Loading...
Resolution Number 08-05-14-01I RESOLUTION NO. 08-05-14-01 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA, RESCINDING RESOLUTION NO. 07-07-17- 04 AND APPROVING THE SCHEDULE OF FEES AND CHARGES FOR CITY SERVICES WHEREAS, the City provides various programs and services for the benefit of certain individuals and/or entities that do not benefit the general public; and, WHEREAS, the City incurs costs to provide these specific programs and services to these individuals and/or entities; and, WHEREAS, the City has developed certain fees and charges to be charged directly to the parties requesting these specific services, participating in these programs or incurring these costs; and WHEREAS, the City updated these fees and charges May 14, 2008 in an effort to assure proper cost recovery, comparability with surrounding communities and meeting the needs of our community; and, ' WHEREAS, fees and charges for City services were combined into one comprehensive fee schedule with annual increases each July, based on the Consumer Price Index (CAI) — All urban Consumers for the Los Angeles -Riverside -Orange County, CA, and where appropriate, on the Engineering New Record index for the Los Angeles area from October to October of each year to assure that fees continue at appropriate levels; and WHEREAS, the City desires to add certain fees and charges in order to generate the necessary revenue to operate City programs and services. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of San Juan Capistrano does hereby adopt the Schedule of Fees and Charges as set forth in Exhibits A through K, attached and incorporated herein: 1. Establish the Schedule of Frees and charges. Approve the updated fees and charges as outlined in Exhibits A through K, attached. 2. Establish a Cost Index for the Annual Update of Fees and Charges. Approve and adopt the use of the Consumer Price Index (CPI) —All Urban Consumers for the Los Angeles -Riverside -Orange County, CA areas from October to October of ' each year, as the cost index for these fees and charges, except for Developer Fees and those items that are governed by a separate agreement or otherwise noted in Exhibits A through K. Developer fees are escalated from October to Page 1 of 2 05-14-2008 October of each year using the Engineering News Record (ENR) index for the Los Angeles Area. 3. Effective Date. Determine that the updated fees and charges shall take effect (60) days after the adoption of this resolution. PASSED, APPROVED, AND AD ED t#isay of May 2008. f'o JOE rctOTO, MAYOR ATTEST: 0, R. MONAHAN, CITY CLERK STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss. CITY OF SAN JUAN CAPISTRANO ) I, MARGARET R. MONAHAN, appointed City Clerk of the City of San Juan Capistrano, do hereby certify that the foregoing Resolution No. 08-05-14-01 was duly adopted by the City Council of the City of San Juan Capistrano at a Regular meeting thereof, held this 14th day of June 2008, by the following vote: AYES: COUNCIL MEMBERS: Allevato, Nielsen, Hribar, Uso and Mayor Soto NOES: COUNCIL MEMBER: None ABSENT: COUNCIL MEMBER: None gAU AR, ARET R. MONAHAN, City Clerk Page 2 of 2 05-14-2008 Misc Fees Summary Exhibit A Descriptions Current Term Fees Alcoholic Beverage Permit City -issued alcohol beverage permits are issued through the Community Services Department for outdoor events held on City property, and through the Community $53.00 Per Event Services Department for indoor events held in a City -owned building Bingo Games Annual License issued by City Manager $28.00 Annual Fire Prevention/ False Alarm Set by County Board of Supervisors Fee charged/administered by Count Shopping Cart, Abandoned Per Cart retrieved $26.90 Smoking Regulation Exemption Hearing City regulations superseded by State law 11/94 election Advertising Banner (Del Obispo & Camino Capistrano) Installation and Removal $210.00 Per Banner Littering (Catch Basins) T-FB—Iowing leaves and grass cuttings into City catch basins $100.00 Per Instance Pursuant to Resolution 08-05-14-01 6/11/2008 Mix (Unless Othemise Noted) Page 1 of 74 EffeaNe July 13, 2008 Business License and Filming Permits Fees Summary Exhibit B Descriptions Current Fees Term Business License Tax $25.00 Annual Application Processing Fee $42.00 Annuaf Professional Employees (Doctors, Dentists, Lawyers) Each Non -Professional Employees Each Duplicating License $11.00 Annual Renewal $11.00 Annual Home Occupation Permit $56.00 Annual One Time/Temporary Business License One -Time NPDES Business Inspection Fee $168.00 Annual Subsequent visits (if required, for every two inspections beyond initial) $168.00 As Required Amusements/Video Game Machines $12.00 Each Arts and Crafts Teachers (excludes public, parochial or private school teachers) $8.00 Annual Housing First 4 Units/Spaces $15.00 Annual Each Additional Unit/Space $1.00 Annual Merchant/Patrol Systems/Merchant Patrolmen $50.00 Each Riding Academy/Animals for Hire - On Premises $12.00 Each Riding Academy/Animals for Hire - Off Premises $25.00 Each Taxi Services - First Vehicle $20.00 Each Additional Vehicle $12.00 Each Vending Machines (gross less than $5,000/yr) $25.00 Each Additional $1,000 $1.00 Each thousand Vendor Permit Fee $38.00 Annual Vendor Code Enforcement $310.00 Each Massage Therapy License Minimum $25.00 Annual Application Processing Fee $42.00 Annual Duplicating License $11.00 Annual Renewal $11.00 Annual City Test $105.00 Annual Pursuant to Resolution 08-05-14-01 6/11/2008 BL & Fllming (Unless Otherwise Noted) Page 2 of 74 Effective ]uly 13, 2008 J Business License and Filming Permits Fees Summary Exhibit B Descriptions Current Fees Term Filming or Photography, Commercial, in Public Facilities Permits Filming $54.00 Per Permit Still photography $27.00 Per Permit Uses Filming interiors $536.00 Per Day Filming exteriors $322.00 Per Day Still photography, inside or outside $108.00 Per Day Pursuant to Resolution 08-05-14-01 6/11/2008 BL & Filming (Unless Otherwise Noted) Page 3 of 74 Effective July 13, 2008 Parking Fees Summary Exhibit B.1 Descriptions Current Fees Term Neighborhood Parking Permit $7.00 Per Individual Permit (Maximum # per household depends on Neighborhood); $11.00 Replacement Fee each permit (managed by City Hall) $7.00 per permit, 4 Permits/ Calle Lorenzo/Calle Resplendor $11.00 Replacement Household Max. Mission Hill $7.00 per permit, 5 Permits/ $11.00 Replacement Household Max. Via Belardes $7.00 per permit, 4 Permits/ $11.00 Replacement Household Max. Calle Winona/Paseo Rosa $7.00 per permit, 5 Permits/ $11.00 Replacement Household Max. Casas Capistrano $7.00 per permit, 5 Permits/ $11.00 Replacement Household Max. Terraca/Estelita $7.00 per permit, 5 Permits/ $11.00 Replacement Household Max. Capo Gardens 1 $7.00 per permit, 4 Permits/ $11.00 Replacement Household Max. Capo Gardens 2 $7.00 per permit, 2 Permits/ $11.00 Replacement Household Max. EI Horno $7.00 per permit, 5 Permits/ $11.00 Replacement Household Max. Country Hills No Fee 5 Permits/ Household Max. Rio Vista $7.00 per permit, 5 Permits/ $11.00 Replacement Household Max. Troy HomesNo Fee 5 Permits/ Household Max. Capistrano Villas (managed by contract firm 22.00 per permit Daily Commuter Parkin Downtown Parking Structure Metered parking slots available in the basement level, spaces $2.00 Daily #1-73 Annual Commuter Parkin Downtown Parking Structure The annual passes maybe purchased at City Hall. They are available on a yearly andpro-rated basis. Month of Purchase for SJC Residents January $125.00 Annual February 115.00 Annual March 104.00 Annual April t94.00 Annual May 83.00 Annual June $73.00 Annual July _ $6_2 00__ _ Annual__ August 52.00 Annual September $42.00 Annual October $31.00 Annual November $21.00 Annual December 10.00 Annual Pursuant to Resolution 08-05-14-01 6/11/2008 Parking (Unless Otherwise Noted) Page 4 of 74 Effective July 13, 2008 Parking Fees Summary Exhibit B.1 Descriptions Current Fees Term Month of Purchase for Non Residents January 400.00 Annual February 367.00 Annual March $333.00 Annual April 300.00 Annual May 267.00 Annual June $233.00 Annual Jul 200.00 Annual August $167.00 Annual September $133.00 Annual October $100.00 Annual November $67.00 Annual December $33.00 Annual Train Parking 3 Hours of less in designated spots Free Overnight Parking at roof level - spaces #320-352) $0.25 Hour 6.00 Da Employee Parking Permit Per Resolution 95-2-7-7 adopted February 7, 1995 Downtown San Juan Capistrano Parking for businesses without a dedicated parkinglot $5.00 Per Employee Pursuant to Resolution 08-05-14-01 6/11/2008 Parking (Unless Otherwise Noted) Page 5 of 74 Effective My 13, 2008 Duplication Fees Summary Exhibit C Descriptions Current Fees Term City Documents and Records The following is a schedule of fees and/or deposits for duplication of records and/or documents for private use: Copies - Black & white copies on bond paper 8 1/2 X 11" and 8 1/2 X 14" - per page copied $0.20 Per Page Copies - Fair Political Practices Commission filings Per Page copied $0.10 Per Page Plans, maps, oversized sheets $4.00 Per Page Plotting Fees/Oversized sheets AND $7.00 Per Sq Ft Tech time to set up plots $56.00 Per Hour Mailing copies At Cost City Council, Agency, or Committee Agendas - Current Agenda Agenda for current meeting (pickup at City Hall) $0.00 No Charge ai irtg o agen as -upon receipt o post-pai ,pre -a resse envelope(s) $0.00 No Charge City Council, Agency, or Committee Minutes - per year Post-paid, pre -addressed envelopes provided by requestor $63.00 Per Request Municipal Code Supplements Mailed upon receipt of payment Invoiced at cost Title 8, Building Regulations $16.00 Per Request Title 8, Supplement Service Mailed upon receipt of payment Invoiced at cost Title 9, Land Use Invoiced at cost Title 9, Supplement Service Mailed upon receipt of payment Invoiced at cost Municipal Code Complete text with binder and tabs Invoiced at cost General Plan - Text $57.00 Per Request Large Zoning or General Plan Maps $6.00 Per Request Recreational Trail Maps $3.00 Per Request Architectural Design Guidelines CD-ROM or Text Document Fiscal Budget $14.00 $47.00 Per Request Per Request Pursuant to Resolution 08-05-14-01 6/11/2008 Dupliczdon (Unless Otherwise Noted) Page 6 of 74 EffectNe July 13, 2006 Duplication Fees Summary Exhibit C Descriptions Current Fees Term Duplication of Meeting Audio Tape Recordings Per Tape - Tape(s) Provided by City $4.00 Per Request Copies of Miscellaneous Electronic Records (Not Otherwise Addressed or Per CD-ROM Provided AND $6.00 Per Request Per Staff Hour for research $56.00 Per Hour Per floppy disk provided $6.00 Per Request Digital Recordings $5.00 Per Request City Council Appeals (excluding land use appeals) $150.00 Per Request Resident Alien Certification $8.00 Per Request Document Certification (per document certified) $2.00 Per Request Document Scan Fee (per page scanned) $0.20 Per Request Document Fax Fee (per page faxed) $0.20 Per Request Other electronic media Miscellaneous Fees At Cost At Cost Per Request Waiver of Fees The above fees may waived at the discretion of the Department Director when it is determined that the general public and/or City will benefit by providing the service at no cost. Examples of appropriate fee waivers include: Requests from City Officials, Commissioners, Committee Members, etc., needing copies to conduct city business; Requests from other public agencies; Requests from non-profit or charitable groups that provide service to community members; Requests from members of the press, representing media circulated to city residents, for the purpose of disseminating information to the public Requests from individuals or other private concerns directly impacted by related pending actions of the legislative body. Questionable fee waivers will be determined by the City Manager Pursuant to Resolution 08-05-14-01 6/11/2008 Duplication (Unless Otherwise Noted) Page 7 of 74 EffectNe July 13, 2008 Bail Schedule Summary Exhibit D Descriptions Municipal Code No. Type of Crime* Current Amount of Bail 1st Penalty 2nd Penalty 3rd Penal! y Bail Schedule See Footnote 1 below Notice + 1st Penalty fee Due after 15 days Notice + 1st + 2nd Penalty fee - Due after 30 days Notice + 1st + 2nd + 3rd Penalty fee - Due after 45 days Parking Meters 4-4.07 I Parking Meters $40.00 $40.00 $20.00 $15.00 Time Limits $40.00 $40.00 $20.00 $15.00 Expiration: Effect $40.00 $40.00 $20.00 $15.00 Parking Meters: Tampering 4-4.09 I $150.00 $150.00 $75.00 $50.00 Parking Meters: Unauthorized deposits 4-4.10 I $52.00 $52.00 $30.00 $20.00 Parking Meters: Use restricted 4-4.11 I $40.00 $40.00 $20.00 $15.00 Enforcement and Obedience Obedience to authorized officers 4-6.202 I $40.00 $40.00 $20.00 $15.00 Unauthorized persons directing traffic 4-6.205 I $40.00 $40.00 $20.00 $15.00 Parking No parking zones 4-6.304 I $40.00 $40.00 $20.00 $15,00 No Stopping zones Loading zones 4-6.305 4-6.306 I $40.00 $40.00 $40.00 $40.00 $20.00 $20.00 $15.00 $15,00 I Passenger loading zones 4-6.307 I $40.00 $40.00 $20.00 $15.00 Bus stops 4-6.308 I $40.00 $40.00 $20.00 $15.00 Tow -away zones 4-6.309 I $40.00 $40.00 $20.00 $15.00 Parking for more than seventy-two (72) hours 4-6.310 I $40.00 $40.00 $20.00 $15.00 Parking for maintaining, repairing or selling vehicles 4-6.311 I $40.00 $40.00 $20.00 $15.00 Parking on grades 4-6.312 I $40.00 $40.00 $20.00 $15.00 Parking on parkways 4-6.313 I $40.00 $40.00 $20.00 $15.00 Overnight Parking: Permit Required 4-6.314 I $40.00 $40.00 $20.00 $15.00 Emergency traffic congestion from assemblages and other functions: Signs 4-6.315 I $40.00 $40.00 $20.00 $15.00 Street sweeping: Signs 4-6.316 I $40.00 $40.00 $20.00 $15.00 Commercial vehicles: Restrictions 4-6.317 I $40.00 $40.00 $20.00 $15.00 Trailers 4-6.319 I $40.00 $40.00 $20.00 $15.00 Unauthorized curb markings 4-6.321 I $40.00 $40.00 $20.00 $15.00 Parking zone for physically handicapped 4-6.323 I 1$275.00 $275.00 $150.00 $125.00 Time Limited parking zones 4-6.324 I $40.00 $40.00 $20.00 $15.00 Right turns at signal controlled intersections: Signs 4-6.403 I $40.00 $40.00 $20.00 $15,00 Truck Routes Streets prohibited 4-6.801 I $150.00 $150.00 $75.00 $50.00 Overload Vehicles Permits: Required 4-6.903 I** $40.00 $40.00 $20.00 $15.00 Escorts 4-6.916 I $20.00 $15.00 Violations 4-6.920 I $4000 $40. 00 $20.00 $15.00 Temporary Street Closures Pursuant to Resolution 08-05-14-01 6/11/2008 Ball Schedule (Unless Otherwise Noted) Page 8 of 74 Effedive July 13, 2008 J Bail Schedule Summary Exhibit D Descriptions Municipal Code No. Type of Crime* Current Amount of Bail 1st Penalty 2nd Penalty 3rd Penalty Special events and storage: Permits required 4-6.1002 I $100.00 $100.00 $50.00 $30.00 Placement of obstructions: Permits required 6.1003 I $100.00 $100.00 $50.00 $30.00 Parades Permits: Required 5-11.02 I $100.00 $100.00 $50.00 $30.00 Animal Control Horses on sidewalks 6-1.03 I $40.00 $40.00 $20.00 $15.00 California Vehicle Code Within a crosswalk 22500b I $40.00 $40.00 $20.00 $15.00 Blocking a driveway 22500e I $40.00 $40.00 $20.00 $15.00 Parked across sidewalk 22500f I $40.00 $40.00 $20.00 $15.00 Double parked 22500h I $40.00 $40.00 $20.00 $15.00 Bus loading zone 22500i I $275.00 $275.00 $150.00 $125.00 Parked in fire lane 22500.1 I $40.00 $40.00 $20.00 $15.00 18" from curb 22502a I $40.00 $40.00 $20.00 $15.00 H/C parking - no permit 22507.8a I $275.00 $275.00 $150.00 $125.00 Parked in blue cross hatches 22507.8c2 I $275.00 $275.00 $150.00 $125.00 Fire Hydrant - within 15' 22514 I $40.00 $40.00 $20.00 $15.00 No license plate 5200 I $40.00 $40.00 $20.00 $15.00 No year/month tab 5204 I 1 $40.00 1 $40.00 1 $20.00 1 $15.00 -Infraction "Unless the offense involves an overweight of more than 4,501 pounds in which event such offense shall be a misdemeanor pursuant to Section 40000.23 of the Vehicle Code. 1 -The original citation is placed on the windshield of the vehicle. If this citation is not paid within 21 days, then one official notice is sent US mail on the 22nd day denoting applicable 1st, 2nd & 3rd penalty fees. This notice states the original bail amount due and that it must be paid with 14 days from the notice date to avoid penalty fees. The following penalty phases are based on the date that the notice is mailed. (Example) 1st penalty applied: If paid after 14 days from notice date, $40 original + $40 penalty = $80 due; 2nd penalty applied: if paid after 30 days, $40 original + 1st penalty of $40 + 2nd penalty of $20 = $100 due; 3rd penalty applied: if paid after 45 days, $40 original + 1st penalty of $40 + 2nd penalty of $20 + 3rd penalty of $15 = $115 due." Pursuant to Resolution 08-05-14-01 (Unless Otherwise Noted) 6/11/2008 Page 9 of 74 Ball Schedule Effective July 13, 2008 Community Services Fees: Building Rentals Summary Exhibit E Must be in conjunction with rental of Lacouague Room 2 + Must be in conjunction with rental of Nydegger Building ++ Must be in conjunction with rental of La Sala Auditorium and/or Courtyard Pursuant to Resolution 08-05-14-01 6/11/2008 CS -Bldg (Unless otherwise Noted) Page 10 or 74 Effective July 13, 2008 Non -San Juan Non -San Juan San Juan San Juan Capistrano Capistrano Building Rentals g Capistrano Capistrano Residents, Businesses: Residents & Businesses Businesses, & Revenue - Non -Profits Non -Profits Generating Activity Facility Maximum Hourly Hourly Hourly Hourly Two hour minimum Occupancy Lacouague Room #2 85 $28.00 $51.00 $73.00 $146.00 Nutrition Room Lacouague Kitchen** $32.00 $32.00 $32.00 $63.00 erda erevent Nydegger Building Banquet: 105 $35.00 $56.00 $79.00 $158.00 Theatre: 150 Nydegger Kitchen+ $32.00 $32.00 $32.00 $63.00 erda erevent La Sala Auditorium Theatre: 130 $63.00 $96.00 $129.00 $258.00 La Sala Courtyard 300 $63.00 $96.00 $129.00 $258.00 La Sala Auditorium $113.00 $179.00 $247.00 $494.00 and Courtyard La Sala Kitchen++ $32.00 $32.00 $32.00 $63.00 (per day/per event La Sala Foyer 1 15 $23.00 $34.00 1 $45.00 $90.00 Alcohol Permit $53.00 $53.00 $53.00 $53.00 erday/perevent Cancellation Fee $26.00 $26.00 $26.00 $26.00 Must be in conjunction with rental of Lacouague Room 2 + Must be in conjunction with rental of Nydegger Building ++ Must be in conjunction with rental of La Sala Auditorium and/or Courtyard Pursuant to Resolution 08-05-14-01 6/11/2008 CS -Bldg (Unless otherwise Noted) Page 10 or 74 Effective July 13, 2008 r -- Community Services Fees: Building Rentals Summary REFUNDABLE CLEANING AND COMPLIANCE DEPOSIT: Meetinas Parties Other Rentals Up to 100 attendees: $100 Up to 100 attendees: $300 Amount of cleaning and compliance Over 100 attendees: $300 Over 100 attendees: $400 deposit will be based on type of activity Rentals with alcohol, add an additional $200 to deposit The cleaning and compliance deposit is refundable, based on the cleanliness of the site after the event, an assessment of damage/repairs to the site associated with the rental, combined with level of compliance with City regulations by renters and guests. Deposits made by check will be deposited with the rental payment prior to the date of the rental. After the rental, .the amount of the deposit to be refunded will be made via City check. The refund process will take two to four weeks. Deposits made by cash or credit card will be processed within two weeks. Rental requests made less than 14 days prior to the date of the event: If the request can be approved in this short amount of time, all payments, including deposit, must be made in cash, money order, cashier's check, or credit card. Checks will not be accepted in this case. Pursuant to Resolution 08-05-14-01 6/11/2008 CS -Bldg (Unless Otherwise Noted) Page 11 of 74 Effective July 13, 2008 Community Services Fees: Community Center Fees Summary Exhibit E *Must be in conjunction with rental of Community Hall Pursuant to Resolution 08 -OS -14-01 6/11/2008 cs-cc (Unless Otherwise Noted) Page 12 of 74 Effective July 13, 2008 Non -San Juan Non -San Juan Community Center San Juan Capistrano San Juan Capistrano Capistrano Businesses: Capistrano Residents, Rentals Residents & Businesses Businesses, & Revenue - Non -Profits Non -Profits Generating Activity Facility Maximum Hourly Hourly Hourly Hourly Two hour minimum Occu an Conference Room 14 $23.00 $45.00 $68.00 $135.00 Meeting Room 30 $28.00 $51.00 $73,00 $146.00 Banquet: 225 $124.00 $146.00 $168.00 $337.00 Community Hall (full size) $124.00 $146.00 $168.00 $337.00 Theatre: 396 Banquet: 144 $79.00 $101.00 1 $135.00 $269.00 2/3 Community Hall $79.00 $101.00 $135.00 $269.00 Theatre: 202 Banquet: 75 $68.00 $90.00 $113.00 $224.00 1/3 Community Hall $68.00 $90.00 $113.00 $224.00 Theatre: 115 Banquet: 43 $45.00 $68.00 $90,00 $180.00 1/6 Community Hall $45.00 $68.00 $90.00 $180.00 Theatre: 48 Kitchen* $42.00 $42.00 $42,00 $83.00 er da er event Patio (outdoor)* $26.00 $26.00 $26.00 $52.00 (per day/per event) Porch (indoor)* $26.00 $26.00 $26,00 $52.00 erda erevent Courtyard* $26.00 $26.00 $26.00 $52.00 (per day/per event Alcohol Permit $53.00 $53.00 $53.00 $53.00 er da er event Cancellation Fee $26.00 1 $26.00 $26.00 $26.00 *Must be in conjunction with rental of Community Hall Pursuant to Resolution 08 -OS -14-01 6/11/2008 cs-cc (Unless Otherwise Noted) Page 12 of 74 Effective July 13, 2008 Ll Community Services Fees: Community Center Fees Summary REFUNDABLE CLEANING AND COMPLIANCE DEPOSIT: Meetinas Parties Other Rentals Up to 100 attendees: $100 Up to 100 attendees: $300 Amount of cleaning and compliance Over 100 attendees: $300 Over 100 attendees: $400 deposit will be based on type of activity Rentals with alcohol, add an additional $200 to deposit The Community Center rental deposit is refundable, based on the cleanliness of the site after the event, an assessment of damage/repairs to the site associated with the rental level, combined with level of compliance with City regulations by renters and guests. Deposits made by check will be deposited with the rental payment prior to the date of the rental. After the rental, the amount of the deposit to be refunded will be made via City check. The refund process will take two to four weeks. Deposits made by cash or credit card will be processed within two weeks. Rental requests made less than 14 days prior to the date of the event: If the request can be approved in this short amount of time, all payments, including deposit, must be made in cash, money order, cashier's check, or credit card. Checks will not be accepted in this case. Pursuant to Resolution 08-05-14-01 6/11/2008 cs-cc (Unless Otherwise Noted) Page 13 of 74 Effective July 13, 2008 Community Services Fees: Gymnasium Fees Summary Exhibit E Gymnasium y Priority Classification 1/2 Gym Full Gym Compliance Per Hour Per Hour Deposit City sponsored or 1 co-sponsoredNone N/C NG events, leagues Required and programs City Approved lease or 2 agreement such Negotiable Negotiable Negotiable as the Boys & Girls Club Programs conducted by Nationally recognized not for 3 profit youth sport $28.00 $56.00 $207.00 groups with open enrollment, which are established in San Juan Capistrano Programs conducted by Category I nationally recognized not for San Juan Capistrano Residents, profit adult and Businesses & Non -Profit 4 senior citizen sports groups $28,00 $56.00 $207.00 Corporations with open enrollment, which are established in San Juan Capistrano Not for profit 5 community, $28.00 $56.00 $207.00 recreational, or educational Club or invitational teams only, run by nationally 6 recognized youth $40.00 $79.00 $207.00 sport groups, which are established in San Juan Capistrano San Juan 7 Capistrano $40.00 $79.00 $207.00 Businesses Pursuant to Resolution 08-05-14-01 6/11/2008 CS -Gym (Unless Otherwise Noted) Page 14 of 74 Effective July 13, 2008 Community Services Fees: Gymnasium Fees Summary Exhibit E Gymnasium Priority Classification 1/2 Gym Full Gym Compliance Per Hour Per Hour Deposit Private sports camps that are 8 located in San $78.00 $156.00 $207.00 Juan Capistrano Cateaory II using the gym for profit** San Juan Capistrano Private Schools Not for profit Community, 9 Educational or $68.00 $135.00 $311.00 Public Service groups Businesses and Cateaory III private sports camps that are Non -San Juan Capistrano Residents, 10 not located in San $88.00 $187.00 $311.00 Businesses, & Non -Profit Juan Capistrano using the Corporations gymnasium for profit use** * Damages are incorporated in agreement **Uses for profit will be assessed an additional administrative charge of 50% Pursuant to Resolution 06-05-14-01 6/11/2008 CS -Gym (Unless Otherwise Noted) Page 15 or 74 E%ealve July 13, 2008 Community Services Fees: Parks Rentals Fees Summary Exhibit E Refundable Cleaning and Compliance Deposit: Please Note: Park rentals of more than 52 persons require a city issued park use permit. Any park rental having a bounce house will require a city issued park use permit. Up to 100 attendees $150.00 101 - 250 attendees $200.00 251 - 350 attendees $300.00 351 - 450 attendees $500.00 Over 450 attendees Deposit will be Determined Deposit Fees for any activity other than picnics will be determined by type of activit * Deposits are refundable based on the cleanliness of the site after the event. An assessment of damage / repairs to the site associated with the rental will be conducted by staff. * Deposits made by check will be deposited upon receipt. The amount of the deposit to be refunded will be made by City check or by Master Card/ Visa depending on what was used for deposit. Check refunds will take 2-4 weeks to process. * If a rental request is submitted less than 14_days prior to the event, all payments including deposit must be made by cash, money order, cashiers check or credit card. Pursuant to Resolution OB -05-14-01 6/11/2008 Cs -Park (Unless Otherwise Noted) Page 16 of 74 E9ective July 13, 2008 San Juan Non -San Juan Non -San Juan Park Rentals Capistrano San Juan Capistrano Capistrano Residents, Capistrano Businesses: Residents&Non- Businesses Businesses, & Non- Revenue - Profits Profits Generating Activity Facility Hourly Hourly Hourly Hourly Three hour minimum Up to 100 attendees $23.00 $34.00 $45.00 $89.00 101 -250 $34.00 1 $45.00 $55.00 $112.00 251 -350 $45.00 $55.00 $68.00 351 and over $55.00 $68.00 $78.00 Cancellation Fee $26.00 $26.00 $26.00 Electricity Use $11.00 $11.00 $11.00 ]j$158A.00 Field Use Fee (If Available) $11.00 $11.00 $11.00 Refundable Cleaning and Compliance Deposit: Please Note: Park rentals of more than 52 persons require a city issued park use permit. Any park rental having a bounce house will require a city issued park use permit. Up to 100 attendees $150.00 101 - 250 attendees $200.00 251 - 350 attendees $300.00 351 - 450 attendees $500.00 Over 450 attendees Deposit will be Determined Deposit Fees for any activity other than picnics will be determined by type of activit * Deposits are refundable based on the cleanliness of the site after the event. An assessment of damage / repairs to the site associated with the rental will be conducted by staff. * Deposits made by check will be deposited upon receipt. The amount of the deposit to be refunded will be made by City check or by Master Card/ Visa depending on what was used for deposit. Check refunds will take 2-4 weeks to process. * If a rental request is submitted less than 14_days prior to the event, all payments including deposit must be made by cash, money order, cashiers check or credit card. Pursuant to Resolution OB -05-14-01 6/11/2008 Cs -Park (Unless Otherwise Noted) Page 16 of 74 E9ective July 13, 2008 Community Services Fees: Athletic Fields Fees Summary Exhibit E Athletic Fields Classification Hourly Fee Seasonal Fee Light Fee Per Field Per Field ** Per Field* Per Hour City sponsored or co- sponsored events, or any 1 use mandated by City -NC- -NC- $23.00 approved lease or agreements Programs run by nationally 2 recognized youth sport $11.00 $560.00 $23.00 groups which are based in San Juan Capistrano Programs run by organized 3 senior groups which are $11.00 $560.00 $23.00 based in San Juan Capistrano 4 San Juan Capistrano $18.00 -NA- $23.00 Residents 5 San Juan Businesses (not NA- $23.00 for pr fit use)$23.00 Programs run by organized 6 adult sport groups based in $23.00 $841.00 $23.00 San Juan Capistrano Club teams/invitational only teams which are run by 7 nationally recognized youth $37.00 -NA- $23.00 sport groups which are based in San Juan Ca istrano 8 San Juan based businesses $37.00 NA $34.00 (for profit use) Not for profit community, recreational, educational 9 and public service groups $68.00 -NA- $23.00 which are not based in San Juan Capistrano Programs run by private, 10 not for profit schools which $78.00 -NA- $23.00 are based in San Juan Ca istrano*** 11 Non-resident individual or $78.00 NA $34.00 rou not for profituse 12 Non San Juan Capistrano $78.00 -NA $46.00 Business AddTonal Fees; Field Prep Fee $30.00 per field Rental of Bases 1$10.00 per field * Seasonal use is based on use of one field for a maximum of 15 weeks ** Minimum rental is 2 hours per field Pursuant to Resolution 08-05^14-01 6/11/2008 CS -Fields (Unless otherwise Noted) Page 17 of 74 Effective July 13, 2006 Community Services Fees: JSerra Fees Summary Exhibit E ]Serra High School Classification Hourly Fee Seasonal Fee Light Fee Per Field per Field ** Per Field Per Hour City sponsored or co-sponsored events - 0 - -N/A- $21.00 Programs run by nationally recognized youth sports groups $26.00 $1,035.00 $21.00 which are based in San Juan Capistrano Programs run by organized senior groups which are based in $26,00 $725.00 $21.00 San Juan Capistrano San Juan Capistrano Residents $37.00 -N/A- $21.00 San Juan Businesses (not for profit use) $42.00 -N/A- $21.00 Not for profit community, recreational, educational and public service groups which are not based in San Juan $42.00 $725.00 $21.00 Capistrano Programs run by private, not for profit schools which are $83.00 $725.00 $21.00 based in San Juan Capistrano Club teams/invitational only teams which are run by nationally recognized youth groups which are based in San $83.00 -N/A- $21.00 Juan Capistrano Programs run by organized adult sport groups based in San $83.00 $828.00 $21.00 Juan Capistrano San Juan Based Businesses (for profit use) $83.00 -N/A- $32.00 Non-resident Individual or Group (not for profit use) $104.00 -N/A- $32.00 Non -San Juan Businesses (for profit use) $130.00 -N/A- $42.00 Additional Fees: Rental of Bases 1$10.00 Der field * Seasonal use is based on use of one field for a maximum of 15 weeks ** Minimum rental is 1 hour per field Pursuant to Resolution 08-05-14-01 6/11/2008 CS-JSerra (Unless Otherwise Noted) Page 18 of 74 Effective July 13, 2008 L Community Services Fees: Community Garden Fees Summary Exhibit E Community Garden Resident Fee Community Garden Fee Schedule Residents Approximate Parcel Size 29' x 20' 580 sq ft $51.00 20' x 20' (400 sq ft) $45.00 30' x 10' (300 sq ft) $40.00 20' x 10' (200 sq ft) $34.00 Miscellaneous: Less than 200 sq ft $28.00 Cleaning and Compliance Deposit $26.00 Non -Residents Approximate Parcel Size 29' x 20' (580 sq ft) $79.00 20' x 20' (400 sq ft) $66.00 30' x 10' 300 sq ft $55.00 20' x 10' 200 sq ft $45.00 Miscellaneous: Less than 200 sq ft $34.00 Cleaning and Compliance Deposit $26.00 Pursuant to Resolution 08-05-14-01 6/11/2008 CS -CG (Unless Otherwise Noted) Page 19 0/ 74 Effective July 13, 2008 Community Services Fees: Early Childhood Development Exhibit E Kindergarten Readiness Fee/Session Class Schedule includes summer) Cost per 6 week session/Monday $120.00 Cost per 6 week session/Tuesday $120.00 Cost per 6 week session/Wednesday $120.00 Cost per 6 week session/Thursday $120.00 Cost er 3 week session Summer classes $120.00 Pursuant to Resolution 08-05-14-01 6/11/2008 CS -KR (Unless Otherwise Noted) Page 20 of 74 Effective July 13, 2008 C u Community Services Fees: Classes & Events Fees Summary Exhibit E Classes & Events Fee Instructional Classes 0 300 per class session Special Events 0 100 per individual item selected Fourth of July Celebration 100 per booth San Juan Summer Nites 30 per booth Da Cam s and Clinics 0 400 per event/activity Swallows Day Parade Bus 1 per passenger Pursuant to Resolution 08.05-14-01 6/11/2008 cs-classes (Unless Otherwise Noted) Page 21 of 74 EffWlve July 13, 2008 Water Development Fees Summary Exhibit F Descriptions Fee Term Miscellaneous Charges Backflow Device Testing Contractor's cost + staff time actually spent Per Application Photoco ies: Re ular sheet u 8.5" x 14" See Duplication Fees Photoco ies: Plans ma s oversized sheets See Duplication Fees Phgtoco ies: Plottin Fees/Oversized sheets See Duplication Fees Photocopies: TIFF Images on CD Rom See Duplication Fees Photocopies: TIFF Images Sent Electronically See Duplication Fees Pressure Test $113.00 Per Application Observe Fire Flow Test $113.00 Per Application Shutdown $123.00 Per Valve After Hours Inspection Included in PD&I fee, night work per codes. Quit Claim Deeds $85.00 Per Hour Easements $85.00 Per Hour + applicant pays for survey legal description and the appraised value of the easement. Computer Data (per sheet) $85.00 Per Hour + printing char es Water Standard Specifications - Pickup 35.00 Per Request Water Standard Specifications - Mail $40.00 Per Request by Mail Rules & Rea for NDW users - Pickup 5.00 Per Request Rules & Reg for NDW users - Mail $9.00 Per Request by Mail Will Serve Letter $56.00 Per Request Water Availability 28.00 Per Request Completion Data Extension $56.00 Per Request Code Enforcement per violation $23.00 Per Violation Water Theft Fine $560.00 Per Theft Meter Tampering $113.00 Per Meter Temper + cost of repairs Labor, materials, equipment, and other charges not specified herein set by City Manager per Basis Sewer Waste Discharge Pretreatment Initial Pretreatment application $113.00 Per Application Annual pretreatment permit $113.00 Per Permit Natural resources extraction Liquid resources extraction Well drilling or re -drilling permits $428.00 Per Well Well renewal permits $107.00 Per Well Business license taxes $160.00 Per Year Production taxes per barrel extracted $0.10 Gas resource extraction Well drilling or re -drilling ermits $428.00 Per Well Well renewal permits $107.00 Per Well Business license taxes $160.00 Per Year Production Taxes per 10,000 cubic feet extracted $1.00 Solid resources extraction Mineral extraction permits $428.00 Per Site Business license taxes $160.00 Per Year Mining taxesper ton extracted $1.00 Pursuant to Resolution 08 -OS -14-01 6/11/2008 H2O0evel (Unless Otherwise Noted) Page 22 of 74 Effective July 13, 2008 J Water and Sewer Service Fees Summary Exhibit G Descriptions Fee Deposits Water and Sewer Residential Security Deposit U to 2X average bill Commercial Security Deposit (Construction, Temporary Use, Private Fire Line)$800.00 Service Establishment Fees (Water and Sewer) Normal business hours $12.00 After normal business hours $80.00 Delinquent Fees (Water and Sewer) Returned Check Charge Late Charge 8% of total bill Shut-off Notice(Courtesy Ta Fee 19.00 Delinquent Processing Charge Normal Business Hours Restoral $41.00 After Normal Business Hours Restoral $80.00 Meter Reconnection After Non -P mt 115.00 Hydrant Meters Hydrant Meter Deposit 800.00 Installation Fee Non -Refundable 57.00 Moving Fee 29.00 Penalty if meter is not in it's assigned location 29.00 Valves fittings, lock and chain if damaged) Replacemen cost and labor Meter Set-up and Each Move Construction and temporary use 29.00 Materials for Damaged Hydrant Meters 2" Eddie Valve Replacement cost & labor 3" Eddie Valve Replacement cost & labor Meter Deposit Swivel Adapter Replacement -1800.00 cost & labor Register Re lacement cost & labor Male Fitting Re lacement cost & labor Female Fitting Replacement cost & labor Lock & Chain Replacement cost & labor Pursuant to Resolution 08-05-14-01 6/11/2008 1120Billing (Unless Otherwise Noted) Page 23 of 74 Effective July 13, 2008 Water and Sewer Service Fees Summary Exhibit G Descriptions Fee Handle main case Re lacement cost & labor Labor & Overhead Per Basis Meter Installation Charges 5/8 - 3 4 Inch 227.00 1 Inch $311.00 1-1/2 Inch $520.00 2Inch Meter Test Fee $723.00 $57.00 Pursuant to Resolution 08-0544-01 6/11/2008 1120BIIIIng (Unless Othemise Noted) Page 24 of 74 Effective July 13, 2008 Planning Fees Summary Exhibit H Descriptions Fee Developer Deposit Applications and Other Special Deposits 1. Schedule of Hourly Rates (City Staff). All staff assigned to Developer Deposit Applications as primary or supporting technical staff shall charge actual hours expended on a project which has been assigned a developer deposit or other special deposit account. Hourly rates of City staff positions shall be determined from the current salary schedule adopted by City Council. Overhead costs shall be added to the staffs hourly rate. Overhead shall be calculated and published annually by the Administrative Services Department in accordance with the Office of Management and Budget Circular A-87 (Cost Principles for State and Local Governments). 2. Schedule of Hourly Rates (Outside Consultants). Consultants' actual cost shall be charged against the developer deposit account. Consultant contracts are determined by the Planning Director and agreement executed by the City Manager. For those applications where an outside consultant is assigned to manage a project in -lieu of city staff or when a deposit is taken for special purposes pursuant to an agreement with the City, an administration fee equivalent to ten percent (10%) of the outside consultant changes shall be charged to the applicable developer deposit or other special deposit account. 3. Developer Deposit Application (initial Deposit). The following application are subject to processing under the provisions of the Developer Deposit System. The Initial Deposit for each application is set forth below. The Planning Director may adjust the initial deposit for a given project applicant upon a determination that the initial deposit will be substantially above or below the amount estimated to complete the project review. 4. Incidental Costs. All incidental costs associated with the project including, but not limited to, postage, printing, mailing, and publication of notices shall be charged against the developer deposit or other special deposit account. The fees and/or deposits listed below are required to be paid to any processing of a development application. The initial deposits are intended to provide funding for processing of an application. If the deposited funds are depleted during the processing of the application, additional funds will be required by the City. If the requested fund are not received, processing of the development application may be delayed or interrupted pending receipt of the funds. Any unused funds at project completion will reimbursed to the applicant. Architectural Control Application $15,000.00 Certificate of Compliance $1,500.00 Conditional Use Permit $8,000.00 Flood Ian Development Permit $1,500.00 General Plan Amendment $10,000.00 Tentative Parcel Map $5,000.00 Tentative Parcel Map Waiver $1,500.00 Tentative Subdivision (Tract Map) $10,000.00 Zone Change $4,000.00 Zone Change with CDP% SDP's, Code Amendments $5,000.00 Grading Plan Modification $5,000.00 Administrative Approval/Land Use Adjustment/Modification $2,000.00 Affordable Housing Agreements $3,000.00 Development Agreements (include modifications) $5,000.00 Development Agreements Annual Review $1,000.00 Sign Program $1,000.00 Annexation $10,000.00 Zone Variance not with other applications) $2,000.00 Zone Variance with Architectural Control (AC) and Conditional Use $2,000.00 Sign, Monument not part of Architectural Control application $1,000.00 Sign Permit $1,000.00 Tree Removal Permits: HOA 10+ Trees $1,000.00 Tree Removal Permits: Planning Commission $1,000.00 Pursuant to Resolution 08-05-14-01 6/11/2008 Ping (Unless Otherwise Noted) Page 25 of 74 EHecthte July 13, 2008 Planning Fees Summary Exhibit H Descriptions Fee Time Extensions Use fifty (50%) percent of ori final de osit Site Plan Review $3,000.00 Mobilehome Park Conversions, Closures, and Cessation of Use Fee $30,000.00 Consultant Relocation Report Market Rate per Item 2 Other Consultant/Technical analyses Market Rate per Item 2 CEQA documents/processing fees Market Rate per Item 2 Assigned City Personnel Market Rate per Item 1 WQMP Review (Small Project - 2 Reviews) $561.00 Additional Small Reviews (as needed - per review) $224.00 WQMP Review (Large Project - 2 Reviews) $897.00 Additional Large Reviews as neededper review $336.00 Maps General Plan Ma $6.00 Zoning Ma $10.00 Los Rios Specific Plan Ma $6.00 Pursuant to Resolution 08 -OS -14-01 6/11/2008 Ping Nnfess Otherwise Noted) Page 26 o/ 74 Effective July 13, 2008 i Planning Fees Summary Exhibit H Descriptions Fee Fixed Fee Schedule The following is a list of development applications that have a fixed fee. This fee shall be paid at the time of application. Land Use Appeals $100.00 Environmental Review State Fish and Game Department) _Negative Declaration/Mitigated Negative Declaration _ $1,877.00 $2,607.00 Environmental Impact Report Exceptions to Title 9 of the Municipal Code Exceptions for Radio and Satellite and Dish Antennas $840.00 $113.00 Home Occupation Permit Modification to CC&R's homeowner association $56.00 $168.00 Development Standards Adjustment $336.00 Grand Opening & Promotional Banner $28.00 Street Banner $89.00 Research (over .25 hours) $56.00 Check Final Map $542 + $28 per lot Zoning Compliance Plan Check Over the Counter (Minor) $125.00 All Others $350.00 Planning Inspections (After first two inspections) $84.00 Special Development Advisory Board (DAB) meeting $391.00 Staff Interpretation $84.00 Planning Commission Interpretation $168.00 10% of estimated cost of deferred improvements Deferred Completion Agreement Zoning Confirmation Letter $84.00 Temporary Sign Permit $28.00 Temporary Use Permit $336.00 Tree Removal Permit Non -Planning Commission Tree Removal Permits: Residential Tree Removal Permits: Commercial Tree Removal Permits: HOA 1-3 Trees Tree Removal Permits: HOA 4-9 Trees Pre -application consultation and preliminary review $28.00 $28.00 $28.00 $109.00 Commercial/industrial tenant improvements or 3 residences or fewer $250.00 Commercial/industrial Isq.ft. to 50,000sq.ft. of -4 residences or more $500.00 Commercial/Industrial 50 000s .ft. or more $750.00 Sign and Banner Permits See Fixed Fee Schedule Special Activities Permits City Wide Special Events Non -Profit) $840.00 City Wide Special Events (Profit) $2,241.00 Merchants Events (Non -Profit) $56.00 Merchants Events (Profit) $168.00 Center -wide Events Non -Profit $85.00 Center -wide Events (Profit) $168.00 Christmas Tree Lots (Non -Profit) $56.00 Christmas Tree Lots (Profit) $250.00 Pursuant to Resolution 08-05-14-01 6/11/2008 Ping (Unless Otherwise Noted) Page 27 of 74 Effective July 13, 2008 Engineering Fees Summary Exhibit I Descriptions Fee Term Digital Submission Fees The following fees shall be charged in addition to the normal plan check fees if the development applicant does not ha ve the capability to provide improvement plans that are not submitted in a digital format. All development improvement plans that are submitted in a digital format in accordance with the adopted digital Submission Standards will not be subject to this fee. The applicable fee is as follows: Size -Plan -Sheet Line Density Clarity D at 1" - 40' Scale Low Good $44.15 Sheet D at 1" - 40' Scale Low Bad $88.29 Sheet D at 1" - 40' Scale High Good $132.45 Sheet at 1" - 40' Scale High Bad $176.60 Sheet Engineering Documents and Records Document and Record Retrieval/Research/Review $53.51 Per Hour (Minimum charge of 15 minutes Each person, firm or corporation shall pay a microfiche or digital storage fee for permit applications, plans, specifications, calculations, coils reports, and all pertinent data required to be maintained by state regulations, per sheet. Digital Ortho Photo Imaging $535.15 Per Foot Tile Includes 2 hour minimum staff time at $52.00 per hour GIS Information Requests As determined by City Engineer Agreements (License & Others) $1,070.29 Lot Line Adjustment Submittal and Processing $1,873.01 Pursuant to Resolution 08-05-14-01 6/11/2008 Eng (Unless Otherwise Noted) Page 28 of 74 EliecYNe July 13, 2008 Engineering Fees Summary Exhibit I Descriptions Fee Term Map/Plan/Application Processing Administration (Due Prior to Map/Plan/Application Approval) Includes the preparation and processing of agreements, resolutions, 3.5% of construction/ City Council and Commission Agenda Reports, presentation to wi with improvement costs osis$50wi0 Commission/boards, field investigation (does not include advertising a minimum of and recording fees) Map Processing (Due with Map Submittal) Plus $337.00 per lot Tract maps and Parcel Maps $856.23 Records of survey $535.15 Plus $52.00 per lot CC & R's $535.15 Duplicate Mylar Deposit $20.69 Per Sheet Improvement Plan Processing Public and Private Improvement Plan Submittal $1,070.29 Checking (on-site & off-site) 3% of Construction Cost and Improvement Costs Hydrology/Hydraulic Studies Minimum up to 5 acres Over Hydrology/Hydraulic Studies (0-20 Acres) $668.93 5 Acres ($669.00 plus $13.00 per additional 0.1 Hydrology/Hydraulic Studies (over 20 Acres)$2,675.73 Plus $2.00 per 0.1 Acre over 20 Acres ($6,500 maximum) Sewer Studies Minimum up to 5 acres Over Sewer Studies (0-20 Acres) $668.93 5 Acres ($669.00 plus $13.00 per additional 0.1 Sewer Studies (over 20 Acres) $2,675.73 Plus $2.00 per 0.1 Acre over 20 Acres ($6,500 maximum) Development Inspections (NPDES Fee applies) 3.5% of construction/ Improvement Costs up to $100,000 improvement costs with a minimum of $100.00 $3,500, plus 3% of Improvement Costs $100,000 and over improvement costs over $100,000 Sureties & Deposits Faithful Performance Surety 100% of construction/ improvement costs Labor and Material Surety 100% of construction/ improvement costs Monumentation Surety 100% of monumentation costs Water surety As required by the City's Water Department Easements (Modification/ Processing) As determined by City Engineer Pursuant to Resolution 08-05-14-01 6/11/2008 Eng (Unless Otherwlse Noted) Page 29 of 74 Effective July 13, 2008 Engineering Fees Summary Exhibit I Descriptions Fee Term FEMA Elevation Certificates $42.81 Advanced Energy Lamp Size 7,000 Lumens Single $96.32 Per Light Double $135.50 Per Light Lamp Size 20,000 Lumens Single $135.07 Per Light Double $200.68 Per Light Encroachment Permit Issuance Fee - Applies to all Permits $56.03 NPDES Permit Fee (Applies to total permit fee with the exception of Right of Way Entry, Storage Bin in Right of Way, and Traffic Control/Lane Closure) 10% of permit fee Plan Check Fee $56.03 Archival Fee/per sheet $1.07 Per Sheet Refundable Deposit $500-$2000 Sewer/Water/Storm Drain Connection (ea) $80.28 Manhole Facility (ea) $80.28 Sewer/Water/Storm Drain Lines - up to 24" Dia. $80.28 min.; $0.77/1-F Development Improvement Inspections - Sewer/Water/Storm Drain Lines over 24" 3.5% of Engineers Estimate Utility Line Installations Up to 100' LF $80.28 Utility Line Installations Over 100' LF $80.28 min.; $0.10/1-F Misc. Street Cut/Pothole/Trench --- --- --- ------ --- ------ Curb/ Gutter (LF) ____plus R/R Sidewalk (Sq. Ft) $160.56 min.; $1.00 /sq.ft.- $80.28 min. Up to 150 LF; Over 150 LF, $80.28 $0.50/1-F $80.28 min. Up to 150 SF;Over 150 SF $80.28 plus $0.15/sq,ft. R/R Driveway - Residential $133.78 R/R Driveway - Commercial $160.54_ Curb Core - up to 3 cores _ $80.28 Haul Route $80.28 Per Day Right -of -Way Entry $160.54 Equestrian Trail Use (Also requires deposit. See below) $80.28 Per Day Equestrian Trail Use - Notification Deposit $103.45 Transportation Permit (per Caltrans current fee sched.) Annual Fee $90.00 Single Trip $16.00 Round Trip $32.00 Traffic Control/Lane Closure not part of another project scope $53.51 Per Day Storage Bin in Right -of -Way $53.51 Per Every Two Weeks Engineering Inspector's Hourly Rate $84.02 Engineering Inspector's Hourly Rate for Night Work $123.30 Skateboard Prohibition Application Fee for designation 1. Application Processing $107.03 Per Application Pursuant to Resolution 08-05-14-01 6/11/2006 Eng (Unless Otherwise Noted) Page 30 of 74 EffectWe ]uly 13, 2008 Engineering Fees Summary Exhibit I Descriptions Fee Term (includes permit application, petition review, sign plan review 2. Inspection $84.02 Gate -Guarded Neighborhood Plan Application The City Council of the City of San Juan Capistrano does hereby establish a fee for applications for gate -guarded neighborhood plan application under Municipal Code Section 8-13.101 to be as follows: Deposit $1,500.00 Required of any applicant for gate -guarded community Fee based on actual costs Applicant shall pay actual hourly costs incurred by City in processing application Processing of fee In event that actual costs incurred exceed $1500 deposit, City will bill for the remainder. In the event that actual costs are less than the deposit, applicant will receive refund. Recycling Facilities Processing fees and deposits associated with site plan review and conditional use permits with respect to the processing of recycling facilities development applications are waived. Water Quality Management Plan Review Fees WQMP 1st/2nd Review (Small Project) $560.30 WQMP Subsequent Review (Small Project) $224.12 WQMP 1st/2nd Review (Large Project) $896.48 WQMP Subsequent Review (Large Project) $336.18 Miscellaneous Fees As determined by City En ineer Pursuant to Resolution 08-05-14-01 6/11/2008 Eng (Unless Otherwlse Noted) Page 31 of 74 Effective July 13, 2008 Building Fees Summary Exhibit 7 Descriptions Fee Term Building Permit Fees See or Call Building Counter Construction and Demolition Submittal $89.64 Deposit 1% of valuation, with $250 minimum Base Fees(per Valuation Table Base $94.99 Per Sq Ft Building Permit See or Call Building Counter Permit Issuance $26.02 Building Address $84.02 NPDES Permit Fee 10% of permit fee Pursuant to Resolution 08-05-14-01 6/11/2008 Bldg (Ugless Otherwise Noted) Page 32 of 74 Effective July 13, 2008 Pursuant to Resolution 08-05-14-01 6/11/2008 8-07 Wables (Unless Mherwlse Notetl) Page 33 of 74 Effective July 13, 2008 ICSO BUILDING VALUATION DATA Data taken from August 2007 Building Safety Journal Table 3-1&,11 - Modified Occupancy and Type for in-house reference of Construction Cost per Sauare Foot Main Category Type DAM Apartment Houses Type 1 or II F.R. $117.81 R-2 Type V -Masonry (or Type III) $91.19 Type V - Wood Frame $86.73 Type I - Basement Garage $47.22 Auditoriums Type I or II F.R $176.23 A-1 Type II - A $165.44 Type II - B $157.97 Type III - A $145.44 Type III - B $144.66 Type V - A $133.39 Type V - B $127.86 Banks Type I or II F.R. $152.75 B Type II - A $142.69 Type II - B $136.02 Type III - A Type III - B $121.77 $120.96 ' Type V - A $108.80 Type V - B $104.41 Bowling Alleys Type II - A $137.34 A-2 Type II - B $132.91 Type III - A $122.28 Type III - B $123.03 Type V - A $112.30 Churches Type I or II F.R. $176.78 A-3 Type II - A $165.99 Type II - B $158.53 Type III - A $145.96 Type III - B $145.18 Type V - A $133.90 Type V - B $128.38 Convalescent Hospitals Type I or II F.R. $253.93 I-2 Type II - A $243.87 Type III - A $222.34 Type V - A $209.39 Dwellings Type V - Masonry $100.76 R-3 Type V - Wood Frame $94.99 Basements - Semi Finished $21.00 Unfinished $15.00 Pursuant to Resolution 08-05-14-01 6/11/2008 8-07 Wables (Unless Mherwlse Notetl) Page 33 of 74 Effective July 13, 2008 Main Category Tyoe Base Fire Stations Type I or II F. R. $152.75 B Type II - A $142.69 Type II - B $136.02 Type III - A $121.77 Type III - B $120.96 Type V - A $108.80 Type V - B $104.41 Homes for the Elderly Type I or II F. R. $149.29 R-4 Type II - A $140.32 Type II - B $134.63 Type III - A $123.81 Type III - B $123.77 Type V - A $113.81 Type V - B $109.35 Hospitals Type I or II F. R. $253.93 I-2 Type III - A $222.34 Type V - A $209.39 Hotels and Motels Type I or II F.R. $142.20 R-1 Type III - A $125.47 Type III - B $125.42 Type V - A $115.46 TypeV - B $111.01 Industrial Plants Type I or II F. R. $89.96 F-1 Type II - A $82.13 F-2 Type II - B $78.44 Type III - A $68.74 Type III - B $68.66 Tilt -Up $50.00 Type V - A $58.56 Type V - B $54.46 ]ails Type I or II F. R. $163.32 I-3 Type III - A $143.67 Type V - A $130.72 Libraries Type I or II F. R. $150.51 A-3 Type II - A $138.73 Type II - B $132.26 Type III - A $118.68 Type III - B $118.90 Type V - A $106.63 Type V - B $102.10 Pursuant to Resolution 08-05-14-01 6/11/2008 8-07 Wables (Unless Otherwise Noted) Page 34 of 74 Effective July 13, 2008 Pursuant to Resolutlon 08-05-14-01 6/11/2008 8-07 V ables (Unless 0themise Notetl) Page 35 of 74 Effective July 13, 2008 Main Category Type 11=2 ' Medical Offices Type I or II F.R. $152.75 B Type II - A $142.69 Type II - B $136.02 Type III - A $121.77 Type III - B $120.96 Type V - A $108.80 Type V - B $104.41 Offices ** Type I or II F.R. $152.75 B Type II - A $142.69 Type II - B $136.02 Type III - A $121.77 Type III - B $120.96 Type V - A $108.80 Type V - B $104.41 Private Garages Wood Frame - VB $36.91 U Masonry - VA $38.76 Open Carports $29.53 Public Garages Type I or II F.R. $83.25 S-2 Type II - B $71.73 Type III - A $62.21 Type III - B $62.13 ' Type V - A $52.03 Restaurants Type III - A $122.28 A-2 Type III - B $123.03 Type V - A $112.30 Type V - B $109.46 Schools Type I or II F.R. $163.27 E Type II - A $153.29 Type III - A $135.26 Type III - B $132.07 Type V - A $120.94 Type V - B $116.38 Service Stations Type II - B $96.13 M Type III - A $86.08 Type V - A $76.10 Canopies $35.00 Stores Type I or II F.R. $109.31 M Type II - A $100.56 Type II - B $96.13 Type III - A $86.08 Type III - B $86.83 Type V - A $74.10 Type V - B $73.26 Theaters Type I or II F.R. $176.23 Pursuant to Resolutlon 08-05-14-01 6/11/2008 8-07 V ables (Unless 0themise Notetl) Page 35 of 74 Effective July 13, 2008 Main Catelaory Ivoe Base A-1 Type III - A $145.44 Type III - B $144.66 Type V - A $133.39 Type V - B $127.86 Warehouses *** S Type I or II F.R. Type II - V-A Type II or V -B TypeIII - A Type III - B Add itions/Alterations R-3 (Refer to Supplemental Cost Data Schedule 3-A.2) ** - Deduct 20% for shell --only buildings *** - Deduct 11% for mini warehouses $83.25 $52.03 $47.93 $62.21 $62.13 $71.25 Pursuant to Resolution 08-05-14-01 6/11/2008 8-07 VTables (Unleys Otherwise Noted) Page 36 of 74 EBecNwe July 13, 2008 Table 3-A Fees Summary Exhibit 3 Building Permit and Inspection Descriptions Fee PERMIT ISSUANCE FEE: For issuing each Permit $26.33 PERMIT & INSPECTION FEE: TOTALCOST/VALUATION 1.00 to 500 $26.33 $500 to $2,000 $26.33 for the first $500 plus $3.16 for each additional $100 or fraction thereof, up to and including $2,000. $2,001 to $25,000 $74.12 for the first $2,000 plus $14.48 for each additional $1,000 or fraction thereof, up to and including $25,000. $25,001 to $50,000 $418.76 for the first $25,000 plus $10.45 for each additional $1,000 or fraction thereof, up to and including $50,000. $50,001 to $100,000 $689.00 for the first $50,000 plus $7.24 for each additional $1,000 or fraction thereof, up to and including $100,000. $100,001 to $500,000 $1,063.60 for the first $100,000 plus $5.79 for each additional $1,000 or fraction thereof, up to and including $500,000. $500,001 to $1,000,000 $3,461.06 for the first $500,000 plus $4.91 for each additional $1,000 or fraction thereof, up to and including $1,000,000. $1,000,001 and up $6,003.01 for the first $1,000,000 plus $3.26 for each additional $1,000 or fraction thereof. Enforcement of State Mandated Title 24 -Energy Provisions Add 20% Enforcement of State Mandated Title 24 -Handicap Provisions Add 10% NPDES Permit Fee Add 10% The fee for a building permit authorizing additional work to that under a valid permit shall be the difference between the fee paid for the original permit and the fee shown for the entire project. Pursuant to Resolution 08-05-14-01 6/11/2008 3-A (Unless Mhemise Noted) Page 37 of 74 ERectNe July 13, 2008 Table 3-A Fees Summary Exhibit 3 Building Permit and Inspection Descriptions I Fee ' Per the Uniform Administrative Code, Section 304, the determination of value or valuation under any of the provisions stipulated in the codes shall be made by the Building Official. The value to be used in computing the building permit and plan review fees shall be the total value of all construction made for which the permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, air- conditioning, elevators, fire extinguishing systems, and any other permanent equipment. Note: Section 105 Definition of Valuations or Value, as applied to a building and its building services equipment, shall be the estimated cost to replace the building and its building service equipment in kind, based on current replacement costs. The unit costs/values for general improvements defined in the "Building Valuation Data Schedule" (Table 3-A. 1) are for projects employing conventional construction with average to good quality. The purpose and intent of the San Juan Capistrano Land Use Management Code is to: a) "provide precise land use regulation as a means of implementing the General Plan," and b) 'provide for the utilization of innovative land planning and building design to achieve high quality, variety, flexibility and efficiency in the design of residential, commercial, industrial and other development projects. " The City employs numerous committees, boards, and commissions to serve as a mechanism to facilitate this endeavor. This renders unique, creative, sophisticated and complex propositions. Due to the nature, type, shape and size of the sites available in San Juan Capistrano located in seismic zone 4, and the existence of moderate to highly expansive soils, special architectural and/or structural features are often employed to mitigate hazardous, unstable and unusual conditions. The Administrative Authority often requires additional plans, specifications, details and engineered computations to substantiate the validity and Integrity of these proposals. The Building and Safety Division defines this type of construction as complex construction with good to excellent quality. A regional modifier of 110% is used to adjust the unit cost to reflect a reasonable and accurate assessment of local cost. An additional 5 percent shall be imposed when special inspections as defined in Section 306 of the Uniform Administrative Code are required. The surcharge is designed to recover cost associated with screening special/deputy inspectors, verification of credentials, reviewing field report and daily memos, communicating with testing agencies and inspection monitoring. U.B.C. Section 2313 Earthquake Regulations requires each structure to be designated as being structurally regular or irregular. Regular structures have no significant physical discontinuities in plan or vertical configuration or in their lateral force -resisting systems such as irregular structures. Structures having one or more of the features listed in Table No. 23-M of the Uniform Building Code shall be designated as having a vertical irregularity. Structures having one or more of the features listed in Table No. 23-N shall be designated as having a plan irregularity. A structure designated as having a vertical irregularity and/or a plan irregularity shall be defined as an irregular structure. An additional surcharge is imposed to recover the cost associated with expending extra time/resources on complex, intricate structures defined as irregular to verify conformance with approved plans to ensure adherence with the codes and regulations of the City of San Juan Capistrano. The following table summarizes and outlines the imposed surcharges: Pursuant to Resolution 08-05-14-01 6/11/2008 3-A (Unless Otherwise Noted) Page 38 of 74 Effective July 13, 2008 'J Table 3-A Fees Summary Exhibit Building Permit and Inspection Descriptions Fee Regular Structure 110% Regular Structure with Special Inspection) 115% Irregular Structure 115% Irregular Structure with Special Inspection) 120% For miscellaneous improvements, refer to the "Supplemental Unit Cost Data Schedule" (Table No. 3-A.2) 2 Or the total cost to the jurisdiction, whichever is the greatest. overhead equipment, hour/ wages, and fringe benefits of the employees This cost shall include supervision, involved. Pursuant to Resolution 08-05-14-01 6/11/2008 3-A (Unless Otherwise Noted) Page 39 of 74 Effective July 13, 2008 Table 3-A.1 Fees Summary Exhibit 3 Building Permit and Inspection Descriptions Fee Term Plan Review Fee 65% of Permit Fee Enforcement of State Mandated Title 24 -Ener Provisions. Add 20% Enforcement of State Mandated Title 24 -Handicap Provisions Add Add 10% MISCELLANEOUS FEES: Inspections outside of normal business hours $84.02 per hour minimum charge - two hours) Reinspection fees assessed under provision of Section 108.8 CBC (i.e. geotechnical, structural, inspections, review, analysis) $84.02 per hour (minimum charge - two hours) Additional plan review required by changes, additions or revisions to approved plans $84.02 per hour minimum charge - one hour Pursuant to Resolution 06-05-14-01 6/11/2008 3-A.1 (Unless Otherwise Noted) Page 40 of 74 Effective July 13, 2008 Table 3-A.1 Supplemental Fees Summary Exhibit.] Building Permit and Inspection Descriptions Fee Term Plan Review Fee REROOF Composition -Fiber lass $2.14 per sq.ft Asbestos - Cement Shingle $2.30 per sq.ft Asphalt Shin le $2.30 per sq.ft Aluminum Shin le $3.21 per sq.ft Wood Shingle $2.41 per sq.ft Wood Shake $2.41 per sq.ft Built -Up $2.14 per sq.ft Clay Tile $4.55 per sq.ft Concrete Tile $4.55 per sq.ft Removal of Existing Roof Covering - Add: $0.54 per sq.ft Roof at or Above Two Stories Add 10% per sq.ft INTERIOR WORK Tenant Improvement $30.60 per sq.ft Suspended Ceiling $12.85 per sq.ft Partition to 8' High $48.17 PLF Partition over 8' Hi h 53.51 PLF SIGNS Double Face Painted Sf n $41.52 per sq.ft Single Face Painted Sin $33.07 per sq.ft Double Face Electrical Si n $95.36 per sq.ft Single Face Electrical Sin $71.28 per sq.ft 4' Sin Pole $32.43 PLF 6' Sign Pole $45.06 PLF 8' Sign Pole $58.86 PLF 10' Sign Pole $72.35 PLF 12' Si n Pole $86.42 PLF WALLS/FENCES: 4" Masonry Block Wall $6.42 per sq.ft 6" Mason Block Wall $9.63 per sq.ft Chain Link or Wire Fence $2.68 per sq.ft Wood Fence $4.28 per sq.ft Wrought Iron Fence $4._0.1 per sq.ft Natural Stone/Rock Wall $9.63 _ per sq.ft Retainin Wall $12.85 per sq.ft Concrete Wall - Poured in Place $16.06 per sq.ft Stucco on Masonry Wall - Add $5.35 per sq.ft Miscellaneous Alterations/Improvements ACCESSORY STRUCTURES Residential: Patio - Trellis Structure $16.06 per sq.ft Patio - Covered Structure $17.12 per sq.ft Patio - Screen/Plastic "Greenhouse" $17.12 per sq.ft Deck - 30" Above Grade $17.12 per sq.ft Shed/Playhouse $11.50 per sq.ft Stairway 12.85 per sq.ft AricultUral: Barn - Livestock/Poultry $19.26 1 per sq.ft Pursuant to Resolution 08-05-14-01 6/11/2008 3-A.1 Supp (Unless Otherwise Noted) Page 41 of 74 ERectNe July 13, 2008 Table 3-A.1 Supplemental Fees Summary Exhibit 3 Building Permit and Inspection Descriptions Fee Term Storage Building $19.M per sq.ft Horticulture Structure 13.91 per sq.ft Pursuant to Resolution 08-05-14-01 6/11/2008 3-A.1 Supp (Unless Otherwise Noted) Page 42 of 74 Effective July 13, 2008 Table 3-A.1 Supplemental Fees Summary Exhibit I Building Permit and Inspection Descriptions Fee Term REMODEL/RENOVATION Install Window/Sliding Glass Door $13.91 per sq.ft Close Exterior Wall Opening $11.23 per sq.ft Add Masonry Fireplace $5,351.47 Fixed Add Prefabricated Fireplace $2,675.73 Fixed Add Bathroom $5,886.62 Fixed DEMOLITION Demolition Issuance Fee $26.33 Permit Fee Per Table 3-A Plan Review Per Table 3-A Refundable on eposi - e amount of the on-site clean up in Table 3-A.2.1 epos/t shall a as set Forth PERMIT ISSUANCE FEE: For the issuance of each permit $26.33 SWIMMING POOL, SPA & HOT TUBS SWIMMING POOL: Gunite $53.51 per sq.ft Vinyl Lined $26.75 per sq.ft Fiberglass $32.11 per sq.ft HYDROMASSAGE POOL: Spa/Hot Tub Gunite $16,054.41 Fixed Fiberglass $7,492.06 Fixed Wood $2,675.73 Fixed HYDROMASSAGE BATHTUB: Jacuzzi/Whirlpool Tub Cast Iron $4,816.32 Fixed Fiberglass $3,746.03 Fixed Crushed Marble $3,746.03 Fixed Purouant to Resolution 08-05-14-01 6/11/2008 3-A.1 Supp (Unless Otherwise Noted) Page 43 of 74 Effective July 13, 2008 Table 3-A.2.1 Fees Summary Exhibit ] Demolition Deposit Fee Schedule Descriptions Fee Term Demolition Deposits 0-1,000 Square Feet $500.00 Fixed 1,000 to 5,000 Square Fee $1,000.00 Fixed 5,000 Square Feet or Greater $1,500.00 Fixed Pursuant to Resolution 08-05-14-01 6/11/2008 3-A,2.1 (unless Otherwise Noted) Page 44 of 74 Effecuwe July 13, 2008 L Table 3-13 Fees Summary Exhibit.] Electrical Permit and Inspection Descriptions Fee Term PERMIT ISSUANCE F : For issuing each permit $26.33 PERMIT & INSPECTION FEE: NEW RESIDENTIAL BUILDINGS: The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time. Occupancy Group R -I_ For new multifamily residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other noncommercial $0.07 per sq.ft automobile storage areas constructed at the same time, per square foot: Occupancy Group R-3: For new single- and two-family residential buildings not including the area of garages, carports and other minor $0.06 per sq.ft accessory buildings constructed at the same time, per square foot: Occupancy Group U: For new garages, carports and other minor accessory buildings $0.03 per sq.ft constructed at the same timeper square foot: For other types of residential occupancies and alterations, additions and modifications to existing residential buildings, use the UNIT FEE SCHEDULE. NEW COM ERCIAVINDUSTRIAL BUILDINGS: The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time. Pursuant to Resolution 08-05-14-01 6/11/2008 3-B (Unless 0therwlse Noted) Page 45 of 74 ENectWe July 13, 2008 Table 3-B Fees Summary Exhibit 3 Electrical Permit and Inspection Descriptions Fee Term Occupancy Group A, B, E, H, and I: For new commercial/industrial buildings not including the area of garages, carports and other minor accessory buildings $0.04 per sq.ft constructed at the same time, per square foot: PRIVATE SWIMMING POOLS/SPA For new private, residential, in -ground swimming pools for single family and multifamily occupancies including a complete system of necessary branch circuit wiring, bonding, grounding, $52.98 underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool, each: In combination with the installation/construction of a spa or $75.28 therapeutic whirpool, total: For new private, spa/therapeutic pool for single family and multifamily occupancies including a complete system of necessary branch circuit wiring, bonding, grounding, underwater $19.48 lighting, water pumping and other similar electrical equipment directly related to the operation of a spa or theraputic whirlpool, each: Nonresidential Appliances For residential appliances and self contained factory wired, non- residential appliances not exceeding one horsepower (HP), kilowatt (KW), or kilovolt ampere (KVA), in rating including medical and dental devices; food, beverage, and ice cream cabinets; illuminated showcases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each: $5.08 Note: For other types of air conditioners and other motor -driven appliances having larger electrical ratings, see Power Apparatus. Pursuant to Resolution 08-05-14-01 6/11/2008 3-B (Unless Otherwise Noted) Page 46 of 74 Effective July 13, 2008 Table 3-13 Fees Summary Exhibit 3 Electrical Permit and Inspection Descriptions Fee Term For motors, generators, transformers, rectifiers, synchronous converters, capacitors, Industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatus, as follows: Rating in horsepower (NP), kilowatts (KW), kilovolt -amperes (KVA) or kilovolt -amperes -reactive KVAR : Up to and includin 1, each: $5.08 Over 1 and not over 10, each: $13.17 Over 10 and not over 50, each: $26.33 Over 50 and not over 100, each: $52.98 Over 100, each: $79.74 Note: For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined ratings ma be used. These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. Busways For trolley and plug -in -type busways, each 100 feet or fraction thereof $7.76 Note: An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in busways. No fee is required for portable tools. Sians. Outline Liahtina and Marauees For signs, outline lighting systems or marquees supplied from one branch circuit each: $26.33 each For additional branch circuits within the same sign outline li htin s stem or marquee, each: $5.08 each Services For services of 600 volts or less and not over 200 amperes in ratio each: $32.65 each For services of 600 volt or less and over 200 amperes to 1000 amperes in ratio each: $66.52 each For services over 600 volts or over 1000 amperes in rating, each: $133.04 each Miscellaneous Apparatus. Conduits and Conductors For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth I $19.48 A - Note: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment. PLAN REVIEW FEE: Plan Review Fee 65% of Permit Fee MISCELLANEOUS FEES: Inspections outside of normal business hours $84.02 per hour' minimum charge - two hours Reinspection fees assessed under provisions of CBC Section 305 1 $84.02 per hour minimum char a two hours Inspections for which no fee is specifically indicated $84.02 per hour' minimum char a two hours Additional plan review required by changes, additions or revisions to a roved tans $84.02 per hour Pursuant to Resolution 08-05-14-01 6/11/2008 3-8 (Unless Otherwise Noted) Page 47 of 74 Effective July 13, 2008 Table 3-113 Fees Summary Exhibit 3 Electrical Permit and Inspection Descriptions Fee Term minimum charge - one hour PUBLIC SWIMMING POOLS/SPAS: For new public, in -ground swimming pools for commercial occupancies including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water $52.98 pumping and other similar electrical equipment directly related to the operation directly related to the operation of a swimming pool, each: In combination with the installation/construction of a spa or thera eutic whirl ool total: 72.46 For new public, spa t erapeutic poo or commercia occupancies including a complete system of necessary branch circuit wiring bonding, grounding, underwater lighting, water pumping and other $21.40 similar electrical equipment directly related to the operation of a Carnivals and Circuses Carnivals, circuses, or other traveling shows or exhibitions utilizing transportable -type rides, booths, displays and attractions. For electric generators and electrically driven rides, each: $25.15 each For mechanically driven rides and walk-through attractions or displays having electric lighting,each: $7.76 each For a system of area and booth lighting,each: $7.76 each For permanently installed rides, booths, displays and attractions, use the UNIT FEE SCHEDULE Temporary Power Service For a temporary service power pole, pedestal, or piggyback, including all pole or pedestal -mounted receptacle outlets and $25.15 appurtenances, each: each For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative light, Christmas $13.17 tree sales lots etc, drop ole each: each Pursuant to Resolution 08-05-14-01 6/11/2008 3-8 (Unless Otherwise Noted) Page 48 of 74 Effectiye July 13, 2008 Table 3-B Fees Summary Exhibit ] Electrical Permit and Inspection Descriptions Fee Term UNIT FEE SCHEDULE Receptacle. Switch and Lighting Outlets For receptacle, switch, lighting or other outlets at which current is used or controlled, except services, feeders and meters. First 20 each: $1.18 each Additional outlets, each: $0.79 each Note: For multi -outlet assemblies, each 5 feet or fraction thereof may be considered as one outlet. For lighting fixtures, sockets or other lamp -holding devices First 20, each: $1.18 each Additional outlets, each: $0.79 each For pole or platform -mounted lighting fixtures, each: $1.18 each For theatrical -type lighting fixtures or assemblies, each: $1.18 each Residential Appliances For fixed residential appliances or receptacle outlets for same, including wall -mounted electric ovens: counter -mounted cooking tops: electric ranges, self-contained room, console, or through- wall air conditioners; space heaters; food waste; food grinders $5.08 Note: For other types of air conditioners and other motor driven appliances having larger electrical ratings, see Power Apparatus. Footnotes for Table No. 3-B 1 Or the total cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wa es and frin a benefits of the em to ees involved. Pursuant to Resolution 08-05-14-01 6/11/2008 3-9 (Unless OMemise Noted) Page 49 of 74 EffWWe July 13, 2008 Table 3-C Fees Summary Exhibit 3 Mechanical Permit and Inspection Descriptions Fee Term PERMIT ISSUANCE FEE: For issuing each permit $26.33 PERMIT & INSPECTION FEE: Unit Fee Schedule For the installation or relocation of each forced air or gravity -type furnace or burner, including ducts and vents attached to such appliance up to and including 100,000 Btu/h $15.84 For the installation or relocation of each forced air or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h $19.48 For the installation or relocation of each floor furnace, including vent $15.84 For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit $7.76 For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code $14.66 For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu/h $15.73 For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu/h to and including 500,000 Btu/h $29.06 For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h $39.87 For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorbtion system over 1,000,000 Btu/h to and including 1,750,000 Btu/h $59.35 For the installation or relocation of each bailer or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h $99.17 For each air -handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto $11.40 Pursuant to Rmlution 08-05-14-01 6/11/2008 3-C (Unless Otherwise Noted) Page 50 of 74 Effective July 13, 2008 Table 3-C Fees Summary Exhibit.] Mechanical Permit and Inspection Descriptions Fee Term Note: This fee shall not apply to an air -handling unit which is a portion of a factory -assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code. For each air -handling unit over 10,000 cfm $20.28 For each evaporative cooler other than portable type $11.40 For each ventilation fan connected to a single dud $8.12 For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit $11.40 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood $11.40 For the installation or relocation of each domestic -type incinerator $19.48 For the installation or relocation of each commercial or industrial - type incinerator $48.17 For each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this code $11.40 PLAN REVIEW FEE: The Plan Review Fee shall be 65% of the Permit Fee MISCELLANEOUS FEES: Inspections outside of normal business hours $84.02 per hour' minimum char e - two hours Reinspection tees assesse un er provisions o CBC Section 305(G) $84.02 per hour' (minimum charge - two hours) Inspections for which no fee is specifically indicated $84.02 per hour' (minimum charge - two hours) Additional plan review required by changes, additions or revisions to approved plans $84.02 per hour' minimum charge - one hour Footnotes for Table No. 3-C ' Or the total cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead equipment, hourly wages and fringe benefits of the employees involved. Pursuant to Resolution 08-05-14-01 6/11/2008 3-C (Unless Otherwise Noted) Page 51 of 74 Effea[We July 33, 2008 Table 3-D Fees Summary Exhibit 3 Plumbing Permit and Inspection Descriptions Fee Term PERMIT ISSUANCE FEE: For issuing each permit $26.33 PERMIT & INSPECTION FEE: For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping, and backflow protection thereof) $10.49 For each building sewer and each trailer park sewer $26.38 Rainwater systems - per drain (inside building) $10.49 For each cesspool (where permitted) $39.87 For each water heater and/or vent $13.17 For each industrial waste pretreatment interceptor including its trap and vent, excepting kitchen -type grease interceptors functioning as fixture traps $21.30 For installation, alteration, or repair of water piping and/or water treating equipment, each: $5.08 For repair or alteration of drainage or vent piping, each fixture: $5.08 For each lawn sprinkler system on any one meter, including backflow protection devices therefore $15.84 For atmospheric -type vacuum breakers 1to 5 $13.17 over 5, each: $2.41 For each backflow protective device other than atmospheric -type vacuum breakers: 2 inches or smaller $13.17 Over 2 inches $26.38 For each gas piping system of one to four outlets $6.58 Outlet For each gas piping system of five or more outlets $1.18 Outlet For Fire Extinguisher Systems: _—Standpipes, wet or dry or combination, each outlet $9.63 Fire sprinkler piping removal or alterations or the replacement of valves, attachments $18.20 Underground fire sprinkler piping or yard piping system (when permit fee has not been obtained for complete automatic fire extinguishing) $46.02 Fire Sprinkler System - Insta I lation/M od ificati on From 1 to 50 fire sprinkler heads $64.22 From 51 to 100 fire sprinkler heads $128.43 From 101 to 500 fire sprinkler heads $321.09 501 to 1,000 fire sprinkler heads $551.20 m 1,001 to 2,000 fire sprinkler heads $766.33 m 2,001 to 3,000 fire sprinkler heads $1,034.98 m 3,001 to 4,000 fire sprinkler heads $1,378.53 m 4,001 to 5,000 fire sprinkler heads tFooreach $1,684.64 r 5,000 fire sprinkler heads $1,990.75 final test of fire pump $191.58 fire hydrant system $38.54 PLAN REVIEW FEE: The Plan Review Fee shall be 65% of the Permit Fee Pursuant to Resolution 08-05-14-01 6/11/2008 3-D (Unless Otherwise Noted) Page 52 of 74 Effective July 13, 2008 C Table 3-D Fees Summary Exhibit 3 Plumbing Permit and Inspection Descriptions Fee Term FEES: Inspections outside of normal business hours $84.02 per hour' (minimum charge - two hours) Reinspection fees assessed under provisions of CBC Section 305(G) $84.02 per hour_'_ (minimum charge - two hours) Inspections for which no fee is specifically indicated $84.02 per hour' minimum char a two hours Additional pan review require y changes, additions or revisions to approved plans $84.02 per hour' minimum char a -one hour 321.09 Grease interce for Ian check and field inspection Footnotes for Table No. 3-C 1 Or the total cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead equipment, hourly wages and fringe benefits of the employees involved. Pursuant to Resolution 08-05-14-01 6/11/2008 3-D (Unless M.h lse Noted) Page 53 of 74 ERectNe July 13, 2008 Table 3-E Fees Summary Exhibit 7 Swimming Pool, Spa, and Hot Tub Permits Descriptions Fee Term As listed in Exhibit A, Table 3-A.2 PERMIT ISSUANCE FEE: For issuing each permit $26.33 ** $50Q.00 BQND I ** $26.33 SWIMMING POOL, SPA & HOT TUBS Pool/Spa Electrical $72.46 Swimming Pool Electrical $52.98 Spa Only Electrical $19.48 Pool/Spa Plumbing $65.02 Spa Only Plumbing $32.38 Pool/Spa Mechanical $29.06 Spa Only Mechanical $19.48 SWIMMING POOL: Gunite $53.51 per sq.ft Vinyl Lined $26.75 per sq.ft Fiber lass $32.11 per sq.ft HYDROMASSAGE POOL: Spa/Hot Tub Gunite $16,054.41 Fixed Fiberglass $71492.06 Fixed Wood $2,675.73 Fixed HYDROMASSAGE BATHTUB: Jacuzzi/Whirlpool Tub Cast Iron $4,816.32 Fixed Fiberglass $3,746.03 Fixed Crushed Marble $3,746.03 Fixed Pursuant to Resolution 08-05-14-01 6/11/2008 3-E (Unless Otherwise Noted) Page 54 of 74 Effective July 13, 2008 r—, Table 3-F Fees Summary Exhibit ] MobileHome Accessory Permits Descriptions Fee Term PERMIT ISSUANCE FEE: For issuing each permit $21.40 SITE PREPARATION: Sewage Disposal System $16.06 Electrical Wiring System $16.06 Water Piping System $16.06 Gas Piping System $16.06 INSTALLATION: Installation $139.14 Cabana $101.68 Private Garage $101.68 Carport $32.11 Awning $32.11 Porch $32.11 Earthquake Bracing $67.43 PLAN REVIEW FEE: For mobilehomes, accessory and miscellaneous structures that do not have standard plan approval through the Department of Housing and Community Development - refer to Table 3-A for Plan Review/Permit Fees. MISCELLANEOUS FEES: Inspections outside of normal business hours $84.02 per hour' (minimum charge - two hours) Reinspection fees assessed under provision of Section 108.8 $84.02 per hour' minimum charge - two hours Pursuant to Resolution 08 -OS -14-01 6/11/2008 3-F (Unless Otherwise Noted) Page 55 of 74 Effective My 13, 2008 Table 3-G Fees Summary Exhibit 3 Grading and Geo Plan Review Descriptions Fee Term PERMIT ISSUANCE FEE: For issuing each permit $26.33 aRMIT & INSPECTION FEE: Total Cost/Valuation 1-2000 $267.57 2001-5000 $401.37 5001-10000 5.00% 10001-50000 4.50% 50001-100000 4.00% 100001-500000 3.50% 500001-1000000 3.00% 1000001 -or more 2.50% SEOTECHNICAL REVIEW FEE: 1-2000 $535.15 2001-5000 $802.72 5001-10000 $1,070.29 1_0001-50000 $1,337.87 _ 50001-100000 $1,605.44 100001-500000 $1,873.01 1000001 -or more $2,140.59 PLAN REVIEW FEE: 1-2000 $181.04 2001-5000 $272.07 5001-10000 3.25% ($500 min.) 10001-50000 2.90% ($500 min.) 50001-100000 2.60% ($2,250 min.) 100001-100001 2.30% ($4,000 min.) 500001-1000000 1.90% ($17,500 min.) 1000001 -or more 1.60% $30,000 min.) MISCELLANEOUS FEES: Inspections outside of normal business hours $84.02 per hourz (minimum charge two hours) Reinspection fees assessed under provisions of CBC Section 108.8 $84.02 per hour 2 (minimum charge two hours) Inspections for which no fee is specifically indicated $84.02 per hourZ (minimum charge two hours) Additional plan review required by changes, additions or revisions to approved plans $84.02 per hour minimum charge - one hour Refundable Bond Deposit amount of the on-site cleanup deposit shall be as set forth in Table 3-G.1 hThe otnotes for Table No 3-G Pursuant o Resolution 08-05-14-01 6/11/2008 3-G (Unless Otherwise Noted) Page 56 of 74 Effective Iuly 13, 2008 Table 3-G Fees Summary Exhibit.] Grading and Geo Plan Review Descriptions Fee Term 1 Per the Uniform Administrative Code, Section 304, the determination of value or valuation under any of the provisions stipulated in the codes shall be made by the Building Official. The value to be used in computing the building permit and plan review fees shall be the total value of all construction work for which the permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, air-conditioning, elevators, fire extinguishing systems and any other permanent equipment. Note: Section 105 Definition of Valuation or Value, as applied to a building and its building services equipment, shall be the estimated cost to replace the building and its building service equipment in kind, based on current replacement costs. The Grading -Unit Cost Data Schedule for excavation and grading work shall be used to calculate the estimated cost of construction. The Grading -Unit Cost Data Schedule shall be established and maintained by the Building Official and City Engineer. The table shall be subject to semi-annual review. The current prevailing cost in the local region shall dictate the unit cost prescribed in the Schedule. The revised amended schedule shall be reviewed by the Director of Engineering and Building Services for formal recommendation to the City Manager's office. The amendment may be executed administratively with the City Manager's approval. 2 Or the total cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved. 3 The deposit system is an account established to recover the cost incurred while reviewing geotechnical reports. This includes time expended and materials/equipment employed. Thus, additional fees may be required for complicated studies. Pursuant to Resolution 08-05-14-01 6/11/2008 3-G (Unless Otherwise Noted) Page 57 of 74 EffeaNe July 13, 2008 Table 3-G.1 Fees Summary Exhibit 3 Grading and Geo Plan Deposit Descriptions 2IR2W 0-500 $500,00 501-1000 $750,00 1001-1500 $1,000.00 1501-2000 $1,250.00 2001-5000 $1,500.00 5001-10000 $2,000.00 10001-15000 $2,500.00 15001-20000 $3,000.00 20001-50000 $5,000.00 50001-100000 $10,000.00 100001 -and u $15,000.00 Pursuant to Resolutlon 08-05-14-01 6/11/2008 3-G.1 (Unless Otherwise Notetl) Page 58 of 74 Effective July 13, 2008 Table 3-G.2 Fees Summary Exhibit 3 Grading and Geo Plan Review Descriptions Cost Per CY Term GRADING UNIT COST DATA SCHEDULE 0-1000 $9.09 1001-10000 $4.55 10001-30000 $3.00 30001-60000 $2.57 60001-500000 $2.24 Over -500000 $1.50 ROCK EXCAVATION No Blasting $13.38 Blasting $37.46 STRUCTURE EXCAVATION: $21.40 IMPORT OR EXPORT $7.76 NOTE: Cost estimates for bonding and securities for grading shall include a 10% contingency amount added to the construction estimate. Total amount (construction plus contingency) should be rounded to the next highest $100 for the bond amount. An administrative surcharge as determined by the Administrative Authority shall be imposed in addition to the bond amount. * - Cubic yardage total denotes cut plus fill combined. Pursuant to Resolution 08-05-14-01 6/11/2008 3-G.2 (Unless Otherwise Noted) Page 59 of 74 EFectNe July 13, 2008 Table 3-H Fees Summary Exhibit ] On Site Improvement Permit and Inspection Descriptions F- Fee Term NOTE: THIS FEE SCHEDULE IS APPLICABLE TO SINGLE FAMILY DWELLINGS ONLY. FOR SUBDIVISION AND COMMERCIAL PROJECTS, REFER TO ENGINEERING FEE SCHEDULE. PERMIT ISSUANCE FEE: For issuing each Permit $26.33 PERMIT & INSPECTION FEE: TOTAL COST/VALUATION $1.00 to $500 $26.33 $500 to $2,000 $26.33 for the first $500 plus $3.16 for each additional $100 or fraction thereof. $2,001 to $25,000 $74.12 for the first $2,000 plus $14.48 for each additional $1,000 or fraction thereof, up to and including $25,000. $25,001 to $50,000 $418.76 for the first $25,000 plus $10.45 for each additional $1,000 or fraction thereof, up to and including $50,000. $50,001 to $100,000 $689.00 for the first $50,000 plus $7.24 for each additional $1,000 or fraction thereof, up to and including $100,000. $100,001 to $500,000 $1,063.60 for the first $100,000 plus $5.79 for each additional $1,000 or fraction thereof, up to and including $500,000. $500,001 to $1,000,000 $3,345.31 for the first $500,000 plus $4.91 for each additional $1,000 or fraction thereof, up to and including $1,000,000. $1,000,001 and up $5,802.25 for the first $1,000,000 plus $3.26 for each additional $1,000 or fraction thereof. GEOTECHNICAL REVIEW FEE: 1-2000 $517.25 2001-10000 $775.88 10001-50000 $1,034.50 50001-100000 $1,293.13 100001-500000 $1,551.75 500001-1000000 $1,810.38 1000001 -or more $2,069.00 PLAN REVIEW FEE• Pursuant to Resolution 08-05-14-01 6/11/2008 3-H (Unless Otherwlse Noted) Page 60 of 74 Effective July 13, 2008 Table 3-H Fees Summary Exhibit J On Site Improvement Permit and Inspection Descriptions Fee Term Plan Review Fee MISCELLANEOUS FEES: Inspections outside of normal business hours $84.02 per hour minimum cham' i e - two hours elnspecUon ees assesse un er provisions of CBC ectlon 305(G) $84.02 per hour (minimum charge - two hours) Inspections for which no fee is specifically indicated $84.02 per hour (minimum charge - two hours) Additional pan review required by changes, additions or revisions to approved plans $84.02 per hour minimum charge - one hour) Pursuant to Resolution 08-05-14-01 6/11/2008 3-H (Unless Other lse Noted) Page 61 of 74 Eflectlye July 13, 2008 Table 3-H Fees Summary Exhibit 3 On Site Improvement Permit and Inspection Descriptions Fee Term Refundable Bond Deposit The amount of the on-site cleanup deposit shall be as set forth in Table 3-H.1 Footnotes for Table No 3-H ' Per the Uniform Administrative Code, Section 304, the determination of value or valuation under any of the provisions stipulated in the codes shall be made by the Building Official. The value to be used in computing the building permit and plan review fees shall be the total value of all construction work for which the permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, air-conditioning, elevators, fire extinguishing systems and any other permanent equipment. Note: Section 105 Definition of Valuation or Value, as applied to a building and its building services equipment, shall be the estimated cost to replace the building and its building services equipment in kind, based on current replacement costs. The On -Site Improvement - Unit Cost Data Schedule (Table No. 3-H.2) for on-site improvement work shall be used to calculate the estimated cost of construction. The On -Site Improvement - Unit Cost Data Schedule shall be established and maintained by the Building Official and City Engineer. The table shall be subject to semi-annual review. The current prevailing cost in the local region shall dictate the unit cost prescribed in the Schedule. The revised schedule shall be reviewed by the Director of Engineering and Building Services for formal recommendation to the City Manager's office. The amendment may be executed administratively with the City Manager's approval. 2 Or the total cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved. 3 The deposit system is an account established to recover the cost incurred while reviewing geotechnical reports. This includes time expended and materials/equipment employed. Thus, additional fees may be required for complicated studies. Pursuant to Resolution 08-05-14-01 6/11/2008 3-H (unless Otherwise Noted) Page 62 of 74 Effeame July 13, 2008 Table 3-1-1.1 Fees Summary Exhibit 3 On Site Improvement Bond Deposit Descriptions Deposit; Refundable Bond Dggosit 0-5000 $250.00 5001-10000 $500.00 10001-20000 $750.00 20001-50000 $1,000.00 50001-250000 $1,250.00 250001-500000 $1,500.00 500001-1000000 $3,000.00 1000001 -or more $5,000.00 Pursuant to Resolution 08-05-14-01 6/11/2008 3-H.1 (Unless Otherwise Noted) Page 63 of 74 Effective July 13, 2008 Table 3-11-11.2 Fees Summary Exhibit 7 On Site Improvement Permit and Inspection Descriptions Fee Term On Site Improvements WALLS/FENCES: 4" Mason Block Wall - $9.63 per sq.ft 6" Masonry Block Wall $10.33 per sq.ft Chin Link or Wire Fence $2.68 per sq.ft Wood Fence $2.95 per sq.ft Wrought Iron Fence $4.01 per sq.ft Natural Stone/Rock Wall $10.71 per sq.ft Concrete Wall - Poured in Place $29.97 per sq.ft Stucco on Masonry Wall - Add $5.35 per sq.ft EROSION CONTROL/LANDSCAPING: Plastic Sheets (Visquene) $0.10 Each Sand Bags $1.33 Each Hydroseeding $0.27 Trees Removal $428.92 Each Planting (15 Gallon) $133.78 Each Landscaping and Irrigation Erosion Control 1.33 PAVING:_ P.C.C. (Portland Cement Concrete $0.41 SF/IN Existing AC $0.70 Existing PCC $1.92 Saw Cut Existing Paving $2.68 PLF Sub rade Preparation $0.27 STREETS/DRIVEWAYS: Berm, AC 6" $8.30 PLF 8" $9.09 PLF Concrete Pattern Stamped $8.03 Cross Gutter 6" PCC $7.76 Curbs Curb 6" PCC $10.71 PLF 8" PCC Curb and Gutter $11.23 PLF 6" PCC $11.77 PLF 8" PCC $13.65 PLF Driveway 4" PCC $3.21 6" PCC $3.91 4" High $10.27 PLF 5" High $12.20 PLF 6" High $17.34 PLF Guard Post & Barricade $642.18 20 LF Header 2" x 6" Redwood $6.95 PLF Lights, Street 90 Watt, EPSV $3,210.88 Each 180 Watt, EPSV $3,505.22 Each Metal Beam Barricade $38.54 PLF Pursuant to Resolution 08-05-14-01 6/11/2008 3-H.2 (Unless Otherwise Noted) Page 64 of 74 Effective July 13, 2008 C Table 3-1-1.2 Fees Summary Exhibit 3 On Site Improvement Permit and Inspection Descriptions Fee Term Pedestrian Ramp $749.21 Each Regulatory Signs - Stop, No Parking,Seed Limit etc.. $240.81 Each Removal of: Existing Curb $5.35 PLF Existing Curb & Gutter $6.42 PLF Sidewalk $1.33 Sidewalk 4" PCC $3.21 Street Name Sin $267.57 Each Traffic Signal 3 Way $198,004.33 Each 4 Way $240,816.08 Each Trail - Equestrian/Pedestrian $9.63 PLF Trench Asphalt Restoration $13.38 PLF Wall Cut-off Pavement $695.69 Each EWER: Cleanout $813.43 Each Cleanout (Sewer Force Main) $1,070.29 Each Cradle (Concrete) $33.18 PLF Dead End $321.09 Each Encasement (Concrete) Type A,B $37.46 PLF Lateral 4" - 30' Lon $1,284.35 _ Each 6" - 30' Long $1,337.87 Each Main 6" VCP/PVC $23.55 PLF 8" VCP/PVC $34.25 PLF 10" VCP/PVC $38.27 PLF 12" VCP/PVC $50.57 PLF 16" VCP/PVC $64.22 PLF 18" VCP/PVC $80.28 PLF 21" VCP/PVC $85.63 PLF Manhole $8,027.20 Each Manhole Adjust Rim to Grade $615.42 Each Pressure Sewer Pipe 4" $23.55 PLF 6" $25.69 PLF 8" $29.97 PLF Concrete Protective Slap ___ Shoring Shorin $_1.1.35 PLF Over Feet Deep $11.77 PLF Stub & Plug 6" or 8" $133.78 Each Wall Concrete Anchor $668.93 PCY Cut-off $139.14 Each WATER: Air & Vacumn Valve Assembly $1,605.44 Each Anchor Block $668.93 Each Blow -Off Assembly Pursuant to Resolution 08-05-14-01 (Unless Otherwise Noted) 6/11/2008 Page 65 of 74 3-N.2 Effective July 13, 2008 Table 3-H.2 Fees Summary Exhibit 7 On Site Improvement Permit and Inspection Descriptions Fee Term 2" $1,337.87 Each 4" _ $2,568.70 Each cut Off Wall $139.14 Each Fire Hydrant Assembly $3,424.94 Each Fire Hydrant Relocation Fittings $1,765.98 Each 8" $187.31 Each (22'/a", 45", 90"Tea Flange, etc) 10" $219.41 Each 12" $251.52 Each Main (All Materials including normal excavation 4" $23.55 PLF 6" $26.75 PLF 8" $30.51 PLF 10" $38.00 PLF 12" $45.49 PLF 14" $53.51 PLF Manual Air Release Assembly $1,605.44 PLF Pipe, Steel 6" - $30.51PLF - - - 8„„ $34.78. - - PLF - Reducer $219.41 Each Relocate Water Meter $535.15 Each Service 3/4” - 1", Water Service $626.12 Each 1'/2", Water Service $1,177.32 Each 2", Water Service $1,980.04 Each Trust Block Valve Assembly, Gate 6", Gate Valve $695.69 Each 8", Gate Valve $1,070.29 Each 10", Gate Valve $1,605.44 Each 12" - 16", Gate Valve $2,408.16 Each Valve Assembly, Butterfly 10", Butterfly Valve $1,305.76 Each 12" Butterfly Valve $1,765.98 Each STORM DRAINAGE: Channel Linin PCC $5.35 Clean Outs Type "A" $3,210.88 Each $4,281.17 Each Culverts Pipe All Materials SDRSD D-60, D-61 4" Private Only) $12.85 PLF 6" (Private Only) $18.20 PLF 8" (Private Only) $22.48 PLF 10" (Private Only) $25.69 PLF 12" (Private Only) $32.11 PLF 15" (Private Only) $38.54 PLF 18" $64.22 PLF 21" $68.49 PLF 24" $72.78 PLF Pursuant to Resolution 08-05-14-01 6/11/2008 3-H.2 (Unless Otherwise Noted) Page 66 of 74 Effective July 13, 2008 L G Table 3-11-11.2 Fees Summary Exhibit 3 On Site Improvement Permit and Inspection Descriptions Fee Term 27" $80.28 PLF 30" 33" $88.83 $96.32 PLF PLF 36" $107.03 PLF 39" $115.60 PLF 42" $124.15 PLF STORM DRAINAGE (CONTD); 48" $142.35 PLF 54" $160.54 PLF 60" $178.74 PLF 66" $195.86 PLF 72" $214.06 PLF Cast in Place PCC Structures 0-20 $535.15 PCY 20 + $428.12 PCY Ditch Brow Ditch $16.06 PLF Earthen Ditch $4.28 PLF Energy Dissipater Headwalls $6,689.34 $1,926.53 Each Each Gravity Type $3,210.88 Each Wing Type $3,724.62 Each Inlets Private Catch Basin 12" x 12" $481.63 Each 18"x 18" $695.69 Each Catch Basin Type "G" $3,746.03 Each Type"F" $3,210.88 Each Type "Y' $3,746.03 Each CSP Inlet $2,675.73 Each Curb Inlet Types A,B,C L = 4' to 10' $3,746.03 Each L = 11'to 20' $4,548.75 Each L = 21'to 28' $8,027.20 Each Inlet Apron $1,605.44 Each _ Lug Concrete $792.01 Each Outlets Curb Outlet Type "A" $428.12 Each Sidewalk/Underdrain Pipe $428.12 Each Sidewalk Underdrain Type "A" $2,140.59 Each Pipe Collar $722.45 Each Rip Rap Dumped $107.03 PCY Placed $128.43 PCY Channel Protection $96.32 PCY Engineering Fabric $0.07 Sand $32.11 PCY Wall Curtain $492.34 Each Pursuant to Resolution 08-05-14-01 6/11/2008 3-11.2 (Unless Otherwise Notecl) Page 67 of 74 Effects. July 13, 2008 Table 3-1i.2 Fees Summary Exhibit ] On Site Improvement Permit and Inspection Note: Cost estimates for bonding and securities for improvements shall include a 10% contingency amount added to the construction estimate. Total amount (construction plus contingency) should be rounded to the next highest $100 for the bond amount. An administrative surcharge as determined by the administrative authority shall be imposed in addition to the bond amount. Pursuant to Resolution 08-0544-01 6/11/2008 3-11.2 (Unless Otherwise Noted) Page 68 of 74 Effeawe July 13, 2008 C Table 3-I Fees Summary Exhibit 3 Microfilm and Digital Imaging Descriptions De osit3 Term MICROFILM-F=EE/DIGITAL IMAGING: Each person, firm or corporation shall pay a microfiche fee for permit applications, plans, specifications, calculations, soils reports, and all pertinent data required to be maintained by state regulations, per sheet: $1.07 per sheet The maximum permissible sheet size shall be 30" H 42"/Size E DOCUMENT RESEARCH: Records retrieval/research, per hour $48.17 per hour Minimum charge - one-half hour DOCUMENT PREPARATION/PROCESSING: Sure A reements/Performance Bonds $280.15 Permits/documents (Up to page sizes 11" H 14"per page $0.22 Plans, biueline, er sheet $1.98 Plans Xerox-bondper sheet $1.39 PROCESSING APPEALS: Fee for processing appeals by the Board of Appeals and Condemnation $168.09 BUILDING RE Fee to assign building address $84.02 per address ADDRESS N 56.10 Pursuant to Resolution 08-05-14-01 6/11/2008 3-I (Unless Otherwise Noted) Page 69 of 74 Effective July 13, 2008 Stockpile Fees Summary Exhibit ] Pursuant to Resolution 08-05-14-01 6/11/2008 Stockpile (Unless Otherwise Noted) Page 70 of 74 EffectlWe July 13, 2008 Descriptions Fee Term STOCKPILE PERMIT FEES NOT IN MUNICIPAL CODE For Plan Check And Ins edion Soil i Y r 0 to 50 $160.54 51- 100 $214.06 101-500 $267.57 501- 1,000 $321.09 1,001 - 5,000 $428.12 5,001 - 10,000 $535.15 10,001-25,000 $695.69 25,001 - 50,000 $963.26 50,001 - Up Varies* * To be determined by City Engineer Pursuant to Resolution 08-05-14-01 6/11/2008 Stockpile (Unless Otherwise Noted) Page 70 of 74 EffectlWe July 13, 2008 Developer Impact Fees Summary Exhibit K Pursuant to Resolution 08-05-14-01 6/11/2008 Devel (Unless Otherwise Noted) Page 71 of 74 E%ectWe July 13, 2008 Fee Term Descriptions Parks and Recreation Facilities Development Fees NOTE: BASED UPON ORDINANCE NO. 210 PASSED ON DECEMBER 11, 1972, UPDATED 1999 49 Units or Less Single family detached dwelling units $11,600.00 Per Unit Attached units, inciu ing duplex, townhomes and apartments $10,512.00 Per Unit Mobile Homes $6,525.00 Per Unit 50 Units or More If there is no park or recreational facility designated in the Recreational Element to be located in whole or in part within the proposed subdivision to serve the immediate and future needs of the residents of the subdivision, the subdivided shall, in lieu of dedicating land, pay a fee equal to the value of the land prescribed for dedication as indicated in Section (1) below and in an amount determined in accordance with the provision of Section (2) below, such fee to be used for a park which will serve the residents of the area being subdivided. Section (1) (b) Town houses and 4 bedroom apts. 3.1 persons per dwelling unit (c) Multiple family dwelling units 2.4 persons per dwelling unit (d) Mobile home dwelling units 1.9 persons per dwelling unit Section (2) Where a fee is required to be paid in lieu of land dedication, the amount of such fee shall be based upon the fair market value of the amount of land which would otherwise be required to be dedicated pursuant to Section (1). The fee shall be paid pursuant to the provisions contained in Section (3). The "fair market value" shall be determined by City Council prior to tentative map approval, based on an appraisal approved by the City and paid for by the subdivider. Section (3) Time of commencement must be designated. At the time the final tract map is approved, the City council shall designate the time when development of the park and recreational facilities shall be paid. Agricultural Preservation NOTE: BASED UPON ORDINANCE NUMBER 316 PASSED ON JANUARY 19, 1977 Residential Development $500.00 Per Unit Per Acre Commerical or Industrial Development $1,000.00 Sewer Connection Fees Per dwelling unit or per meter whichever is greater $4,320.16 Per mobile home space $4,320.16 Per motel room with kitchen facility $4,320.16 Non-residential- including commercial, industrial, public Per 1500 SF of buildings, schools, churches, motels, and hotels without $4,320.16 Floor area or kitchen facilities; fraction thereof Capistrano Circulation Fee Program Traffic Impact Fees Residential Land Use Category/Unit Pursuant to Resolution 08-05-14-01 6/11/2008 Devel (Unless Otherwise Noted) Page 71 of 74 E%ectWe July 13, 2008 Developer Impact Fees Summary Exhibit K Descriptions Fee Term Single DU (Primary and Secondary)/Dwelling Unit $7,387.00 Multiple DU/Dwelling Unit $6,088.00 Commercial Land Use Category/Unit Auto Dealership/Acre $228,000.00 Auto Repair/Service/sf of floor area $3.04 Church/sf of Floor area $3.54 Clinic/sf of floor area Commercial/sf of floor area $12.99 $8.51 Elementary/Middle School/student $170.00 Equestrian/Stable $76.00 Golf Course/Acre $6,330.00 High School/student $520.00 Hospital/sf of Floor area $7.60 Hotel/Room $3,310.00 Industrial/sf of floor area $3.88 Mortuary/sf of floor area $9.42 Motel/Room $3,870.00 Museum/sf of floor area $5.32 Nursing Home/bed $2,280.00 Office/R & D/sf of floor area $6.40 Private School/student $360.00 Racquet Club/Health Spa/Court $15,200.00 Self Storage/Unit $150.00 Service Station/Site Service Station w/Mart/Site $35,625.00 $35,625.00 Theater/Seat $680.00 Systems Development (Ordinance 364) NOTE; BASED UPON ORDINANCE NUMBER 364 PASSED ON JUNE 29, 1978 Systems Development 1 % of estimated building permit valuation of a building or $1.00 whichever is higher New Building Construction Ordinance 211 NOTE; BASED UPON ORDINANCE NUMBER 211 PASSED ON NOVEMBER 13, 1972 Schedule A -Fees for plans submitted to the Architectural (1) Residential Single family dwellings $50.00 Per Unit Duplexes $50.00 Per Unit Multi -family dwellings (three or more units) $50.00 Per Unit or eac ote or mote room wit out a kitchen excluding bathrooms $25.00 Per Unit Mobile home park pads * $25.00 Per Pad Permanent buildings and landscape only nee conform to qualify. (2) Commercial For each commercial building unit in a building, per square foot of gross floor area, including any area within a building designed for the parking of vehicles $0.03 Per Sq Ft (3) Industrial Pursuant to Resolution 08-05-1401 6/11/2008 Dewl (Unless Otherwise Noted) Page 72 of 74 Effective July 13, 2008 Developer Impact Fees Summary Exhibit K Descriptions Fee Term For each commercial building unit in a building, per square foot of gross Floor area, including any area within a building designed for the parking Of vehicles $0.03 Per Sq Ft Schedule B - Fees for plans not submitted to the Architectural Review Board for approval (1) Residential Single family dwellings $75.00 Per Unit plus VO per bedroom over one Duplexes $75.00 Per Unit plus $SO per bedroom over one Multi -family dwellings (three or more units) $75.00 Per Unit plus $SO per bedroom over one __For­e_acF_K_0teI or motel room wit out a itc en excluding bathrooms $35.00 Per Unit Mobile home park pads $35.00 Per Pad (2) Commercial For each commercial building unit in a building, per square foot of gross Floor area, including any area within a building designed for the parking of vehicles $0.05 Per Sq Ft (3) Industrial For each commercial building unit in a building, per square foot of gross floor area, including any area within a building designed for the parking of vehicles $0.05 Per Sq Ft Housing In -Lieu Development Housing In -Lieu Development One percent of valuation as determined under the City of San juan Capistrano Muncipal Code Section 8-1.05 NOTE: BASED UPON ORDINANCE NUMBER 767 PASSED ON JULY 5, 1995 Drainage Area LOS $1,170.00 $860.00 Per Acre Per Acre L02 L03 $320.00 Per Acre L05 $170.00 $780.00 Per Acre Per Acre M01 LOIS02 $1,470.00 Per Acre Advance Energy for Street Lights Lamp Size 7,000 Lumens Single $96.32 Per Light Double $135.50 Per Light Lamp Size 20,000 Lumens Single $135.07 Per Light Double $200.68 Per Light Domestic Water Development Charges Plan Check & Inspection Fees 7.1% of improvement value Per Application Preliminary Processing fee, Tract & Parcel Map $303.39 Per Application Water Capacity Pursuant to Resolution 08-05-14-01 6/11/2008 Devel (Unless Otherwise Noted) Page 73 of 74 Effective July 13, 2008 Developer Impact Fees Summary Exhibit K Pursuant to Resolution 08-05-14-01 6/11/2008 Devel (Unless Otherwise Noted) Page 74 of 74 Effective July 13, 2008 Fee Term Descriptions Water Capacity per meter or DU, whichever is $3,867.16 Per Meter or DU greater Water Capacity for Commercial area per SF of Per SF building area: the greater of the $/SF price or the $0.63 commercial for the meter given above. area. _$/DU Ca ital Im rovement Per dwelling unit or per meter whichever is greater $2,976.74 Per Application Per mobile home space $1,489.93 Per Application Water Capital Improvement for Commercial per SF Per SF of building area: the greater of the $/SF price or $0.48 commercial the$/DU for the meter given above. area. Water Capital Improvement for Agricultural per SF of planted area: the greater of the $/SF price or $0.07 $/SF planted the$/DU for the meter given above. agricultural area Stora a Char e Per dwelling unit or per meter whichever is greater $3,560 Per Application Per mobile homes ace $1,761 Per Application Water storage for Commercial and Industrial per Per SF square foot of building area; the greater of the $/SF $1.00 commercial price or the $/DU for the meter given above. area. NOTE: BASED UPON CSJC RESOLUTION NO. 04-05-18-04, Adopted May 18, 2004 Non -Domestic Water (Recycled Water) Plan Check & Inspection Fees 7.1% of improvement value Per Application Recycled Water Capacity Charge: the greater of the $/ cfs $/cfs maximum maximum day demand charge given or the $/AF charge $834,015 day demand. below. Recycled Water Capacity Charge: the greater of the $/AF $13,479 $/AF of annual demand charge given or the $/cfs charge above. demand. Preliminary Processing fee, Tract & Parcel Map $303.39 Per Application NOTE: BASED UPON CVWD RESOLUTION NO. 00-9-5-1, Adopted September 5, 2000 Pursuant to Resolution 08-05-14-01 6/11/2008 Devel (Unless Otherwise Noted) Page 74 of 74 Effective July 13, 2008