drawings, industry standards, and manufacturer's recommendations to provide only approved materials and installation workmanship. We understand the importance for proper notification and establishing a positive relationship with residents and businesses to complete the lining work. We will coordinate the notification process, which will involve mailing notifications, community meetings, advanced warning signs, hand-delivered notices, and speaking directly to affected residents and businesses. 2. Preconstruction Meeting Mr . White will chair the preconstruction and progress meetings. Prior to the Notice to Proceed, Mr . White and Mr. Ruiz will meet jointly with the contractor, City, and other involved entities as needed to outline for the contractor the following: contract administration guidelines, contractual roles and relationships , and reinforcement of specific requirements for safety, security, and access through various construction areas . Dudek will prepare the agenda, conduct the meeting , and issue meeting minutes . The preconstruction meeting will set the tone for the project, and it is crucial that the contractor understands that we expect him to comply with the contract documents, particularly in regards to public relations. The goal is to make certain that the contractor understands we are there to enforce the specifications, and that we will do it fairly and consistently . 3. Construction Management I Inspection Mr. Ruiz and Mr. White wil l report on the contractor's work, including that which is not applied in strict conformance with the contract specifications, project submitta ls, and manufacturer's requirements. The CM will assist in reviewing and coordinating submittal and RFI reviews with the City to expedite the submittal turnaround process. Dudek will provide the following reporting and recordkeeping: Setup Logs . Mr. White will maintain logs for submitta ls, RFI's, Request for Proposals (RFP's), and Change Orders (CO) in a format assessable to City staff. We will set our fi les up according to the City's requirements. These logs will be updated weekly and sent to the City for review and will be included in the bi-weekly meeting minutes . Material Tickets. The inspector will maintain excellent records of the material tickets (wet out logs, concrete delivery tickets , etc.) which are critical to insure the correct amount and type of resin are being used on each CIPP liner. Inspection. Mr. Ruiz will inspect all construction-related activities and recommend acceptance of work when performed in accordance with the contract documents on a full-time basis. He will work with the contractor to fairly interpret the contract drawings and specifications. The inspector will coordinate review of all RFI's, will obtain a suitable response as soon as possible and continue to interface with the City until the RFI is answered satisfactorily. The inspector will provide daily reports and digital photos documenting the contractor's progress for each working day. The digital photos will be included with each daily report. DUDEK CM & Inspection Services for the Annual Sewer Rehabilitation Program, CJP 15701 2 4 . Public Relations The project will occur on and affect City streets and some residential easements . Public outreach will be one of the most important aspects of the job. Dudek wi ll work with the City and contractor to develop and implement a community outreach program that wil l prov ide reg ul ar updates to residents and bus inesses affected by this project. The program will include d istribu ti ng mai lers and door hange rs to residents and businesses located around the project. We suggest mai lers be sent out two weeks in advance as wel l as advanced warning signs (for the open trench areas). We suggest the fina l not ice be sent 48-ho urs in advance rather than 24-hours, as it will give the contractor the ab ili ty to make special arrangements, if needed, for special-needs residents . Mr. Rui z's ce ll number will be included on the mai ler and notices hand de livered to ensure that he can directly handle concerns and comp laints . Mr. Ruiz will attend to all res ident and busi ness co ncerns and comp laints in an exped itious, professional , and courteous manner. Mr. Ru iz will ma inta in a log of all such co ncerns and compla in ts to ensure each of these issues are addressed . 5. Change Order Preparation, Negotiation, and Processing Mr. White will prepare RF is (at the request of the City), cost estimates, review cost proposa ls, track extra work or disputed work from the contractor for changes and negotiate fina l costs with the final approval of the City. Mr . Ruiz will monitor and track disputed and extra work . Dudek will not authorize any changes or extra work without the permission of the City. We wi ll prepare wr itten justificat ions for each approved change order, which will be presented to the City . We wi ll track all potent ial and exec uted change orders on a change order log , which tracks both cost and schedu le impacts . Dudek wi ll not au th or ize any change orders or changes to the contract documents wit hout wri tten approva l of t he City and an executed change order. Should any additiona l support be required for a change order, claims ana lysis or negotiatio n, Mr. George Litzinger will assist to resolve these issues . 6. Construction Schedule We will review and analyze each activity and t he logic to determine if the work conforms to the contract requ irements and if th e work can be built to th e contract or's schedule. We will co mpare produ ct ion rates and material rates. We wi ll also review t he sched ul e to ensure that it conforms wit h the requ irements of the City as we ll as any stated working day li mitat ions, City holi days, etc. stated in t he co ntr act. Mr . Li nsdau will prepare a month ly constr uction report, as req ui red , by the City inc luding a summary of work progress, budget, and schedule status . 7. Construction Progress Meetings Mr. White will chair bi-week ly construction progr es s meetings and will prepare the agendas and distribute the meeting minutes from these meet ings. The meeting minutes wil l des ignate who is responsible for action item resu lts, and wi ll be distributed to all in attendance and to t he City wi th in 48 hours of the meeting. These action items , chrono log ica ll y listed, will be tracked unt il t hey are reso lved . 8. Progress Payments The Dudek team realizes the importance of an accurate and t imely review of the monthly progress payments . Mr. Ruiz will field measure and track all bid quantities in accordance with contract documents as the work is being installed . Mr . Ruiz will meet with the contractor and discuss and agree to pay quantities, schedule of DUDEK CM & Inspection Serv ices for the Annua l Sewer Rehabi litati on Program, CIP 15701 3 values (for lump sum bid items), and review the contractor's "as-bu il ts" at the end of the month. Dudek will then make a recommendation to the City for the amount of the monthly progress payment on a City-approved format payment request. 9. Testing Services Both Mr. Ruiz and Mr. White are thoroughly trained in the procedures of field testing and will provide: visual inspection, liner thickness, and liner sample acquisition. They will coordinate the testing of structural properties, chemical resistance properties, testing for leakage of the installed liner, and chain-of-custody procedures to ensure accurate test results for the CIPP liners . Mr. Ruiz will be responsible to for coordinating and scheduling any required testing lab seNices for both the CIPP liners and other. Mr. Ruiz will maintain a materials testing log to document the location and material being tested. Mr . White will also review all material test results and review Mr. Ruiz's logs for accuracy. Mr. Ruiz will not ify the contractor immediate ly of any fai ling test results, which will be tracked on a material testing log until the issue is resolved. 10. Quality Review, Sampling Dudek will verify the quality of the work being performed throughout all phases of the project, perform close visual obseNations at regular inteNals, and suNey the overall progress of the project. Mr. Ruiz will provide the overall site quality review and perform/coordinate all testing on the project. Mr. White will be our second set of eyes to ensure the testing frequency and review the test results to ensure that all work and materials provided are in accordance with the contract documents. Mr. Ruiz will check CIPP liner thickness, review pre-and post-CCTV and will follow the inspection and liner defect practices per NASSO standards. Mr. Ruiz will also collect and log material delivery tickets, verify pipe diameter, and check sewer line grade on a daily basis. He will inspect the CIPP liner and material deliveries prior to installation and will log all material delivery tickets. Mr. White will assist Mr. Ruiz with inspection duties, when needed , since citywide lining projects require tracking multiple operations, and will be on site weekly to review inspection reports, spot check review CCTV and the open trench and CIPP work being installed as a second level quality control check, since Mr. White is also NASSCO trained inspector himself. Mr. Ruiz will ensure a minimum of 25% of CIPP lining material installed will be tested, however the contractor will not know which ones will be tested, as we will collect a sample from each CIPP inversion. Mr. Ruiz and Mr. White will review all pre-and post-CCTV. Dudek will prepare a report identifying point repair locations, offset joints, laterals to be trimmed, CIPP liner defects, and SLCs for pre-and post-CCTV. 11. Safety Program Both Mr. White and Mr. Ruiz have received OSHA safety training and are familiar with all project-related safety requirements. Mr. Ruiz is capable of recognizing and identifying safety hazards. Unsafe actions or procedures will immediately be reported to the contractor. Mr. White will review the contractor's safety program submitta l to ensure it is compliant with OSHA regu lations. The inspector will suspend the contractor's work if imminent hazard is not addressed immediately, such as open unprotect excavation or improper shoring of a trench . Our goal is to keep the contractor and public safe at all times. 12. Traffic and Pedestrian Control, Public Safety Mr. White will review all traffic control plans submitted by the contractor prior to sending them to the City for approval to help streamline the process and avoid wasting the time of the traffic engineer . Mr. Ruiz will monitor the placement and maintenance of all traffic control devices and enforce the traffic control/parking restrictions DUDEK CM & Inspection SeNices for the Annual Sewer Rehabilitation Program, CIP 15701 4 as specified by the City and contractor's traffic contro l plan on a daily basis . Mr. White wi ll coordinate with the police, fire, traffic, and san itation departments and all affected agencies pr ior to impl ementation of traffic contro l set up with mass emails. 13. Storm Water Pollution Prevention Plan Mr. Ruiz is a QSP and will review, monitor, and ensure the contractor's environmental compliance with NPDES/Best Management Practices (BMPs) to prevent Storm Wat er Pollution from construction-related act ivities and verify the contractor's comp liance . We do recommend requiring the contractor to provide their own independent QSP and QSD in the contract documents so that the quality assurance and control responsibi lities are square ly on the contractor's shou lders . 14. Record Drawings and Documents Upon completion of the project, we will furni sh the City with a full set of as-bu ilt Record Drawings . We wil l incorporate modifications and changes from all sources, such as submitta ls, RFI's, field orders, extra wor k, and change orders. We will compare records with the contractor's record drawings at the conclusion of the project with our record documents and prepare a comp lete as-bu il t record for the City. 15. Project Close-Out Dudek will prepare a punch li st of items developed with the City to identify all deficient or incomplete work once the project is substantially comp lete and will follow up with the contractor until it is complete. Once the project is acceptable, Dudek will provide the City with a recommendation to file the Notice of Completion . Dudek will provide all close-out documentation and files within 30 days of Noti ce of Completion. Dudek will assist the City in preparing all final change orders and progress payment to close out the project. We will assist the City as needed during the project warranty period. 2 Qualifications and Experience 2.1 Dudek Overview Since 2009, Dudek has provided construction management and in spect ion serv ices to the cities of Culver City, Carlsbad and Huntington Beach on severa l sewer linin g rehabilitation and open trench sewer line replacement projects . In short, we know the project and can offer hi gh-qua li ty inspection and construction management service without any ramp-up time or hiccups, saving the City va lu ab le time and money. Key solutions we offer the City for this project include the following : Experience with Your Project and Trenchless Technology As one of the on ly firms in Sout hern California with emp loyees cert ifi ed in National Association of Sewer Service Company (NASSCO) standards, Dudek proposes Mr. Garrett White and Ryan Ruiz. Both are fluent in NASSCO standards and both have comp leted the In spector Training and Certification Program (ITCP), Manhole and Assessment Certification Pr ogram (MACP), and Pipeline Assessment and Certification Program (PACP). DUDEK CM & Inspection Services for the Annual Sewer Rehabilitation Program, CIP 15701 5 Fee Proposal Tasks 1. Contract Administration (included in #2) 2. Construction Progress Meetings 3. Construction Management (1/2 Time) 4. Construction Inspection (Full Time)* 5. Project Close-Out 6. Misc. Direct Costs TOTAL *Prevailing Wage Rate *Based on a 120 working days or 1,000 hours City of San Juan Capistrano Annual Sewer Rehabilitation Program, CIP 15701 DUDEK FEE PROPOSAL-COST SUMMARY Project Construction Construction Support Staff Manager Manager Inspector (if req'd) Incidentals Hourly Rate Hourly Rate Hourly Rate Hourly Rate (if req'd) $0 $0 $0 $0 $0 $150 $0 $0 $0 $0 $0 $125 $0 $0 $0 $0 $0 $120 $0 $0 $0 $125 $120 $0 $0 DUDEK CM and Inspection Services for the Annua l Sewer Rehabi litation Program, CIP 15701 Mileage Reprographics (if req'd) (if req'd) Total Cost $0 $0 $0 $0 $0 $15 ,000 $0 $0 $62 ,500 $0 $0 $120 ,000 $0 $200 $10 ,000 $2 ,500 $210,000 Exhibit 2 DUDEK 2015 STANDARD SCHEDULE OF CHARGES ENGINEERING SERVICES Project Director ..................................................................... $255 .00/hr Principal Engineer Ill ............................................................. $225 .00/hr Principal Engineer II ............................................................. $215 .00/hr Principal Engineer I .............................................................. $205.00/hr Program Manager ................................................................ $205 .00/hr Senior Project Manager ........................................................ $195.00/hr Project Manager ................................................................... $190 .00/hr Senior Engineer 111 ................................................................ $185 .00/hr Senior Engineer II ................................................................ $175 .00/hr Senior Engineer I ................................................................. $165.00/hr Project Engineer IVfTechnician IV ........................................ $155 .00/hr Project Engineer lllfTechnician Ill ......................................... $140.00/hr Project Engineer llfTechnician 11 ........................................... $125.00/hr Project Engineer lfTechnician 1 ............................................. $110.00/hr Project Coordinator ................................................................. $85.00/hr Engineering Assistant ............................................................. $75 .00/hr ENVIRONMENTAL SERVICES Principal ............................................................................... $235.00/hr Senior Project Manager/Specialist!! ..................................... $220.00/hr Senior Project Manager/Specialist 1 ...................................... $21 0 .00/hr Environmental Special ist/Planner V I ..................................... $190.00/hr Environmental Specialist/Planner V ...................................... $170.00/hr Environmental Specialist/Planner IV ..................................... $160.00/hr Environmental Specialist/Planner Ill ..................................... $150.00/hr Environmental Specialist/Planner II ...................................... $130.00/hr Environmental Special ist/Planner I ....................................... $120.00/hr Analyst 111 ............................................................................. $110.00/hr Analyst II .............................................................................. $100.00/hr Analyst I ................................................................................. $90 .00/hr Planning Assistant II ............................................................... $80 .00/hr Planning Assistant 1 ................................................................ $70.00/hr COASTAL PLANNING/POLICY SERVICES Senior Project Manager/Coastal Planner 11 ........................... $215 .00/hr Senior Project Manager/Coastal Planner ! ............................ $205.00/hr Environmental Specialist/Coastal Planner VI ........................ $195 .00/hr Environmental Specialist/Coastal Planner V ......................... $175 .00/hr Environmental Specialist/Coastal Planner IV ........................ $165 .00/hr Environmental Specialist/Coastal Planner Ill ........................ $155 .00/hr Environmental Specialist/Coastal Planner II ......................... $145 .00/hr Environmenta l Specialist/Coastal Planner I .......................... $135 .00/hr ARCHAEOLOGICAL SERVICES Senior Project Manager/Archaeologist 11 ............................... $21 0 .00/hr Senior Project Manager/Archaeologist 1 ................................ $200 .00/hr Environmental Specialist/Archaeologist VI ............................ $180.00/hr Environmental Specialist/Archaeologist V ............................. $160.00/hr Environmental Specialist/Archaeologist IV ............................ $150 .00/hr Environmental Specialist/Archaeologist 111 ............................ $140 .00/hr Environmental Specialist/Archaeologist II ............................. $130 .00/hr Environmental Specialist/Archaeologist! .............................. $120 .00/hr Environmental Specialist/Paleontologist Ill ........................... $160.00/hr Environmental Specialist/Paleontologist II ............................ $140.00/hr Environmental Specialist/Paleontologist I ............................. $120.00/hr Paleontological Technician 111 ................................................. $80 .00/hr Paleontological Technician 11 .................................................. $70 .00/hr Paleontological Technician ! ................................................... $50 .00/hr Archaeolog ist Technician II ..................................................... $70 .00/hr Arc haeolog ist Technic ian 1 ...................................................... $50 .00/hr CONSTRUCTION MANAGEMENT SERVICES Principal/Manager ................................................................ $195 .00/hr Senior Construction Manager .............................................. $180 .00/hr Senior Project Manager ........................................................ $160 .00/hr Construction Manager .......................................................... $150 .00/hr Project Manager ................................................................... $140.00/hr Resident Engineer ............................................................... $140.00/hr Construction Engineer .......................................................... $135 .00/hr On -site Owner's Representative ........................................... $130.00/hr Construction Inspector 111 ...................................................... $125 .00/hr Construction Inspector 11 ....................................................... $115 .00/hr Construction Inspector 1 ........................................................ $1 05 .00/hr Prevailing Wage Inspector .................................................... $135.00/hr DUDEK COMPLIANCE SERVICES Compliance Director ............................................................ $200.00/hr Compliance Manager ........................................................... $140.00/hr Compliance Project Coordinator ........................................... $100.00/hr Compliance Monitor ............................................................... $90 .00/hr HYDROGEOLOGICAL SERVICES Principal ............................................................................... $235 .00/hr Sr. Hydrogeologist tV/Engineer IV ....................................... $215 .00/hr Sr. Hydrogeologist Ill/Engineer 111 ......................................... $200 .00/hr Sr. Hydrogeologist 11/Engineer 11 ........................................... $180 .00/hr Sr. Hydrogeologist 1/Engineer ! ............................................. $165 .00/hr Hydrogeologist VI/Engineer VI ............................................ $150.00/hr Hydrogeologist V/Engineer V ............................................... $140.00/hr Hydrogeologist tV/Engineer IV ............................................. $130.00/hr Hydrogeologist Ill/Engineer 111 .............................................. $120.00/hr Hydrogeologist It/Engineer 11 ................................................ $110.00/hr Hydrogeologist 1/Engineer 1 .................................................. $1 00.00/hr Technician ............................................................................. $95 .00/hr DISTRICT MANAGEMENT & OPERATIONS District General Manager ..................................................... $175.00/hr District Eng ineer ................................................................... $160 .00/hr Operations Manager ........................................................... $150 .00/hr District Secretary/Accountant ................................................ $85.00/hr Collections System Manager .................................................. $95 .00/hr Grade V Operator ................................................................ $100 .00/hr Grade IV Operator .................................................................. $85 .00/hr Grade Ill Operator .................................................................. $80.00/hr Grade II Operator ................................................................... $63 .00/hr Grade I Operator .................................................................... $55 .00/hr Operator in Train ing ............................................................... $40.00/hr Collection Maintenance Worker 11 ........................................... $55 .00/hr Collection Maintenance Worker !. ........................................... $40.00/hr OFFICE SERVICES Technicai/Drafting/CADD Services 3D Graphic Artist. ................................................................. $150 .00/hr Senior Designer ................................................................... $140 .00 /hr Designer .............................................................................. $130 .00/hr Assistant Designer ............................................................... $125 .00/hr GIS Specialist IV .................................................................. $150 .00/hr GIS Specialist Ill .................................................................. $140 .00/hr GIS Specialist II ................................................................... $130.00/hr GIS Specialist I .................................................................... $120 .00/hr CADD Operator 111 ................................................................ $120.00/hr CADD Operator 11 ................................................................. $115 .00/hr CADD Operator! .................................................................. $100.00/hr CADD Drafter ......................................................................... $90.00/hr CADD Technician .................................................................. $80.00/hr SUPPORT SERVICES Technical Editor 111 ................................................................ $140 .00/hr Technical Editor 11 ................................................................. $125 .00/hr Technica l Editor I ................................................................. $110 .00/hr Publications Specialist 111 ...................................................... $100.00/hr Publications Specialist 11 ......................................................... $90.00/hr Publications Specialist ! .......................................................... $80.00/hr Clerical Administration 11. ........................................................ $80.00/hr Clerical Administration !. ......................................................... $75 .00/hr Forensic Engineering -Court appearan ces , depositions , and interrogatories a s expert wi tn ess wi ll be billed at 2 .00 times normal rates . Emergency and Holidays-Minimum charg e of two hours will be billed at 1.75 times th e normal rat e . Material and Outside Services -Subcontractors, re nt al of special eq uipment . special reproducti ons a nd blueprinting , out side data processi ng and computer servi ces , etc .. are charged at 1.15 times th e direct cost. Travel Expenses -Mileag e at current IRS all owable rates . Per die m where overnight stay is involved is charg ed at cost lnvoices,Late Charges. -All fees will be bill ed to Client mon thly and shall be due and payable upon receipt. Invo ices are de linque nt if not pa id within thi rty (30) days from th e date of th e invoice. Client agrees to pa y a monthl y late charge eq ual to one percent (1 %) per month of th e out standing balance until pai d in fu ll . Annual Increases -Unless identifi ed otherwi se , th ese standard rates wi ll increase 3% annually . Effective January 1, 2015 CONSTRUCTION AGREEMENT THIS CONTRACT is made and entered into, to be effective, this __ day of , 2015, by and between the CITY OF SAN JUAN CAPISTRANO, hereinafter referred to as "City," and Nu-Line Technologies LLC, hereinafter referred to as "Contractor." City and Contractor mutually agree as follows: Section 1. General Conditions. Contractor certifies and agrees that all the terms, conditions and obligations of the Contract Documents as hereinafter defined, the location of the job site, and the conditions under which the work is to be performed have been thoroughly reviewed, and enters into this Contract based upon Contractor's investigation of all such matters and is in no way relying upon any opinions or representations of City. It is agreed that this Contract represents the entire agreement between the parties. It is further agreed that the Contract Documents including the latest edition of the Standard Specifications for Public Works Construction, Notice Inviting Bids, Special Instructions to Bidders, if any, and Contractor's Proposal are incorporated in this Contract by reference, with the same force and effect as if the same were set forth at length herein, and that Contractor and its subcontractors, if any, will be and are bound by any and all of said Contract Documents insofar as they relate in any part or in any way, directly or indirectly, to the work covered by this Contract. "Project" as used herein defines the entire scope of the work covered by all the Contract Documents. Anything mentioned in the Specifications and not indicated in the Plans, or indicated in the Plans and not mentioned in the Specifications, shall be of like effect as if indicated and mentioned in both. In case of discrepancy in the Plans or Specifications, the matter shall be immediately submitted to City's Engineer, without whose decision Contractor shall not adjust said discrepancy save only at Contractor's CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-1 Attachment 2 own risk and expense. The decision of the Engineer shall be final. Section 2. Materials and Labor. Contractor shall furnish, under the conditions expressed in the Plans and Specifications, at Contractor's own expense, all labor and materials necessary, except such as are mentioned in the Specifications to be furnished by the City, to construct and complete the Project, in good workmanlike and substantial order. If Contractor fails to pay for labor or materials when due, City may settle such claims by making demand upon the surety to this Contract. In the event of the failure or refusal of the surety to satisfy said claims, City may settle them directly and deduct the amount of payments from the Contract price and any amounts due to Contractor. In the event City receives a stop notice from any laborer or material supplier alleging non-payment by Contractor, City shall be entitled to deduct all of its costs and expenses incurred relating thereto, including but not limited to administrative and legal fees. Section 3. Description of Project. The Project is described as: Annual Sewer Rehabilitation Program (CIP 15701) as delineated on the Contract Documents prepared by the City of San Juan Capistrano, dated April 2015. Work to include: the construction of Sanitary Sewer and Storm Drain Cured-In-Place Pipe, Manhole Rehabilitation and all appurtenant work. Section 4. Plans and Specifications. The work to be done is shown in a set of detailed Plans and Specifications entitled: Annual Sewer Rehabilitation Program (CIP 15701 ). The plans are located in the Specifications as Appendix F -Contract Exhibits. CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-2 Said Plans and Specifications and any revisions, amendments or addenda thereto are attached hereto and incorporated herein as part of this Contract and referred to by reference. Section 5. Time of Commencement and Completion. Contractor agrees to commence the Project within ten (1 0) calendar days from the date set forth in the "Notice to Proceed" sent by City and shall diligently prosecute the work to completion within one hundred twenty (120) calendar days from the date of the "Notice to Proceed" issued by the City excluding delays caused or authorized by the City as set forth in Sections 7, 8 and 9 hereof. Section 6. Time is of the Essence. Time is of the essence of this Contract. As required by the Contract Documents, Contractor shall prepare and obtain approval of all shop drawings, details and samples, and do all other things necessary and incidental to the prosecution of Contractor's work in conformance with an approved construction progress schedule. Contractor shall coordinate the work covered by this Contract with that of all other Contractors, subcontractors and of the City, in a manner that will facilitate the efficient completion of the entire work in accordance with Section 5 herein. City shall have complete control of the premises on which the work is to be performed and shall have the right to decide the time or order in which the various portions of the work shall be installed or the priority of the work of other subcontractors, and, in general, all matters representing the timely and orderly conduct of the work of Contractor on the premises. Section 7. Excusable Delays. Contractor shall be excused for any delay in the prosecution or completion of the Project caused by acts of God; inclement weather which exceeds the number of calendar days estimated by the City and set forth in Section 5 hereof; damages caused CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-3 by fire or other casualty for which Contractor is not responsible; any act, neglect or default of City; failure of City to make timely payments to Contractor; late delivery of materials required by this Contract to be furnished by City; combined action of the workers in no way caused by or resulting from default or collusion on the part of Contractor; a lockout by City; or any other delays unforeseen by Contractor and beyond Contractor's reasonable control. City shall extend the time fixed in Section 5 for completion of the Project by the number of days Contractor has thus been delayed, provided that Contractor presents a written request to City for such time extension within fifteen ( 15) days of the commencement of such delay and City finds that the delay is justified. City's decision will be conclusive on the parties to this Contract. Failure to file such request within the time allowed shall be deemed a waiver of the claim by Contractor. No claims by Contractor for additional compensation or damages for delays will be allowed unless Contractor satisfies City that such delays were unavoidable and not the result of any action or inaction of Contractor and that Contractor took all available measures to mitigate such damages. Claims will be handled in accordance with Section 10-05 of the General Conditions. The City's decision will be conclusive on all parties to this Contract. Section 8. Extra Work. The Contract price includes compensation for all work performed by Contractor, unless Contractor obtains a written change order signed by a designated representative of City specifying the exact nature of the extra work and the amount of extra compensation to be paid all as more particularly set forth in Section 9 hereof. City shall extend the time fixed in Section 5 for completion of the Project by the number of days reasonably required for Contractor to perform the extra work, as determined by City's Engineer. The decision of the Engineer shall be final. CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-4 Section 9. Changes in Project. A. City may at any time, without notice to any surety, by written order designated or indicated to be a change order, make any change in the work within the general scope of the Contract, including but not limited to changes: 1) in the Specifications (including drawings and designs); 2) in the time, method or manner of performance of the work; 3) in the City-furnished facilities, equipment, materials, services or site; or 4) directing acceleration in the performance of the work. B. A change order shall also be any other written order (including direction, instruction, interpretation or determination) from the City which causes any change, provided Contractor gives the City written notice stating the date, circumstances and source of the order and that Contractor regards the order as a change order. C. Except as provided in this Section 9, no order, statement or conduct of the City or its representatives shall be treated as a change under this Section 9 or entitle Contractor to an equitable adjustment. D. If any change under this Section 9 causes an increase or decrease in Contractor's actual, direct cost or the time required to perform any part of the work under this Contract, whether or not changed by any order, the City shall make an equitable adjustment and modify the Contract in writing. Except for claims based on defective specifications, no claim for any change under paragraph (B) above shall be allowed for any costs incurred more than twenty (20) days before the Contractor gives written notice as required in paragraph (B). In the case of defective specifications for which the City is responsible, the equitable adjustment shall include any increased direct cost Contractor reasonably incurred in attempting to comply with those defective specifications. CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-5 E. If Contractor intends to assert a claim for an equitable adjustment under this Section 9, it must, within thirty (30) days after receipt of a written change order under paragraph (A) or the furnishing of a written notice under paragraph (B), submit a written statement to the City setting forth the general nature and monetary extent of such claim. The City may extend the thirty (30) day period. Contractor may include the statement of claim in the notice under paragraph (B) of this Section 9. F. No claim by Contractor for an equitable adjustment shall be allowed if made after final payment under this Agreement. G. Contractor hereby agrees to make any and all changes, furnish the materials and perform the work that City may require without nullifying this Contract. Contractor shall adhere strictly to the Plans and Specifications, unless a change therefrom is authorized in writing by the City. Under no condition shall Contractor make any changes to the Project, either in additions or deductions, without the written order of the City and the City shall not pay for any extra charges made by Contractor that have not been agreed upon in advance in writing by the City. Contractor shall submit immediately to the City written copies of its firm's cost or credit proposal for change in the work. Disputed work shall be performed as ordered in writing by the City and the proper cost or credit breakdowns therefore shall be submitted without delay by Contractor to City. Section 10. Liquidated Damages for Delay. The parties agree that if the total work called for under this Contract, in all parts and requirements, is not completed within the time specified in Section 5 plus the allowance made for delays or extensions authorized under Sections 7, 8 and 9, the City will sustain damage, which would be extremely difficult and impracticable to ascertain. The parties therefore agree that Contractor will pay to City the sum of Five Hundred Dollars and No Cents ($500.00) per day, as liquidated damages, and not as a penalty, for each and every calendar day during which completion of the Project is so delayed. CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT 8-6 Contractor agrees to pay such liquidated damages and further agrees that City may offset the amount of liquidated damages from any monies due or that may become due Contractor under this Contract. Section 11. Contract Price and Method of Payment. City agrees to pay and Contractor agrees to accept as full consideration for the faithful performance of this Contract, subject to any subsequent additions or deductions as provided in approved change orders, the sum of one million seventy four thousand sixty one dollars and no cents ($1 ,074,061.00) plus a 10% contingency amount of $107,406.10 for a not to exceed total amount of $1,181,467.10. The Contract amount of $1,074,061.00 is currently available as itemized on the attached Exhibit "A," and described as the Bid Schedule. The contingency amount of $1 07,406.10 is for City approved change orders only in accordance with the City's purchasing policy. Within thirty (30) days from the commencement of work, there shall be paid to the Contractor a sum equal to ninety percent (95%) of the value of the actual work completed plus a like percentage of the value of material suitably stored at the worksite, treatment plant or approved storage yards subject to or under the control of the City, since the commencement of the work as determined by the City. Thereafter, on a schedule issued by the City at the commencement of the job which shows a minimum of one payment made to the Contractor per month for each successive month as the work progresses and the request for payment due dates from the Contractor to meet the payment schedule, the Contractor shall be paid such sum as will bring the total payments received since the commencement of the work up to ninety percent (95%) of the value of the work completed since the commencement of work as determined by the City, less all previous payments, provided that the Contractor submits the request for payment prior to the end of the day required to meet the payment schedule. The City will retain five percent (5%) of the amount of each such progress estimate and material cost until the Final Payment. CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-7 Payments shall be made on demands drawn in the manner required by law, accompanied by a certificate signed by the City's Engineer, stating that the work for which payment is demanded has been performed in accordance with the terms of the Contract, and that the amount stated in the certificate is due under the terms of the Contract. Partial payments on the Contract price shall not be considered as an acceptance of any part of the work. Section 12. Substitution of Securities in Lieu of Retention of Funds. Pursuant to Public Contract Code Section 22300 et seq., the Contractor will be entitled to post approved securities with the City or an approved financial institution in order to have the City release funds retained by the City to insure performance of the Contract. Contractor shall be required to execute an addendum to this Contract together with escrow instructions and any other documents in order to effect this substitution. Section 13. Completion. Within ten (1 0) days after the contract completion date of the Project, Contractor shall file with the City's Engineer its affidavit stating that all workers and persons employed, all firms supplying materials, and all subcontractors upon the Project have been paid in full, and that there are no claims outstanding against the Project for either labor or material, except those certain items, if any, to be set forth in an affidavit covering disputed claims, or items in connection with Stop Notices which have been filed under the provisions of the statutes of the State of California. City may require affidavits or certificates of payment and/or releases from any subcontractor, laborer or material supplier. Section 14. Contractor's Employees' Compensation. A. General Prevailing Rate: City has ascertained from the State of California Director of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for legal CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-8 holiday and overtime work in the locality in which the work is to be performed for each craft or type of work needed to execute this Contract, and copies of the same are on file in the Office of the Engineer of City. The Contractor agrees that not less than said prevailing rates shall be paid to workers employed on this public works contract as required by Labor Code Section 177 4 of the State of California. C. Forfeiture For Violation: Contractor shall, as a penalty to the City, forfeit a sum of not more than Two Hundred Dollars ($200.00) for each calendar day or portion thereof for each worker paid (either by the Contractor or any subcontractor under it) less than the prevailing wage rates as determined by the Director of Industrial Relations for the work or craft in which the worker is employed. The amount of the penalty shall be determined by the labor commissioner and the difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by the contractor or subcontractor, all in accordance with Section 1775 of the Labor Code of the State of California. D. Travel and Subsistence Pay: Section 1773.8 of the Labor Code of the State of California, regarding the payment of travel and subsistence payments, is applicable to this Contract and Contractor shall comply therewith. E. Apprentices: Section 1777.5, 1777.6 and 1777.7 of the Labor Code of the State of California, regarding the employment of apprentices, is applicable to this Contract and the Contractor shall comply therewith if the prime contract, or a contract of a specialty CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-9 contractor not bidding for work through a general or prime contractor, involves Thirty Thousand Dollars ($30,000.00) or more. F. Workday: In the performance of this Contract, not more than eight (8) hours shall constitute a day's work, and Contractor shall not require more than eight (8) hours of labor in a day from any person employed by him hereunder except as provided in paragraph (B) above. Contractor shall conform to Article 3, Chapter 1, Part 7 (Sections 1810 et seq.) of the Labor Code of the State of California and shall forfeit to the City as a penalty, the sum of Twenty-five Dollars ($25.00) for each worker employed in the execution of this Contract by Contractor or any subcontractor for each calendar day during which any worker is required or permitted to labor more than eight (8) hours in any one calendar day and forty (40) hours in any one week in violation of said Article. Contractor shall keep an accurate record showing the name and actual hours worked each calendar day and each calendar week by each worker employed by Contractor in connection with the Project. G. Record of Wages; Inspection: Contractor agrees to maintain accurate payroll records showing the name, address, social security number, work classification, straight-time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker or other employee employed by it in connection with the Project and agrees to require that each of its subcontractors does the same. All payroll records shall be certified as accurate by the applicable Contractor or subcontractor or its agent having authority over such matters. CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-10 In accordance with Labor Code section 1771.4, Contractor and each subcontractor shall furnish the certified payroll records directly to the Department of Industrial Relations ("DIR") on a weekly basis and in the format prescribed by the DIR, which may include electronic submission. Contractor shall comply with all requirements and regulations from the DIR relating to labor compliance monitoring and enforcement. Certified payroll records of the contractor and subcontractor shall also be available to the employee or employee's representative, the Division of Labor Standards Enforcement, and the Division of Apprenticeship Standards and shall comply with all of the provisions of Labor Code Section 1776, in general. Section 15. Surety Bonds. A) Contractor shall guarantee Contractor's performance of this Agreement by providing CITY with the following security instruments (the "Security Instruments") on forms approved by CITY for the purposes and in the amounts as follows: a. A "Faithful Performance Bond" to ensure faithful performance of this Agreement in regard to the Project in the amount of 100% of the estimated cost of the Project; and b. A "Labor and Materials Bond" to secure payment to any contractor, subcontractor, persons renting equipment or furnishing labor or materials for the Project required to be constructed or installed pursuant to this Agreement in the additional amount of 100% of the estimated cost of the Project. c. In lieu of providing the bonds described/required above, Contractor may substitute a "Letter of Credit" in a form acceptable to CITY. B) In order to guarantee and warranty the completed Project, and in addition to the Security Instruments referenced in Paragraph 4(A) above, Contractor shall provide to City the following Security Instruments: a. A "Warranty Bond" for the work warranting the accepted work for a period of one (1) year following said acceptance against any defective work or labor done or defective material furnished. The amount of such Warranty Bond for the Project shall be equal to twenty-five percent (25%) of the estimated construction cost of the Project. CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-11 b. In lieu of the Warranty Bond, Contractor may substitute a "Letter of Credit" in a form acceptable to the City (said Letter of Credit having an equivalent value as the Warranty Bond). C) All Security Instruments required by this Agreement shall be kept on file with the City Clerk. The terms of the Security Instruments required by this Agreement are hereby incorporated into this Agreement by reference. D) Payments under the Security Instruments shall be required to be made (and, with respect to bonds, litigation shall be required to be instituted and maintained) in the County of Orange, State of California. E) Each of the Security Instruments shall be automatically renewing. F) The Security Instruments shall reference Contractor's obligations under this Agreement, shall be irrevocable, and shall include as an additional obligation secured the responsibility to compensate CITY for all of CITY's attorneys' fees and litigation expenses reasonably incurred by CITY in enforcing its rights under the Security Instruments. This Contract shall not become effective until such bonds are supplied to and approved by the City. Section 16. Insurance. A. Contractor is also aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for Workers' Compensation or undertake self-insurance in accordance with the provisions of that Code and will comply with such provisions before commencing the performance of the work of this Contract. B. Contractor and all subcontractors will carry workers' compensation insurance for the protection of its employees during the progress of the work. The insurer shall waive its rights of subrogation against City, its officers, agents and employees and shall issue a certificate to the policy evidencing same. C. Contractor shall at all times carry, on all operations hereunder, bodily injury, including death, and property damage liability insurance, including automotive CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-12 operations, bodily injury and property damage coverage. All insurance coverage shall be in amounts specified by City in the Insurance Requirements and shall be evidenced by the issuance of a certificate in a form prescribed by the City and shall be underwritten by insurance companies satisfactory to City for all operations, subcontract work, contractual obligations, product or completed operations, all owned vehicles and non-owned vehicles. Said insurance coverage obtained by the Contractor, excepting workers' compensation coverage, shall name the City, its Directors, Officers, Agents, Employees, Engineers, and Consultants for this contract, and all public agencies from whom permits will be obtained and their Directors, Officers, Agents and Employees, as determined by the City, as additional insureds on said policies. D. Before Contractor performs any work at, or prepares or delivers materials to, the site of construction, Contractor shall furnish certificates of insurance evidencing the foregoing insurance coverages and such certificates shall provide the name and policy number of each carrier and policy and that the insurance is in force and will not be canceled without thirty (30) days' written notice to City. E. Contractor shall maintain all of the foregoing insurance coverages in force until the work under this Contract is fully completed. The requirement for carrying the foregoing insurance shall not derogate from the provisions for indemnification of City by Contractor under Section 17 of this Contract. Notwithstanding nor diminishing the obligations of Contractor with respect to the foregoing, Contractor shall subscribe for and maintain in full force and effect during the life of this Contract, the following insurance in amounts not less than the amounts specified and issued by a company admitted in California and having a Best's Guide Rating of A-Class VII or better: Worker's Compensation CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 In accordance with the Workers' Compensation Act of the State of California --Minimum of AGREEMENT B-13 Public Liability, in the form of either Comprehensive General Liability or Commercial General Liability written on a per-occurrence basis Automobile liability, including non-owned and hired vehicles $1,000,000 $1,000,000, per occurrence, or alternatively, $1,000,000 aggregate, separate for this project. $1,000,000 per occurrence City or its representatives shall at all times have the right to inspect and receive the original or a certified copy of all said policies of insurance, including certificates. Contractor shall pay the premiums on the insurance hereinabove required. Section 17. Risk and Indemnification. All work covered by this Contract done at the site of construction or in preparing or delivering materials to the site shall be at the risk of Contractor alone. Contractor agrees to save, indemnify and keep City, its Directors, Officers, Agents, Employees, Engineers, and Consultants for this Contract, and all public agencies from whom permits will be obtained and their Directors, Officers, Agents and Employees harmless against any and all liability, claims, judgments, costs and demands, including demands arising from injuries or death of persons (Contractors' employees included) and damage to property, arising directly or indirectly out of the obligations herein undertaken or out of the operations conducted by Contractor, save and except claims or litigation arising through the sole negligence or sole willful misconduct of City, and will make good to and reimburse City for any expenditures, including reasonable attorneys' fees City may incur by reason of such matters, and if requested by City, will defend any such suits at the sole cost and expense of Contractor. Section 18. Stop Notice Administration. City reserves the right to charge Contractor for City's actual administrative time (including attorney's time) to administer and process stop notices filed by Contractor's subcontractors, material-men, or any other claimant or lienholder. Section 19. Termination. A. This Contract may be terminated in whole or in part in writing by either CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-14 party in the event of substantial failure by the other party to fulfill its obligations under this Contract through no fault of the terminating party, provided that no termination may be effected unless the other party is given: (1) not less than ten (1 0) calendar days' written notice (delivered by certified mail, return receipt requested) of intent to terminate, and (2) an opportunity for consultation with the terminating party prior to termination. B. This Contract may be terminated in whole or in part in writing by the City for its convenience, provided that the Contractor is given (1) not less than ten (1 0) calendar days' written notice (delivered by certified mail, return receipt requested) of intent to terminate, and (2) an opportunity for consultation with the terminating party prior to termination. C. If termination for default or convenience is effected by the City, an equitable adjustment in the price provided for in this Contract shall be made, but (1) no amount shall be allowed for anticipated profit on unperformed services or other work, and (2) any payment due to the Contractor at the time of termination may be adjusted to cover any additional costs to the City because of the Contractor's default. If termination for default is effected by the Contractor, the equitable adjustment shall include a reasonable profit for services or other work performed, but no adjustment will be allowed for anticipated profits. The equitable adjustment for any termination shall provide for payment to the Contractor for services rendered and expenses incurred prior to the termination, in addition to termination settlement costs reasonably incurred by the Contractor relating to commitments which had become firm prior to the termination. D. Upon receipt of a termination action under paragraphs (A) or (B) above, the Contractor shall (1) promptly discontinue all affected work (unless the notice directs otherwise), and (2) deliver or otherwise make available to the City all data, drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated by the Contractor in performing this Contract whether completed or in process. CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-15 E. Upon termination under paragraphs (A) or (B) above, the City may take over the work and may award another party an agreement to complete the work under this Contract. Contractor agrees to perform all work under this Contract in accordance with the City's designs, drawings and specifications. The Contractor guarantees for a period of at least one ( 1) year from the date of substantial completion of the work that the completed work is free from all defects due to faulty materials, equipment or workmanship and that he shall promptly make whatever adjustments or corrections which may be necessary to cure any defects, including repairs of any damage to other parts of the system resulting from such defects. The City shall promptly give notice to the Contractor of observed defects. In the event that the Contractor fails to make adjustments, repairs, corrections or other work made necessary by such defects, the City may do so and charge the Contractor the cost incurred. The performance bond shall remain in full force and effect through the guarantee period. The Contractor's obligations under this clause are in addition to the Contractor's other express or implied assurances under this Contract or state law and in no way diminish any other rights that the City may have against the Contractor for faulty materials, equipment or work. Section 20. Assignment. No assignment by the Contractor of this Contract or any part hereof, or of funds to be received hereunder, will be recognized by the City unless such assignment has had prior written approval and consent of the City and the surety. Section 21. Attorneys' Fees. If any action at law or in equity is necessary to enforce or interpret the terms of this Contract, the prevailing party shall be entitled to reasonable attorneys' fees, costs CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-16 and necessary disbursements in addition to any other relief to which it may be entitled. If any action is brought against the Contractor or any subcontractor to enforce a Stop Notice or Notice to Withhold, which names the City as a party to said action, the City shall be entitled to reasonable attorneys' fees, costs and necessary disbursements arising out of the defense of such action by the City. The City shall be entitled to deduct its costs for any Stop Notice filed, whether court action is involved or not. Section 22. Resolution of Disputes. The City and the Contractor shall comply with the revisions of California Public Contracts Code Section 20104, et seq., regarding resolution of construction claims for any claims which arise between the Contractor and the City. Section 23. Department of Industrial Relations Registration. Pursuant to Labor Code section 1771.1, no subcontractor may be listed on a bid proposal for any work related to the Project unless registered with the California Department of Industrial Relations ("DIR"). Furthermore, Contractor is hereby notified that no subcontractor may be awarded a contract for any work related to the Project unless registered with the DIR. Pursuant to Labor Code section 1771.4, Contractor is hereby notified that the Project is subject to compliance monitoring and enforcement by the DIR. Contractor will maintain and will require all subcontractors to maintain valid and current DIR Public Works Contractor registration during the term of this Agreement. Contractor shall notify the District in writing immediately, and in no case more than twenty-four (24) hours, after receiving any information that Contractor's or any of its subcontractor's DIR registration status has been suspended, revoked, expired, or otherwise changed. Section 24. Notices. Any notice required or permitted under this Contract may be given by ordinary CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-17 mail at the address set forth below. Any party whose address changes shall notify the other party in writing. To City: To Contractor: City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Attn: Keith Van Der Maaten, P.E. Public Works and Utilities Director Dominic Burtech, President Nu-Line Technologies, LLC. 1 02 Second Street, Suite B Encinitas, CA 92024 Section 25. Counterparts and Facsimile Signatures. This agreement may be executed by the Parties in counterparts, which counterparts shall be construed together and have the same effect as if all parties had executed the same instrument. Counterpart signatures may be transmitted by facsimile, email or other electronic means and have the same force and effect as if they were original signatures. Signature Page Follows. CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 AGREEMENT B-18 IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract as of the date first hereinabove written. ATTEST: By: ______ ---==-=--------- Maria Morris, City Clerk APPROVED AS TO FORM: By:·-------=------- Jeff Ballinger, City Attorney CITY OF SAN JUAN CAPISTRANO ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 CITY OF SAN JUAN CAPISTRANO By:......,._--:--=----:-------- Derek Reeve, Mayor NU-LINE TECHNOLOGIES, LLC By:~6:=.:::::::=-----,~~~-- AGREEMENT B-19 Construction Plans and Specifications for the Annual Sewer Rehabilitation Program, CIP 15701 (plans are included in the specifications as Appendix F) are on file and available for review at the City Clerk's Office. This is EXHIBIT B, consisting of one page , referred to in and made a part of the AGREEMENT between OWNER and CONTRACTOR. BID SCHEDULE ANNUAL SEWER REHABILITATION PROGRAM, CIP 15701 Description Estimated Unit Unit Price Extended ID Quantity Price 1 Mobilization/Demobilization 1 LS '35,cdJ . OD 35,DCO.d) (Cannot exceed 10% of bid items 2-25) 2 SCRRA (Railroad) Right of Entry Agreement-1 LS ~~~cx::D.OO 18,000 . 0() Application and Compliance Fees Complete 3 Sheeting, Shoring and Bracing 1 LS J1a.XHO Jloao .cm 4 Temporary Sewer Bypass 6" (All Segments) 1 LS ~>CUD-00 ~~.01) 5 Cured In Place Pipe Lining-6" 2,125 LF 33 . &o 11,~00 ·00 6 Temporary Sewer Bypass 8" (All Segments) 1 LS 10)00\).110 10 :(J)O ·"l> 7 Cured-In-Place Pipe Lining -8" 5,038 LF ?IJ.OD 1&1,2JII .Ob 8 Cured-In-Place Pipe Partial Lining (Spot Repair) 8" 20 LF zso .oo s,xo.au 9 Temporary Sewer Bypass 12" (All Segments) 1 LS ';'3 1 t_, !l). (JD ?i~,&.m . ou 10 Cured-In-Place Pipe Lining -12" 953 LF SS .()O S2/I.(I.C6t 11 Temporary Sewer Bypass 18" & 21 " (All Segments) 1 LS 'ltl 310 .(10 tt'l, ~, 0 ·0'0 12 Cured in Place Pipe Lining -18" 19 LF ~'1.® s,~s-3.m) 13 Cured In Place Pipe Lining-21" 4,939 LF g~ 01 ~w.c.-H a1 14 Cured-In-Place Pipe Lining-21" (Storm Drain) 64 LF 12.1·® g .JZ.&.IfJ 15 Cured In Place Pipe Lining -36" (Storm Drain) 145 LF 12.~-au '2.(; ~;6.01) 16 Remove Protruding laterals, gaskets, other 36 EA 'Z.(.,£'.0\) Cf,rl/o.((b obstructions 17 Manhole Rehabilitation (includes pressure grouting) 7 EA '3,25~.0i) :22 .7lf1·Vl 18 Manhole Rehabilitation (no pressure grouting) 8 EA ·z~~(l5 .qo '2..'2. 1 '14 0. {ft) 19 Manhole Rehabilitation, Rebuild Trough Only 4 EA (1S ~0.0\) (., ,l (,O. 00 20 Manhole Frame & Cover 11 EA ,,s:oo .(T"l; I(,,S'OO 01> 21 Service Lateral Connection Repair (Top Hat Style) 16 EA 11S dO t'Q 'L~ ,oro .{Tj) 22 Install 6" Terminal Cleanout 1 EA '&,OOV .OD ~,aro .m 23 Install Arguello Way Sewer Improvements 1 LS 'L1 1 SOV.(t) 'Z-1 I ~ O[J. at 24 Traffic Control, Public Convenience and Safety 1 LS tOJISO .Vb IO.fSO.{"I) 25 Raise Manhole 4 EA I,S ({).cJl) &,cw . rn BID TOTAL : I, 074, Dt, f. 00 Bid Total in Words : ON. p'l,l( t4 f.. ~ v tnt'-\. fc tAr 11-w.,Ullnd J Name of Bidder or Firm Annual Sewer Rehabilitation Program, CIP 15701 S'nE\-~ -Oro{_ ()ol!a.~ ard' ~" Gn/-.t J UNIT PRICE BID SCHEDULE BID FORMS Exhibit A