Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Resolution Number 09-04-21-04
RESOLUTION NO. 09-04-21-04 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA, AMENDING RESOLUTION 08-05-14-01 AND APPROVING THE SCHEDULE OF FEES AND CHARGES FOR CITY SERVICES WHEREAS, the City provides various programs and services for the benefit of certain individuals and/or entities that do not benefit the genera[ public; and, WHEREAS, the City incurs costs to provide these specific programs and services to these individuals and/or entities; and, WHEREAS, the City has developed certain fees and charges to be charged directly to the parties requesting these specific services, participating in these programs or incurring these costs; and WHEREAS, the City updated these fees and charges April 21, 2009 in an effort to assure proper cost recovery, comparability with the surrounding communities and meet the needs of our community; and, WHEREAS, fees and charges for City services were combined into one comprehensive fee schedule with annual increases each July, based on the Consumer Price Index (CPI) — All Urban Consumers for the Los Angeles -Riverside -Orange County, CA area from October to October of each year tied to a cost index to assure that fees continue at appropriate levels; and, WHEREAS, the City desires to add certain fees and charges in order to generate the necessary revenue to operate City programs and services. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of San Juan Capistrano does hereby adopt the Schedule of Fees and Charges as set forth in Exhibits A through K, attached and incorporated herein by reference. 1. Establish the Schedule of Fees and Charges. Approve the updated fees and charges as outlined in Exhibits A through K. 2. Establish a Cost Index for the Annual Update of Fees and Charges. Approve and adopt the use of the Consumer Price Index (CPI) — All Urban Consumers for the Los Angeles -Riverside -Orange County, CA area from October to October of each year, as the cost index for these fees and charges, except for developer related fees and those items that are governed by a separate agreement or otherwise noted in Exhibits A through K. The City Manager is authorized to administratively adjust the fees and charges each July, up to an amount equal to the above referenced cost indices without further city Council review. 3. Effective Date. Determine that the updated fees and charges shall take effect sixty (60) days after the adoption of this resolution, but no earlier than July 1, 2009. PASSED, APPROVED, AND ADOPTED this 21St day gf-.April 2009. IELSEN, MAYOR ATTE T f., M O RGARET 90) ARAN, CITY CLERK STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss. CITY OF SAN JUAN CAPISTRANO ) 1, MARGARET R. MONAHAN, appointed City Clerk of the City of San Juan Capistrano, do hereby certify that the foregoing Resolution No. 09-04-21-03 was duly adopted by the City Council of the City of San Juan Capistrano at a Regular meeting thereof, held the 21$t day of April 2009, by the following vote: AYES: COUNCIL MEMBERS: Allevato, Freese, Hribar, Uso and Mayor Nielsen NOES: COUNCIL MEMBER: None ABSENT: COUNCIL MEMBER: None MARGARET R. WNHAN, City Clerk FEE. WORKBOOK Fees Effective H31091VIt No Increase Table of Contents Miscellaneous Business License and Filming Permits Fees Summary Parking Duplication Fees Summary Bail Schedule Summary Community Services Fees Summary Water Development Fees Summary Water and Sewer Service Fees Summary Community Development Fee Summary - Planning Public Works Fee Summary - Engineering Community Development Fee Summary - Building Developer Impact Fees Summary A B C D E F Exhibit A Exhibit B Exhibit BA Exhibit C Exhibit D Exhibit E Exhibit F Exhibit G Exhibit H Exhibit I Exhibit J Exhibit K Misc Fees Summary Exhibit A Descriptions Current Term Fees Alcoholic Beverage permit City -issued alcohol beverage permits are issued through the Community Services Department for outdoor events held on City property, and through the Community $54.81 Per Event Services Department for indoor events held in a City -owned building Bingo Games Annual License issued by City Manager $29.00 Annual Orange County Sheriff's Department /False Alarm $85.00 Set by County Board of Supervisors Feecharged/administered by County Orange County Fire Authority/False Alarm $85.00 Set by County Board of Supervisors Fee charged/administered by County Shopping Cart, Abandoned Per Cart retrieved $27.82 Smoking Regulation Exemption Hearing City regulations superseded by State law (11/94 election) Advertising Banner (Del Obispo & Camino Capistrano) ...._. _. . i Installation and Removal $217.00 Per Banner tittering (Catch Basins) Per administra Blowing leaves and grass cuttings into City catch basins $100.00 tive citation Pursuant to Resolution 09-04-21-04 6/16/2009 Misc (Unless Otherwise Noted) Page 2 of 75 Effective July 1, 2009 Business License and Filming Permits Fees Summary Exhibit B Descriptions Current Term Fees Business License Tax $25.00 Annual Application Processing Fee $43.00 Annual Professional Employees (Doctors, Dentists, Lawyers) $25.00 Each Non -Professional Employees $5.00 Each Duplicating License $11.00 Annual Renewal $11.00 Annual Home Occupation Permit ........_ ...-....._.....�... $58.€30 Annual _.....-._.._ .....____ _..._.. _.-..__.... _..._._ ......._ One Time/Temporary Business License -- - - $5.00 -....... One -Time NPDES Business Inspection Fee $174,00 Annual As Subsequent visits (if required, for every two inspections beyond initial) $174.00 Required ---- .._...... ........-- - ---- - -- . ..._......_._..----...... --- ....__..._... Amusements/Video Game Machines -- $12.00 -- - - - Each Arts and Crafts Teachers (excludes public, parochial or private school teachers) $8.00 Annual Housing First 4 units/Spaces $15.00 Annual - -- — - -----._.._._............_._.---- Additional Unit/Space _.. _.__.._. Each- $1.00 -... - Annual .. .... _ _.._ __ ...__-._ ....__._ -___.. _ -- - -- _ - Merchant/Patrol Systems/Merchant Patrolmen _ $50.00 _........ Each Riding Academy/Animals for Hire - On Premises $12.00 Each Riding Academy/Animals for Hire - Off Premises $25.00 Each .... .. ....._.._. .._.__ .... ..- - --- -... Taxi Services - First Vehicle -- $20.00 _ ... .... -- Each _ __..------.._. ._ _. .._......_. _. ..._ _....--.,__.__ ...__-__.. .. Additional Vehicle ...._._..__.__ $12.00 _ Each Vending Machines (gross less than $5,01)0/yr) $25.00 - Each - __ _ _ ---- ..... --------- ..__.... ..._ ....-d � ...... _ Each Additional $1,000 $1.00 thousand �._ _ . ...... � _ _ _.._ _._ Vendor Permit Fee $39.00 Annual Vendor Code Enforcement $321.00 Each Massage Therapy License Minimum $25.00 Annual Application Processing Fee . $43.00 Annual - __-..�.. ....... ... _.._... -- - .:.... .................._ - Duplicating License $11.00 Annual - - - .... ....__......__. __ .. ......_.. - - ...... Renewal - - .. $11.00 Annual City Test $109.00 Annual Pursuant to Resolution 09-04-21-04 6/16/2009 BL & Filming (unless Otherwise Noted) Page 3 of 75 Effective July 1, 2009 Business License and diming Permits Fees Summary Exhibit B Descriptions Current Fees Term Filming or Photography, Commercial, in Public Facilities Permits i=ilfning �$50.00-_ Per Permit Still photography – $28.00 - ._... Per Permit Uses _..- - _. Filming interiors g_exte.....___ --_- ....... —._ $333.00 — Per Da y .. --.__--- Still photography, inside or outside $112.00 Per ©ay Pursuant to Resolution 09-04-21-04. 6/16/2009 BL & Filming (Unless Otherwise Noted) Page 4 of 75 Effective July 1, 2009 Parking Fees Summary Exhibit BA Descriptions Current Fees Terra Neighborhood Parking Permit_ _...._ _..-._._......... _.. _........ ------------- $7.00 Per Individual Permit (Maximum # per household depends on Neighborhood); $11.00 Replacement Fee each permit (managed by City Hall) $7.24 per permit, 4 Permits/ Calle Lorenzo/Came Resplendor $11.38 Replacement Household Max. .... $7.24 per permit, 5 Permits/ Mission Nil[ $11.38 Replacement Household .... ....... $7.24 per permit, 4 Permits/ Via Selardes $11.38 Replacement Household Max. $7.24 per permit, S Permits/ Calle Winona/Paseo Rosa $11.38 Replacement Household Max. $7.24 per permit, 5 Permits/ Casas Capistrano $11,38 Replacement Household W.._ ... _ -_ .�_� _ _ _. -- - -. _.-.- _. $7.24 per permit, 5 Permits/ Terraca/Estelita $11.38 Replacement Household _ _.............— _ _ - - -Permi 1._ ....__.. $7.24 per permit, 4 Permits/ Capp Gardens. $11.38 Replacement Household Max...._ — $7.24 per permit, 2 Permits/ Capo Gardens 2 $.1.1.38 Replacement Household __._.--_.- .- ...___.__ ......._ _._...W- _:._ ... _ :__ _____ ......___._ _.._ ......__ Max- -.----- $7.24 per permit, 5 Permits/ EI Horno $11,38 Replacement Household Max. 5 Permits/ Country Hills No Fee Household . _._ .. it, Permits/ Rio Vista $24 11.38 Replacement Household .Max. S Permits{ Troy Homes No Tree Household Capistrano Villas (managed by contract firm) $22 per permit, $32 per permit Re lacemet Downtown Parkin Structure Daily Commuter Parking (Downtown _...... g _.... ... --- _._ Metered parking slots available in the basement level, spaces $2.00 Daily #1-73 Annual Commuter Park inySDowntown Parking Structure The annual passes may be purchased at City Hall. They are available on a yearly andpro-rated basis. Month of Purchase for SJC Residents January - - . ....._..... _..:m..__. _... _ - — -- ---- $125.00 Annual February $115.00 Annual -----_- - - March _ -- $104.00 Annual - - April - $94 00.-_ Annual May - _.. $8.3,00 - _._.Annual $73.00 --- Annual ___._._.___..............J.u.ne July $6200 $62.00....._— . _..nual ..An $52,00.. - Annual - -August _ _ - -- September --- $42.00 Annual...._..__ October $31.00 Annual November._._ W $_21.00 Annual -- - -_ __..,.... _._ December .:.. 10.00 Annual Pursuant to Resolution 09-04-2.1-04 6/16/2009 Parking (Unless otherwise Noted) Page 5 of 75 Effective )u[y 1, 2009 Parking Fees Summary Exhibit BA Descriptions Current Fees Term Month of Purchase for Non Residents ... January $4(}[}.00 Annuai _,._.._.- February — - _. _._. - =- ......... ..........._ - 67 00 ----- Annual _ _.. March_._ _.�- ----. �. ..............................__$ $333.00 - _ _..W.. --- April_.. ......_- _.. ......_.__Annual X300.00 Annual May. - $267.00 Annul _ June .-.._. _. ._ $233.00 _ Annual July $200 August _..�- -- -- _.....Annual $167.00 Annual September $133.00 Annual ..... October — $100.00 - -- Annual November- ___....-- $67.00- Annual December .._..--_ -- $33.00 -- Annual Train Parking 3 Hours of less in designated spots ..._._ - Free - - ....... Overnight Parking at roof level - spaces #320-352)Tmm -_ _. _ $0.25 - --- Hour $6.00 Da Employee Parking Permit Per Resolution 95-.2-7-7 adopted February 7, 1995 - .....__�.. -- .__g_...—_._....._$6.00 Downtown San Juan Capistrano Parkin for businesses without p -------- _ Per a dedicated parkinglot Employee Pursuant to Resolution 09-a4-21-04 611.6/2009 Parking (Unless Otherwise Noted) Page 6 of 75 Effective July 1, 2009 Duplication Fees Summary Exhibit C Descriptions Current Term Fees City Documents and Records The following is a schedule of fees and/or deposits for duplication of records and/or documents for private use: Copies - Black & white copies on bond paper ---8..1/2 X 11" and 8 1/2 X 14" - per page copied ---------....._... -- -._. _$0.2_0___ ......._Per....Page--.. Copies _ Fair Political Practices Commission filings Per Page copied ... ... ._ .. .._ ...... .._.m....... _ . .. ...._._ $0,.10 . _-....._. --- Per Page - Plans, maps, oversized sheets ............ .......... _- -- $4.00 Per Page Plotting Fees/Oversized sheets AND $7,00 Per Sq Ft Tech time to set up plots - $58.00 Per Hour -_......._._._._......._._.__ - - - - - --- --- Mailing copiesAt ... _.._ ..... Cost City Council, Agency, or Committee Agendas - Current Agenda_ Agenda for current meeting {pickup at City Hall) $0.00 )iia Charge ... ---... ......... ........r ,. Marling of agendas - upon receipt OT post=paid; pre-dddress2d_...._....__.:_....._.._._.._._.......---- _..—. envelope(s) - - - -- - $0.00 No Charge _. ....._ City Council, Agency, or Committee Minutes - per year Post-paid, pre -addressed envelopes provided by requestor $65.00 Per Request Municipal Code Supplements �nvo�ced at Mailed upon receipt of payment cost Title 8, Building Reguiations $16.00 Per Request Title 8, Supplement Service _--- _ , _ ._._ ..... _ ............ _ idd at Mailed upon receipt of payment cost Title 9, Land Usecost - --- ----- --- - - Title 9, Supplement Service - --.. _..m _ .. __ -- -............._.._ Invoked at Mailed upon receipt of paymentcost ..... __._....._... Municipal Code ...... ----- _ . _ ...... ----- — - -- ------ invoiced at Complete text with binder and tabs cost General Plan - Text $57.00 Per Request Large Zoning or General Plan Maps $6.00 Per Request Recreational Trail Maps $3.00 Per Request - - _..._......._..._.__................................ Architectural Design Guidelines - CD-ROM or Text Document $14.00 Per Request Fiscal Budget $47.00 Per Request Pursuant to Resolution 09-04-21-04 6/16/2009 Duplication (Unless dtherari9e Noted) Page 7 of 75 Effective ]uly 1, 2009 Duplication Fees Summary Exhibit C Descriptions Current Term Fees Duplication of Meeting Audio "Cape Recordings Per `ape - Tape(s) Provided by City - . ... __..._._......___ _... .... — .... _..... $4.60 _ ..........W Per Request _ ..._ Copies of Miscellaneous Electronic Records (Not Otherwise Addressed or - -- Per CD-ROM Provided AND. — $6.€30 Per Request __-...._ Per Staff Hour for ese research _ .._.... _ -_.-_-- -- $56,00 Per Hour.. Per floppy disk provided$6.60 Per Request Digital Recordings. $6.00 Per Request City Council Appeals (excluding land use appeals) $50.00 Per Request Resident Alien Certification $8.00 Per Request Document Certification (per document certified) $2.00 Per Request Document Scan Fee (per page scanned) $0.20 Per Request Document Fax Fee (per page .faxed) $0.20 Per Request Other electronic media At Cost At Cost Per Request Miscellaneous Fees Waiver of Fees The above fees may waived at the discretion of the Department Director when it is determined that the general public and/or City will benefit by providing the service at no cost. Examples of appropriate fee waivers include. Requests frorn City Officials, Commissioners, Committee Members, etc., needing copies to conduct city business; Requests from other public agencies; ._... ......... --- Requests from non-profit or charitable groups that provide service to community members; Requests from members of the press, representing media circulated to cityresidents, for the purpose of disseminating information to the public Requests from individuals or other private concerns directly impacted by related pending actions of the legislative body. Questionable fee waivers will be determined by the City Manager Pursuant to Reso€ution 09-04-21-04 6/16/2409 Duplication (Unless Otherwise Noted) Page 8 of 75 Effective My 1, 2009 Bail Schedule Summary Exhibit D Pursuant to Resolution 09-04-21-04 6/16/2009 Bail Schedule (Unless otherwise Noted) Page 9 of 75 a=ffective July 1, 2009 Municipal Type of Current ist 2nd 3rd Descriptions Code No. crime* t Amoun Penalty Penalty Penalty of Bail Notice + lst Notice + 1st Notice + 1st Bait Schedule See Penalty fee - + 2nd + 2nd + 3rd Footnote 1 Due15 Penalty fee - Penalty fee Below days Due after 30 Due Due after 45 days days Parking Meters Expiration: Effect 4-4.07 - I - $47.00 $47.00 .. ........._ $23.00 .._...... - $18.00 - - - - -- Expiration: Extensions -- 4-4.08 I ....... ._.._..._. $47.00 - $47,00 _... _.._.. $23,00 $18.00 - - -- Parking Meters. Tampering -- ---- -- - 4-4.09 . _ ... ... - I $170.00 ....... ... $170.00 $85,00 $60.00 Parking Meters: Unauthorized deposits _ 4-4.10 - 1 $60.00 _ $60.00 -------- $30.00 .m.... -_- -- _ $20.00 -.. _ ..._._ Parking Meters: Use restricted 4-4.11 I $47.00 $47.00 $23.00 $18.00 Enforcement and Obedience ___ . -- - _....... . _.... _ .... -------- ----- ...._ Obedience Obedience to authorized officers 4µ6.202 1 $47.00 $47.00 $23.00 $18.00 ....._.._ .------ --- _..... UnauthOrized persons directing -._ .. traffic 4-6.205 1 $47.00 $47.00 $23.00 $18,00 Parking No parking zones - 4-6.304 --- I $47.00 - ... .... $47.00 $23.00 - $18,00 _..... _ - -- --- - No Stopping zones 4-6.305 _ ....- _ 1 ..._.... ....--- $47.00T -._ .. $47.00 . ...__ $23.00 --- $18.00 _ _ - -- - Loading zones 4-6.306 1 $47.00 $47.00 $23.00 $18.00 Passenger loading zones 4-6307._ _,__ _._I., . ._,$47.00 $47.00 $23.00 $18.00 stops _. ............Bus 4-6.308 I $47.00 $47.00 $23.00 -- $18.00 ..............Tow-- - - away zones 4-6.309 1 $47.00 $47.00 $23,00 $18.00 Parking for more than seventy-two (72) hours 4-6.310 I $47.00 $47.00 $23.00 $18.00 Parking for maintaining, repairing or selling vehicles _ ...._..... - 4-5.311 - - - 1 --- $47.00 - $47.00 _ --- . $23.00 $1.8.00 - - . ..------ ------ - ._.._.... Parking on grades --- 4-6.312 -- 1 - $47.00 - $47.00 - .- $23.00 _..--.....,_, $18.00 - _...._.._, --- Parking - ....... .. .. ..... -- -- Overnight Parking: Permit Required -- 4-6.314 1 $47.00 $47.00 $23.00 $18,00 Emergency traffic congestion from assemblages and other functions: Signs 4-6.315 1 $47.00 $47.00 - $23.00 -- - $18.00 - _... -._.._ Street sweeping. Signs -- - 4-6.316 W.. .....V.......... 1 -I` - _ .._.-- $47.00 -_ - ... $47.00 $23.00_____$_18_._00 _-_ - _ Commercial vehicles: Restrictions 4-6.317 $47.00 $47.00 $23. 00 $18.00 .... - ...-- �Trailers - _ 4--6.319 1 $47.00 $47.00 $23.00 $18-00 Unauthorized curb markings _ ..-..__ _._.... _._. -- - 4-6.321 --_.... I $47.00 - - $47.00 $23,00 __...... ._. $18.00 Parking zone for physically handicapped 4-6.323 1 $300.00 $300.00 $i50.00 Time Limited parking . __ ........__..... $23.00...._.._.._.__... ....... Flight turns at signal controlled intersections: Signs 4-6.403 1 $47.00 $47.00 $23.00 $18.00 Truck Routes Streets prohibited _ 4-6.801 1 $160.00 $160.00 $80.00 $60.00 Overload Vehicles Permits: Required4--6.903 1** $47.00 _ . _ $47.00 ...._. _- ..... $23.00 $18 00 __.. ... Escorts 4-6.916 1 $47.00 $47.00 $23.00 $18.00 - Violations 4-6.920 I $47.00 $47,00___L____$23.00_ $18.00 Pursuant to Resolution 09-04-21-04 6/16/2009 Bail Schedule (Unless otherwise Noted) Page 9 of 75 a=ffective July 1, 2009 Bail Schedule Summary Exhibit D *Infraction 4,501 pounds in which event such offense shall be a misdemeanor pursuant to Section 40000,23 of the Vehicle 1 -The original citation is placed on the windshield of the vehicle. If this citation is not paid within 21 days, then one official notice is sent US mail on the 22nd day denoting applicable 1st, 2nd & 3rd penalty fees. Thls notice states the original bail amount due and that it must be paid within 14 days from the notice date to avoid penalty fees. The following Pursuant to Resolution 09-04-21-04 6/16/2009 Bail schedule (Unless Otherwise Noted) Page 10 of 75 Effective duly 1, 2009 Municipal Type of Current1st 2nd 3rd Descriptions Code No. Crime* Amount Penalty Penalty Penalty of Bail Temporary Street Closures Special events and storage: Permits required 4-6.1002 1 $110.00 $110.00 $55.00 $35.00 Placement of obstructions: Permits required 6.1003 1 $110.00 $110.00 $55.00 $35.00 Parades Permits: Required 5-11.02 1 $110.00 $110.00 $55.00 $35.00 Animal Control - - - Horses on sidewalks -- 6-1.03 --. ---- - 1 $47.00 $47.00 $23.00 _...... . _ $18.00 California Vehicle Code _ _._.._-__.._. Within a crosswalk .. _ .. - 22500b -- -- 1 - $47.00 $47.00 _ -$23.00 ....._._ $18.00 _..- _.... Blocking a driveway 22500e 1 $47.00 _ $47.00 $23.00 $18.00 Parked across sidewalk 22500f 1 $47.10 $47.00 $23.00 $18.00 _:.:.:...................m.m......... ..... Double parked -- ........... ....... 22500h - -------.._.. 1 ........... ....................--.... $47.00 -- ........ .......................... ._. $47.00 -- -- - $23.00 _._._. -....__........ --- $18.00 - ........... . Bus loading zone 225001 1___.. -- $300.00 -- $300.00 $150.00 $130.00 Parked in fire lane 22500.1 1 $47.00 $47.00 $23.00 $18.00 18" from curb 22502a I $47.00 $47.00 - $23.00 $18.00 H/C parking - no permit - - _.._............. 22507.8a 1 -- $300.00 --......... .,.... _...... $300.00 .._....... --- --...._. $150.00 _ $130.00 ._._.__........... --- Parked in blue crass hatches 22507.8c2 1 $300.00 $300.00 $150.00 $130.00 .. -- - - Fire Hydrant - within 1.5' - ----- 22514 1 $47.00 $47.00 - $23.00 -- -- $18.00 No license plate 5200 1 $47.00 $47.00 $23.00 $18.00 No year/month tab 5204 1 $47.00 $47.00 $23.00 $18.00 *Infraction 4,501 pounds in which event such offense shall be a misdemeanor pursuant to Section 40000,23 of the Vehicle 1 -The original citation is placed on the windshield of the vehicle. If this citation is not paid within 21 days, then one official notice is sent US mail on the 22nd day denoting applicable 1st, 2nd & 3rd penalty fees. Thls notice states the original bail amount due and that it must be paid within 14 days from the notice date to avoid penalty fees. The following Pursuant to Resolution 09-04-21-04 6/16/2009 Bail schedule (Unless Otherwise Noted) Page 10 of 75 Effective duly 1, 2009 Community Services Fees: Building Rentals Summary Exhibit E Building Rentals g San Juan Capistrano Residents & Non -Profits San Juan Capistrano Businesses Non -San Juan Capistrano Residents Businesses, & [Von -Profits Non -San Juan Capistrano Businesses: Revenue - Generating Activity Facility Maximum Hourly Hourly Hourly Hourly Two hour minimum Occupancy Lacouague Room #2 85 $29.00 $53.00 $75.00 $151.00 Nutrition Room Lacouague Kitchen** $33.00 $33.00. $33.00 $65.00 (per_day/peI .gy, TD--_._._ _ ._.. Nydegger Building Banquet: 105 $36.00 $58.00 $82.00 $163.00 Theatre: 150 Nydegger Kitchen+ $33.00 $33.00 $33.00 $65.00 -.- (Per day/pef evert}_. m. .... .. -- - - __ ... -- -._.._ - - ---- La Sala Auditorium Theatre: 130 $65.00 $99.00 $133.00 $267.00 La Sala Courtyard300 $65.00 $99.00 $133.00 $267.00 - . -- ... La Sala Auditorium ----------- $117.04 $185.00 $255.00 $511 00 and Courtyard - „_- - La Sala Kitchen-+ $33.00 $33.00 $33.00 $65.00 -- (per day/per event) ._.._T_. La Sala Foyer 15 - $24.00 $35.00 $47.00 $9100 Alcohol Permit $5500 $55.00 $55.00 $55.00 eve _ (per_d_ ay/_per nti..... _..__ . Cancellation Fee $27.00 $27.00 $27.00 $27.00 ** Must be in conjunction with rental of Lacouague Room 2 + Must be in conjunction with rental of Nydegger Building ++ Must be in conjunction with rental of La Sala Auditorium and/or Courtyard Pursuant to Resolution 09-04-21-04 6/16/2009 cs-Bldg (unless Otherwise Noted) Page 11 of 75 Effective July 1, 2009 Community Services l=ees: Building Rentals Summary G AND COMPLIANCE DEPOSIT: Meetings Parties Up to 100 attendees: $100 Up to 100 attendees: $300 Over 100 attendees: $300 Over 100 attendees: $400 Rentals with alcohol, add an additional $200 to deposit ;The cleaning and compliance deposit is refundable, based on the cleanliness of the site after the event, an assessment of damage/repairs to the siteassociated with the rental, combined with level of compliance with City regulations by renters and guests. Deposits made by check will be deposited with the rental payment prior to the date of the rental. After the rental, the amount of the deposit to be refunded will be made via City check, The refund process will take two to four weeks. Deposits made by cash or credit card will be processed within two weeks. Rental requests made less than 14 days prier to the date of the event: If the request can be approved in this short amount of time, all payments, including deposit, must be made in cash, money order, cashier's check, or credit card. Checks will not be accepted in this case. Pursuant to Resolution 09-04-21-04 6/x6/2009 CS -Bldg (Unless OtherMse Noted) Page 12 of 75 Effective Suly 1, 2009 Community Services Fees: Community Center Fees Summary Exhibit E C©mmunit Center Y Rentals San Juan Capistrano Residents & Non -Profits San Juan Capistrano Businesses Non -San Juan Capistrano Residents, Businesses & Non -Profits Non -San Juan Capistrano Businesses: Revenue - Generating Activity Facility Maximum Occupancy Hourly Hourly Hourly Hourly Two hour minimum Conference Room 14 $24.00 $47.00 $70.00 $1.40.00 Meeting Room 30 $29.00 $53.00 $75.00 $151.00 Banquet: 225 $128.00 ..-- $151.00 - ._._.............. $174.00 -- - $348.00 Community Hail (full size) Theatre: 396 $128.00 $151.00 $174.00 $348.00 - ---- - - - - -- - _... _ Banquet: 144 $82.00 ....... .--- $104.00 $140.00 $278.00 2/3 Community Hall Theatre: 202 $82.00 $104.00 $140.00 $278.00 Banquet: 7S m $70.00 $93.00 $117.00 $232.00 1/3 Community Hail Theatre: 115 $70.00 $93.00 $117.00 ........ __.__ _.. . $232.00 _ -- --- - --- ----- -- - - Banquet: 43 _.... --_- $47.00 ..........----- $70.00 $93.00 $186.00 1/6 Community Hall Theatre: 48 $47.00 $70.00 $93.00 $186.00 - ---- __.._._._, ., . _ Kitchen* m_ $43.00 $43.00 $43.00 $86.00 -iper day/per event)..-----_-- ---- Patin (outdoor)* $27.00 $27.00 $27.00 $54.00 T(per day/per event) Porch (Indoor)* $27.(10 $27.00 $27.00 $54,00 event) ........... ............. _ . Courtyard* $27.00 $27.00 $27.00 $54.00 day/Per event) Alcohol Permit $55.00 $55.00 $55,00 $55-00 (per day/per event) Cancellation Fee $27.00 $27.00 $27.00 $27.00 *Must be in conjunction with rental of Community Hall Pursuant to Resolution 49-04-21-04 6/16/2009 cs-cc (unless QtherMse Noted) Page 13 of 75 Effective July 1, 2009 Community Services l=ees: Community Center Fees Summary iti�lrlDNDABLI� CI�R�NING AN© COMPLIANCE DEPOSIT.- - - - Up to 100 attendees: $100 Up to 100 attendees: $300 Over 100 attendees, $300 Over 100 attendees: $400 jlentals with alcohol, add an additional $200 to deposit The Community Center rental deposit is refundable, based on the cleanliness of the site after the event, an assessment of damage/repairs to the site associated with the rental level, combined with level of compliance with City regulations by renters and guests. Deposits made by check will be deposited with the rental payment prior to the date of the rental. After the rental, the amount of the deposit to be refunded will be made via City check. The refund process will take two to four weeks. Deposits made by cash or credit card will be processed within two weeks. Renta( requests made less than 14 days prior to the date of the event: If the request can be approved in this short amount of time, all payments, including deposit, must be made in cash, money order, cashier's check, or credit card. Checks will not be accepted in this case. Pursuant to Resolution 09-04-27,-04 6/16/2009 cs-cc (Unless Otherwise Noted) rage 14 of 75 Effective 3uly 1, 2009 Community Services Fees: Gymnasium Fees Summary Exhibit E Gymnasium Priority Classification 1/2 Gym Per Hour Full Gym Per Hour Compliance Deposit City sponsored or co-sponsoredNone -N/C- _NC_ events, leagues Required and programs ..----- City Approved lease or i 2 agreement such Negotiable 1', Negotiable Negotiable as the Boys & Girls Club Programs conducted by Nationally recognized not for 3 profit youth sport $29.00 $58.00 $214.00 groups with open enrollment, which are established in San Juan Capistrano -- --- -- Category I Programs conducted by San Juan Capistrano nationally Residents, Businesses & recognized not for Non -Profit Corporations profit adult and 4 senior citizen $29.00 $58,00 $214.00 sports groups with open enrollment, which are established in San Juan Capistrano Not for profit 5 community, $29.00 $58.00 $214.00 recreational, or educational Club or E invitational teams only, run by nationally 6 1 recognized youth $41.00 $82.00 $214,00 sport groups, which are established in San Juan Capistrano Businesses and private schools 7 located in SJC $41.00 i $82.00 $214.00 using the gym for profit Pursuant to Peso€ution 09-04-21-04 6/16/2004 CS -Gym (Unless Otherwise Noted) Page 15 of 75 Effective July 1, 2009 Community Services Fees: Gymnasium Fees Summary Exhibit E Gymnasium Priority Classification 1/2 Gym Full Gym Compliance Per Hour Per Hour Deposit Businesses and Category II Private sports camps that are San Juan Capistrano 8 not located in San $81.00 $161.00 $214.00 Juan Capistrano. Private Schools using the gym for profit** Not for profit Community, I 9 Educational or $70.00 $140.00 $322.0€3 Public Service groups �! j Category t1 Businesses and private sports l camps that are Non -San Juan not located in San 10 $91.00 $193.00 $322.00 Capistrano Residents, Juan Capistrano 1 Businesses, & Non- using the Profit Corporations gymnasium for', profit use** * Damages are incorporated in agreement **Uses for profit will be assessed an additional administrative charge of 50% Pursuant to Resolution 09-04-21-04 6/16/2009 CS -Gym (Unless Otherwise Noted) Page 16 of 75 Effective My 1, 2009 Community Services Fees: Parks Rentals Fees Summary Exhibit l Refundable Cleaning and Compliance Deposit: Please Note: Park rentals of more than 50 persons require a city issued park use permit. Any park rental having a bounce house will require a city issued park use permit. Lip to 100 attendees 101 - 250 attendees 251 - 350 attendees 351 - 450 attendees Over 450 attendees Deposit Fees for any activity other than picnics will be determined by type of activity * Deposits are refundable based on the cleanliness of the site after the event. An assessment of damage / repairs to the site associated with the rental will be conducted by staff. * Deposits made by check will be deposited upon receipt. The amount of the deposit to be refunded will be made by City check or by Master Card/ Visa depending on what was used for deposit. Check refunds will take 2-4 weeks to.process. * If a rental request is submitted less than 14 days prior to the event, all payments including deposit must be made by cash, money order, cashiers check or credit card. Pursuant to Resolution 09-04.21-04 6/16/2009 CS -Park (Unless Otherwise Noted) Page 17 of 75 Effective July 1, 2009 Non -San Juan Non -San Juan Park Rentals San Juan Capistrano Residents & Non- San Juan Capistrano Capistrano Residents, Capistrano Profits Businesses Businesses, & Non- Businesses: Revenue - Profits Generating Activity Facility Hourly Hourly Hourly Hourly Three hour minimum Up to 100 attendees _. ... ....., . .__--__.,..._.m....., $24.00 ....... _, _ -- $35.00 -- $47.00 _._. $92.00 ... - _.,... -- —..... 101 - 250 $35.00 $47.00 $57.00 $116.00 251 -350 $47,00 $57.00 $70.00 $140.00 351 and over $57.00 $70.00 $81.00 $16300 Cancellation Fee $27.00 -- $27.00 - $27.00 $27.00 ElectricityUse 11.00 $11.00 $11.00 $11.00 Field Use Fee (If Available) $11.00 $11.00 $11.00 $11.00 Refundable Cleaning and Compliance Deposit: Please Note: Park rentals of more than 50 persons require a city issued park use permit. Any park rental having a bounce house will require a city issued park use permit. Lip to 100 attendees 101 - 250 attendees 251 - 350 attendees 351 - 450 attendees Over 450 attendees Deposit Fees for any activity other than picnics will be determined by type of activity * Deposits are refundable based on the cleanliness of the site after the event. An assessment of damage / repairs to the site associated with the rental will be conducted by staff. * Deposits made by check will be deposited upon receipt. The amount of the deposit to be refunded will be made by City check or by Master Card/ Visa depending on what was used for deposit. Check refunds will take 2-4 weeks to.process. * If a rental request is submitted less than 14 days prior to the event, all payments including deposit must be made by cash, money order, cashiers check or credit card. Pursuant to Resolution 09-04.21-04 6/16/2009 CS -Park (Unless Otherwise Noted) Page 17 of 75 Effective July 1, 2009 Community Services Fees: Athletic Fields Fees Summary Exhibit E Athletic Fields Classification Hourly Fee Per Field ** Seasonal Fee Per Field* Light Fee Per Field Per Hour City sponsored or co- sponsored events, or any 1 use mandated by City -NC- -NC- $24.00 approved lease or agreements - Programs run by nationally recognized youth sport 2 $11.00 $579.00 $25.00 groups which are based in San Juan Capistrano Programs run by organized 3 senior groups which are $11.00 $579.00 $25,00 based in San Juan Capistrano 4 San Juan Capistrano $19.00 -NA- $24.00 ResWents mm TSan Juan Businesses (not $24.00 -NA- $24.00 : _,.m.__........_I ...._......_..._....---for profit use) Club teams/invitational only teams which are run by nationally recognized youth $24.00 $870.00 $24,00 sport groups which are based in San Juan Capistrano- Club teams/invitational only teams which are run by nationally recognized youth 7 sport groups which are $38.00 -NA- $24,QQ based in San Juan Capistrano 8 San Juan based businesses $38.00 -NA- $35.00 (far profit use) ......._ ........ ....... . _._._. _ ._ ..... Not for profit community, recreational, educational 9 and public service groups $70.00 -NA- $24.00 which are not based in San Juan Capistrano - - - -- - Programs run by private, 10 not for profit schools which $81.00 -NA- $24.00 are based in San Juan Capistrano*** Non-resident individual or $81.00 -NA- $35.00 group (not for profit -use) 12 Non San Juan Capistrano $81.00 -NA- $48.00 Business Additional Fees: Field Prep Fee $30.00 per field Rental of Bases 1$10.00 per field Pursuant to Resolution 09-04-71-04 6/10/2009 CS -Fields (unless Otherwise Noted) Page 18 of 75 Effective July 1, 2009 Community Services Fees: Athletic Fields Fees.Summary Exhibit E * Seasonal use is based on use of one field for a maximum of 15 weeks ** Minimum rental is 2 hours per field pursuant to Resolution 09-04-21-04 6/16/2609 CS -Fields (Unless Otherwise Noted) Page 19 of 75 Effective July 1, 2009 Seasonal Dight Fee Athletic Fields Classification Hourly Fee Fee Per Per Field Per Fier Field* Per Hour * Seasonal use is based on use of one field for a maximum of 15 weeks ** Minimum rental is 2 hours per field pursuant to Resolution 09-04-21-04 6/16/2609 CS -Fields (Unless Otherwise Noted) Page 19 of 75 Effective July 1, 2009 Community Services Fees: 3Serra Fees Summary Exhibit E 7Serra Hirsh School Classification Hourly Fee Seasonal Fee Light Fee Per Field Per Field ** Per Field Per Hour City sponsored or co-sponsored events - 0 - -N/A- $22.00 Programs run by nationally recognized youth sports groups which are based in San Juan Capistrano $27.00 $1,070.00 $22.{30 Programs run by organized senior groups which are rased in San Juan Capistrano $27.00 $750.00 $22.00 San Juan Capistrano Residents $38.00 -N/A- $22.00 San Juan Businesses (not for profit use) $43.00 -N/A- $22.00 Not for profit community, recreational, educational and public service groups which are not based in San Juan $43.00 $750.00 $22.00 Capistrano Programs run by private, not for profit schools which are based in San Juan Capistrano $86.00 $750.00 $22.00 Club teams/invitational only teams which are run by. nationally recognized youth groups which are based in San $86.00 -N/A- $22.00 Juan Capistrano Programs run by organized adult sport groups based in San Juan Capistrano $86.00 $856.00 $22.00 San Juan Based Businesses (for profit use) $86.00 -N/A- $33.00 Non-resident Individual or Group (not for profit use) $108.00 -N/A- $33.00 Non -San Juan Businesses (for profit use) $134.00 -N/A- $43.00 Additional Fees: Rental of Bases 1$10.00 per field Seasonal use is based on use of one field for a maximum of 15 weeks ** Minimum rental is 1 hour per field Pursuant to Resolution 09-94-21-04 6/16/2069 CS -]Serra (Unless Otherwise Noted) Page 20 of 75 Effective July 1, 2009 Community Services Fees: Community Garden Fees Summary Exhibit E Community Garden Community Garden Fee Schedule _-..�..._.._.......... � .__...-. Residents Current Fee Approximate Parcel Size . m_ ....m . _... - - - ..--- ,.�---- 29' x 20' X80 sq ft) M ------ _.- ._.._..__ _._$52.00 _ .. -- . .... — _._.. 20' x 20' (400 sq ft) _ ...... $46.00 -. 30'x 10' (300 sq ft)--- -- --- -- $41.00..... 20'x 10' (200 sq ft) _......$35.00.._...._ Miscellaneous: Less than 200 sq ft $28.00 Cleaning and Compliance Deposit - --$26.00 - Non -Residents Approximate Parcel Size -- --x"-2-0'-(58,0-sq-ft) - - -- -- $81.00...._ --......_._ 20' x 20' (400 sq-ftj - .._. ._. . ----- .... W _... .,W _.. ,_. _._ _.. $fi8,00 30' x 10' (300 sq ft) - --- ----- $56.00- 20' x 10' (200 sq ft) - _ - -- - $46.00 _ ..... _.. ....... . .... Miscellaneous: Less than 200 sq ft$35.06 -- - - _ — ---- -.. . ..._ ... _ ..-- __._. Cleaning and Compliance Deposit $26.00 -- Pursuant to Resolution 09-04-21-04 6/16/2009 G5 -CG (Unless otherwise Noted) Page 21 of 75 Effective July 1, 2009 Community Services Fees: Early Childhood Development Exhibit E Kindergarten Readiness Class Schedule (includes summer) Cost per 6 week session/Monday _........ ...... s _- Cot .....per 6 week session/Tuesday Cost per 6 week session/Wednesday Cost per 6 week session/Thursday Cost per 3 week session (Summer classes Fee/Session $124.00 $124.00 $124.00 $124 0--0'- $124.00 Pursuant to Resolution 09-04-21-04 6/26/2909 C5 -KR ,Unless Otherwise Noted) Page 22 of 75 Effective 3uly 1, 2009 Community Services Fees: Classes & Events Fees Summary Exhibit E Classes & Events Current Fee Instructional Classes $0 - $300 per class session Special Events Fourth of July Food Booth commercial vendor $250 per booth San Juan Summer Nites $50 per booth pray Camps and Clinics $0 - $400 per event/activity Pursuant to Resolution 09-04-21-04 6/16/2009 CS -Classes (Unless Otherwise Noted) Page 23 of 75 Effective July 1, 2009 Water Development Fees Summary Exhibit F Descriptions Current Fees Term Miscellaneous Charges -- _..... -...m -- -._. . W. ...... - - _ ..._.... Per Application Contractor's cost Backflow Device Testing + staff time actually spent Photocopies: Regular sheet up 8,5" x 14" See Duplication Fees Photocopies: Plans, maps, oversized sheets See Duplication Fees Photocopies: Plotting Fees/Oversized sheets See Duplication Fees Photocopies: TIFF Images on CD Rom See Duplication Fees Photocopies: TIFF Images Sent Electronically See Duplication Fees Pressure Test $113.00 --- ..... Per Apel -i .0t on-- _ _- - — . _ - _-. - ....... -- ©hutdownlre Flaw Test- - 13.00 - �Vla --- - -... $12300e _ _ Per veion Included in PD&I After Hours Inspection fee, night work per codes. -- _. Quit Claim Deeds -. �85.I�� _._.... -- _ _. _.. Per Hour Per Hour + applicant pays Easementsfor $85.00 survey legal description and the appraised Computer Data (per sheet) $85.00 Per Hour + printing charges Water Standard Specifications - Pickup - - --_ $35.00 - - Per_Request Water Standard Specifications -Mail $40,00 Per Request by Mail Re Rules & for NDW users - Picku _.......... 5,00 - ._... __._.._- - Per Request Rules & Reg for NDW users - Mail $9.00 Per Request by _..._.__--- _ -.......... W... - -- ._ M all - W , .._--.._. ill _ . Serve Letter ... --- - ___..._ $56.00-- - Per Request- Water Availability, $28.00 Per Request Completion Data Extension $56 00 Per Request Code Enforcement per violation -_ $23.00 __- Per Violation __.......__._. Water Theft Fine $1,000.00 Per Theft Per Meter Meter Tampering $117.00 Temper + cost --- - - _..... of repair_...... Labor, materials, equipment, and other charges not specified herein set by City Manager Per Basis Sewer Waste Discharge Pretreatment _ _ - - - - -- Inrtial pretreatment application -- -- _ _$113 00 — . ---- Per Application Annual retreatment ermit 113.00 Per Permit Pursuant to Resolution 09-04-21-04 6/16/2009 H2GDevel (Unless Otherwise Noted) Page 24 of 75 Effective 3uiy 1, 2009 Water Development Fees Summary Exhibit F Descriptions Current Fees Term Natural resources extraction Liquid resources extraction Well drilling or re -drilling permits _., --- $42$.00 —Per Well _ _Well renewal permits —..__.__.. $107.00 _ ........ _—Per Weil Business license taxes $160.00 Per Year Production taxes,per barrel extracted $0.10 Gas resource extractian Well drilling or re -drilling permits 428.00 Per Well efl en Wrewal permits $107.00 Per Well Business license taxes$160.00 — Per Year Production Taxes, per 10,000 cubic feet extracted .......... -- —_ $1..00 Solid resources extraction Mineral extraction permits __. _.._.. 428.00 Per Site Business license taxes $160.Q0 -- Per Year Minin2 taxes, eer ton extracted $1.00 Pursuant to Resolution 09-04-21-04 6/16/2009 N2ODevel (Unless Otherwise Noted) Page 25 of 75 Effective July 1, 2009 Water and Sewer Service Fees Summary Exhibit G Descriptions Current Fees Deposits (Water and Sewer) Residential Security Deposit Commercial Security Deposit (Construction, Temporary Use, $827.00 Private Fire Line) Service Establishment Fees (Water and Sewer) Normal business hours $16.00 After normal business hours $86.00 Delinquent Fees (Water and Sewer) .. Returned Check Charge$25.00 _ Late Charge 8% of total bill Shut-off Notice (Courtesy Tag) Fee W _ - -_ _ .. _. __.-____ . $20.00 Delinquent Processing Charge -N-ormal Business Hours Restoral $42.00 After (-. W ....._ _.--- ... _... -_---- Meter Reconnection After Non -P mt 119.00 Hydrant Meters Hydrant Meter Deposit $827.00 Installation Fee Non -Refundable) Moving Fee __. _ _. _ __. _ $30.00 - — -- Penalty (if meter is not in it's assigned location)_._ $30.00 Valves, fittings, lock and chain (if damaged) Replacement cost andlabor Muer Breakdown (Non. -refundable, Construction and temporary ry - $30.00 use Materials for Damaged Hydrant Meters 2" Eddie Valve Replacement cost & labor " Valve ---- ._ - ._.... Replacement cost &labor _ ....._ _..__. W Meter Deposit _.._.__ _. --- - ......._ . _:......_ _ ..._ _._. X827.00 __ _ ....... .._.__.. - Swivel Adapter --- _- .....-.. _ -- Replacement cost & labor - - Register - - - .... ......._...__ _ Replacement cost & labor - Male Fitting Replacement: cost & labor Female Fitting _. _._ .._ ... --- --- - Replacement cost & labor _ -- _ _ .... .._... ... Lock & Chain Replacement cost & labor ...... - _ W__ - -- ��.... _. Labor & Overhead Per Basis Meter Installation Charges 5/8 - 3/4 Inch $235.00 Inch .. ._ _.-�... _ -: $322.00... —.1 - _._. 1-1/2 Inch - ....._$538.00 2 Inch$748.00 Actual cost plus labor, may Meter Test Fee (Refundable if meter is inaccurate) include 3rd party certification Pursuant to Resolution 09-64-21-04 6/17/2009 1-12013iiiing (Unless Otherwise Noted) Page 26 of 75 Effective July 1, 2009 Planning Deposits/Fees Summary Exhibit H Pursuant to Resolution 06-05-14-01 6116/260g CD -Ping (Unless Otherwise Noted, Page 27 of 75 Effective July 1, 2009 Current Fees Descriptions Developer Deposit Applications and Other Special Deposits 1. Schedule of Hourly Rates (Gty Staff). Ail staff assigned to Developer Deposit Applications as primary or supporting technical staff shall charge actual hours expended on a project which has been assigned a developer deposit or other special deposit account. Hourly rates of City staff positions shall be determined from the current salary schedule adopted by City Council. Overhead costs shall be added to the staff's hourly rate. Overhead shall be calculated and published annually by the Administrative Services Department in accordance with the Office of Management and Budget Circular A-87 (Cost Principles for State and Local Governments). _ - - .... w, . .,_,............ ...... - 2. Schedule of Hourly Rates (Outside Consultants). Consultants actual cost shall be charged against the developer deposit account. Consultant contracts are determined by the Planning Director and agreement executed by the City Manager. For those applications where an outside consultant is assigned to manage a project in -lieu of city staff or when a deposit is taken for special purposes pursuant to an agreement with the City, an administration fee equivalent to ten percent (1001o) of the outside consultant changes shall be charged to the applicable developer deposit or other special deposit account. -- .. .-.........-- - 3. Developer Deposit Application (initial Deposit). The following application are subject to processing under the provisions of the Developer Deposit System. The Initial Deposit for each application is set forth below. The Planning Director may adjust the initial deposit for a given project applicant upon a determination that the initial deposit will be substantially above or below the amount estimated to complete the projectL[gview 4. Incidental Costs. All incidental costs associated with the project including, but not limited to, postage, printing, mailing, and publication of notices shall be charged against the developer deposit or other special deposit account. The fees and/or deposits listed below are required to be paid to any processing of a development application. The initial deposits are intended to provide funding for processing of an application. If the deposited funds are depleted during the processing of the application, additional funds will be required by the City. If the requested fund are not received, processing of the development application may be delayed or interrupted pending receipt of the funds. Any unused funds at project completion will reimbursed to the applicant. Planning Division - DEPOSITS (*) * Architectural Control Application $15,000.00 * Certificate of Compliance $1,500.00 ** Conditional Use Permit $8,000.00 * Floodplan Development Permit $1,500.00 * General Plan Amendment $10,000.00 - - -- --- - - - * Tentative Parcel Map$5,000.00 -......... .... ._--..... ... ..... -- - - -- - — -- -- _........................... -- * Tentative Parcel Map Waiver - — ._........ -- $1,500.00 * Tentative Subdivision (Tract Map)$10,000.00 * Zone Change $4,000.00 _ _ .._. _ - _ - -- - -- __.W. _ __, ...-- .._._.._. _ .. .---- * Zone Change with CDP's, SDP's, Code Amendments . m _. I— - - $5,000.00 _ - .. .,...... _, m -- ...__ * Grading Plan Modification - - - _ .. $5,000.00 * Administrative Approval/La-..-..._ - --___s m _ --/" ---.- _i,--_ _ __....-__.... ......._-$2,-000- nd Use Ad ustment/Modification - - .-_---- $2,000.00 * Affordable Housing Agreements_ $3,000.00 ...... - * Development Agreements (include modifications) - - -- $5,000.00 * Developm ............. ...._._ _ _ _ _ ._._ _ _ . _ _ _ .... ....---- ...-- _ * Sign Program $1,000.00 * Annexation $10,000.00 �� Zone Variance (notwithother applications) $2,006.00 Zone Variance (with Architectural Control (AC) and Conditional Use Permit applications) $2,000.00 * Sign, Monument (not part of Architectural Control application) $1 000.00 _._ ... _._......... _-------. __-.__-- * tree Removal Permits: HOA 10+ Trees _ ._ - _.._ _ - ........_ .... - -- _ - $1,000.00 * Tree Removal Permits: PlanningCommission _._ $1,000.00 Pursuant to Resolution 06-05-14-01 6116/260g CD -Ping (Unless Otherwise Noted, Page 27 of 75 Effective July 1, 2009 Planning Deposits/Fees Summary Exhibit H Current Fees Descri Time Extensions Use fifty (50%) estimated percent of I original deposit ........ . .. . . Zoning Confirmation Letter .. .. ... ... ... . .... ........... ... . .. . . . . .................. . ....... . . . ... Site Plan Review ...... . ... . . . . ..... .. .......... ..... .. .. . ...... . .... ____ __---- --- ----- $3,000.00 ._ _.__.. ..._._. * Mobilehome Mobilehome Park Conversions, Closures, and Cessation of Use Fee $30,0WOO - - — - - ----------- -------- - - MdFka .- 1�ae Consultant Relocation Report per Item 2 ---------Market Rat6 Other Consultant/Technical analyses per Item 2 Mammate CEQA documents/processing fees per Item 2 Tree Removal Permits: Commercial Market Rate Assigned City Personnei per Item 1 * WQMP Review (Small Project - 2 Reviews) . . . . . . .... . (Small . ............. $561.00 ...... .... .......... ...... .. . . .. -------------- - . * Additional Small Reviews (as needed - per review) . . ...... ...... . . . ........ - $224.00 * WQMP Review (Large Project - 2 Reviews) $897�00 . .. ... . .... . . .... .. ....... . .... .... .... .... .. . ........ Additional Large Reviews as needed - per review) ... .... ........ $336-00 Planning Division Fixed Fee Schedule The following is a list of development applications that have a fixed fee. This fee shall be paid at the time Commerciallindustrial I sq. ft. to 50, 000sq. ft. or 4 o, more ....... .... ................ .. . ..... r of application. $500.00 . ..... ....... ..... . . . . . . . . .. ............................. . . . . . . ..... . ........... Land Use Appeals (Pursuant to Resolution 08-12-16-02) ------------ I .... . ........ Non -Applicant (Pursuant to Resolution 08-12-16-02) $155,00 Applicant (Pursuant to Resolution $775.00 Exceptions to Title 9 of the Municipal Code $868.00 Exceptions for Radio and Satellite and Dish Antennas $116,00 Home Occupation Permit .... .. . . ..... .____._.... . . . ....... .... ..... ..... . $57,00 Modification to CC&R's (homeowner association) . ..... I . .. ... $173,00 Grand Opening & Promotional Banner $29.00 Sign Permit (Over -the Counter) ........ . ........ .... .... . . $115.00 Street Banner$92.00 Research (over .25 hours)$57.00 Check Final Map . $560 + $29 ......... Zo-ni.n.g. Compliance Plan Check Over the Counter (Minor) $129.00 $36.1.00-- . Inspections (After first tw_ o- 6n_sp`e`dbo_n_s)'_ ---- ----- ...... Special Development Advisory Board (DAB) meeting . .... .. . ..... .... . -._._$391.00 Staff Interpretation $86.00 Planning Commission Interpretation $173.00 Deferred Completion Agreement estimated I cost of ........ . .. . . Zoning Confirmation Letter .. .. ... ... ... . .... ........... ... . .. . . . . .................. . ....... . . . ... ... . . ... ..... $86.00 ............ . .. . . ........ . ...... Temporary Sign Permit ... . .. .. ........ ... ... ... ... ... . . .. . ........ ....... . � � .. . .... ..... -- $29,00 Temporary Use Permit $347,00 Tree Removal Permit ....... ..... ... Non -Planning Commission .... ... .......... . .... ............ . . . . . . ..... .... .............. . Tree Removal Permits: Residential $29.00 Tree Removal Permits: Commercial $29.00 mm Tree Removal Permits: HOA 1-3 Trees $29.00 Tree Remova� Permits: HOA 4-9 Trees . . ... ....... $113,00 Pre-appfication consultation and preliminary review ... ......... Commercial/industrial tenant improvements or 3 residences or fewer ............... _ .--_ 'residences__'_- $250.00 Commerciallindustrial I sq. ft. to 50, 000sq. ft. or 4 o, more ....... .... ................ .. . ..... r $500.00 Commercial/Industrial 50,000sq.ft, or more $750,00 Pursuanl, to Resolo(lon 08- 05-14-01 6116/2009 M -Ping (Untess Otherwise Noted) Page 28 of 75 Effective July 1, 2009 Planning Deposits/Fees Summary Exhibit H of Activities Permits City Wide Special Events (Non- ..........._..........- _. - — ... � � ........�.._ __ City Wide Special Events (Prow Merchants Events (Non -Profit) Merchants Events (Profit) Center -wide Events (Non -Profit Center -wide Events (Profit) Christmas Tree Lots (Non-Prc�f1 Christmas Tree Lots (Profit) Descriptions Banners Current Fees 69.00 317.00 A.00 174.00 58,00 Z59.0q T29.4(3 ;29.00 Pursuant to Resolution 08-05-14-01 6/16/2009 C© -Ping (Unless Otherwise Noted) Page 29 of 75 Effective July 1, 2009 Engineering Fees Summary Exhibit T Pursuant to Resolution 09-04-21-04 6/16/2049 PW -Eng (Unless OtherMse Noted) Page 30 of 75 Effective July 1, 2009 Current Fees Term Descriptions Digital Submission Fees The following fees shall be charged in addition to the normal plan check fees if the development applicant does not have the capability to provide improvement plans that are not submitted in a digital format. All development improvement plans that are submitted in a digital format in accordance with the adopted digital Submission Standards will not be subject to this fee. The applicable fee is as follows: Size -Plan -Sheet line Density Clarity D at 1" - 40` Scale Low Good _.. . ...— -- $44.15 Sheet - -- D at 1" - 40' Scale Low Bad _ _ _ -- .......... ...... ... .. $88.29 - _.. Sheet D at 1" -'40' Scale High Good $132,45 Sheet D at 1" - 40' Scale High Bad $176.60 Sheet Engineering Documents and Records Per Hour (Minimum Document and Record Retrieval/Research/Review $53.51 charge of 15 Minutes) Each person, firm or corporation shall pay a microfiche or digital storage fee for permit applications, plans, specifications, calculations, coils reports, and all pertinent data required to be maintained by state regulations, per sheet. Digital Ortho Photo Imaging $535.15 Per Tile Includes 2 hour minimum staff time at $52.00 per hour GIS Information Requests As determined by ----- ----. -- City Engineer ...:.._.. _ . __. . Agreements (License & Others) $1,070.29 Lot Line Adjustment Submittal and Processing $1,873.01 Map/Pian/Application Processing Administration (Due Prior to Map/Plan/Application Approval) Includes the preparation and processing of agreements, resolutions, 3.5% of construction/ City Council and Commission Agenda Reports, presentation to improvement costs Commission/boards, field investigation (does not include advertising with a minimum of and recording fees) $500,00 Map Processing (Due with Map Submittal) Tract maps and Parcel Maps $856.23 Plus $337 per lot Records of survey $535.15 Plus $51.72 per lot $535.15 Duplicate Mylar Deposit $20,69 per Sheet Improvement Plan Processing Public and Private Improvement Plan Submittal $1,070,29 3% of Construction Checking (on-site & off-site) Cost and Improvement Costs Pursuant to Resolution 09-04-21-04 6/16/2049 PW -Eng (Unless OtherMse Noted) Page 30 of 75 Effective July 1, 2009 Engineering Fees Summary Exhibit I Pursuant to Resolution 09-04-21-04 6/16/2009 PW -Eng (Unless Otherwise Noted) Page 31 of 75 Effective July 1, 2009 Current Fees Term Descriptions Hydrology/ Hydraulic Studies Minimum up to 5 acres Over 5 Acres Hydrology/Hydraulic Studies (0-20 Acres) $668.93 ($692 plus $13.00 per additional 0.1 Acre) Plus $2.00 per 0.1 Hydrology/Hydraulic Studies (over 20 Acres) $2,675.73 Acre over 20 Acres ($6,500 maximum) Sewer Studies Minimum up to 5 acres Over 5 Acres Sewer Studies (0-20 Acres) $668.93 ($691.74 plus $13.00 per additional 0.1 Acre) Plus $2.00 per 0.1 Sewer Studies (over 20 Acres) $2,675.73 Acre over 20 Acres ($6,500 maximum) Development Inspections (NPDES Fee applies) 3.5% of construction/ Improvement Costs up to $100,000 improvement costs with a minimum of $100.00 $3,500, plus 311/6 of Improvement Costs $100,000 and over improvement costs over $100,000 Sureties & Deposits 100% of Faithful Performance Surety construction/ improvement costs 100% of Labor and Material Surety construction/ improvement costs Monumentation Surety 100% of rnonumentation costs .......... ... ..... .... ....... ........ _-..m, ,_.._m. ------- ..W_ ... _- As required by the Water surety City's Water Department Easements (Modification/ Processing) As determined by City Engineer FEMA Elevation Certificates $42.81 Advanced Energy Lamp Size 7,000 rumens Single $96.32 Per light _.... .. Double $1.35.50 Per tight lamp Size 20,000 lumens Single $135.07 Per Light Pursuant to Resolution 09-04-21-04 6/16/2009 PW -Eng (Unless Otherwise Noted) Page 31 of 75 Effective July 1, 2009 Engineering Fees Summary Exhibit I Current Fees Term Descriptions Double $200.68 Per Light Encroachment Permit Issuance Fee - Applies to ail Permits $56.03 NPDES Permit Fee (Applies to total permit fee with the exception of Right of Way Entry, Storage Bin in Right of Way, and Traffic 10% of permit fee Control/Lane Closure) Plan Check Fee - - _ _ _.....$56,03 ...... Archival Fee/per sheet $1.07 -......._ w__._..._ Per Sheet Refundable Deposit $500-$2000 Sewer/Water/Storm Drain Connection (ea) ........ .--- - - - - $80.28 Manhole Facility (ea) $80.28 Sewer/Water/Storm Drain Lines - up to 24" Dia. $80.28 min.; $0 77/LF ----- --- Development Improvement inspections - Sewer/Water/Storm 3.511/o of Engineers Drain Lines over 24" Estimate .. ... _..... ---. --------- ----- r .. _... __ Utility Line Installations Up to 100' LF $80.28 Utility Line Installations Over 100' LF $80.28 min., ..__ _ ..._ --------------- -M_M/ F ......... Misc. Street Cut/Pothole/Trench $160.56 min.; $1.00 -- $80.28 min. Up to Curb / Gutter (LF) 150 LF; Over 150 LF, $80.28 plus $0.50/LF $80.28 min. Up to R/R Sidewalk (Sq. Ft) 150 SF;Over 150 SF $80.28 plus $0.15/sq.ft. R/!2 Driveway - Residential $133.78 R/R Driveway - Commercial _..._ ...__. ---- r.. __- .._...._._.... $160.54 . .. Curb Core - up to 3 cores -.... $80,28 ....... Haul Route $80.28 Per lay Right -of -Way Entry ._.... _ ... ---- .. - -- - -- $160.54 .. ..._.__,..__..._... _ Equestrian Trail Use (Also requires deposit. See below) $80.28 Per Day Equestrian Trail Use - Notification Deposit --...�.. $103.45 Transportation Permit (per Caltrans current fee sced.) Annual Fee $90.00 Single Trip$16.00 - _.._..._...-... _.... ------ __... _.... ._. - -- - - Round Trip _ _Traffic $32.00 Control/Lae Closure n of part of another project scope $53.51 Per Day Obstruction in Right -of -Way $53.51 Per Every Two Weeks Engineering Inspector's Hourly Rate $84.02 Engineering Inspector's Hourly Rate for Might Work $123.30 Skateboard Prohibition Application Fee for designation 1. Application Processing ........_. ...--- ------ .__W,_._.., --- $107.03 (includes permit application, petition review, sign pian . _.... ........ ..._., review - 2. Inspection $84,02 Gate -Guarded Neighborhood Plan Application Pursuant to Resolution 09-04-21-04 6/16/2009 M. -Eng (Unless Otherwise Noted) Page 32 of 75 Effective July 1, 2009 Engineering Fees Summary Exhibit I Pursuant to Resolution 09-04-21-04 6/16/2009 PW -Eng (Unless Otherwise Noted) Page 33 of 75 Effective July 1, 2009 Current Fees Term Descriptions The City Council of the City of San Juan Capistrano does hereby establish a fee for applications for gate -guarded neighborhood plan application under Municipal Code Section 8-13.101 to be as follows: [deposit$1,5.00.00 Required of any applicant for gate -guarded community Fee based on actual costs Applicant shall pay actual hourly costs incurred by City in. -----.....-_......._..__._-..-processing application - --- Processing of fee In event that actual costs incurred exceed $1500 deposit, City will blH for the remainder. In the event that actual costs Per Application are less than the deposit, applicant will receive refund. Recycling Facilities Processing fees and deposits associated with site plan review and conditional use permits with respect to the processing of recycling facilities development applications are waived. Water Quality Management Plan Review Fees WQMP 1st/2nd Review (Small Project) $560,30 WQMP Subsequent Review (Small Project) $224.12 — ............._....... ...._._.. -- WQMP 1st/2nd Review (Large Project) __ W------- __...._.__ ...... __........W. _ -- _ _. _ - ___.._...— - $896.48 _............._._... _.._-,................. WQMP Subsequent Review (Large Project) $886.18 Miscellaneous Fees As determined by City Engineer Pursuant to Resolution 09-04-21-04 6/16/2009 PW -Eng (Unless Otherwise Noted) Page 33 of 75 Effective July 1, 2009 Building Fees Summary Exhibit 3 Descriptions Building Permit Fees Current Fees I Term Construction and Demolition Submittal$89.64 . ..... .. ......... . . ........... .......... ........... ..... 1% of Deposit valuation, with $250 minimum Base Fees.(perValuation -Table.)__ . Base s -e __94.99 Per Sq Ft i3uildin� Permit Permit Issuance .. ... ... ... ... ......... $26.02 Building Address $84.02 .. ...... .................. .... . .... . .... . — --- ----- NPDES Permit Fee $168.00 Pursuant to Resolution 09-04-21-04 6/16/2009 CD -Bldg (Unles5 Otherwise Noted) Page 34 of 75 Effective July 1, 2009 ICBO BUILDING VALUATION DATA Data taken from the February 2009 Building Safety Journal Square Foot Construction Casts a,b,c,d Grau (2006 International Building Code) RR2 of Construction. IA IB IIA IIB IIIA IIIB IV VA VB A-1 Assembly, theaters, with stage $207.99 $201.27 $196.59 $188,35 $177.31 $172.08 $182.33 $161.78 $155.82 A-1 Assembly, theaters, without stage $188.37 $181.65 $176.97 $168.72 $157,73 $152.50 $162,70 $142.19 $136.23 A-2 Assembly, nightclubs $160,35 $155.84 $151.87 $146.10 $137.40 $133.56 $140.99 $124.59 $120.41 A-2 Assembly, restaurants, bars, banquet halls $159,35 $154.84 5149.87 $145.10 $135.40 $132.56 $139.99 $122.59 $119.41 A-3 Asseinbly,churches $191.73 $185.01 $180.33 $172.08 $161.06 $155,82 $166.06 $145,52 $139,56 A-3 Assembly, general, community halls, libraries, museums $162.11 $155.39 $149.71 $142.46 $129.82 $126.20 $136.44 $114.89 $109.93 A-4 Assembly, arenas $187.37 $180.65 $174.97 $167.72 $155,73 $151.50 $161.70 $140.19 $135.23 B Business $161,10 $155.30 $150.33 $143.24 $130.34 $125.39 $137.63 $114,22 $109.47 E Educational $176.25 $170.31 $165.47 $158.26 $148.32 $140.74 $153,03 $130.54 $125.61 F-1 Factory and industrial, moderate hazard $97.68 $93.20 $87.88 $84.96 $76.10 $72.71 $81,54 $62.67 $59.24 F-2 Factory and industrial, low hazard $96.68 $92.2.0 $87.88 $83.96 $76.10 $71.71 $80.54 $62.67 $58,24 H-1 High Hazard, explosives $91.50 $87.02 $82.70 $78.78 $71.10 $66,71 $75.36 $57.67 $0.00 H234 High Hazard $91.50 $87.02. $82.70 $78.78 $71.10 $66.71 $75.36 $57.67 $53.24 H-5 HPM $161.10 $155.30 $150.33 $143.24 $130.34 $1.25.39 $137.63 $114.22 $109.47 I-1 Institutional, supervised environment161.32 $155.78 $151.61 $145.46 $135.81 $132,09 $146.81 $122.94 $118.11 I-2 Institutional, hospitals $271.13 $265.33 $260.35 $253.27 $239.63 $0.00 $247.66 $223.51 $0.00 I-2 Institutional, nursing homes $189.55 $183.75 $178.78 $171.69 $159.17 $0.00 $166.08 $143.05 $0.00 I-3 Institutional, restrained $185.16 $179.37 $174.39 1167.30 $155.66 $149.72 $161.69 $139.55 $132.80 1-4 Institutional, day care facilities $161.32 $155.78 $.151,61 $145.46 $135.61 $132.09 $146,81 $122.94 $118.11 M Mercantile $119.24 $114.73 $109.76 $104.99 $95.94 $93.10 $99.88 $83.13 $79.95 R-1 Residential, hotels $163.43 $157.90 $153.72 $147.58 $137.69 $133.97 $148.68 $124,81 5119.99 R-2 Residential, multiple family $136.97 $133,.44 $127.26 $121,11 $111.35 $107.63 $122.34 $98.47 $93,65 R-3 Residential, one- and two-family $12.9.98 $126.37 $123.27 $120.01 $115.61 $112.61 $118.02 $108.33 $101.95 R-4 Residential, care/assisted living facilities $161.32 $155.78 $151.61 $145.46 $135.81 $132.09 $146,81 $122.94 $118,11 S-1 Storage, moderate hazard 590.50 $86.02 $80.70 $77.78 $69.10 $65.71 $74.36 $55.67 $52.24 S-2 Stora e, low hazard $89,50 $85.02 $80.70 $76.78 $69.10 $64.71 $73.36 $55.67 $51,24 U Utility, miscellaneous $69.10 $65.33 $51.44 $58.37 $52.71 $49.14 $55.08 $41.61 $39.61 a. Private Garages use Utility, miscellaneous b. Unfinished basements (all use groups) = $15.00 per sq ft C, For shell only building deduct 20 percent d. N.P. = not permitted 9Ursuant to Resolution 08-12-16-02 6/16(2009 09-10 vfables - (Jnless Otherwise Noted) Page 35 of 75 Effective My 12, 2009 Table 3-A Fees Summary Exhibit 3 Building Permit and Inspection Descriptions Current Fees $2,001. to $25,000 $25,001 to $50,000 $50,001 to $100,000 $100,001. to $500,000 $500,001 to $1,000,000 $1,000,001 and up $26.33 for the first $500 plus $3.16 for each additional $100 or fraction thereof, up to and including $2,000, $74.12 for the first $2,000 plus $14.48 for each additional $1.,000 or fraction thereof, up to and including $25,000. $418.76 for the first $25,000 plus $10.45 for each additional $1,000 or fraction thereof, up to and including $50,000. $689.00 for the first $50,000 plus $7.24 for each additional $1,000 or fraction thereof, up to and including $100,000. $1,063.60 for the first $1.00,000 plus $5.79 for each additional $1,000 or fraction thereof, up to and including $500,000. $3,461.06 for the first $500,000 plus $4.91 for each additional $1,000 or fraction thereof, up to and including $1, 000,000. $6,003.01 for the first $1,000,000 plus $3.26 for each additional $1.,000 or fraction thereof. _... _........— _..._. -- - m - ,..Enforcement of State Mandated Title 24 -Energy Add 20% Enforcement of State Mandated Title 24 -Handicap _ Add 10% NPDES Permit l=ee - - Add 10°10 The fee for a building permit authorizing additional work to that under a valid permit shall be the difference between the fee 2aid for the ori incl ermit Pursuant to Resolution 09-04-21-04 6/16/2004 3-q ,Un€ess Otherwise Noted) Page 36 of 75 Effective July 1, 2009 Table 3-A Fees Summary Exhibit J Building Permit and Inspection Descriptions Current Fees Per the Uniform Administrative Code, Section 304, the determination of value or valuation under any of the provisions stipulated in the codes shall be made by the Building Official. The value to be used in computing the building permit and plan review fees shall be the total value of all construction made for which the permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, air-conditioning, elevators, fire extinguishing systems, and any other permanent equipment. Note: Section 105 Definition of Valuations or Value, as applied to a building and its building services equipment, shall be the estimated cost to replace the building and its building service equipment in kind, based on current replacement costs. The unit costs/values for general improvements defined in the "Building Valuation Data Schedule" (Table 3-A. 1) are for projects employing conventional construction with average to good quality. The purpose and intent of the San Juan Capistrano Land Use Management Code is to: a) "provide precise land use regulation as a means of implementing the General Plan, " and b) "provide for the utilization of innovative land planning and building design to achieve high quality, variety, flexibility and efficiency in the design of residential, commercial, industrial and other development projects." The City employs numerous committees, boards, and commissions to serve as a mechanism to facilitate this endeavor. This renders unique, creative, sophisticated and complex propositions. Due to the nature, type, shape and size of the sites available in San Juan Capistrano located in seismic zone 4, and the existence of moderate to highly expansive soils, special architectural and/or structural features are often employed to mitigate hazardous, unstable and unusual conditions. The Administrative Authority often requires additional plans, specifications, details and engineered computations to substantiate the validity and integrity of these proposals. The Building and Safety Division defines this type of construction as complex construction with good to excellent quality. A regional modifier of 110% is used to adjust the unit cost to reflect a reasonable and accurate assessment of local cost. An additional 5 percent shall be imposed when special inspections as defined in Section 306 of the Uniform Administrative Code are required. The surcharge is designed to recover cost associated with screening special/deputy inspectors, verification of credentials, reviewing field report and daily memos, communicating with testing agencies and inspection monitoring. U.B.C. Section 2313 Earthquake Regulations requires each structure to be designated as being structurally regular or irregular. Regular structures have no significant physical discontinuities in plan or vertical configuration or in their lateral force -resisting systems such as irregular structures. Structures having one or more of the features listed in Table No. 23- M of the Uniform Building Code shall be designated as having a vertical irregularity. Structures having one or more of the features listed in Table No. 23-N shall be designated as having a plan irregularity. Pursuant to Resolution 09-04-21-04 6/16/2009 3-A (Unless Otherwise Noted) Page 37 of 75 Effective July 1, 2009 Table 3-A Fees Summary Exhibit J Building Permit and Inspection Descriptions Current Fees A structure designated as having a vertical irregularity and/or a plan irregularity shall be defined as an irregular structure. An additional surcharge is imposed to recover the cost associated with expending extra time/resources on complex, intricate structures defined as irregular to verify conformance with approved plans to ensure adherence with the codes and regulations of the City of San Juan Capistrano. The following table summarizes and outlines the imposed surcharges: Regular Structure Regular Structure (with Special Inspection) _....- ._.._ --- - _..._................. -- .-......... .............. ._. Irregular Structure Irregular Structure (with Special Inspection) For miscellaneous improvements, refer to the "Supplemental Unit Cost Data Schedule" (Table No. 3-A.2) z Or the total cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. Pursuant to Pesolubon 09-04-21-64 6/16/2009 3-q (Unless Otherwise Noted) Page 38 of 75 Effective July 1, 2009 Table 3-A.1 Fees Summary Exhibit 3 Building Permit and Inspection Descriptions Current Fees Term 65% of Permit Pian Review Fee Fee Enforcement of State Mandated Title 24 -Enemy ProvisionsAdd 20% Enforcement of State Mandated Title 24 -Handicap Provisions (Add lflp/o__. -. _.. MISCELLANEOUS FEES: Inspections outside of normal business hours___ .._....- .$84.02 perhour --- - - - (minimum charge - two hours) - - Reinspection fees assessed under provision of Section 108.8 CBC (i.e. geotechnical, structural, inspections, review, analysis) _ _...._ __ - -. .._.__....._ $84 02 per hour (minimum charge - two hours) Additional plan review required by changes, additions or revisions to approved plans ----- - .....__.....__._... -- - - .._m........_..._..._._....._ $84.02 per hour minimum charge - one hour -- - __ Pursuant to Resolution 09-04-21-04 6/16/2009 3-A.1 (Unless Otherwise Noted) Page 39 of 75 Effective July 1, 2009 Table 3-A.1 Supplemental Fees Summary Exhibit J Building Permit and Inspection Descriptions Current Fees Term Plan Review Fee Composition - Fiberglass____. _. $2.14 per sq.ft Asbestos - Cement Shingle _- - - - $2.30 -perrsq,ft As halt Shingle p ----- ._...... _ _._. -- --_ _..__ per sq.ft Aluminum Shingle _ -- - _..._.. -- - - - . .........$2.3b $3.21 .._,., per sq.ft - _ .._._ ._.._.._- Wood Shingle - -- - .. 2.41 . _......- q _ per sq.ft Wood Shake $2.41 per sq.ft Built -Up - P _ ..- _...... _ - $2.14 per s ft _Clay Tile - _.._..... ._.. $4.55 per sq.ft Concrete Tile - -- --- _...--- ------ --- __. $4.55 _ per sq.ft ..._.... Removal of Existing Roof Covering Add __.__ ..- _ . _ _ .-_ - $0.54 per sq.ft -- -- - Roof at or Above Two Stories ---- _..... ...._......._ Add 10% .... -- per sq.ft INTERIOR WORK Tenant Improvement _.._. _.. - $30.60 per sq.ft - ---- - Suspended Ceilin _ ---- p -_. ,....- g _..--.._.. ..---..... - ...�.�.._.w... ----- $12.85 --..._.. per sq.ft Partition to 8' High h --- ... ..._. $48.17 PLF ...... ._ _... - - , ...__. - - - Partition over 8' High -- ..--- $53.51 ---...... -- -. PLF SIGNS Double Face Painted Sign _ __. . 41.52 per sq.ft ...... Sin le Face Painted ed Si n _._...._�......_ -- .._._$. $33.07 - - per sq.ft Doule Face Electrical Sign _._ _ ._.__ $95.36 per sq.ft__... S-6--g-le-Face Electric .... Sign._9 _, ..-. - -- -- $71_...28 per sq.ft. _...-_.:.. 4' Sign Pole $32.43 - - - - - PLF _... 6` Sign Pole - -- $45.06 PLF ... 8' Sign Pole - -- - _ $58.8_6 ---PLF 10' Sign Pole _....._ $72.35 PLF -- 12' Sign Pole _.� ---...m.-�------- $86.42 PLF -- WALLS/FENCES: Masonry 4" Masan Block Wall _-- _ ._ _.__. _ . - _- __ _.._ $6,42 per sq.ft 6" Mas- onry Blocl< Wall - $9.63 per sc{.ft_. Chain Link or Wire Fence -..... -- - --. _.. M. - $2.68 per sq.ft Wood l=ence _.....__ - _ . -- .__ X4.28.. per sq.ft ^..__.. Wrought Iron Fence ....__. _......._ $4.01 _.......--- per sq.ft Natural Stone/Rock Wall - _...._ ____. _.. _. _ Retaining -Nall $12,85 per sq.ft Concrete Wali Poured in Place - ___..., . -- ... $16.06 per sq.ft ......... .._ Stucco on MasonryWall - Add $5.35 per sq.ft _ Miscellaneous Alterations /Improvements ACCESSORY STRUCTllRFS Residential. _.._. ..... _ .......... .._ ---- Patio - Trellis Structure - - _-....._.. $16.06 - -._ per sq.ft Patio - Covered Structure --- __ _..__.. _ _ - - $17.12 per sq . ft - Patio - Screen/Plastic "Greenhouse" - _-- _ mm _ - 17.12 per sq.ft Deck - 30" Above Grade .. -._ __. W_ $17.12 per sq.ft Shed/Playhouse _._..... ..... Y house - _ .. $11.50 ------.... per sq,ft Stairway _ ...... $12.85 per sq.ft .. - Agricultural: Barn -Livestock/Poultry $19.26 per sq.ft Pursuant to Resolution 09-04-22-04 6/16/2009 -3-A.1 Supp (Unless Otherwise Noted) Page 40 of 75 Effective July 1, 2009 Table 3-A,1 Supplemental Fees Summary Exhibit 3 Building Permit and Inspection Descriptions Current Fees Term Storage Building Horticulture Structure $x.9.26. . $13 .91 ._.............. _... per sq.ft per sq.ft Pursuant to Resolution 09-04-21-04 6/16/2009 3-A.1 Supp (Unless Otherwise Noted) Page 41 of 75 Effective )uly 1, 2009 Table 3-A.1 Supplemental Fees Summary Exhibit 3 Building Permit and Inspection Descriptions I Current Fees I Tera REMODEL/RENOVATION Install Window/Sliding Glass Door $13.91 per sq.ft Opening Close Exterior Wall n - _ .....-1?._ g - - $1,,23 t per sq,ft Add Masonry Fireplace $5,351.47 Fixed .......... _. ... Add Prefabricated Fireplace . $2,675.73 Fixed Add Bathroom $5,886.62 Fixed DEMOLITION Demolition Issuance Fee $26.33 Permit Fee .. _ ............. Per Table 3-A _ -- _ Plan Review -- - Per Table 3-A - --- Refuno�jble Bond Deposit - The amount of the on-site clean up deposit shall be as set Forth in Table 3-A.2.1 PERMIT ISSUANCE FEE: For the issuance of each permit _. __.._. $26.33 - SWIMMING POOL, SPA & HOT TUBS SWIMMING POOL: Gunite _ � .... $53,51 per sq.ft Vinyl Lined y _ _._ ._. $26.75 per s ft __. Fiberglass -- _. 32.11 per sq.ft HYDROMASSAGE POOL: Spa/Hot Tub Gu nice - ..............--- - -- $1 ---- — 6,05441 - Fixed ........ ... ...____ Fiberglass_._.._-- $7,492.06 Fixed --__.__ Wood _ ....__ -- - $2,675.73 Fixed' HYDROMASSAGE BATHTUB: - ......... ._... -- _ _ ............... - ,....... ...... , ....- - Jacuzzi/Whirlpool Tub - -- --- - CastIran $4,-816.32 Fixed _ -- Fiberglass — --- $3,746.03 Fixed - Crushed Marble — -- - - - - _--- $3,746.03 ---- --_.._...-...----- Fixed Pursuant to Resolution 09-04-21-04 6/16/2009 3-A.1 Supp (Unless Otherwise Noted) Page 42 of 75 Effective July 1, 2009 Table 3-A.2.1 Fees Summary Exhibit ] Demolition Deposit Fee Schedule Descriptions Fee Term Demolition Deposits _ .. ....... — _...._ 0-1, 00_0 Square Feet _. � w- -- $500.00 _._�1,0©0.00 _ _ _ __..-. Fixer 1,000 to 5,000 Square l=ee � - __.._. ..- — -- .....�...... ....._� Fixed -- —.._ — m..T.___ 5,000 Square Feet or Greater 5,000 $1,500.00 r Fixed to Resolution 09-04-21-04 6/16/2009 3-A.2.1 (Unless Otherwise Noted) Page 43 of 75 Effective 7uly 1, 2009 Des For issuing each permit Table 3-B Fees Summary Exhibit 3 Electrical Permit and Inspection S Current Fees 26.33 The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time. Occupancy Group R-1: For new multifamily residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other noncommercial automobile storage areas constructed at the same time, per square foot: Occupancy Group R-3: For new single- and two-family residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot: Occupancy Group U: For new garages, carports and other minor accessory buildings constructed at the same time, per square foot: For other types of residential occupancies and alterations, additions and modifications to existing residential buildings, use the UNIT FEE SCHEDULE. $0.07 $0.03 The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time. ccupancy Group A, B, E, H, and I: .......... _. For new commercial/industrial buildings not including the area of garages, carports and other minor accessory buildings $0.04 constructed at the same time, per square foot: For new private, residential, in -ground swimming pools for single family and multifamily occupancies including a complete system of necessary branch circuit wiring, bonding, grounding, $52.98 underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool, each: In combination with the installation/construction of a spa or therapeutic whirpool, total: $75.28 Term per sq.ft per sq.ft per sq.ft per sq.ft Pursuant to Resolution 09-04-21-04 6/16/2009 3-13 (Unless Otherwise Noted) Page 44 of 75 Effective )uly 1, 2009 Table 3-B Fees Summary Exhibit 3 Electrical Permit and Inspection Descriptions Current Fees Term For new private, spa/therapeutic pool for single family and multifamily occupancies including a complete system of necessary branch circuit wiring, bonding, grounding, underwater $19.48 lighting, water pumping and other similar electrical equipment directly related to the operation of a spa or theraputic whirlpool, each: Nonresidential Appliances For residential appliances and self contained factory, wired, non- residential appliances not exceeding one horsepower (P), kilowatt (KW), or kilovolt ampere (KVA), in rating including medical and $5.08 dental devices; food, beverage, and ice cream cabinets; illuminated showcases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each: Nome: For other types of air conditioners and other motor -driven appliances having larger electrical ratings, see Power Apparatus. Pursuant to Resolution 09-04-21-04 6/15/2009 3-8 (unless Otherwise Noted) Page 45 of 75 Effective July 1, 2009 Table 3-B Fees Summary Exhibit 3 Electrical Permit and inspection Descriptions Current Fees Term Power.A aratus - For motors, generators, transformers, rectifiers, synchronous __._......_ ....... _..--- .......... ._ converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatus, as follows: Rating in horsepower (HP), kilowatts (KW), kilovolt -amperes (KVA) or kilovolt -am eres-reactive KVAR : Up to and including 1, each: $5.08 Over 1 and not over 10 each: $13,17 _,_- - .. ...... ------ Over 10 and not over 50, each: $26,33 Over 50 and not over 100 each. $52.98 Over 100, each:-- -. -- - $79.74 Mote: For equipment or appliances having more than one motor, transformer, hearer, etc,, the sum of the combined ratings may be used. These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment, Busways - __...._ _ .... ... _._ ...._..� _ For trolley and plug -in -type busways, each 100 feet or fraction _........ thereof $.._7.76 !vote: An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in busways, No fee is required for portable tools. Signs, Outline Lighting and Marquees For signs, outline lighting systems or marquees supplied from one branch circuit, each: - - $26,33 each For additional branch circuits within the same sign outline ...... - ..... _.. ..... lighting system or marquee, each: $5.08 each Services For services of 600 volts or less and not over 200 amperes in ratinq, each: $32,65 each For services of 600 volt or less and over 200 amperes to 1000 amperes in rating, each: $66.52 each For services over 600 v_..... olts or over 1000 amperes in rating, each: $133.04 each Miscellaneous Apparatus, Conduits and Conductors - _ .. -- -- _.: ....... For electrical apparatus, conduits and conductors for which a $19.48 permit is required but for which no fee is herein set forth Note: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment. PLAN REVIEW FEE: Plan Review Fee 65% of Permit Fee MISCELLANEOUS FEES: . -- - ...�....._ Inspections outside of normal business hours _- $84.02 per hours (minimum charge - two fours Reinspection fees assessed under provisions of CBC Section 305 $84.02 hour' (q) _-..-. _-___.._.. --- - - .. _.._ ................ ..... .. ........ per Pursuant to Resolution 09-04-21-04 6/16/2009 3 -ix (Unless QtherMse Noted) Page 46 of 75 Effective 3uly 1, 2009 Table 3_g Fees Summary Exhibit 3 Electrical Permit and Inspection Descriptions Current Fees Term (minimum charge - two hours) .._... ..,. .. _ -- ..... _ _ no _ Inspections for which fee is specifically indicated -- $84.02 mer hours --(minimum charge - twohours) _ - _ _M.._._. - - _ -- . ._.. ............. ----- Additional plan review required by changes, additions or $84.02 per hour z --- revisions to approved plans_ -_ _ ....... (minimum charge - one hour) PUBLIC SWIMMING POOLS/SPAS: For new public i'n- round swimming g g pools for commercial occupancies including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related to $52'98 the operation directly related to the operation of a swimming pool, each: Pursuant to Resolution 09-04-21-04 6/16/2009 313 (Unless Otherwise Noted) Page 47 of 75 Effective July 1, 2009 Table 3-B Fees Summary Exhibit 3 Electrical Permit and Inspection Descriptions Current Fees Term In combination with the installation/construction of a spa or therapeutic whirlpool, total: $72.46 For new public, spa/therapeutic pool for commercial occupancies including a complete system of necessary branch circuit wiring bonding, grounding, underwater lighting, water pumping and other $21.40 similar electrical equipment directly related to the operation of a s a or them utic whirlpool, each: Carnivals and Circuses ------------- Carnivals, circuses, or other traveling snows or exhibitions utilizing transportable -type rides, booths, displays and attractions. -For ..__ - electric generators and electrically driven rides, each: $25,15 each .. ........_..._....._ .___- ____ ... -....- - --...._.W.......... --- For mechanically driven rides and walk-through attractions or - - ..__ ........ . displays having electric lighting, each: - -. __....._ .... - ----- $7.76 -- -- - ..................... each -- ..__._... For a system of area and booth lighting, each, $7.76 each ---- - __.. ... - - - - -- For permanently installed rides, booths, displays and attractions, -- ----- ------ — _ _ _ use the UNIT FEE SCHEDULE Temporary Power Service For a tenpor service ower ole __.__. _--_- -- ry p pole, or piggyback, ......_ . ......___.___ ___ .__.._ ..__._m... _...._...... .. including all pole or pedestal -mounted receptacle outlets and $25.15 appurtenances, each:_ __._.__ 'an'd - each For a temporary distrib-ution system and temporary lighting -- -' receptacle outlets for construction sites, decorative light, Christmas $13.17 tree sales lots etc., drop ole each: each UNIT FEE SCHEDULE Rece tacle Switch and Li htin Outlets For receptacle, switch, lighting or other outlets at which current is used or controlled, except services, feeders and meters. First 20, each: --- ------ ----- _. �:. _ ..-$1.18_._ _._.._..._ ._ Additional outlets, each: $0.79 each !Vote: For multi -outlet assemblies, each 5 feet or fraction thereof may be considered as one outlet. _._....__ _..------- , Lighting Fixtures For lighting fixtures, sockets or other lamp -holding devices ...- _._.._ - - - First 20, each: $1.18 each ....... - - - _ _.. _..- -- - -. ...., ...... _._.... _ _ . ... . . .. .. ....... _ -... ........-_ __---- Additional outlets, each: $0.79 each For pole or platform -mounted lighting fixtures, each: $1.18 each ..._ _......_ ....... _ ......_ ...-........... For theatrical -type lighting fixtures or assemblies, each: $1.18 each - -. Residential Appliances For fixed residential appliances or receptacle outlets for same, including wall -mounted electric ovens: counter -mounted cooking $5.08 tops: electric ranges, self-contained room, console, or through - wall air conditioners; space heaters; food waste; food grinders .. _ . Nater For other types of air conditioners and other motor driven appliances having larger electrical ratings, see Power Apparatus. Footnotes for Table No, 3--8 Pursuant to Resolution 09-04-21-04 6/16/2009 3-8 (Unless Othemise Noted) Page 46 of 75 Effective July 1, 2009 Table 3-B Fees Summary Exhibit Electrical Permit and Inspection Descriptions Current Fees Term Or the total cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. Pursuant to Resolution 09-04-21-04 6/16/2009 3-B (Unless Otherwise Noted) Page 49 of 75 Effective July 1, 2009 Table 3-C Fees Summary Exhibit 3 Mechanical Permit and Inspection Descriptions Fee Term PERMIT ISSUANCE FEE: For issuing each permit $26.33 PERMIT & INSPECTION FEE: -- . _._ Unit Fee Schedule For the installation or relocation of each forced air or gravity -type furnace or burner, including ducts and vents attached to such appliance up to and including 100,000 Btu/h -- - - $15.84 --- For the installation or relocation of each forced air__.._ or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h ._...... ..�. � .... $19.48 _......_.._ _ _ For the installation or relocation of each floor furnace, including vent $15.84 For the installation, relocation or replacement of each appliance _ vent installed and not included in an appliance permit $7.76 For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code $14.66 For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu/h $15.73 ____w._...... ------- -------- -_...._._... For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu/h to and including 500,000 Btu/h $29.06 For the installation or relocation of each boiler or corepressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h $39.87 For the installation or relocation of each boiler or corepressor over 30 horsepower to and including 50 horsepower, or for each absorbtion system over 1,000,000 Btu/h to and including 1,750,000 Btu/h $5935 For the installation or relocation of each boiler or refrigeration corepressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h __._ ...... _ - --- -._ _ _. ------..._-. . $99.17 . ---- For each air -handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto $11.40 Pursuant to Resolution 09-04-21-04 6/7.6/2009 3-C (Unless Otherwise Noted) Page 50 of 75 Effective July 1, 2009 Table 3-C Fees Summary Exhibit 7 Mechanical Permit and Inspection Descriptions Fee Term Note. This fee shall not apply to an air -handling unit which is a portion of a factory -assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code. For each air -handling unit over 10,000 cfm $20.28 For each evaporative cooler other than portable type $11.40 For each ventilation fan connected to a single duct $8.12 For each ventilation system which is not a portion of any heating or air-conditioning system authorized by apermit ........... ..............._..._......._.__._......�.-......... - For the installation of each hood which is served by mechanical exhaust, including the ducts for such food $11.40 For the installation or relocation of each domestic -type incinerator _. __.... .... ... - ----- — - -- - — ___ .. _..... $19.48 ._- -- -............. .__ _.._. ....... .... ... .... --- For the installation or relocation of each commercial or industrial - type incinerator $48.17 For each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this code $11,40 . W.._ ......... . _... ,W....__.._. PLAN REVIEW FEE., _ -- - - --- ----- _.. - ...�............... ... ......... _ -._ -_m: ... __...... ........ The Plan Review Fee shall be 65% of the Permit Fee .. _ ..._._..._.. - -- - - --- MISCELLANEOUS FEES: ..J .... . Inspections outside of normal business hours$84.02 per hour' ,._...�.....—..........-_ (minimum charge - two hours) _.. Reinspection fees assessed under provisions of CBC Section 305(G) $84.02 per hour' (minimum charge - two hours) ---.. -...... _._.— _._.._ -._ .._.._ _._... -- — --- .. ... .._ .__..._.._ _ . ___ .. ....... Inspections for which no fee is specifically indicated $84.02 per hour' (minimum charge - two hours) ... Additional plan review required by changes, additions or revisions to approved pians _._. _._ .._..._._._._ _. _ _.... .... _._._..._._ _ --- _-- --__-. _--- $84.02 _ _._..._ per hour' (minimum charge - one hour) Footnotes for Table No. 3-C - .... _... ......... --.. ----_..._ ...... .... ...... ....... - ' Or the total cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. Pursuant to Resolution 09-04-21-04 6/16/2009 3-C (Unless Otherwise Noted) Page 51 of 75 Effective July 1, 2009 Table 3-D Fees Summary Exhibit J Plumbing Permit and Inspection Descriptions Current Fees Terra PERMIT ISSUANCE FEE: _. ._._..-....._.._...----- -. _. ..------...... ...... ....... . -- For issuing each permit - -T- ... _._. $26.33 _....._.... ............ --- PERMIT & INSPECTION FEE: For each plumbing fixture or trap or set of fixtures on one trap !(including water, drainage piping, and backflow protection thereof) $10.49 For each building sewer and each trailer park sewer .-. ..._ $26.38 ... -- Rainwater systems - per dram inside building) - -- Y p ...._. ( g) _. -,-_1- - ----__...---- - -- For each cesspool (where permuted) -- - _.._$10.49 $39.87 - - - For each water heater and/or vent $13.17 For each industrial waste pretreatment interceptor including its :trap and vent, excepting kitchen -type grease interceptors C_ jfunctioning as fixture traps - $21.30 'For installation, alteration, or repair of water piping and/or water - treating equipment, each: $5.08 I For repair or alteration 6f drainage or vent piping, each fixture _.._._.. ... - $5.08 __ For each lawn sprinkler system on any one meter, including . ........ backflow protection devices therefore $15.84 For atmospheric -type vacuum breakers -- ---- _.._ Ito _. -- -- $13.17 _ . _ ......_--- _ .._ - over 5 each. - _ - -- $2.41 - - -_. For each backflow protective device other than at-rn©spheric-type ''vacuum breakers: __ ..... — - 2 inches or smaller_.._$13.17 --- _-,_,_- ,Over 2 inches $26.38 IFor each gas piping system of one to four outlets $6.58 Owlet For each gas piping System of five or more outlets $1.18 Outiet For Fire Extinguisher Systems: IStandpipes, wet or dry or combination, each outlet ..... ....... _... $9.63 - - .. .- -- j 1 Fire sprinkler piping removal or alterations or the replacement of ;valves, attachments -- Underground firesprinkler piping or and piping System (when --$-18_.20 Permit fee has not been obtained for complete automatic fire ext� -_---- ---- $46.02 Are Sprinkler er System-Installation/Modification _..... _ - _ ---------. ....._. ._ ... -- o 1 to 50 fire sprinkler heads - .._ .--- -.......... ... $64.2_2 _...-- lFrom 51 to 100 fire sprinkler heads -- --__m - - $128.43 - - - p s --- _ _ . From 101 to 500 fire s r€nkler head - $321.09 From 501 to 1,000 firesprinkler heads $551.20 'From 1,001 fo 2,000 fires sprinkler heads _ _ $766.33 _- -�� -- -_-- -..__.....-p - From 2 001 to 3 000 fires sprinkler heads -- c._._ _ P_... ... - - $1,034.98 From 3,001 to 4,000 fire sprinkler heads $1,378.53_ _'JF From 4,001 to 5,000 fire sprinkler heads _ _ - --- ! ! $1,684_64 -- = r 5Ove,000 fires sprinkler heads W......_ ._._ p - - $1,990.75 .._._...... Ori inal fire pump $191.58_.. ._.... W__ _-.... r_.i -test _of For each fire hydrant system - $38.54 Pursuant to Resofution 09-04-21-04 6/15/2009 3-D (Unless Otherwise Noted) Page 52 of 75 Effective My 1, 2009 Table 3-13 Fees Summary Exhibit J Plumbing Permit and Inspection Descriptions Current Fees Term PLAN REVIEW FEE:. ._ ..... - The Plan Review Fee shall be 65% of the Permit Fee - _____- _........ _.... ___,. MISCELLANEOUS FEES: ..... ..----- - Inspections outside of normal business hours . _. _ ..--- -- — - W _.. $84.02 .---. - — ...... _._.-------- per hour' -- (minimum charge - two hours) _.... � .......... _ . .._. .......... Reinspection fees assessed under provisions of CBC Section -- - - 305(G) $89,02 per hour (minimum charge - two hours) Inspections for which no fee is specifically indicated $84.02 per hour' {minimum charge - two hours Additional plan review required by changes, additions or revisions to approved plans _......._ - $84.02 .._ . _. per hour' ._ .._._... ..----- - - (minimum charge - one hour) --- ._ Grease interceptor plan check and field inspection $321.09 Footnotes for Table No. 3-C Or the total cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. Pursuant to Resolution 09-04-21-04 6/16/2009 3-D (Unless Otherwise Noted) Page 53 of 75 Effective July 1, 2009 Table 3_E Fees Summary Exhibit 3 Swimming Pool, Spa, and Hot Tub Permits Descriptions Fee Term As listed in Exhibit A, Table 3-A.2 PERMIT ISSUANCE FEE: For issuing each permit_ $.26.33 ** $500.00 BOND REQUIRED** $26.33 SWIMMING POOL, SPA & HOT TUBS __.._ Pool/-Sa Electrical $72.46 Swimming Pool Electrical $52.98 -- Spa Only Electrical -- --- $19.48 — -__. m _... .........—_—_-.-. Pool/Spa Plumbing ._...�.... .. ..... - ---$65.02 - - Spa Only Plumbing$32.38 -----_._ --- Pool/Spa Mechanical $29.06 Spa Only Mechanical $19.48 SWIMMING POOL: Gunite $53.51 per sq.ft Vinyl Lined $26.75 per sq.ft Fiberglass $32.11 per sq.ft HYDROMASSAGE POOL: _. -- Spa/Hot Tub-------- Gunite - $16,054.41 Fixed g— 06 `7 ,492 Fixed -- -- - Wood $2,675.73 Fixed HYDROMASSAGE BATHTUB: __....... ... __ -- - - ..m._-.. __..._._.._._. _ _ _ _..__....- - Jacuzzi/Whirlpool Tub _---_..._ - ... ..._.-- - .._ _... - - Cast Iron$4,816,32 - -. ............. .. Fixed Fiberglass Fixed - - - Crushed Marble -------- -_$3,746,03 -- $3,746.03 Fixed Pursuant to Resolution 09-04-21-04 6/16/2049 3-E (Unless Otherwise Noted) Page 54 of 75 Effective July 1, 2009 Table 3-F Fees Summary Exhibit ] MobileHome Accessory Permits Descriptions I Current Fee I Term For issuing each permit $21.40 SITE PREPARATION: ..._...--------- - - ----- ......... �.. ... ..............._... _...._.... Sewage Disposal System _ $16.06 _. Electrical Wiring System _.. _ _.......W....._.. - --- ---- $16.06 ...�......�...m. � .........................�...�. Water Piping System$16.06 ..... ............ _._ _ - -- - -- -- -- Gas Piping System $16.06 INSTALLATION: --- Installation _ _-.--------- $133.14-- _ Cabana- _ ........... $101.68 - - -- - -- - ._..__.... Private Garage .......... _._._..- --------._.�.__. - -- -.. _...---- $101.68 _..._-. - ----- Carport..._.__. ---- -_. .-,_._._ - ___ - ....._.... $3211 — -.. n.� -�_. Awning- ------ 32.11 ---._.._ _.... -. Porch $32.11 Earthquake Bracing $67.43 PLAN REVIEW FEE: - .......__........ _._._ _.._. _...._... ...._ ....... .... ............ ...................... _.. -- _...__... ............. For mobilehomes, accessory and miscellaneous structures that do ... .... .......... ... -- - - ._ ....... - -----................ . not have standard plan approval through the Department of Housing and Community Development - refer to Table 3-A for Plan Review/Permit Fees, MISCELLANEOUS FEES: Inspections outside of normal business hours _...._._._ — ....M._... $84.02 ....._.._--- -- per hour' -- -- ._ (minimum charge - two hours) _- .............___..... ____..... ....... ....... ..... .__ .......-- ...::.... -- - _ ......_..__:_-..--...... ........_........... ........ . Reinspection fees assessed under provision of Section 108.8 $84.02 per hour' (minimum charge - two hours) Pursuant to Resolution 09-04-21-04 6/16/2009 3-F (Unless Otherwise Noted) Page 55 of 75 Ef€ect'€ve July 1, 2009 Table 3-G Fees Summary Exhibit 3 Grading and Geo Plan Review Descriptions Current Fees Term PERMIT ISSUANCE FEE: ..._..... ...,... ..,_.. - -----_,_.__ _-._.._.. - - For issuing each permit $26.33 PERMIT & INSPECTION FEE: Total Coseyaluation 1-2000 -.,._._ $267.57 - --- 2001-5000 --. - ----- $401.37 - 5001.-10000 - - ._-_ - 5.00% -_-.--- -- - - __-_ --_ _ - -_ _..___-.—. _ .. �000�-50000 _... _ __.---4:socio . - - � _ .........._- 50001.-1.00000 -- --- 4.00% _-— --------- - — -------- 100001-5000x0 _ .......__ -_..__... ,3:5011%0 .......... --- . -.._._------- 500001-1000000 ----- _._ -- 100% .... ._ - - - - _ 1000001 -or more ...�_ . _ 2.50% GEOTECHNICAL REVIEW FEE: 1-2000 $535.15 2001-5000 ..._.....- ... _.. -- --- - --- - _ .._.------ $802.72 saa 1-1 0000 - ----- ---------- 10001-50000 - _,.�. $1,337.87 a...-... - -_...� 50001-100000 $1,605.44 100001-500000 $1,873.01 1000001 -or more$2,140.59 PLAN REVIEW FEE: ...-..._.. ...�.....-- ..-......... .. ---- 1-2000 $181.04 2001-5000 ---.. - _.._.-__._.._..._ — - $272.07 3.25 5001-10000 ($500 rain.) 2.90% 10001-50000 ($500 min.) 2.60% 50001-100000($2,250 min.) 2.30% 100001-100001 ($4,000 min.) 1.90% 500001-1000000 ($17,500 min.) 1.60% 1000001 -or more ($30,000 min.) MISCELLANEOUS FEES: _.._ __.- _. -- -- . - -- Inspections outside of norma[ business hours _ ------- - - $84.02 per hour z - W _ (minimum charge -two hours) _ - _ .............. _._ ...._.. Reinspection fees assessed under provisions of CBC Section 108.8 _ _ WW..... $84.02 per hour2 . ..........-- _ ......... (minimum charge - two hours) ..._.___-_:._. _.-.._.._._. .-------- _.._.. ___ _._._-�_ _ _._..__._ Inspections for which no fee is specifically indicated $84.02 per hour Pursuant to Resolution 09-04-21-04 6!7.6/2009 3-G (Unless Otherwise Noted) Page 56 of 75 Effective July 1, 2009 Table 3-G Fees Summary Exhibit 3 Grading and Geo Plan Review Descriptions Current Fees Term (minimum charge - two hours) -- .... ........ _ ._..__._......_...___.. _..__....._...._ Additional plan review required by changes, additions or -_--...__..._......._. ...... ..�..__..... ._..... ....._._._.. revisions to approved plans $84.02 per hour' (minimum charge one hour Refundable Bond Deposit The amount of the on-site cleanup deposit shall be as set forth in Table 3-G,1 Footnotes for Table No, 3-G Per the Uniform Administrative Code, Section 304, the determination of value or valuation under any of the provisions stipulated in the codes shall be made by the Building Official. The value to be used in computing the building permit and plan review fees shall be the total value of all construction work for which the permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, air-conditioning, elevators, fire extinguishing systems and any other permanent equipment. . !Vote: Section 105 Definition of Valuation or Value, as applied to a building and its building services equipment, shall be the estimated cost to replace the building and its building service equipment in kind, based on current replacement costs. The Grading -Unit Cost Data Schedule for excavation and grading work shall be used to calculate the estimated cost of construction. The Grading -Unit Cost Data Schedule shall be established and maintained by the Building Official and City Engineer. The table shall be subject to semi-annual review. The current prevailing cost in the local region shall dictate the unit cost prescribed in the Schedule. The revised amended schedule shall be reviewed by the Director of Engineering and Building Services for formal recommendation to the City Manager's office. The amendment may be executed administratively with the City Manager's approval. z Or the total cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved. 3 The deposit system is an account established to recover the cost incurred while reviewing geotechnical reports. This includes time expended and materials/equipment employed. Thus, additional fees may be required for complicated studies. Pursuant to Resolution 09-04-21-04 6/16/2009 3-G (Unless Otherwise Noted) Page 57 of 75 Effective July 1, 2009 Table 3-G.1 Fees Summary Exhibit J Grading and Geo Plan Deposit Pursuant to Resolution 09-04-21-04 6/16/2009 3-G.1 (Unless Otherwise Noted) Page 58 of 75 Effective July 1, 2009 Current Descriptions Fees/Deposit Refundable Bond De osit - _.. ....._.._._ -... _. 0-500 - $51T05 __ ...__ .... - $775,58 1001-1500 -__ _�._.. -- ---- __....__ -._... ...............__.._.._______ _. _ .......--— $1,034.10 1501-2000 _._�..._....._._........_ _.. __ -_ - ---------__.....-- $1,292.63 2001-5000 _...�... _ _._ $1,551.15 �oa1-10000 _ --._ _ ._ .. ___..------ ------ - --- $2,068...2.0--- 10001-15000 _ _ ._.. - -- ----- —_----- $2,585.25 15001-20000- $3102.30 20001 50_000 -- $5,170.50 50001 100000 - -----------_ --- - - _.._ .....- 100001. -and p -- - _x.10,341.00 $15,511.50...... Pursuant to Resolution 09-04-21-04 6/16/2009 3-G.1 (Unless Otherwise Noted) Page 58 of 75 Effective July 1, 2009 Table 3-G.2 Fees Summary Exhibit 3 Grading and Geo Plan Review Descriptions GRADING UNIT COST DATA SCHEDULE Term 0-1000 $9.09 - 1001-10000.. W...... _ ._ -- ._ . _..�...._ .. .... $4.55 ........ - - —_ 1.0001-30000 $3.00 _ _�_--- 300Q1-6000pm.�._. __ ��.___..._......_-_. .�.__, _____..... � _...._..... ...___ $.2.57 60001-50000.0.._...._-.. -- -- — --- .._. - - --........................ $2.24 Over -500000 �. _. _......�� _ .....,,_._....._ _ _ .�..___..� _ ....� .�.. _..._-- --_ --- $1.50 ROCK EXCAVATION _._ No Blasting$13. 38 Blasting _. _.._.__ _. _._.. $37.45 __...---- _. ...., _ STRUCTURE EXCAVATION. $21.40 -----__-_. IMPORT OR EXPORT -- -- _._... $7.76 NOTE: Cost estimates for bonding and securities for grading shall include a 10% contingency amount added to the construction estimate. Total amount (construction plus contingency) should be rounded to the next highest $100 for the bond amount. An administrative surcharge as determined by the Administrative Authority shall be imposed in addition to the bond amount. * - Cubic yardage total denotes cut plus fill combined. Pursuant to Resolution 09.04.21-04 6/16/2009 3-G.2 (unless Otherwise Noted) Page 59 of 75 Effective July S, 2009 Table 3-H Fees Summary Exhibit 3 On Site Improvement Permit and Inspection Descriptions Current Fees Term NOTE: THIS FEE SCHEDULE IS APPLICABLE TO SINGLE FAMILY DWELLINGS ONLY. FOR SUBDIVISION AND COMMERCIAL PROJECTS, REFER TO ENGINEERING FEE SCHEDULE, PERMIT ISSUANCE FEE: For issuing each Permit $26.33 PERMIT & INSPECTION FEE, .... .... ..----..... - TOTAL COST/VALUATION - - - --- ..m. ...... ... — -- ......... . $1.00 to $500 --- $26,33 $500 to $2,000....-- $26.33 for the first $500 plus $3.16 for each additional $100 or fraction thereof. $2,001 to $25,x00 ---- $74.12 for the first $2,000 plus $14.48 for each additional $1,000 or fraction thereof, up to and including $25,000. -- - . .......... - - ---- . $25,001 to $50,000..._......... ..................----------- --------------.... ................ $418.76 for the first $25,000 plus $10.45 for each additional $1,000 or fraction thereof, up to and including $50,000. $50,001 to $100,000 $689.00 for the first $50,000 plus $7.24 for each additional $1,000 or fraction thereof, up to and including $100,000. $100,001 to $500,000 $1,063.60 for the first $100,000 plus $5.79 for each additional $1,000 or fraction thereof, up to and incluftg $500,000. $500,001 to $1,000,000 $3,345.31 for the first $500,000 plus $4.91 for each additional $1,000 or fraction thereof, up to and including $1,000,000. - - - -- - - $1,000,001 and up - ---- $5,802.25 for the first $1,000,000 plus $3.26 for each additional $1,000 or fraction thereof. Pursuant to Resolution 09-04-21-04 6/16/2009 3-H (Unless Otherwise Noted) Page 60 of 75 'Effective July 1, 2009 Table 3WH Fees Summary Exhibit 7 On Site Improvement Permit and Inspection Descriptions Current Fees Term GEOTECHNICAL REVIEW FEE, 1-2000$517.25 --... ........ ... - _. . ....... _._ 2001-10000 $775.88 10001-50000 -----._...., _ $1,034.50 50001-100000 $1,293.13 ----- - ... - ..... .... .._....--- 100001-500000 _.. _ - -- _ -- ---- ................... $1,551.75 .._..._�... �. ........ ...._ __..... .._._.- _ .-....... ._ ..._ ... 500001-1000000 $1,810.38 1000001 -or more $2,069.00 PLAN REVIEW FEE: - --— Plan Review Fee .......... _ --- MISCELLANEOUS FEES: Inspections outside of normal business hours $84.02 per hourz (minimum charge - two hours) Reinspection fees assessed under provisions o CBC Section 305(G) $84.02 per hour (minimum charge - two hours) Inspections for which no fee is specifically indicated - ... _ ._ ----._ .... ----- - ....._-. $84.02 per Your' (minimum charge - two hogs) Additional plan review required by changes, additions or revisions to approved plans $84.02 per hour' (minimum charge - one hour) Refundable Bond Deposit: The amount of the on-site cleanup deposit shall be as set forth in Table 3-H.1 Footnotes for Table No. 3-H 1 Per the Uniform Administrative Code, Section 304, the determination of value or valuation under any of the provisions stipulated in the codes .shall be made by the Building Official, The value to be used in computing the building permit and plan review fees shall be the total value of all construction work for which the permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, air-conditioning, elevators, fire extinguishing systems and any other permanent equipment. Note; Section 105 Definition of Valuation or Value, as applied to a building and its building services equipment, shall be the estimated cost to replace the building and its building services equipment in kind, based on current replacement costs. The On -Site Improvement - Unit Cost Data Schedule (Table No. 3-H.2) for on-site improvement work shall be used to calculate the estimated cost of construction. The On -Site Improvement - Unit Cost Data Schedule shall be established and maintained by the Biiding Official and City Engineer. The table shall be subject to semi-annual review. The current prevailing cost in the local region shall dictate the unit cost prescribed in the Schedule. The revised schedule shall be reviewed by the Director of Engineering and Building Services for formal recommendation to the City Manager's office. The amendment may be executed administratively with the City Manager's approval. Pursuant to Resolution 09-04-21-04 6/16/2009 3-H (Unless otherwise Noted) Page 61 of 75 Effective Juiy 1, 2009 Table 3-H Fees Summary Exhibit 3 On Site Improvement Permit and Inspection Descriptions Current Fees Terra a Or the total cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved. deposit system is an account established to recover the cos — s The de p Y t incurred while reviewing geotechnical reports. This includes time expended and materials/equipment employed. Thus, additional fees may be required for complicated studies. Pursuant to Resolution 09-04-21-04 6/16/2009 3-H (Unless Otherwise Noted) Page 62 of 75 Effective 7uly 1, 2009 Table 3-H.1 Fees Summary Exhibit I On Site Improvement Bond Deposit Descriptions Current Fee/Deposit3 Refundable Bond Deposit 6-5000 �.. __�.--------_... _....... ... .... - $250.aa 5001-10000 ....._... _-__ _....__ ... _..--------...-__.— - -- $500.00 - - - 10001-20000 .. - $750.00 ...�...._..____._......_. 20001-sooaa $1,600.00 _..__..........................__._.. __ 50001-250000 _. ...__ ......_ _ �._. _.............._._.__.....--...._.____..___ $1,�56.6a 250001-500000 --- - $1,500.00 -____- 500001 1000000 --... ...._.�.._._._ .-_.....____ --__--__ _ $3,000.00 1006061 -or more $5,000.00 Pursuant to Resolution 09-04-21-04 6/16/2009 3^H.1 {Unless Otherwise Noted) Page 63 or 75 Effective July 1, 2009 Table 3-H.2 Fees Summary Exhibit 3 On Site Improvement Permit and Inspection Descriptions I Current Fee I Term On Site Improvements WALLS/FENCES: ............ .. ... ....... 4" Masonry Block Wall . . . ... ...... $9�63 . ..... ....... ....... .. . . . . ... . ............ . per sq.ft 6" Masonry Block Wall$1033 . . . ....... ........... .... per sq.ft Chin Link or Wire Fence$2.68 — - ------ . .... . ............ ...... . ........ .. . ...... ...... ................ .... ... .... ..................... ...... ... . . . . ... . .. . . . . . .................. per sq,ft . . . Fence $2.95 per sq.ft --wood Wrought Iron Fence . . . ............ $4.01 per sq.ft . Natural Stone/Rock Wall ... . . . . ...................... $10.71 per sq.ft . ............. ............... . .... ............ Concrete Wall - Poured in Place ... . . .. -------- $29.97 per sq.ft Stucco on Masonry Wall $5.35 per sq,ft EROSION CONTROU.LA.NDSCAPING: -- - 6"PCC ........ . ......... ......... .. . . .... ... ...... . . Plastic Sheets (Visquene) $0.10 PLF ---- ------ . ...... Sand Bags ... . ... .. . . . ... . ....... . $1.33 Each . .................... . ..... . . . Hydroseeding ........ ....... .. ... .. .............. $0.27 .... . . ..... . . . ..... ------- Trees .... . .. . .. . .............. 61, PCC . . . .. ................ --- -------- --- ---- Removal ....... . . ........... ........... . . . ............... . $428.92 Each Planting (15 Gallon) ...... . ... .. ................. .... . .. $133.78 .... . ... .. ... Each Landscaping and Irrigation (Erosion Control) $1.33 - - ------- -- PAVING: 4" PCC . . .... . ..... . . ........ . - ----- - ---- . . . ...... . P.C.C. (Portland Cement Concrete) .. . .. . ... .. .......... . ...... _ .. .................... .... . .................. . . . . $0.41 SF/IN--,, . ....... xisting AC . .... . . ...... $3.91 Existing PCC . . . .... . .... — -- - ----------- $1.92 ... Saw Cut Existing Paving $2.68 PLF Su bqrade Preparation $0.27 ... . . .... .... PLF Berm, AC 6"$8.30 PLF ............ $9.09 PLF . . . ..... .... ..... .... ..... . .. Concrete . . . . ..... . ............ Pattern Stamped .......... . . ..... .... . .......... . ...... . . . . .... ................ - $8.03 . ............ -------- . .... Cross Gutter 6" PCC $7.76 Curbs __ .... ........... . . ........ ........ Cu rb - ------------ ...... . --- ---- -- - 6"PCC $10.71 PLF .. . . ......... ..... ..... PCC ... ............. .... ... . ... ... . . ..... ............ ..... ... . ...... ........ $11�23 PLF .. .... .... ....__ . . . ................... .. .... . . ....... . Curb and Gutter . . . . . . . ...... .... . . ......... ................. .. .... . .. . .. . .............. 61, PCC $11.77 PLF 81, PCC ------ ..... .. .... . ....... . ... . ...... .. _ . ..... ....... ... ... . .... . . .... $13.65 . .... ......... . . ........ .. _._ PLF .... ...... . ..... Driveway ....... ...... ....... _------. ...... . . .... - - ------- -- . . ........... . 4" PCC . . .... . ..... . . ........ . $3.21 . .. . . ........... .. . 6" PCC_ . . . . . . ............... . . .... . . ...... $3.91 4" High ... $10.27 PLF ... . ....... . . .... .... . . . ... 5" High . . . . . . . .............. . ................ $12.20 ... . . .... .... PLF -- ------ ..... ......... ... . .. . .. .... . ... ............. .. .. ......... 6" High $17,34 PLF . . . .............. Guard Post & Barricade $642.18 20 LF . ...... .. . . . ................. Header 2" x 6" Redwood .... .. . .. .. .... $6,95 PLF . .... . . ...... __ ..... . . . ..... ... ... ........ .. . ...... ........ Lights, Street — -- ----- ... .. ............ .. .... . . .......... .. ..... .... ............... .. .............. .. Pursuant to Resolution 09-04-21-04 6/16/2009 3-H.2 (Unless Otherwise Noted) Page 64 of 75 Effective July 1, 2009 Table 3-H.2 Fees Summary Exhibit 3 On Site Improvement Permit and Inspection Descriptions Current Fee Term 90 Watt, EPSV$3,210.88 - -- _..___3,505.22 Each 180 Watt_, EPSV -- Each Metal Beam Barricade $38.54 PLF Pedestrian Ramp - - $749.21 Each Regulatory Signs - Stop, No Parking, Speed Limit, etc.. $240.81 Each Removal of: Existing Curb$5.35 PLF Existing Curb & Gutter $6.42 PLF Sidewalk _.._ --- --.._...._........_.- -_- $1.33 - ............._.._.._.....�..._.... -.W _.._.. Sidewalk (4'' PCC) .....__ ...._ ... ..�.............. _._- .,... __ .......- -__ ... - X3.21 _ -- ---- --- -.._ Street Name Sign _ ...........__ - - . _ _......._.,.. _ _.._.._.... - _- ..__.._._. $257.57 _. --- Each -- Traffic Signal -- - - - _ 3.....WaY- $198,004.33 Each 4 Way $240,816.08 Each Trail - E uestrian/Pedestrian $9.63 -- PLF - --- --- . _ ___.�.._._... .... - ---- - - Trench Asphalt Restoration -_ _-_ _ ..- .__._ _ �_......�..__w. ..�._.... .. _.._...... --- $13.38 --- _. PLF Wall .Cut-ofPavement -- - -- $695.69 Each SEWER: Cleanout $813.43 Each Cleanout (Sewer F . ....... � - - - - ----- - - - — - ..... � -- -- Cradle_ (Concrete) __ ........_ . _ $33.18 f - -- _.. PLF .._ _ .._...... - Dead End $321.09 Each - _.-�- _ _..._� __�_...... _�..._ d........ --.----------- - Encasement (Concrete) Type A,B - ... - $37.46 - PLF -- Late ra l - - ....... _ .._ _ _ ..._ . _ .__ ...m__.. _ 4" - 30' Long - - $1,284.35 --- - Each 6" - 30' Long $1,337.87Each Main - 6;-VCP/P_VC_..- ......... -... -- - $23.55 PLF 8" VCP/PVC_V.w.::: - _-.: _�- - -- --:_..:-------------------- $34.25 _ _.._ - PLF _ . ......._ - --i 6„V C PI PVC - - --- $38.27 PLF _-. _ -_ _. ... .......... _M..._ ._..m..... ....._ ___.__.-____ 12" VCP/PVC - - - $50.57 - -- -- PLF - ...-- -_ _ . ...... 16» VCR/PVC--- - $64.22 PLF - 18" VCP/AVC ---_ - -- - - $80.28 PLF - - - ----- ........� _._. _, ...... . . ......._ - --- 21" VCP/PVC --- $85.63 ALF Manhole _ - $8,027.20Each --- Manhole Adjust Rim to Grade - ---- -- - - - . ..._.. $615.42 .- ... .. ......._ Each Sewer Pipe ._._..._.� ......� .�.-,._ .----..-- - _�_.. -.-55' .-.---..-..Pressure . _- 4„ $Z3 PLF 6�� _. ....__..._ . � .-- - -- ---- ---- -- -- $25.69 _ _._.._....�.... PL._.......___. 8'f$29.97 ALF ...... .. :. ........ - - -- Concrete Protective Slap - - $11.35 --- - ----- PLF Shoring _ Over 5 Feet Deep -._ ......_..._. $11.77 PLF Stub & Plug 6" or 8"$133.78 Each Wall Pursuant to Resolution 09-04-21-04 6/16/2009 3-H.2 (Unless Otherwise Doted) Page 65 of 75 Effective July 1, 2009 Table 3-H.2 Fees Summary Exhibit 3 On Site Improvement Permit and Inspection Descriptions I Current Fee I Term Concrete Anchor $668.93 PCY Cut-off $139.14 Each W WATER: - - _ .......... --- ....... -- Air & Vacumn Valve Assembly $1,605.44 - -- Each Anchor Block — - $668.93 Each Blow -Off Assembly - -- ;,-- $1,337.87 Each ------ .._...__- $2,558_.70 Each --- .. �. --- Cut Off Wall $139.14 Each Fire Hydrant Assembly_...$3,42.94..._...-._....._.._ ---- .Each Fire Hydrant Relocation Fittings $1,765.98 Each _ _ - $187.31 Each _. .... - - - .. ..... (22 1/4 45", 90" Tea Flange, etc) 101f $219.41 Each --. _ ------ _.... .. -- $251.52 Each .:. Main (All Materials including normal excavation) — _ - $23.55 PLF ------ __ .. - $26.75 PLF $30.51 PLF $38.00 PLF $45.49. PLF ---- ------ -- -. . _ $53.51 PLF -- Manual Air Release Assembly ----Pipe, --1,s0S.44 PLF Steel._._.... .__ _---------_..__._ _..._..._._ _--- _ $30.51 PLF _- ..... _..__. _._:._. ._ 8" $ 34.78 PLF Reducer - --- ---- $219.41 Each Relocate Water Meter- - $535.15 - Each Service W_ 3/4" 1", Water Service --_.._ $625.12 - Each .. __ .... -- .. -- 1 1/2", Water Service $�.,�.77.32 - --- Each Each. 2", Water Service --- - $1 980.04 Each Trust Block Valve Valve Assembly, Gate , Gate 6"tValve _ $b95.69 ._._- Each j�. 8", Gate Valve $1,070.29 Each 10", Gate Valve----- _.__...___._.._...._.__....__....__..... $1,605.44 Each --- 12" - 16", Gate Valve �,._..__.._ $2,408.16 ..—_._........._........ Each Valve Assembly, Butterfly - -- -- 10" Butterfly Valve -_c_ y Each --..... ...._..__ - - _ ... - - - �.......:- - 12", ButterflyValve _$1,305.76 _-----.....__.. $1,76.5.98 Each STORM DR . Channel Lining - - --- --- PCC _........_....... - $ 5.3 5 Clean Outs Type "A" $3,210.88 _ Each «B,. - 281.17 Each - -Type --$4 Culverts Pipe All Materials) SDRSD D-60, D-61 Pursuant to Resolution 09-04-21-04 6/16/2009 3-H.2 {Unless Otherwise Noted) Page 66 of 75 Effective July 1, 2009 Table 3-H.2 Fees Summary Exhibit 3 On Site Improvement Permit and Inspection Descriptions Current l=ee Term 4" (Private Only)$12.85 PLF �_....__ 6" Private Only)__._$18.20 ......... PLF 8" (Private Only) - -- $22.48 -- - PLF 10" (Private Only) $25.69 PLF 12" (Private Only)$32.11 PLF M ...... .. _.m _ _.... - . _ .__ 15" (Private Only) .-...__.. ... ... -- $38.54 - PLF... " PLF 21" �..W._ .._ - -... .. _ .... _. _.._._. .. _...--- $68.49-._..._,..� PLF ........ ..... -- 24" $72.78 -- - - - PLF 27$80.28 PLF 30" -- — ...... ...... ..- - $88.83 PLF _.____.................. _ ._._. ....__...__._...-----..__..._..--------------- 33" ......... .......... — - -----...._._...._..__.....-.............._ $96.32 PLF --..._..._. 36" - - - -- - ----- - $107.03 — - - ._........ . PLF 5.60 ...... PLF - 42" - - .._.... - - ............._ $124.15 - _ PLF STORM DRAINAGE (CONTDh ..... ._�__48" ......__ $14. 54.;. r---- - - $160.54 ----------.�__.._...._.. PLF _--_6p„ _ . _. _ .. _..___......�. _....m........... - $178.74 ....... _ . _ PLF - .... ..... .._...------- 66" - - ---- — —_........ .._._._ ._........... $195.86 - -- -- - - -- PLF 721r _ $214.0 Cast in Place PCC Structures . - 0 - 20_....._535.15 PCY -- 20+ _....... $428.12 -- PCY - Ditch _._-- ... ..... ... ._._. ..... ... _..................... __..._.._____.__.. Brow Ditch $16.06 PLF - Earthen Ditch �� -- ----- _ _. -------- _-._..._...4.28 PLF Energy Dissipater$6,689.34 - _ _.. - _ ..... - - ...__.. Each Headwall... -.m__-.. $1,926.53 Each Gravity Type__$.3,210.88 Eaeh Wing....... _.__ -- _._ - ._.. --------------------- $3,724,62.--- Each Inlets - Private Catch Basin 12" x 12" -- _ ...... __481.63 _ __..... --- Each _18" x 18" $695,69...... -- --Each n._. Catch Basin TypeG - - ..... - $3,746.03 Each Type "F"$3,210.88 ._ . ..... _.__ _.._ _.._ Each ........ Type "1"$3,746.03 __. -_.. _ .__-- ..-._-$2,675.73 Each _ _ --CSP Inlet Each Curly Inlet Types A,B,C _ - ............... ........m. _ . _m ._-. . ...... — ------ -- - _ m _ _......_.. _ _ ... . _ L = 4' to 10' $3,746.03 Each .._.--------- ----- - - -- --.. -- .._.._ -- L =_ .I �......to 20' - -- -$4,548.75 -- - Each L = 21' to 28' --- - - - $8,02_7.20 Each _. -------__----_ ......_ . _... --_- InletApron ._------_--_� - -.. _...._..... --- ---- _ ....,... .... _.. $1,605.44 ........ - - --- .........._.. Each Lug ._Concrete_._.$792.01 Each Outlets Curb Outlet __-- -- --- Pursuant to Resolution 09-64-21-04 6/16/2009 3-H.2 (Unless Otherwise Noted) Page 67 of 75 Effective July 1, 2009 Table 3-H.2 Fees Summary Exhibit 3 On Site Improvement Permit and Inspection Descriptions Current Fee Terra _ Type "A" $425.12 Each Sidewalk/Underdrain Plpe $428.12Each Sidewalk Underdrain Type "A" $2 140.59 Each --pe Collar _. $722.45 Each Rip Rap Dumped $107x03 - - - - -- PCY -.. Placed — $125.43PCY Channel Protection --__._._.__...__ — --------._ �.. ...._ $96.32 PCY -__ ._._.__ Engineering Fabric .__.___ --- $0.07 - ---- Sand--- ---- m ....mm�� __..--- $52.11 PCY . _. -- -- Wall W Curtain - - ---- $492.34 - ...am —Eah ch .----_-_- Cot -off Drain $S565S Each ----- Note. Cost estimates for bonding and securities for improvements shall include a 10% contingency amount added to the construction estimate. Total amount (construction plus contingency) should be rounded to the next highest .$100 for the bond amount. An administrative surcharge as determined by the administrative authority shall be imposed in addition to the bond amount. Pursuant to Resolution 09-04-21-04 6/16/2009 3-H.2 (Unless Otherwise Noted) Page 68 of 75 E=ffective July 1, 2009 Table 3-I Fees Summary Exhibit 3 Microfilm and Digital Imaging Pursuant to Resolution 09-04-21-04 6/16/2009 3-1 (Unless Otherwise Noted) Page 69 of 75 Effective July 1, 2009 Current Descriptions Fee/Deposit Term MICROFILM FEE/DIGITAL IMAGING: Each person, firm or corporation shall pay a microfiche fee for permit applications, plans, specifications, calculations, soils reports, and all pertinent data required to be maintained by state regulations, per sheet: $1.10 per sheet The maximum permissible sheet size shall be 24" H 36"/Size E DOCUMENT RESEARCH: Records retrieval/research, per hour $49.81 per hour (Minimum charge - one-half hour) DOCUMENT PREPARATION PROCESSING: Surety Agreements/Performance Bonds$289.71 .T_ .m_.._. __._. Permits/documents U to page sizes 11" 14" --- - Plans, blueline, per sheet $2.04 Plans, Xerox -bond, per sheet $1.43 PROCESSING APPEALS: _ F6emfor processing appeals by fhe Board of Appeals and - Condemnation $173.82 BUILDING ADDRESS Fee to assign building address $86.89 per address ADDRESS CHANGE: $58.01 Pursuant to Resolution 09-04-21-04 6/16/2009 3-1 (Unless Otherwise Noted) Page 69 of 75 Effective July 1, 2009 Stockpile Fees Summary Exhibit J Descriptions current Fees STOCKPILE PERMIT FEES (NOT IN MUNICIPAL CODE) For Plan Check And Inspection Sail Quantity In Cubic Yards __..... .......... .... ..... ...----------------- ---------- 50 _..... ---_ . _._ _ ..... 51 - 100 ,w.�..-_,__-- _166.Q2 $221.36 101 - 500 56i-- 1,000 _ ... —_ _.. ......_ ._.. - $332.04 -....__. __.:. - 1,001 - 5,000$442.72 51001- ia,a©© $553.40 10,001-25,000 $719.41 25,001 - 50,000 $996.1 50,0Q1 - Up Varies* ......... ... -- - . _.._ ..�......_..... * To be determined by City Engineer Pursuant to Resolution 09-04-21-04 6/16/2(309 stockpile (Unless Otherwise Noted) Page 70 of 75 Effective July 1, 2009 Developer Impact Fees Summary Exhibit K Pursuant to Resolution 09-04-21-04 6/16/2009 Devel (Unless Otherwise Noted) Page 71 of 75 Effective July 1, 2009 Current Fees Term Descriptions Parks and Recreation Facilities Development s Fee .... ... ... NOTE: BASED UPON ORDINANCE NO. 210 PASSED ON DECEMBER 11, 1972, UPDATED 1999 . . . .... . ... . .... . .... ........ ..... ..... .. ...... ..... 49 Units or Less .... . .... . . . .... . . .... ... ................ ... .. . . .... ... . .. .... ......... . ................. .. Single family detached dwelling units . ........ . ... . ... $11,600.00 .. . . ...... Per Unit Attached units, including duplex, townhomes and apartments $10,512.00 Per Unit Mobil�—Ho-ffi-e--s-- ... ........ .. . .. . ........ $6,525.00 Per Unit . . .... 50 Units or More -If There- is no park or recF&W&-n—a7-fE-ici1ftk Element to be located in whole or in part within the proposed subdivision to serve the immediate and future needs of the residents of the subdivision, the subdivided shall, in lieu of dedicating land, pay a fee equal to the value of the land prescribed for dedication as indicated in Section (1) below and in an amount determined in accordance with the provision of Section (2) below, such fee to be used for a park which will serve the residents of the area being subdivided. Section (I . ........... - ----- --------- (b) Town houses and 4 bedroom apts. (c) Multiple family dwelling units . ............ .. (d) Mobile home dwelling units . . . ......... . .. ...... Section (2) VVTrV;;T—,_._.....m....___.--.-_-_-_ amount of such fee shall be based Upon the fair market value of the amount of land which would otherwise be required to be dedicated pursuant to Section (1). The fee shall be paid pursuant to the provisions contained in Section (3). The "fair market value" shall be determined by City Council prior to tentative map approval, based on ......... ... . .. ...... an appraisal approved by the City and paid for by the subdivider. Section (3 Time of commencement must be designated. At the time the final tract map is approved, the City council shall designate the time when development of the park and recreational facilities shall be paid. Agricultural Preservation NOTE: BASED UPON ORDINANCE NUMBER 316 PASSED ON JANUARY 19, 1977 . .. . ....... . ........ . . .... .... . .............. . . . . ........ ...... .................. .. . Residential Development$500.00 Per Unit Commerical or Industrial Develoe�i��nt .............. . . �1,000-00 Per Acre Sewer Connection Fees . . .......... .. ..... . —..- . ..... . . Per dwelling unit or per meter whichever is qreater ... ............ . .......... .. .... . ....... _�4,Mj.,46 . ........ . ... Per mobile home space - . ... ........ .......... $4,30L46 Per motel room with kit facilit 9- y$4,301.46 . . ... ................. ........... ........... ... . Non-residential- including commercial, industrial, public buildings, Per 1500 SF of schools, churches, motels, and hotels without kitchen facilities; $4,301 A6 floor area or fraction thereof Pursuant to Resolution 09-04-21-04 6/16/2009 Devel (Unless Otherwise Noted) Page 71 of 75 Effective July 1, 2009 Developer Impact lees Summary Exhibit K Pursuant to Resolution 09-04-21-04 6/16/2009 Devel (Unless Otherwise Noted) Page 72 of 75 Effective July 1, 2009 Current Fees Term Descriptions Capistrano Circulation Fee program Traffic impact Fees Residential -----_ __-- Land Use Cateqory/Unit .. ........ _ - - Single DU (Primary and Secondary)/Dwelling Unit _ ......_.._ $7,387 00 _ _... _,_.......................... ... .......... f Multiple DU/Dwelling Unit $6,088.00 Com_._._._ mercial Land Use Catenary/Unit ....._ ___ r — Auto Dealership/Acre /Acre $22$,00Q.00 .......... Auto Repair/Service/sf of floor area .... --- $3.04 Church/sf of floor area $3.54 Clinic/sf of floor area $12.99 Commercial/sf of floor area $8.51 Elementary/Middle School/student $170.00 Equestrian/Stable $76.00 Golf Course/Acre $6,330.00 High School/student $520.00 #hospital/sf of floor area $7.60 Hotel/Room ......_.. - - .... $3,310.00 _ .....__..... .. Industrial/sf of floor area ....... $3.88 Mortuary/sf of floor area - --- -..... $9.42 ....... - $3,870.00 Museum/sf of floor area - .. _ ......_. $5,32 - --- — - ........ Nursing Home/bed _. _ . _ ._._ _ $2,280.00 ......_..-- - - -. _ ........... _ .. -- Office/R & D/sf of floor area -- -'P' -- - - rivate School/student ....... _...... _ .. _ . _. _... $360.00 _..._. Racquet Club/Health Spa/Court $15,200.00 Self Storage/Unit-__...._.._..........._........_.._-...... _....._............. ...... - -- _....._....----$150.0[i.._.....__ ... ...........__..__...._......._...... ------ Service Station/Site $35,625.00 Service Station w/Mart/Site $35,625.00 Theater/Seat _ $680.00 Systems Development (Ordinance 364) _. NOTE: BASED UPON ORDINANCE NUMBER 364 PASSED ON JUNE 29, 1978 1 % of estimated building permit Systems Development valuation of a building or $1.00, whichever is higher New Building Construction (Ordinance 21 1) NOTE: BASED UPON ORDINANCE NUMBER 211 PASSED ON NOVEMBER 13, 1972 Schedule A - Fees for pl. .... __. (1) Residential _ __.. __ ._..... - -- -.. ._ ............... .._ ..._ . _ _ . _......._... _ Single family dwellings _ $50.00 .. Per Unit _ Duplexes p - $50.00 Per Unit Multi -family dwellings (three or more units) $50.00 Per Unit For each hotel or motel room without a kitchen excluding bathrooms _ ....._... ._...... $25.00 Per Unit - _.. _.... _. .... Mobile home park pads $25.00 Per Pad * Permanent buildings and landscape only need conform to qualify. _... ___.._...._. .. _ ._._._ - .. .... (2) Commercial Pursuant to Resolution 09-04-21-04 6/16/2009 Devel (Unless Otherwise Noted) Page 72 of 75 Effective July 1, 2009 Developer Impact Fees Summary Exhibit K Pursuant to Resolution 09-04-21-04 6/16/2009 Devei (Unless Otherwise Noted) Page 73 of 75 Effective July 1, 2009 Current Fees Terra Descriptions For eacri commercial ui ing unit in a builaing, per square root 0 gross floor area, including any area within a building designed for the parking of vehicles ........_.............. .. .:. ... - .. ___--- $0.03 -- _....__ _.._...._ Per Sq Ft (3) Industrial - Tor �acn commercia[ uii"d€ng unit €n a bu€iain 9. Per squarer-----.._.... __. gross floor area, including any area within a building designed for the parking of vehicles $0.03 Per Sq Ft Schedule B - Fees for plans not submitted to the Architectural Review Board for approval - (1) Residential Single family dwellings $75.00 - --- Per Unit - . ...... ..... ... - ...... -- - ........_..... - - -- - -- - - plus $10 per bedroom over one _.--- .. . -... _ -__-- . _. � ._.. � ... -._ - - - _ W..._. Duplexes p $75.00 Per.,__.__-__--- Unit _ plus $10 per bedroom over one _.._..._ - --- _ Multi -family dwellings (three or more units) - $75.00 .__ ......._ --- Per Unit -....... - -- ..._.........m..._. . -- - - --- - plus $10 per bedroom over one - For each hotel or motel room without a kitchen excluding bathrooms $35.00 Per Unit ---Per Mobile home park pads $35.00 Pad (2) Commercial ror earn commercial uiiaing unit in a D-Mding, per square toot of" .._ ._.. ........... gross floor area, including any area within a building designed for the parking of vehicles $0.05 Per Sq Ft (8) Industrial - i --or commercial" bLir(lng"union a'6uitd-i persquare -took of- gross floor area, including any area within a building designed for the parking of vehicles $0.05 Per Sq Ft Housing In -Lieu Development One percent of valuation as determined under Housing In -Lieu Development the City of San Juan Capistrano Muncipal Code Section 8-1.05 NOTE. BASED UPON ORMNANCE NUMBER 767 PASSED ON JULYS 1995 .....--._..-----— ._....._...................- Drainage Area .... -.................................._.... - - - . - -- -- LOl _ _- $1,17000. ..____?erAcre _ -.Y�._. __- L02$860.00 _.-.:..--.-_.. � _:_ -:�� �.m: - Per Acre320.00 X03 $ _.........._. Per Acre - _.... _.. ... _.- - _.._._ _. ----.— -- - ---- L05 - -- ---- - - - $170.00 _._.... Per Acre _ _..._..... ._._. .._........... ------ M01 $780.00 _ - Per Acre ...----- _ ........ ....... ..... _ ... _..._ __....... _..._ _ .�.�. .... LOIS02_. __._ $1,470.00 Per Acre Domestic Water Development Charges Pursuant to Resolution 09-04-21-04 6/16/2009 Devei (Unless Otherwise Noted) Page 73 of 75 Effective July 1, 2009 Developer Impact Fees Summary Exhibit K Current Fees Terra Descriptions 7.1% of improvement value or Plant Check & Inspection Fees $1513/sheet plus Per Application a processing fee, whichever is higher ..... .... _- -- .. --- ---- _ _ Preliminary Processing fe-- e--, Tract & Parcel Map _ $302.07 Per Application Pursuant to Resolution 09-04-21-04 6/16/2009 ©evel (Unless Otherwise Noted) Page 74 of 75 Effective July 1, 2Q09 Developer impact Fees Summary Exhibit K Pursuant to Resolution 09-04-Z1-04 6/16/2009 Pevel (Unless Otherwise Noted) page 75 of 75 Effective July 1, 2009 Current Fees Terra Descriptions Water Capacity --- - .-- _ __ _. _-. --------- - - -.._..... _..._.............. $3,850.41 Per Meter or DU Water Capacity per meter or DU, whichever is greater Water Capacity for Commercial area per SF of building area: the $0.63 Per SF commercial greater of the $/SF price or the $/DU for the meter given above. area. . _ - -- ------ ... ....... ..-........ _. _ ._ _..------------- Capital lmprot�ement Per dwelling unit or per meter whichever is greater $2,963.84 Per Application Per mobile home space $1,483.47 Per Application Water Capital Improvement for Commercial per SF of building Per SF area: the greater of the $/SF price or the$/DU for the meter given $0.48 commercial above. area. . .....- -- _... Water Capital Improvement for Agricultural per SF of planted area. - _ $/SF planted the greater of the $/SF price or the$/DU for the meter given $0.07 agricultural above. area Storage Chafe _.. Per dwelling unit or per meter whichever is greater - - .._............._..._..___. -.-._ ........ --- $3,544 - ... _.....__......... Per Application Per mobile home space $1,773 Per Application Water storage for Commercial and Industrial per square foot of Per SF building area; the greater of the $/SF price or the $/DU for the $0.72 commercial meter given above. .... -- — _ _ _ .. _ __... .....__ ----- - ._ _ _ area. -._, --- NOTE: BASED UPON CSIC RESOLUTION NO. 04-05-18-04, Adopted May 18, 2004 Non -Domestic Water (Recycled Water) Plan Check & Inspection Fees 7.1% of improvement value Per Application Recycled Water Capacity Charge: the greater of the $/ cfs maximum day $830,402 $/cfs maximum demand charge given or the $/AF charge below. day demand. Recycled Water Capacity Charge: the greater of the $/AF demand charge $13,421 $/AF of annual given or the $/cfs charge above. demand. Preliminary Processing fee, Tract & Parcel Map$302 _- - -- _ -_ - - -- PerApplication NOTE: BASED UPON CVWD RESOLUTION NO. 00-9-5-1 Adopted September 5,,_2..._...,, 000 Green Building Standards Fee - - -- - -- - .... _.. - ---- -- __ _._....-- .. Permit Valuation $1-$25,000 - - - - - $1.00 ........... Permit Valuation $25,001-$50;000 _. .r - $2.0 Permit Valuation $50,001-$75,000 - $3.00 Permit„ Valuation $75,001-$100,000 ......_._. . - $4.0C3- Eve ry $25,000 or fraction thereof above $100,000 Add $1.00 Pursuant to Resolution 09-04-Z1-04 6/16/2009 Pevel (Unless Otherwise Noted) page 75 of 75 Effective July 1, 2009