Resolution Number 84-2-21-4296
RESOLUTION NO. 84-2-21-4
COMPLETION OF THE SAN JUAN CAPISTRANO
PUBLIC LIBRARY EXCLUDING WATER FEATURE
(NEWPORT HARBOR CONSTRUCTION)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SAN JUAN CAPISTRANO, CALIFORNIA, DECLARING
WORK TO BE COMPLETED AS TO PLANS AND
SPECIFICATIONS FOR THE CONSTRUCTION OF THE
SAN JUAN CAPISTRANO PUBLIC LIBRARY, EXCLUDING
THE WATER FEATURE (NEWPORT HARBOR CONSTRUCTION)
WHEREAS, on the 6th day of July, 1982, the City of San
Juan Capistrano entered into a contract with Cecil Mays d.b.a.
Newport Harbor Construction, for the construction of the San Juan
Capistrano Public Library; and,
WHEREAS, the City Manager has evaluated the final
quantities and cost figures and recommends approval.
NOW, THEREFORE, the City Council of the City of San
Juan Capistrano does resolve as follows:
SECTION 1. That the work required to be performed by
said contractor has been completed, except for the water feature
which is more specifically defined in Exhibit "A," attached
hereto.
SECTION 2. That the total cost of said work, except
for the water feature, is in the amount of $1,674,152.39.
SECTION 3. That the work is hereby accepted and
approved, with the exception of the water feature.
SECTION 4.
forward a "Notice of
County of Orange for
The City Clerk is
Completion" to the
recording.
directed to forthwith
County Recorder of the
PASSED, APPROVED AND ADOPTED this 21st day of
February , 1984 , by the following vote, to wit:
AYES: Councilmen Friess, Hausdorfer, Buchheim,
Schwartze, and Mayor Bland
NOES: None
ABSENT: None
ATTEST:
i 1la001-
-1-
297
STATE OF CALIFORNIA
COUNTY OF ORANGE
CITY OF SAN JUAN CAPISTRANO
ss.
I, MARY ANN HANOVER, City Clerk of the City of San Juan
Capistrano, California, DO HEREBY CERTIFY that the foregoing is a
true and correct copy of Resolution No. 84-2-21-4, adopted by
the City Council of the City of San Juan Capistrano, California,
at a regular meeting thereof held on the 21st day of
February , 1984 .
(SEAL) 2 22 >_iyl��`�
MARY N ANOVER, CITY CLERK
STATE OF CALIFORNIA
COUNTY OF ORANGE ) ss. AFFIDAVIT OF POSTING
CITY OF SAN JUAN CAPISTRANO )
MARY ANN HANOVER, being first duly sworn, deposes
and says:
That she is the duly appointed and qualified City Clerk
of the City of San Juan Capistrano;
That in compliance with State laws of the State
California and in further compliance with City Resolution
No. 83-12-20-3 and on the 24th day of February ,
she caused to be posted:
RESOLUTION NO. 84-2-21-4
being: COMPLETION OF THE SAN JUAN CAPISTRANO
PUBLIC LIBRARY, EXCLUDING WATER FEATURE
(NEWPORT HARBOR CONSTRUCTION)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SAN JUAN CAPISTRANO, CALIFORNIA, DECLARING
WORK TO BE COMPLETED AS TO PLANS AND
SPECIFICATIONS FOR THE CONSTRUCTION OF THE
SAN JUAN CAPISTRANO PUBLIC LIBRARY, EXCLUDING
THE WATER FEATURE (NEWPORT HARBOR CONSTRUCTION)
of
1984 ,
in three (3) public places in the City of San Juan Capistrano,
to wit: City Hall; Old Fire Station Recreation Complex; Orange
Countyy Public Library.
ORD. NO_..._..._ RfS. NO..........
----- k/. Mayor has signed c� ") `-W
..._...._-- Clerk has signed
City Seal stamped
__.. ---All blanks typed in
..Absent' --=- t9------- .... ...........
_....__..._.
"Noes ..._...: -.-r7> ............------------- '--'---.......
� . Typed in Official Record Book
.............. Posted to Classified Cards �.
............. Copies sent
_---------__.-..---"' ....................
Legal Publication ordered to be published
......_...-- (date) ...-......................... .... -.................. _... _.
No. Affidavits .................................
No. Printed copies required .. �.....
Remarksrk-
-2-
MARY ANN OVER, CITY CLERK
San Juan Xapistrano, California
A 298
Woodward Dike, Inc.
Landscape Architecture/ Site Planning
479 Ocean Avenue, Suite D
Laguna Beach. California 92651
714 752-1122 714 494-7095
v:.00dward Dike
Cana Dike
February 3, 1984 'r"Maswev
Mr. Snaier Z. Varkel
Newport Harbor Construction Company
3439-B Via Lido
Newport Beach, CA 92663
RE: Water Feature at Orange County Public Library, San Juan Capistrano
Dear Snaier:
On January 24, 1984 we conducted a water featureiinspection. The following
are our observations:
Pump Pit Room
1. Install chain lank enclosure on pump pit room as per detail on plans.
Reflection Pool
1. Re -tile skimmer opening as per skimmer detail.
2. Lower fountain lights to a position flush with the pool floor surface.
3. Replace pea gravel at fountain light niches.
4. Re -tile and grout all defective tile surface areas.
Half Bowl and Flume Area
1. Adjust top half bowl to a level position.
2. Re-form half bowl scallops to allow water flow to be directly over the
flume. Eliminate water flow on back wall and surrounding area.
3. Remove wall plaster on half bowl wall and waterproof this area. Leak-
age is occuring along the flume wall connection. (Re -plaster as required.)
4. Re -tile inlet pipe area.
5. Re -tile top of flume to provide a surface that drains to the pool.
6. Re -tile and grout all defective tile surface areas.
Fountain Element Area
1. Fountain components should be grouted to eliminate water spouts be-
tween bowls and pedestals (prior to any action, verify this item with
the City of San Juan Capistrano).
299
Mr. Snaier Varkel
February 3, 1984
Page 2
2. Fountain components must be level to operate properly.
3. Re -tile top of fountain wall to provide a surface that drains to the
pool.
4. Re -tile and grout all defective tile surface areas.
5. Repair leakage in ornate curb.
6. Re -paint ornate curb, as required.
7. Replace (1) fountain light.
8. Re -surface concrete podium at fountain element.
Upon completion and correction of the aforementioned items and the items
found in the letter prepared by Chuck Schardt, the fountain element shall
be reviewed. At this review Ernest Reason will need to be present to demon-
strate this installation. At this time final flow adjustments may be neces-
sary to achieve the desired effect.
Sincerely,
WOODWWAA�RRDD,.DIKE, INC.
Thome W r
Vice President
TW:mn
Enclosure
cc: Mr. Chuck Schardt