Resolution Number 90-4-17-4 75
RESOLUTION NO. 90-4-17-4
ENVIRONMENTAL IMPACT REPORT 90-1 (BARKLEY)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN
JUAN CAPISTRANO, CALIFORNIA, CERTIFYING
ENVIRONMENTAL IMPACT REPORT 90-1 AS COMPLETE
WHEREAS, the applicant L.P. Barkley and Associates, 66 Fairlake, Irvine,
California, has submitted Rezone 89-2, an application to rezone approximately 26 acres
of land identified as Lot 38 of Tract l 1753; and,
WHEREAS, the applicant has also submitted a combined residential concept
plan and Vesting Tentative Tract Map 13846, proposing to subdivide the preceding-
identified property into hillside estate lots; and,
WHEREAS, the City Council has determined that the project will have a
significant effect on the environment, has accordingly required preparation of an
environmental impact report, designated herein as EIR 90-1, by a City-retained
environmental consultant, and has otherwise carried out all requirements of the
California Environmental Quality Act (CEQA); and,
WHEREAS, in accordance with Section 15083 of the CEQA Guidelines,
numerous opportunities were provided for public participation in the environmental
review process, both before and during preparation of the environmental impact report
(EIR). These included the following:
1. The optional step under CEQA of holding a pre-preparation scoping
meeting, attended by two of the Hunt Club residents.
2. The forwarding of the rough draft or "screencheck" EIR to both of the
foregoing residents as well as other interested residents of the Hunt Club
for comment prior to printing the draft EIR (no comments were received
at that time).
3. The transmittal of several letters notifying nearby residents of the
progress of the environmental review process and, upon completion, the
availability of the draft EIR for resident review.
4. Direct meetings and phone contacts between staff and concerned
residents.
5. The inclusion of residents beyond the required 300-foot boundary radius
for mailing of both Planning Commission and City Council public hearing
notices regarding the EIR and the project; and,
WHEREAS, the final EIR, consisting of the draft environmental impact report,
comments from the public on the draft report, and responses to those comments prepared
in accordance with Section 15088 of the CEQA Guidelines, has been reviewed by the City
Council; and,
WHEREAS, the City, through its environmental consultant, has prepared a
monitoring program to ensure that mitigation measures identified in the EIR are
implemented; and,
-I-
w
WHEREAS, the City's Planning Commission has forwarded the EIR to the City
Council recommending certification as complete; and,
WHEREAS, a public hearing has been duly advertised in the Capistrano Valley
News and held to receive and review public testimony on the EIR and the project; and,
WHEREAS, the City Council finds that changes or alterations have been
required in or incorporated into the project, in the form of the project design features
and required mitigation measures described hereinbelow, which avoid or substantially
lessen each of the significant environmental effects identified in the final EIR. The
identified impacts and the evidence and rationale supporting the finding that each such
impact will be avoided or substantially lessened are as follows:
A. Landform Alteration
1. Potential Impacts
The project would result in the movement of 92,170 cubic yards of
earth, of which 85,170 would be imported from offsite. This would
result in significant landform alteration to create building pads,
roads, and infrastructure.
2. Evidence and Rationale Supporting Finding that Environmental
Impacts will be Avoided or Substantially Lessened
The mitigation measures set forth in Exhibit R-1, attached hereto,
under the heading "Landform Alteration" will substantially lessen
the significant environmental effects of the earth movement in the
following ways:
a. The requirement for the overall project grading to conform to
the recommendations from the Preliminary Geotechnical
iReport, and for future individual lot grading to conform to an
additional detailed geotechnical report prepared for each lot
will insure that all grading provides for safe and stable
development within the project.
b. The requirements for City approval of haul routes for import
of fill material will minimize the impacts of the import
operations on nearby residents.
C. Additional mitigation measures listed under "Visual Quality",
"Noise", and "Archaeology" will lessen the visual,
construction, and other impacts of the proposed grading.
B. Visual Quality
1. Potential Impacts
Moderate to high visual impacts will occur when the project is
viewed from the Marbella Country Club development or from high
viewpoints overlooking the site such as the Aja residence. Lower
visual impacts will occur when the project is viewed from upper
Steeplechase Drive.
-2-
177
2. Evidence and Rationale Supporting Finding that Environmental
Impacts will be Avoided or Substantially Lessened
The 29 mitigation measures required as conditions of project
approval, set forth in Exhibit R-1 under the heading "Visual
Quality," will substantially lessen the significant visual impacts in
the following ways:
a. The requirements that the scale of the new homes to be built
is compatible with the existing hillside landforms and that
vertical building elements be limited and horizontal elements
emphasized will result in the new construction being blended
into the natural landscape as viewed, both from below
(Marbella Country Club) and above (Aja residence,
Steeplechase Drive).
b. The requirements that building colors and other architectural
design standards adhere to those of the Marbella Country
Club development will ensure that the new project will be
harmonious in appearance to the nearby Marbella homes
instead of the new project standing out as a separate
contrasting development.
C. The requirements that the new homes be sited to the rear of
the graded pads and that they be placed in front of
manufactured slopes wherever possible will serve to screen
the graded slopes from the valley below.
d. The limitations on hillside drainage structures, the blending
of manufactured slopes into ungraded slopes at their
interfaces, the rounding of manufactured slopes at their tops
and toes, the alignment of roads parallel to the contours of
the slopes, and the limitations on retaining walls will all serve
to minimize and soften the visual effects of the project
grading, viewed from both above and below.
e. The limitations on project lighting will serve to minimize the
visual impacts of the development at night and will help to
maintain the semi-rural estate character of the area.
f. The requirements for the retention of natural slope
vegetation, the preservation of the existing eucalyptus trees,
the use of informal groupings of tree clusters and shrub
drifts, and the use of perimeter landscaping at the top of the
ravine will help restore the natural character of the site after
grading is completed.
C. Air Quality
1. Potential Impacts
The EIR analysis concluded that no significant microscale air
quality impacts would occur from the project because of the low
number of new dwelling units.
-3-
2. Evidence and Rationale rti
Suppong Finding that Environmental
impacts will be Avoided or Substantially Lessened
a. The low density and small scale of the project, 15 homes on
26.5 acres, will limit the air quality impacts of the project.
Thus, significant impacts will be avoided by the project
characteristics in this category.
b. Although no significant adverse air quality impacts are
projected, standard City requirements for watering during
grading and limitations on hours of grading operations will
limit the residual air quality impacts by reducing the amount
of airborne dust created by grading operations.
C. In addition to the above, the mitigation monitoring program
for the project, attached hereto as Exhibit R-1, contains
reference to transportation-related air quality impacts
resulting from development throughout the region. These
include: improved public transit; areawide carpool program;
on-street parking controls; park and ride lots; incentives for
carpools, transit, bicycles and walking; bicycle lanes and
storage; staggered work hours; and traffic flow
improvements.
These measures are presently being implemented on a
regional basis.
D. Hydrology
1. Potential Impacts
The ravine will be eliminated as a surface drainage feature. In
addition, construction of homes and roads will slightly increase the
amount of impermeable surface in the area, thus incrementally
increasing water runoff by an estimated 6.4 percent over the
undeveloped condition.
2. Evidence and Rationale Supporting Finding that Environmental
Impacts will be Avoided or Substantially Lessened
The construction of a major 30-inch diameter storm drain in Street
"A", plus the surface of Street "A" itself will carry storm and
nuisance water runoff from both the present project and from the
existing Hunt Club development at the top of the ravine. The
storm drain will be sufficient to accommodate runoff from a 25- _
year storm through the ravine per City standards. The estimated
flood flow from a 25-year storm is 80 cubic feet per second (cfs).
The excess flow from a 100-year storm, an added 18 cfs, will be
carried without overflow on the street itself.
E. Biological Resources
1. Potential impacts
Development of the property will result in the loss of existing
vegetation and habitat/foraging area and a corresponding loss or
-4-
179
displacement of wildlife presently inhabiting the property. None of
the affected species have been identified as rare, threatened, or
endangered.
2. Evidence and Rationale Supporting Finding that Environmental
Facts will be Avoided or Substantially Lessened
a. The requirement that the existing stand of eucalyptus trees
at the mouth of the ravine be retained will mitigate the
impacts of ravine development and will preserve nesting and
roosting places for the bird species that presently inhabit the
site.
b. The requirement for approval of a landscape plan for the
development of each lot using native plant species to the
maximum extent possible will help to replace native
vegetation lost to grading.
C. The project design, preserving 65 percent of the property in
ungraded open space, will maximize the preservation of
existing vegetation on the hillside parallel to Golf Club Road.
d. The conveyance of an open space easement to the City will
ensure that the ungraded open space will be preserved as
such.
F. Noise, Light and Glare
1. Potential Impacts
The analyses in the EIR concluded that no significant noise or
light/glare impacts would result from the project.
�. Evidence and Rationale Supporting Finding that Environmental
Impacts will be Avoided or Substantially Lessened
a. The low density and small scale of the project, 15 homes on
26.5 acres, will limit the noise and the light and glare
generation. Thus, significant impacts will be avoided by the
project characteristics in these categories.
b. Residual noise impacts will be mitigated by City limitations
on construction hours of operation and City regulations
limiting noise generation onto nearby properties.
C. Residual light and glare impacts will be mitigated by the
requirement for the approval of a lighting plan for each lot
prior to issuance of a building permit. The lighting plan will
require the use of low intensity outdoor lighting and will
require the shielding of light sources from other properties.
G. Land Use and Relevant Planning
1. Potential Impacts
The EIR concluded that no significant land use planning impacts
-5-
180
would result from the project.
2. Evidence and Rationale Supporting Finding that Environmental
Impacts will be Avoided or Substantially Lessened
The project as proposed at .6 dwelling units/acre complies with the
General Plan's maximum one unit/acre designation for the property ^1
and with other relevant General Plan elements. Therefore,
significant impacts in this category have been avoided by the
design characteristics of the project.
H. Population
1. Potential Impacts
The EIR concluded that no significant population impacts would
result from the project.
2. Evidence and Rationale Supporting Finding that Environmental
Impacts will be Avoided or Substantially Lessened
The projected population increase from the project at full buildout
of 53 persons would represent approximately .9 percent of the
City's projected growth to the year 2000. This growth is provided
for in the City's General Plan and within its growth management
system. Therefore, significant impacts in this category have been
` avoided by the characteristics of -the project, i.e. the low number
of dwelling units and accompanying small population increase.
I. Transportation/Circulation
` 1. Potential impacts
The EIR analysis concluded that no significant transportation or
circulation impacts would result from the project.
2. Evidence and Rationale Supporting Finding that Environmental
Impacts will be Avoided or Substantially Lessened
The EIR traffic generation analysis found that the project will
result in a trip increase of approximately 225 vehicles per day at
buildout. This increase would result in no changes to the level of
service (LOS) on any roadway serving the project. Therefore,
significant impacts in this category have been avoided by the
characteristics of the project, i.e. the low number of dwelling units
and accompanying low traffic generation.
J. Archaeology
i
1. Potential Impacts
No cultural material, prehistoric or historic, was found as a result
of a physical survey of the property. However, four prehistoric
sites have earlier been identified in the vicinity of the project.
Also, the mouth of the ravine is a flat area containing substantial
native vegetation and was judged to have moderate potential as an
-6-
181
archaeological site. The dense vegetation made visual inspection
of the ground in this area impossible. If resources are present at
this location, development could have a significant impact.
2. Evidence and Rationale Supporting Finding that Environmental
Impacts will be Avoided or Substantially Lessened
The following mitigation measure would be imposed as a condition
of approval of the project:
Prior to the issuance of any grading permit, thi
subdivider/developer shall provide evidence to the Director of
Community Planning and Development that a certified
archaeologist has been retained to observe all ground clearing
and grading activities associated with the project. The
archaeologist shall have the authority to halt or redirect work
should any archaeological resources be discovered. If
additional or unexpected archaeological features are
discovered, the archaeologist shall report such findings to the
project developer and the Director of Community Planning
and Development. If the archaeological resources are found
to be significant, the archaeological observer shall determine
appropriate actions, in cooperation with the
subdivider/developer and the City, for exploration and/or
salvage. Excavated finds shall be offered to the City, or its
designee, on a first refusal basis. The subdivider/developer
may retain said finds if written assurance is provided that
they will be properly preserved in Orange County, unless such
finds are of special significance, or a museum in Orange
County indicates the desire to study and/or display them, in
which case items shall be donated to the City or its
designee. These actions, as well as final mitigation and
disposition of the resources shall be subject to the approval of
the Director of Community Planning and Development.
The preceding mitigation measure will provide for: 1) the
identification of any archaeological resources uncovered during
development; and 2) the preservation of any significant resources
uncovered. Thus, potential significant impacts in this category
have been substantially lessened by these mitigation safeguards.
K. Fire Protection
1. Potential Impacts
The EIR found that the property is located within an area
considered to be high fire hazard and that, therefore, development
could expose future residents and property to the potential of
wildland fire. Correspondence from the Orange County Fire
Department indicated that the risk could be effectively mitigated.
2. Evidence and Rationale Supporting Finding that Environmental
Impacts will be Avoided or Substantially Lessened
The following fire protection mitigation measures would be
imposed on any project approval to substantially lessen the
-7-
�. 82
significant environmental impacts of fire danger:
j a. Prior to the recordation of a final tract map, water
4 improvement plans for adequate fire protection and financial
security shall be posted for the installation per the Municipal
j Code. The adequacy and reliability of water system design,
location of valves, and the distribution of fire hydrants shall
be evaluated in accordance with Insurance Services Office
suggested standards contained in the "Grading Schedule" for
Municipal Fire Protection.
b. Prior to the issuance of any building permits for combustible
construction, evidence that a water supply for fire protection
is available shall be submitted by each lot owner/developer
and approved per the Municipal Code. Fire hydrants shall be
in place and operational to meet required fire-flow prior to
the commencement of any construction with combustible
materials.
C. Prior to the issuance of a grading permit for the project, a
fuel modification plan and program shall be prepared by the
subdivider/developer and approved by the County Fire
Department. The plan shall show special treatment necessary
to achieve an acceptable level of risk in regard to the
exposure of structures to flammable vegetation and shall
address the method of removal and installation; mechanical
or hand labor to be used; and provisions for its continued
maintenance. The approved fuel modification plan shall be
completed to the satisfaction of the Fire Department prior to
the issuance of the applicable use and occupancy permit for
each lot.
d. Prior to the issuance of any certificate of use and occupancy
within the subdivision, Street "A", as identified on the
tentative tract map, shall be red-curbed and posted "No
Parking -- Fire Lane" per Section 10.207 of the 1985 Uniform
Fire Code in a manner meeting the approval of the County
Fire Department; and,
WHEREAS, the City Council finds that the foregoing explanations of specific
project characteristics and mitigation measures constitute the "substantial evidence in
the record" required by Section 15091 of the CEQA Guidelines to support the finding that
the significant environmental effects of the project will be avoided or substantially
lessened; and,
WHEREAS, the City Council hereby finds that the six alternatives to the
project addressed in the environmental impact report are not feasible because of the
following economic, social, and other considerations:
A. No Project
1. Description
The "No Project" alternative assumes that the existing regulations
applicable to the property would remain in place. The EL(25)
(Large Estate, minimum 25-acre lot size) zoning currently on the
-8-
�� rte....-..
183
property would allow a maximum of one dwelling unit on the site.
2. Findings
With only one dwelling unit on the property, all of the potential
impacts analyzed in the EIR would be significantly reduced,
depending on the size of that one residence and its location within
the property. However, because the potential impacts of the
Project itself have been avoided or reduced to a level of
insignificance, the reduction in impacts from this alternative is
incremental. Also, because the ownership of the property would
continue to be held by one owner, this alternative would likely not
result in the permanent preservation of open space as provided by
the Project via dedications to the City.
B. No Development
1. Description
The "No Development" alternative assumes that the site would
remain vacant.
2. Findings
The preservation of the entire site in open space is not
economically feasible because it would deny the owner any
economic use of the property and would therefore require its
purchase by the City. No City funds are available for such a
purchase. (The owner has not indicated a willingness to preserve
the property as open space by either retaining it without
development or by donating it to the City). In addition, the ravine
bottom will require drainage improvements in order to control both
erosion within the ravine and siltation downstream where the
ravine runoff is transferred into the Marbelia Country Club
drainage system. These improvements are not feasible without at
least some level of development of the property to support the
improvement costs.
C. Alternate Site Design
1. Description
This alternative assumes 15 dwelling units in a modified
configuration. It proposes that the units be clustered in
approximately one-acre parcels in the northern portion of the site,
roughly in the areas of Lots 1-6 as shown on the present plan.
2. Findings
This alternative is not acceptable to the City because it would
require that all units be built on the steepest portions of the site.
It would thus increase the overall grading impacts of the project.
In addition, although this alternative would result in less visual and
noise impacts to the Hunt Club residents, it would result in
correspondingly greater such impacts to the Marbella residents.
-9-
D. Increased Density
1. Description
4 This alternative would allow the maximum number of units
presently permitted under the General Plan, i.e. 26 units on the
26.5-acre property, or about one unit per acre overall. r.
2. Findings
This alternative is not acceptable to the City because the
environmental impacts of the increased density would be
significantly increased in almost every impact category.
E. Reduced Density
1. Description
A reduced-density project, providing for seven units on Lots 1-7 of
the present plan, would remove all development from the ravine
area.
2. Findings
By nature of its reduction in size, this alternative would result in
an incremental decrease in the potential environmental impacts of
the Project. This alternative would still require the
implementation of mitigation measures, however, to lessen
potential impacts of development. Its lesser size alone and the
corresponding reduction of impacts form the basis for its
identification in the EIR as the environmentally superior
alternative. Because the Project will also reduce all of its
potential impacts to a level of insignificance, there is relatively
little overall difference between the environmental impact of the
two projects once built. Also, the Project, at .57 units per acre, is
already substantially below the General Plan density maximum of
one unit per acre. In view of the above, the City believes that the
Project is comparable to this alternative in terms of the General
i Plan land use designation on the property and the policies set forth
in the General Plan text.
F. Alternative Project Location
1. Description
An alternate project location, on a vacant property of similar
topography, could be the area at the eastern terminus of Camino
Las Ramblas.
2. Findings
With respect to environmental impacts, this alternative would
require significant grading to render the site buildable. This could
result in significant visual impacts on nearby residents. Also, the
soil conditions of this alternate site would require more corrective
work to ensure stable development. The air, noise, biological
-10-
I
185
resources, light and glare, population, and transportation impacts
of this alternative would be similar to those of the Project as
proposed. Impacts relating to hydrology may be somewhat greater
than the Project as proposed.
This alternative would result in an increase in impacts relative to
landform alteration and fire protection compared to the Project.
This alternative would also require a zone change from Open Space
and Growth Management to Residential. Although the majority of
impacts from this alternative should be mitigable to levels of
insignificance, selection of this alternative would only be
transferring a development with no significant impacts (i.e. the
Project) from one area of the City to another. Avoidance of or
reduction in impacts, not transference on increase, is the goal of
CEQA. Therefore, because this alternative would not result in an
overall reduction in impacts, but may create additional impacts
over and beyond those of the Project, it is not considered as
desirable as the Project.
NOW, THEREFORE, BE IT RESOLVED, that, in accordance with Section 15090
of the CEQA Guidelines, the City Council of the City of San Juan Capistrano does hereby
certify that:
1. FIR 90-1 was prepared in compliance with the California Environmental
Quality Act and is final and complete.
2. The information contained in the final FIR was reviewed and considered
by the Council prior to action on the project.
BE IT FURTHER RESOLVED, that the Mitigation Monitoring Program
prepared to ensure that the mitigation measures identified in the EIR are implemented is
hereby adopted and incorporated herein by reference. Said Mitigation Monitoring
Program is attached hereto as Exhibit R-1.
PASSED, APPROVED, AND ADOPTED this 17th day
Of -April , 1990.
Z'
GA LA
. USDORFER, MAY R
ATTEST:
I CL R
-11-
X96
' STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF SAN JUAN CAPISTRANO )
1, GEORGE SCARBOROUGH, Acting City Clerk of the City of San Juan
Capistrano, California, DO HEREBY CERTIFY that the foregoing is a true and correct
copy of Resolution No. 90-4-17-4 adopted by the City Council of the City of San
Juan Capistrano, California, ata regular meeting thereof held on the 17th day
of April , 1990, by the following vote:
AYES: Councilmen Schwartze, Friess, Buchheim, Bland
and Mayor Hausdorfer
NOES: None
ABSENT: None
(SEAL)
GESCARnOROUGH, ACTNqlCITY CLERK
II
I
i
i
i
-12_
i
18 '7
EXHIBIT R-1
MITIGATION MONITORING PROGRAM
i
�GaTiox �arn+aQ�c raoc�asu � I.
TENTATIVE WALT TT 13846 $ RZ 89-2
Compliance Compliance
tiri+i�tior Ifsas�ue M Paae Point Gate
i
I
A. landform Alteration/Visual Quality
landform Alteration
1. All recommendations contained in the 29 GP
Revised Preliminary Geotechnical Report dated
October 20, 1989 shall be incorporated into
the grading and design of structures and
grading for the project, all in a manner
meeting the approval of the City Engineer. j
2. Prior to the issuance of a grading permit 29 GP
for development of any lot on the tract map, j
the applicant shall submit a detailed geotech-
nical report for the review and approval of
the City zngineer. This report will primarily
involve an assessment of potential soil-related ,
constraints and hazards such as slope
instability, settlement, liquefaction, or
related secondary seismic impacts where
determined to be appropriate by the City
Engineer. The report shall also include
evaluation of potentially expansive soils and
recommended construction procedures and/or
design criteria to minimize the effect of
these soils on the proposed development.
1
oospliance Lianoe
pig Point _
3. Prior to the issuance of a grading permit, 29 GP
the applicant shall identify the location of
any borrow sites from which extra fill will be
imported and the route of haul to the project
site and provide such information for the
review and approval of the City.
Visual Quality
1. All residences and associated walls, fences, 30 BP
decks, or other structural elements shall
adhere to the design philosophy and architectural
standards outlined in the Marbella Golf and
Country Club's •Barbella Property Association
Architectural Review Committee's Regulations
and Guidelines for Design and Construction
Standards.•
2. The scale of buildings shall be kept 30 BP
compatible with existing landforms.
3. Horizontal architectural elements shall be 30 BP
emphasized for residential structures.
Primarily vertical architectural features such
as large, unbroken wall faces or towers shall
be avoided.
4. On lots 1-7, 9 14, and 15, visually unbroken 30 BP
two story structures shall be avoided. A
horizontal architectural element, whether
structural or finish, shall visually separate
the first and second stories. Alternately,
the second story shall be stepped back.
2 M
Compliance Oomplianos
BlR Pane Point Data
5. Roof pitch shall be a maximum of 3.5=12. 30 HP
6. Retaining walls visually integrated with 30 HP
building design shall be limited to six feet
in height. Retaining walls not associated
with structures and facing either the Marbella
Golf and Country Club or the residences within
The Hunt Club or on the Aja property shall be j
limited to four feet in height.
7. The configuration of all exterior light 30 HP
sources shall be directed away from the Marbella
Golf and Country Club or residences within The
Hunt Club or on the Aja property. Exterior
lighting shall be very low level and low wattage.
Floodlighting of structures, trees, or plantings
for purely display purposes shall be avoided.
i
S. The color, material and size of any signage 30 HP
shall be appropriate in relation to adjacent
development.
i
9. Colors to be used on exterior buildings, 30 BP
fences, and walls shall be as outlined within
the Marbella Golf and Country club design
regulations and guidelines, with the following
exception. Structures located on lots 7-14
shall be limited to Peach, villa (peach/brown) ,
and Hacienda (light/brown) .
10. Structure siting for lots 7-14 shall be 30 GP
toward the extreme rear of the graded lots,
with structures sited directly against or into
the hillside slopes.
Camplianoe apliance
RS Paas Point Date
11. The aim of precise road and driveway 30 GP
alignments shall be to minimize cut and fill
on hillside slopes.
12. Slope grading techniques in visually 31 GP
sensitive areas shall be designed to visually
blend manufactured and existing slopes.
Grading design should emphasize slope
contouring techniques, including contour
indulation and variable slopes.
13. Newly graded slopes shall be designed to 31 GP
smoothly blend with existing topography. Tops
and toes of slopes shall be rounded. hard
edges and angles shall be avoided.
14. Residential pads shall be designed to 31 GP
absolutely minimize cuts on hillsides behind
the residences.
is. Grading shall be designed to preserve the 31 GP
visually apparent aspects of existing swales
and natural drainage patterns on hillsides
visible from the Marbella Golf and Country Club.
16. The use of brow ditches, cross slope 31 GP
drains, and down drains on cut slopes shall be
limited to areas absolutely requiring such
structures for erosion control.
oompliance cumplianoe
88 Paas Point Date
17. Graded areas associated with residences, 31 GP
roads, or driveways shall be landscaped
immediately upon completion of grading and
compaction.
16. Driveways associated with lots 7-14 shall 31 GP
be limited to masonry units, concrete or
textured concrete. Masonry color is limited to
tan, beige, or light earth tones. Concrete
must be tinted to match the same range of tones.
19. Significant existing stands of trees on 31 GP
the site shall be preserved.
20. The natural vegetation of the site shall 31 GP
be preserved on all hillside areas not
directly affected by grading. Clearing of
natural vegetation on slopes behind residences
shall be limited to that required by grading
and by fire protection.
21. Introduced landscaping shall be limited 31 GP
to areas directly associated with residences,
roads, and driveways. No introduced
landscaping shall be employed on hillsides
more than 30 feet above residential pad
elevations. Existing natural vegetation shall
be protected and maintained on upper hillside
slopes.
22. The plant palette shall be appropriate to 31 LP
the Mediterranean character of the site.
Domplianoe apliamoe
JWLRMW
Paint Date
23. Graded slopes more than 30 feet above 31 GP
residential pad elevations shall be revegetated
immediately following compaction using native
plant species.
24. Landscaping along roads and driveways 31 Ip
shall emphasize informal and varied massing,
rather than linear or regular placement. Trees
with mature heights of over 30-35 feet shall
be avoided.
25. Driveways associated with lots 7-14 shall 32 LP
have perimeter landscaping treatments with
informal drifts of shrubs at least 3-4 feet
in height.
26. The eastern portion of the property boundary 32 LP
adjacent to the sections of lots 10 and 11
proposed for development shall have a 20 foot
landscaped buffer with low canopy trees and
shrubs arranged in an informal and varied
pattern. The aim shall be to soften the edge
of the development blocking inappropriate
views while allowing windows for some longer
views farther down the ravine.
27. Nanufactured slopes shall be placed behind 32 GP
homes (i.e. , on uphill side) wherever possible.
28. The City of San Juan Capistrano's 32 Sp
Guidelines for Hillside Custom Homes shall be
adhered to.
� pp��
Ccmplianos ftmpliance W
xxMizowPoint Irate
29. Where retaining walls are needed, crib 32 GP
walls or stepped terrace walls with plantings ,a,,,.
shall be used.
B. Air Quality
Because almost all of the project-related air 37 GP
quality impact derive from vehicular sources
beyond the control of the project sponsors or
local regulatory agencies, there is little
potential for substantial impact mitigation.
Certain mandatory measures such as dust control
during construction to prevent dust nuisance
and compliance with energy conservation
standards in Title 24 of the California j
Administrative Code will be implemented, but
they do not address the basic transportation
related air quality impacts.
The AQNP does, however, contain a number of 37 N/A
transportation control measures (TCK's) which
should therefore, be considered for inclusion
where possible in project planning. These
measures include:
o improved public transit
o Areawide carpool program
o on-street parking controls
o Park and ride lots
o Incentives for carpools, transit, bicycles
and walking
o Bicycle lanes and storage
o Staggered work hours
z
litigation measureaNPliance
Compliance
B Poirot Date
o Traffic flow improvements
in order for these measures to be effective, 37 NSA
they need to be organized at a program level
involving not only one single project, but the
entire San Juan Capistrano area. This 15 unit
development of itself is far too small to
effectively be a major part in any travel
reduction program. However, with a requirement
of the AQNP that local jurisdictions develop
air quality elements or sub-elements in the
General Plans, a more effective integration of
these candidate measures will likely be
attained at the local level.
C. Hydrology
1. Prior to the recordation of any final tract 38 NR
map or prior to the issuance of any grad
permits, whichever occurs first, the applicant
shall design and construct the following
improvements and provide necessary dedications
in a manner meeting the approval of the City
Engineer:
a. All provisions for surface drainage: and
b. All necessary storm drain facilities
extending to a satisfactory point of
disposal for the proper control and
disposal of storm runoff: and
too
c�omplianoe C1omQlianoe
mitigation NDAMLVM Zia-ewe Point Date
c. Where determined necessary by the City
Engineer, the associated easements shall
be dedicated to the City of San Juan Capistrano.
�I
D. Biological Resources
1. The stand of eucalyptus trees shall be 44 GP
retained as roosting and nesting areas for
raptors and other birds.
2. A landscape plan shall be approved by the 44 GP
Director of Community Development for each
dwelling prior to the issuance of a grading
permit. Said plan shall indicate a reliance on
the use of native species in the landscape
plant palette to the maximum extent possible.
3. An open space easement shall be offered 44 GP
for dedication to the City over all areas of
each lot outside of the immediate area of
development. The manner and form of such
easement shall be subject to the review and
approval of the Director of Community
Development.
s
Compliance Compliance
Mitigation Measure EIR Paoe Point Date
4. Prior to the issuance of any grading N/A GP
permit for the property, the applicant shall
provide evidence that he has obtained an
agreement with the State Department of Fish
and Game pursuant to Section 1601-03 of the
Fish and Game Code and/or a permit from the
U.S. Army Corps of Engineers pursuant to
Section 404 of the Clean Water Act or that
no such agreement/pexnit is required in a
manner meeting the approval of the City
Engineer.
9A
Compliance compliance
Poirot Date M
B. Noise/Light and Glare
Noise
1. Prior to the issuance Of any grading permits, 48 GP
the applicant/builder shall provide evidence
acceptable to the City Engineer that:
A. All construction vehicles or equipment,
fixed or mobile, operated within 1000 feet of
a dwelling shall be equipped with properly
operating and maintained mufflers.
B. All operations shall comply with the City
of San Juan Capistrano Noise ordinance.
C. stockpiling and/or vehicle staging shall
be located as far as practicable from dwellings.
2. Construction activities shall be prohibited
between the hours of 7:00 pm and 7:00 an on
weekdays and s:o0 pm and 9:oo an on weekends
and holidays. Such limits shall be stated on
any grading or building permit issued for the
project.
14
c��i�noe oospi�tao�oe
Light and Glare
1. Prior to the issuance of a building permit 48 gp
for each structure, the applicant/builder
shall submit a lighting plan for the review and
approval of the Director of Community
Development as required by the City Municipal
Code Section 9-3.614. The purpose of this
review is to ensure that all lighting proposed
to be included on each building site complies
with Section 9-3.614.
F. Archaeology
1. Prior to the issuance of any grading permit, 64 GP
the applicant shall provide evidence to the
Director of Community Development that a
certified archaeologist has been retained to
observe all ground clearing and grading
activities associated with the project. The
archaeologist shall have the authority to halt
or redirect work should any archaeological
resources be discovered. If additional or
unexpected archaeological features are
discovered, the archaeologist shall report such
findings to the project developer and the
Director of Community Development. If the
archaeological resources are found to be
significant, the archaeological observer shall
determine appropriate actions, in cooperation
with the project developer and the City, for
exploration and/or salvage. Excavated finds
u
OOmplianoe Compliance
ffi Pane Point Date
shall be offered to the City, or its designee,
on a first refusal basis. Applicant any retain
said finds if written assurance is provided
that they will be properly preserved in Orange
County, unless such finds are of special
significance, or a museum in orange County
indicates desire to study and/or display them
at this time, in which case items shall be
donated to the City or designee. These actions,
as well as final mitigation and disposition of
the resources shall be subject to the approval
of the Director of Community Development.
G. Fire Protection
1. Prior to the recordation of a final tract 66 MR
map, water improvement plans shall be submitted
to and approved by the Fire Chief for adequate
fire protection and financial security posted
for the installation. The adequacy and
reliability of water system design, location
of valves, and the distribution of fire
hydrants will be evaluated in accordance with
Insurance Services Office suggested standards
contained in the "Grading schedule" for
Municipal Fire Protection.
22
Q� �l�iance
2. Prior to the issuance of any building 66 HP
permits for combustible construction, evidence
that a water supply for fire protection is
available shall be submitted to and approved
by the Fire Chief. Fire hydrants shall be in
place and operational to meet required fire-
flow prior to the commencing of construction
with combustible materials.
3. Prior to the issuance of any grading 66 GP
permits, a fuel modification plan and program
shall be approved by the Fire Chief. The plan
shall show the special treatment to achieve
an acceptable level of risk in regard to the
exposure of structures to flammable vegetation
and shall address: The method of removal and
installation: mechanical or hand labor, and
provisions for its continued maintenance. The
approved fuel modification plan shall be
installed prior to the issuance of building
permits, under the supervision of the Fire Chief„
and completed prior to the issuance of applicable
use and occupancy permits.
4. Prior to the issuance of any certificates 66 coo
of use and occupancy, street 'A' , as identified
on the tentative tract map, shall be red curbed
and posted `No Parking-Fire Lane" as per 1985
Uniform Fire Code Section 10.207 in a manner
meeting the approval of the County Fire Chief.
HP - Prior to issuance of a building persit
Coo - Prior to issuance of a certificate of use and occupancy
Gp - Prior to issuance of a grading persit
Ip - Prior to approval of a landscape plan
N/A - Not applicable
NR - Prior to recordation of a final subdivision map