Loading...
Ordinance Number 896ORDINANCE NO. 896 AN ORDINANCE OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA, APPROVING A COMPREHENSIVE DEVELOPMENT PLAN FOR WHISPERING HILLS ESTATES (CDP 04-01) THE CITY COUNCIL OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS: WHEREAS, Whispering Hills LLC, 19700 Fairchild Road, Suite 120, Irvine, CA 92612, has filed an application with the City of San Juan Capistrano for approval of a Comprehensive Development Plan (CDP) to establish permitted uses, development standards, and other zoning regulations for the property zoned "PC" Planned Community, located in the southeastern part of the City, west of La Pata Avenue and north of the Prima Deschecha landfill, and WHEREAS, the Planning Commission has held duly -noticed public hearings on the preceding CDP application and has recommended approval, and WHEREAS, the City staff and the City's consulting project manager have prepared a detailed staff report on the CDP to the City Council dated July 20, 2004, and WHEREAS, on July 20, 2004, the City Council held a public hearing and considered the proposed rezoning and associated land use applications for the project, the recommendation of the Planning Commission and other advisory Commissions, and the evidence and arguments submitted by the City staff, the developer, and all interested parties. A notice of time, place and purpose of the public hearing was duly given and testimony was presented to and considered by the City Council at the public hearing, and WHEREAS, on May 21, 2002, the City Council certified a Final Environmental Impact Report (FEIR) and Findings in accordance with the California Environmental Quality Act (CEQA) to address the environmental impacts of a similar but more intensive project on the property. Based on a review of that FEIR, the City's Environmental Administrator has determined that the present proposed project qualifies for an EIR Addendum pursuant to Section 15164 of the CEQA Guidelines, which Addendum, including an Initial Study of the present project, a new traffic study, an updated Mitigation Monitoring and Reporting Program, and associated other environmental documentation, has been prepared, reviewed by the Planning Commission and City Council, and made available to the public. The Addendum is incorporated by reference as Exhibit C, as if fully set out herein. In addition, the FEIR and Findings are incorporated by reference as if fully set out herein. All records pertaining to preparation, review, and comment on the FOR and Addendum are retained in the Planning. Department of the City of San Juan Capistrano. SECTION 1. Findings Regarding EIR Addendum and Mitigation Monitoring and — Reporting Program. The City Council finds that, pursuant to CEQA Guidelines Section 15164, an Addendum to the Final EIR has been prepared because: a. None of the circumstances described in CEQA Guidelines Section 15162 requiring a subsequent EIR have occurred; and b. Minor technical additions in the Addendum help to further explain and refine, rather than substantively alter, the Final EIR; and c. The Addendum does not raise important new issues about significant effects on the environment. 2. The City of San Juan Capistrano exceeded the public notice requirements under Public Resources Code 21092 posting a notice of the availability of the Initial Study and Addendum on the project site and at the Orange County Clerk -Recorder. 3. The City Council has reviewed and considered all environmental documentation and has found that the Addendum properly concludes that all environmental effects and mitigation measures associated with the project are adequately addressed in the Final EIR, and has examined with particular care whether there are any potential effects peculiar to the project, as well as the adequacy of the performance of adopted mitigation measures, all as set forth in the Addendum, and has found that said Addendum is particularly responsive to the actual environmental effects and public comments to date. 4. Section 21166 of CEQA and Section 15162 of the CEQA Guidelines provide that, where an EIR has been prepared, no new EIR need be prepared unless there are changes in the project, its underlying circumstances, or new information, which result in new or more severe impacts than were originally documented in the EIR. 5. The Certified Final EIR prepared by the City of San Juan Capistrano for the Whispering Hills Estates project completely and adequately documents the impacts of the project. 6. The Addendum contains substantial evidence supporting the conclusion that impacts of the project are not new or more severe than those predicted in the Final EIR, and that such evidence has been carefully and independently reviewed by the City of San Juan Capistrano staff responsible for the accuracy of such evidence. Also, as demonstrated by the Addendum, impacts of the project will be less than the earlier project in many of the topical areas (i.e. 2 aesthetics, grading, air quality, hydrology/water quality, noise, and traffic), as the number of dwelling units has been reduced. 7. Pursuant to Public Resources Code Section 21083.3, there are no effects on the environment that are peculiar to the project that would require preparation of a new, subsequent or supplemental EIR. Also, no new information has become available indicating that the impacts and mitigation measures associated with the Project are not adequately addressed in the Final EIR. Accordingly, no additional, subsequent, or supplemental EIR need be prepared for the project. SECTION 2. Findings Regarding Comprehensive Development Plan. The Comprehensive Development Plan (CDP), attached hereto as Exhibit B, is consistent with the City's General Plan and Land Use Code because of the following findings: Land Use Designations - The City's General Plan designates the property as "Planned Community", "Very Low Density Residential" (maximum density of one dwelling unit per acre), and "General Open Space" . The General Open Space designation was assigned to the SDG&E transmission line right-of-way extending diagonally through the property from northwest to southeast. The two ridgelines on the site are designated as "Major Ridgelines", to be preserved in open space per the Conservation and Open Space Element. Residential Density - The density of the residential portion of the Planned Community (VTTM 16634) is 155 dwelling units = 314 acres = .49 du/acre. This is within the maximum General Plan density of one unit per acre. Transmission Corridor Open Space Designation - The General Open Space designation is meant to show that the area occupied by the electric transmission lines is to remain in open space. The aboveground portion will remain in open space, with the central portion being realigned to accommodate the undergrounding of the eastern portion. That undergrounded portion will be relocated in the main entry street, "A" street, which is to be flanked by open space on both sides in the form of high school playfields on the north and the detention basins on the south. Thus, the General Plan transmission line open space will be preserved in its undergrounded condition, though with a slightly different alignment. Therefore, the CDP is consistent with the General Open Space designation. Major Ridgelines - The CDP retains the two major ridgelines in open space. Zoning Designation - The property is designated "PC" and "GOS" on the Official Zoning Map. The PC District zoning classification requires adoption of a Comprehensive Development Plan. The purpose of adoption of the CDP by zoning ordinance is to establish the site-specific permitted uses and specific development standards (e.g. lot sizes, setbacks, etc.) for the property. Transmission Corridor Zonino - The GOS zoning follows the General Plan General Open Space designation for the electric transmission corridor. As discussed above under "General Plan", the preservation of this corridor in open space is achieved in both its aboveground and underground segments. The transmission line corridor is surrounded on both sides by the area zoned "PC" on the Zoning Map. It is also part of, and under common ownership with, VTTM 16634. Therefore, for purposes of coordinated planning, zoning and development and in conformity with the purpose and intent of the PC District, the corridor has been included in the CDP. SECTION 3.. Approval. In light of the preceding findings, the City Council hereby: Determines that, since none of the conditions described in Section 15162 of the CEQA Guidelines calling for a new EIR have occurred, and since the information reported in the EIR Addendum dated June 2004, incorporated by reference as Exhibit C as if fully set out herein, does not raise important new issues about the significant effects on the environment, pursuant to Section 15164 of the CEQA Guidelines, the Final EIR and Addendum adequately address the environmental effects and feasible mitigation measures associated with the Project. 2. Adopts the "Statement of Overriding Considerations", attached hereto as Exhibit A. The FEIR determined that the present project's similar predecessor, the High School/193 DU Alternative, would have a significant unavoidable cumulative impact in the area of air quality. The City Council has balanced this significant adverse environmental impact against environmental benefits and other benefits resulting from approval of the proposed project, which are identified in the Statement of Overriding Considerations, and hereby finds that the benefits override the identified adverse environmental impacts. Approves Comprehensive Development Plan CDP 04-01, attached hereto as Exhibit B. SECTION 4. Effective Date. This Ordinance shall take effect and be in force thirty (30) days after its passage. 12 SECTION 5. City Clerk's Certification. The City Clerk shall certify to the adoption of this Ordinance and cause the same to be posted at the duly designated posting places within the City and published once within fifteen (15) days after passage and adoption as required by law; or, in the alternative, the City Clerk may cause to be published a summary of this Ordinance and a certified copy of the text of this Ordinance shall be posted in the Office of the City Clerk five (5) days prior to the date of adoption of this Ordinance; and, within fifteen (15) days after adoption, the City Clerk shall cause to be published the aforementioned summary and shall post a certified copy of this Ordinance, together with the vote for and against the same, in the Office of the City Clerk. PASSED, APPROVED AND ADOPTED this 3rd day-kf Aug*t, 2004. JOE S070, MA ATTEST: e, MARC RET R. MONAHAN, CITY CLERK STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss. CITY OF SAN JUAN CAPISTRANO ) I, MARGARET R. MONAHAN, appointed City Clerk of the City of San Juan Capistrano, do hereby certify that the foregoing is a true and correct copy of Ordinance No. 896 which was regularly introduced and placed upon its first reading at the Regular Meeting of the City Council on the 20`h day of July 2004 and that thereafter, said Ordinance was duly adopted and passed at the Regular Meeting of the City Council on the 3'd day of August 2004 by the following vote, to wit: AYES: COUNCIL MEMBERS: Allevato, Bathgate, Swerdlin, Hart & Mayor Soto NOES COUNCIL M E NNDrys �46� ChOI�N�I� ME BE N R. MONAHAN, City Clerk EXHIBIT A STATEMENT OF OVERRIDING CONSIDERATIONS STATEMENT OF OVERRIDING CONSIDERATIONS WHISPERING HILLS ESTATES A. UNAVOIDABLE IMPACTS IDENTIFIED IN FOR The Whispering Hills Estates project, like its similar predecessor, the High School/193 DU Alternative addressed in the adopted Final Environmental Impact Report (FEIR), would have a significant unavoidable cumulative impact in the area of air quality, as described in detail in the Statement of Findings and Facts for the FEIR. The FEIR identified all feasible mitigation measures with respect to the above impact. Although these mitigation measures may substantially lessen this significant impact, adoption of the measures will not fully avoid the impacts. As a result, to approve the project, the City must make a statement of overriding considerations pursuant to State CEQA Guidelines Sections 15043 and 15093. This statement allows a lead agency to cite a project's general economic, social or other benefits as a justification for choosing to allow the occurrence of specified significant environmental effects that have not been avoided. The statement explains why, in the agency's judgement, the project's benefits outweigh the unavoidable significant effects. B. IDENTIFIED PUBLIC BENEFITS The City, in its review and consideration of the proposed Whispering Hills Estates project, and in consideration of the significant unavoidable cumulative impact in the area of air quality, hereby adopts the following determinations and findings regarding the Unavoidable Adverse Impacts for the following overriding reasons: The project will contribute housing in the City of San Juan Capistrano by the provision of additional residential units. The provision of additional housing is a public benefit of the project. The project will provide housing opportunities that meet the objectives and policies the City's General Plan Housing Element and SCAG's Regional Housing Needs Assessment. Also, with regard to affordable housing opportunities, the project will be required to pay an affordable housing in -lieu fee equal to one percent of the project's building permit valuation. 2. An extensive trail system has been planned in the City's General Plan, including equestrian, multi -use, and bicycle trails. The project provides for implementation of a number of such trails. EXHIBIT B COMPREHENSIVE DEVELOPMENT PLAN COMPREHENSIVE DEVELOPMENT PLAN WHISPERING HILLS ESTATES PLANNED COMMUNITY CITY OF SAN JUAN CAPISTRANO ADOPTED BY CITY COUNCIL 813104 TABLE OF CONTENTS CHAPTER/SECTION PAGE CHAPTER 1: INTRODUCTION 1.1 Purpose and Intent 1-1 1.2 Size and Location of Property 1-2 1.3 General Plan and Zoning 1-2 1.4 Definitions 1-4 CHAPTER 2: LAND USE AND CIRCULATION 2.1 Land Use 2-1 2.2 Circulation and Access 2-4 2.3 Parks and Trails 2-4 2.4 Public Utilities 2-5 CHAPTER 3: PERMITTED USES AND DEVELOPMENT STANDARDS 3.1 Introduction 3-1 3.2 General Provisions 3-1 3.3 Residential Land Uses 3-1 3.4 Nonresidential Land Uses 3-4 CHAPTER 4: PROJECT IMPLEMENTATION 4.1 Phasing 4-1 4.2 Zoning Conditions 4-1 4.3 Development Review Procedures 4-2 3 1. INTRODUCTION 1.1 PURPOSE AND INTENT This Comprehensive Development Plan (CDP) is intended to implement the PC "Planned Community" zoning for the Whispering Hills Estates Planned Community'. The Planned Community is composed of the following two primary areas: Area A: Consisting of Subarea Al: Vesting Tentative Tract Map 16634 (VTTM 16634), under review by the City concurrently with this CDP, and a four -acre .'remainder' parcel on the north side of "A" Street near La Pate Avenue (see Exhibit 2); plus Subarea A2: a 34 -acre subarea located in unincorporated territory between the City boundary and La Pate Avenue which is to be annexed to the City. Area B: The 52 -acre± San Juan Hills High School site, which is being purchased from the owner of VTTM 16634 by the Capistrano Unified School District (CUSD). Previously, as allowed by state law, the CUSD Board of Trustees overrode the City zoning on this portion of the Planned Community in order to permit establishment of the High School. Therefore, permitted uses and development standards for this Area are under the authority of CUSD and the Division of the State Architect. Thus, this CDP does not establish zoning regulations for Area B. Section 9-3.315 of the City's Land Use Code (Title 9 of the Municipal Code) identifies the purpose and intent of the PC District: "(1) Encourage the use of modern land planning and design techniques to create developments integrating a mixture of different types of land uses; "(2) Realize the economic, social, and aesthetic advantages of combining different types of land uses in a coordinated community design, such developments to be of sufficient size to provide related areas for various uses, which may include varying housing types; commercial retail and service activities; industrial uses; recreation, school and other public facilities and other appropriate land uses. The regulations forthe Planned Community (PC) District are designed to permit the adoption of a Comprehensive Development Plan (CDP) providing for a diversity of uses, building relationships, and open spaces within planned building groups, while insuring compliance with the General Plan and this Code; "(3) To insure, by means of land use regulations and specific conditions of approval, a more efficient use of open space, the separation of pedestrian and vehicular traffic, increased project amenities and compatibility with surrounding development; For purposes of brevity in this CDP, the Whispering Hills Estates Planned Community is sometimes referred to as "Whispering Hills"or the "Whispering Hills Planned Community". 1-1 WHISPERING HILLS ESTATES COMPREHENSIVE DEVELOPMENT PLAN "(4) To achieve the coordinated planning and orderly development of different contiguous parcels of land by means of an approved Comprehensive Development Plan; and "(5) To provide open space, agricultural, and low density residential interim use of property until a Comprehensive Development Plan is approved and implemented". 1.2 SIZE AND LOCATION OF PROPERTY The Whispering Hills Planned Community is located on 404 acres in the southeastern portion of the City of San Juan Capistrano (see Exhibit 1). Of that, Subarea "A1" consists of 314 acres included in the residential project, VTTM 16634, (see Table 1). and a remainder parcel of about four acres, which is not a part of VTTM 16634. Subarea "A2" consists of a 34 -acre property presently located in unincorporated territory between the City boundary and La Pate Avenue (see Exhibit 2). All or part of this territory will be annexed to the City in accordance with a condition of approval on VTTM 16634. Since this property is presently outside the boundaries of the City, the land use and other regulations in this CDP will become active on the property only upon its prezoning and annexation to the City. Area B is the future public San Juan Hills High School, occupying approximately 52 acres. The property has two northwesterly trending ridges (see Exhibit 1). These ridgelines are designated for preservation in the General Plan. The property also contains two electric transmission corridors. 1.3 GENERAL PLAN AND ZONING 1.3.1 GENERAL PLAN Land Use Designations - The City's General Plan designates the property as "Planned Community", "Very Low Density Residential" (maximum density of one dwelling unit per acre), and "General Open Space". The General Open Space designation was assigned to the SDG&E transmission line right-of-way extending diagonally through the property. The two ridgelines on the site are designated as "Major Ridgelines", to be preserved in open space per the Conservation and Open Space Element. Residential Density - The density of the residential portion of the Planned Community (VTTM 16634) is 155 dwelling units +314 acres =.49 du/acre. This is within the maximum General Plan density of one unit per acre. 1-2 7. G WHISPERING HILLS ESTATES COMPREHENSIVE DEVELOPMENT PLAN Transmission Line Open Space Designation - The General Open Space designation is meant to show that the area occupied by the electric transmission lines is to remain in open space. The aboveground portion will remain in open space, with the central portion being realigned to accommodate the undergrounding of the eastern portion. That undergrounded portion will be relocated in the main entry street, "A" street, which is to be flanked by open space on both sides in the form of high school playfields on the north and the detention basins on the south. Thus, the General Plan transmission line open space will be preserved in its undergrounded condition, though with a slightly different alignment. Therefore, this CDP is consistent with the General Open Space designation. Maior Ridgelines - This CDP retains the two major ridgelines in open space (see Exh. 2). 1.3.2 ZONING The property is designated "PC" and "GOS" on the Official Zoning Map. The PC District zoning classification requires that a Comprehensive Development Plan be integrated into the PC zoning in order to establish permitted land uses and development standards on a PC -designated property. This is the Comprehensive Development Plan for the Whispering Hills PC. The GOS zoning follows the General Plan General Open Space designation for the electric transmission corridor. As discussed above under "General Plan", the preservation of this corridor in open space is achieved in both its aboveground and underground segments. The transmission line corridor is surrounded on both sides by the area zoned "PC" on the Zoning Map. It is also part of, and under common ownership with, VTTM 16634. Therefore, for purposes of coordinated planning, zoning and development and in conformity with the purpose and intent of the PC District, the corridor has been included in this CDP. 1.4 DEFINITIONS For the purposes of this Comprehensive Development Plan, the term "Land Use Code' shall mean Title 9 of the City of San Juan Capistrano's Municipal Code, as last revised. Unless otherwise indicated herein, all terms used in this Comprehensive Development Plan shall have meanings as defined in the Land Use Code. 1-4 2. LAND USE AND CIRCULATION 2.1 LAND USE 2.1.1 SUMMARY This Comprehensive Development Plan for VTTM 46634 provides for the following land uses and development within the Whispering Hills Planned Community: A public high school. 2. Vesting Tentative Tract Map (VTTM)16634: A maximum of 155 single family dwelling units, with a maximum of 15 dwelling units in the west canyon area, on minimum 30,000 -square -foot lots, and the remaining 140 units in the east canyon area on minimum 10,000 -square -foot lots. 3. Open space -oriented uses on Subarea "A2": a 34 -acre area located between VTTM 16634 and La Pata Avenue to be annexed to the City. This area will also include a private neighborhood park serving the east canyon residential area. 4. The remainder of the property will be used for permanent open space, trails, detention basins, habitat mitigation/restoration, ane} utilities, and an electric transmission line corridor. 2.1.2 LAND USE PLAN Exhibit 2 shows the land use plan for the Whispering Hills Planned Community. Table 1 shows the land use distribution for the various areas shown on Exhibit 2. As shown in Table 1, the gross density of the residential portion of the Planned Community, VTTM 16634, is 0.49 dwelling units per acre (155 dwelling units on 314 acres). As shown on Exhibit 2, a minimum 500 -foot wide open space buffer is established within the west canyon area along its boundary with the existing Hidden Mountain Estates development (Tract 11826). No structures other than fencing and the project entry for the west canyon residential area will be placed in the buffer area. 2-1 BE TO THE CITY i 1 S ♦ yygq �K� � � BE TO THE CITY i WHISPERING HILLS ESTATES COMPREHENSIVE DEVELOPMENT PLAN _LAN S OISTIR*TIOI Land, ..................................................... ......... ................. ............ ......... .... -......... Single Family Residentiai tEast Canyon ,10,000 SF Lots) ............................................................................................................I.......... Single Family Residential (West Canyon — 30,GGJ SF Lots) .................................................... _.......................... ......._............ I........... Lot "H" Open Space Area ..............................................................................................1.......I.................. Conservation Easement Area __Pe�r,r.:i=JRe,ace ........................................................................:...........I.............--......... Total Subtotai - V'. 6334: .................................................................................................................. Remainder Parcel on Nort`:dc; c`. "A" Street ............................................................................................— .......... ................ Subtotal — Subarea "Al": .......................................................................................................................... Subarea "A2" — Unincorporated Area to be Annexed to C ..................................................................................................................... Tota, — Area "A': Total —Area "B". Sal": JLian Hills Hi h Scr ojl: ............................................................................................. TOTAL — Whispering Hills E3tates Planned Con 2.1.3 OPEN SPACE AND RIDGELIKE PRESERVATION 110 30 5... 169 314 4... There are two general types of open space within the Whispering Hills PC: Natural open space (including open space that has been returned to a naturalized state after disturbance from grading) and landscaped open space areas. Chapter 3 of this CDP identifies the permitted land uses within open space areas. The 169 -acre "Conservation Easement" area shown on Exhibit 2 is required by the California Depaitment of Fish and Gama: as part of Streambed Alteration Agreement R5- 2002-0115 and the United States Army Corps of Engineers as part of Permit No. 200001593-RLK. There are two prominent ridgelines running from the northwest to southeast through the middle of the property (see Exhibit 1). These ridgelines, which join and become one near the southern edge of VTTM 16634, are designated in the General Plan as "Major Ridgelines". Section 9-3.411(c) of the Land Use Code specifies the following: "No construction activity, including but not limited to grading on any major ridgeline so designated on the General Plan Map shall be allowed; more specifically, no construction activity, including but not limited to grading, shall be permitted within 200 feet (horizontal) of a General Plan designated 2-3 WHISPERING HILLS ESTATES COMPREHENSIVE DEVELOPMENT PLAN ridgeline, or as designated on a final City subdivision map in accordance with. required development conditions, except at as allowed under subsection (e) Exemptions." At adoption of this CDP, grading for the San Juan Hills High School was being carried out under the authority of the Capistrano Unified School DistricPs override of City zoning on the property per state law: The grading envelope for the high school extends into the east canyon residential area of VTTM 16634 .inorder to ensure that stability and other geotechnical considerations are addressed: Future development associated with VTTM 16634 will comply with the ridgeline preservation requirements of Section 9-3.411 of the Land Use Code. 2.2 CIRCULATION AND ACCESS 2.2.1 EXISTING ROADWAYS The San Diego Freeway (Interstate 5) provides north -south regional access to the Whispering Hills PC. The freeway is located approximately one and one-half miles west of the project site. Freeway access is provided at Ortega Highway (SR -74) via a diamond interchange and by slip ramps south of San Juan Creek Road along Camino Capistrano and along Valle Road. The local circulation system in the vicinity of the project site includes San Juan Creek Road, which is currently a two-lane secondary roadway east of La Novia Avenue, with sections that have been fully improved to four lanes. La Pata Avenue is a two-lane roadway east of the the Planned Community. Antonio Parkway connects with Ortega Highway opposite La Pata. Ortega Highway is a four -lane east -west primary arterial except east of Via Cordova, where it is two lanes. 2.2.2 CIRCULATION PLAN Primary access to the Planned Community will be provided via La Pate Avenue to the east canyon area and Avenida La Mancha to the west canyon. There will be two points of access onto La Pate; a main access controlled by a traffic signal for both the high school and the east canyon area, and a right -turn in only secondary access for the high school. Exhibit 2 shows the internal circulation system for VTTM 16634. 2.3 PARKS AND TRAILS 2.3.1 PARKS A private neighborhood park will be provided within the east canyon residential area. The size location and improvements for the park will be determined in conjunction with review of VTTM 16634. 2-4 WHISPERING HILLS ESTATES 2.3.2 TRAILS AND BIKEWAYS COMPREHENSIVE DEVELOPMENT PLAN Recreational trails and bikeways will be provided in general conformity with the conceptual alignments shown on Exhibit 3 and the City's Design Manual for Equestrian and Hiking Trails and City bikeway standards, subject to any restrictions imposed by the conditions of the Conservation Easement Area (California Department of Fish and Game Streambed Alteration Agreement R5-2002-0115; United States Army Corps of Engineers Permit No. 200001593-RLK). 2.4 PUBLIC UTILITIES Water and sanitary sewer systems will be provided as shown on VTTM 16634. Storm drain systems will be as provided in the project's Storm Water Pollution Prevention Plan and VTTM 16634, and will be installed in accordance with the Clean Water Act Section 401 Water Quality Certification (File No. 02C-039) for the project. 2-5 41 V EVS77NG TRAILS WING AND EQUESMAN TRAILS (PROPOSED) Now Trag Connecims SS (proposed by City SteM UNY S&WO Road aii jEXHEVT3: CONCEPTUAL TRALS PLAN 3. PERMITTED USES AND DEVELOPMENT STANDARDS 3.1 INTRODUCTION The Planned Community (PC) District regulations included in this Chapter are adopted pursuant to Section 9-3.315 of the Land Use Code. The purpose of the land use regulations is to define the permitted uses, development standards and other zoning regulations for the Whispering Hills Estates Planned Community. In cases where a land use or a development regulation is not addressed in this Chapter, the appropriate section of the Land Use Code (Title 9 of the City of San Juan Capistrano Municipal Code) shall govern. In cases of conflict between a land use or development regulation in this Chapter and the Land Use Code, this Chapter shall prevail. 3.2 GENERAL PROVISIONS The following land use regulations specify permitted land uses and development standards related to lot size, setbacks, and building heights. The Planning Director shall have the authority to review proposed land uses that are not listed in the land use regulations. The Planning Director shall determine that a proposed unlisted use may be permitted if the proposed use: Is compatible with the purpose and intent of the subject land use district; Is of a nature that is comparable to the principal, temporary or conditional uses permitted in the subject land use district; and Will not be detrimental to property in the vicinity of the proposed use. 3.3 RESIDENTIAL LAND USES 3.3.1 APPLICABILITY AND PURPOSE The regulations in this Section 3.3 apply to the residential portion of Area "A" in the Whispering Hills Planned Community. The purpose of these regulations is to provide for the development, maintenance and preservation of low density residential development with single family residences on individual lots, plus associated infrastructure and open space consistent with the PC Zoning. District, and to comply with the City General Plan Land Use Element that designates -the area included in VTTM 16634 as "Very Low Density Residential", allowing up to one dwelling unit per acre. 3.3.2 PRINCIPAL USES AND STRUCTURES PERMITTED Single-family detached dwellings. 3-1 WHISPERING HILLS ESTATES Parks and open space, public or private. Clubhouses, community pools and cabanas. Bicycle, equestrian and hiking trails. Drainage facilities and detention basins. 6. Public facilities and utilities. COMPREHENSIVE DEVELOPMENT PLAN 3.3.3 CONDITIONAL USES AND STRUCTURES PERMITTED Second residential units, as provided for in the California Government Code, subject to the requirements of the applicable section(s) of the Land Use Code. 2. Large family day care homes serving 14 or fewer children, in accordance with Chapter 3.6 of the California Health and Safety Code, subject to the requirements of the applicable section(s) of the Land Use Code. 3.3.4 ACCESSORY USES AND STRUCTURES PERMITTED -- 1. Home occupations, subject to the requirements of the applicable section(s) of the Land Use Code. 2. Unlighted tennis courts and othergame courts on individual residential lots, subject to the requirements of the applicable section(s) of the Land Use Code. Night lighting of such courts is prohibited unless a conditional use permit is approved. 3. Non-commercial keeping of household pets customarily incidental and accessory to residential use, subject to the requirements of the applicable section(s) of the Land Use Code. The keeping of wild, exotic, or non-domestic animals is prohibited 4. Swimming pools, spas, fences, patio covers, gazebos, garages and similar structures and facilities customarily incidental and accessory to residential use, subject to the requirements of the applicable section(s) of the Land Use Code. 5. Small family day care homes serving 8 or fewer children, in accordance with Chapter 3.6 of the California Health and Safety Code, subject to the requirements of the applicable section(s) of the Land Use Code. 6. For residences in the west canyon only, the following accessory use is permitted: the keeping of horses, noncommercial, subject to the requirements of the applicable section(s) of the Land Use Code. Other accessory uses and structures determined by the Planning Director to be 3-2 WHISPERING HILLS ESTATES COMPREHENSIVE DEVELOPMENT PLAN incidental to the operation of the permitted use. 3.3.5 TEMPORARY USES AND STRUCTURES PERMITTED 1. Model homes, temporary real estates offices and signs within subdivisions, subject to the requirements of the applicable section(s) of the Land Use Code. 2. Temporary construction facilities, including trailers, subject to the requirements of the applicable section(s) of the Land Use Code. 3. A temporary caretaker residence during the construction of a permanent single- family residence on an individual lot, subject to the requirements of the applicable section(s) of the Land Use Code. 3.3.6 DEVELOPMENT STANDARDS FOR RESIDENTIAL LAND USES Table 2 specifies the standards for residential development within the Planned Community. Max. No. of Residential Lots 15 140 ..........................................................................................:.......................................:........................... Min. Lot Size 30,000 10,000 ..........................................................................................:.......................................:........................... Min. Street Frontage' 90 60 ....................................................................................;.......................................;........................... Max. Structural Height (ft.) 35 35 ............................................................................................................................................................ Min. % of One -Story Units Per District i 0 P0% Min. Front Yard Setback (ft)2 ..........................:....................................... 30 20 :......................... Min. ....................................... Side Yard Setback (ft.) 4015 49f5 14 ;........... Min. Rear Yard Setback (ft) ..................... ................. 25 I............ 25 ....................................................................................:.......................................:......................... Max. Floor Area Ratio 0.25 0.40 Floor Area Ratio (1 s' floor/lot area) 0.25 0.35 ..........................................................................................:.......................................:......................... Floor Area Ratio (2ntl floor/first floor) 80% 80% 3-3 WHISPERING HILLS ESTATES COMPREHENSIVE DEVELOPMENT PLAN RESIDE EitEt:O�PMENT� T ` �. Minimum street frontages for lots on a cul-de-sac or street "knuckle" shall be 40 percent of the minimum street frontage shown. "Flag" lot street frontages shall be minimum 20', and setbacks shall conform to the requirements of the applicable section of the Land Use Code. 2 For side -entry type garages, the front'setbaek may be reduced for the garage portion only to 20' in the west canyon area and 12' in the east canyon area., 9 Min. side setbacks may be distributed within each lot in the east canyon as follows: Min. 6' one side and min. 14' other side. In all cases, however, the min. side setback adjacent to streets shall be 10'. 3.3.7 SUPPLEMENTAL RESIDENTIAL REGULATIONS Signs, parking, fences, swimming pools and other regulations for residences within the Planned Community shall be as provided in the appropriate section(s) of the Land Use Code. 3.4 NONRESIDENTIAL LAND USES 3.4.1 APPLICABILITY AND PURPOSE The purpose of the regulations in this Section 3.4 is to provide permitted uses and development standards for the nonresidential areas within the Planned Community. The regulations in this Section shall apply to the open space and other nonresidential areas within Area "A", including Lots D through H on VTTM 16634, the four -acre± remainder parcel outside VTTM 16634 (see Exhibit 2), and the property between VTTM 16634 and La Pata Avenue to be annexed to the City. Permitted uses and development standards for the San Juan Hills High School site (Area "B") shall be determined by the Capistrano Unified School District and the Division of the State Architect, as provided understate law. 3.4.2 PRINCIPAL USES AND STRUCTURES PERMITTED The following permitted uses apply to all of Area "A", including both Subareas "A1" and "A2"; and consisting of all open space and other nonresidential areas within Area "A"; Parks, playfields and related facilities. Passive open space. 3. Bicycle, equestrian and hiking trails. Habitat mitigation. 3-4 WHISPERING HILLS ESTATES 5. Water reservoirs. 6. Electrical, water, sewer and other utility lines. 7. Drainage facilities and detention basins. 8. Fuel modification. COMPREHENSIVE DEVELOPMENT PLAN 9. Grading necessary to accomplish resideftel development. 3.4.3 CONDITIONAL USES AND STRUCTURES PERMITTED The following conditional uses apply only to Subarea "A2": the property between VTTM 16634 and La Pate Avenue and shall only become applicable upon prezoning and annexation of that area to the City: 1. Recreation vehicle storage 2. Educational facilities 3. Commercial outdoor recreation 4. Commercial horse stables 5. Communication transmitting, receiving and relay facilities 6. Wholesale plant nursery, with no selling to the general public 7. Utility buildings 3.4.4 ACCESSORY USES AND STRUCTURES PERMITTED Accessory uses and structures incidental to the operation of a permitted use, such as signage, fences and walls 3.4.5 TEMPORARY USES AND STRUCTURES PERMITTED Temporary construction facilities, including trailers, subject to the requirements of the applicable section(s) of the Land Use Code. 3.4.6 DEVELOPMENT STANDARDS FOR NONRESIDENTIAL LAND USES For nonresidential portions of Area "A", permitted structures and facilities and development standards shall be determined in conjunction with approval of the structure or facility by the City. For San Juan Hills High School (Area "B"), setbacks, building _ 3-5 WHISPERING HILLS ESTATES COMPREHENSIVE DEVELOPMENT PLAN heights, and other development standards are not regulated by this CDP, and shall instead be determined by the Capistrano Unified School District and the State Architect. 3-6 4.' PROJECIAMPLEMiENTATION 4.1 PHASING Phasing of development, roadways and utilities serving the residentia pertion of the Planned Community shall be determined in conjunction with the approvai of VTTM.166''34. The anticipated phasing of home construction in the residential portion is shown in Exhibit 4. However, this phasing plan ;s conceptual orriy and may not occur precisely as shown on the Exhibit as development proceed%. 4.2 ZONING CONDITIONS 4.2.1 ADMINISTRATION OF ZONING CONDITIONS 1 he zoning condit,ons set gut ;-,erein are ,ricorporated into this CDP approval. Any suJ division rnap app5cr; ;o,. filed r: Ti the C:iy crderutis CDP shall strictly conform to the CDP plan and the zoning t�ond�i':.is sot oui •tr tl i:; Section 4.2. The purpose of the conditions and other requirements in this Section is to ensure consistency of development in the Whispering Hills Planned Community with the General Plan, Land Use Code, this CDP, and the mitigation measures identified in the Environmental Impact Report prepared for the project. The requirements listed in this Section shall be in addition to other conditions of approval on tentative maps, site plans, and other entitlements. The City Council may modify any of the conditions in this CDP without an amendment to the CDP if it determines that sucl- modrfcadon is necessary to ensure appropriate timing and design of required implerentation measures or to otherwise advance the Purpose and Intent of the CDP (as set out in Chapter 1). 4.2.2 MITIGATION MEASURES FROM EIR The mitigation measures identified in the Mitigation Monitoring Program for the Environmental Impact Report (EIR) shall be irapc.3ed by the City Council. The Planning Director may modify such mitigation measures or impose substitute mitigation measures if the Director determines that such modifications or substitute measures are necessary to ensure the feasibility of the mitigation measure and/or to achieve its purpose as identified in the EIR. 4.2.3 BUFFER BETWEEN WEST CANYON AND HIDDEN MOUNTAIN ESTATES A minimum 500 -foot wide open -space buffer area shall be established and maintained within the west canyon area along its boundary with the existing Hidden Mountain Estates development (Tract 11826). No structures other than fencing and the new oroiect entry shall be placed in this buffer area. 4-1 WHISPERING HILLS ESTATES COMPREHENSIVE DEVELOPMENT PLAN 4.3 DEVELOPMENT REVIEW PROCEDURES All residential development within the Planned. Community, except custom homes on individual lots, shall be subject to review and approval, of development plans by the Planning Commission in accordance with the development review process for tentative treet neaps, as set out in the applicable section(s) of the Land Use Code. Residential building permits allowed in a given year shall be subject to the requirements of Section 9-2.325 of the Land Use Code (Growth Management, except as otherwise modified through adoption by the City Council of a Development Agreement for the project. 4-2 4v C7 C 1=1:1:II-3It« ADDENDUM TO ENVIRONMENTAL IMPACT REPORT (Dated June 2004, maintained separately because of bulk)