Resolution Number 91-6-18-4223
RESOLUTION NO. 91-6-18-4
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN
JUAN CAPISTRANO, CALIFORNIA, APPROVING TENTATIVE
TRACT MAP 13726/AREA PLAN/COMPOSITE DEVELOPMENT
PLAN FOR GLENDALE FEDERAL AREA H
WHEREAS, the applicant, Glendale Federal Development Corporation, 16601
Ventura Boulevard, Encino, California, has submitted Tentative Tract Map 13726/Area
Plan/Composite Development Plan for Area H, proposing to subdivide approximately 46
acres of land into 63 hillside estate lots (Assessors Parcel Nos. 124-140-63 and 124-140-
65); and,
WHEREAS, the Environmental Review Board determined that the project may
have a significant effect on the environment, has accordingly required preparation of a
Suppleme7tal Environmental Impact Report and a Mitigation Monitoring Program, and
has otherwise carried out all requirements of the California Environmental Quality Act;
and,
WHEREAS, the project was reviewed by the Equestrian Commission on
January 14, January 28, and March 11, 1991; and by the Traffic and Transportation
Commission on February 13 and February 27, 1991; and by the Planning Commission on
April 9 and May 14, 1991; and,
WHEREAS, a public hearing has been duly advertised in the Capistrano Valley
News and held to receive and review public testimony on the project; and,
WHEREAS, the City Council of the City of San Juan Capistrano finds and
determines as follows:
1. The proposed project, as conditioned, and its design and improvements
are consistent with the goals, policies, and objectives of the General Plan
and with Comprehensive Development Plan 81-2 for the Glendale Federal
Planned Community, which permits the development of a maximum of 63
units in area H.
2. The proposed project, as conditioned, is consistent with Comprehensive
Development Plan 81-2 zoning for the Single Family District and
otherwise conforms to all applicable requirements of Title 9 (Land Use)
of the City's Municipal Code,
3. The project site is physically suitable for the type and density of the
proposed development.
4. The design and improvements of the proposed project will not cause
substantial environmental damage; nor will said design or improvements
avoidably injure wildlife or their habitat.
5. The design of the proposed project and the type of improvements will not
cause serious public health problems.
6. The design or improvements of the proposed project will not conflict
with easements acquired by the public at large for access through or use
of property within the proposed project.
7. The design or improvements of the proposed project will not interfere
with the maintenance or preservation of an historical site.
8. The proposed Composite Development Plan and Area Plan, which are
being submitted simultaneously with the Tentative Tract Map, are
consistent with the requirements of Comprehensive Development Plan
81-2.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of
San Juan Capistrano hereby approves Tentative Tract Map/Area Plan/Composite
Development Plan for Glendale Federal Area H, subject to the following conditions:
Expiration - In accordance with the State Subdivision Map Act, the
tentative map shall expire 24 months from the date of the tentative map
approval.
CC&Rs - The developer shall submit a set of conditions, covenants, and
restrictions for the project. Said CC&Rs shall be approved by the
Director of Planning, the City Engineer, and the City Attorney prior to
approval of a final map. The CC&Rs shall be recorded in conjunction
with the final map and shall include at a minimum:
a. Provision for maintenance of common open space, project entry
statement, and slopes by the homeowners association.
b. Maintenance of private drainage facilities and fuel modification
zones within the project by the homeowners association or
equivalent.
C. The prohibition of building construction or ornamerLal landscaping
within the drainage facility/fuel modification zone maintained by
the homeowners association.
d. A statement that advises private lot owners that this subdivision is
surrounded by undeveloped natural open space owned by the City of
San Juan Capistrano and that no maintenance, improvements or
irrigation is currently planned for these lands.
e. The prohibition of radio or television antennas projecting above any
roof eaves per Section 9-3.609 of the Municipal Code.
A stipulation that all homes built within the project shall
incorporate the use of low -flow plumbing fixtures.
-2-
g. If there is a conflict between a parkway street tree within the
public right-of-way and a proposed driveway access for a lot, then
the lot owner must obtain permission from the City Engineering
and Building Department to relocate the tree.
h. The Architectural Design Guidelines, as approved by the
Community Design Commission prior to the approval of the final
map (Refer to Condition #32).
The CC&Rs shall also include a stipulation that the preceding CC&R
provisions and restrictions shall not be altered in the future without prior
City approval.
3. Construction Mitigation Program - The applicant shall be required to
prepare and adhere to a strict construction mitigation program for area
H. The construction mitigation plan shall address the impacts of both
custom home and production home development. The plan shall be
approved by the Director of Planning and Director of Engineering and
Building prior to issuance of grading permits and shall contain the
following controls:
A. Tract Grading
1. Movement on and off the site of heavy earth moving
equipment.
2. Location of equipment storage and service area together with
limits on hours of operation.
3. Daily access to the site by workers including hours of work,
travel routes, limits on noise and dust, etc.
B. Construction of Production Homes
I. Required access to the project site.
2. Hours of operation, including maintenance activities.
3. Method for dust and noise control.
4. Security of construction site.
5. Method and timing of street and site cleaning.
6. Plan for separation of construction traffic and related
activities from completed and occupied residential units.
7. Designation of area for equipment maintenance.
8. Lighting and noise standards for use of the equipment
maintenance area after normal construction hours.
-3-
o,26 .4
9. A construction phasing program .With states the timing of
construction for portions of the project as well as other
improvements such as streets, landscaping, and recreational
facilities.
C. Construction of Custom Homes
1. Controls 1-9 above.
2. Record construction controls against the title to the
property.
3. Require as a condition of approval for each grading or
building permit on each lot:
a. A bond and agreement for compliance with the rules.
b. Provision of personnel to supervis, and enforce the
rules during construction.
D. Enforcement
1. The Director of Planning may modify the construction
mitigation program standards if on-site observations indicate
that the construction activities are creating a nuisance to
adjacent residential property.
2. The City shall retain and the applicant shall pay for the cost
of acquiring a project enforcement officer to ensure
compliance with the construction mitigation program.
3. If it is determined that the developer is in violation of the
approved construction mitigation program, then the Director
of Planning is authorized to shutdown the project by reason of
said violation.
4. In the event that rain or other natural conditions render the
construction access road impassible, the Directors of
Planning and Engineering and Building may authorize
supervised and controlled the use of Camino La Ronda by
construction vehicles for a temporary period of time.
The construction mitigation program for Area H shall be
coordinated with the construction mitigation program for Areas C
& D. In particular, construction traffic using the second access to
Area H and traveling through Areas C & D must use the southern
access to La Novia Avenue near the freeway off -ramp at Valle
Road.
4. off -Site Traffic Improvement - Prior to approval of the final map the
developer shall contribute a fair share of the cost, based on Area H
project traffic generation, towards the following improvements:
IM
227
a. Widen La Novia Avenue from two to four lanes between Calle
Arroyo and San Juan Creek Road.
b. Increase the capacity of Ortega Highway between 1-5 and Rancho
Viejo Road.
C. Widen the La Novia Bridge at San Juan Creek Road.
d. Contribute to a future signal at San Juan Creek Road/Calle
Cartagena.
e. Contribute to the relocation of the I-5 offramp at Valle Road.
5. Camino La Ronda - Prior to approval of the final map, the developer
shall submit a plan for stop signs and pavement markings on Camino La
Ronda between La Novia Avenue and the southern terminus of La
Ronda. The plan shall be approved by the Director of Engineering and
Building. The developer shall install the signs and pavement markings in
conjunction with the installation of the Area H project street
improvements.
6. Emergency Access - Prior to approval of the final map, the developer
shall submit a plan for a 20 -foot -wide emergency access from Camino La
Ronda to the appropriate emergency access in the Hidden Mountain
development. This access may be combined with the 20 -foot General
Plan equestrian/hiking trail along the northern border of the tract. The
plans shall be approved by the Director of Engineering and Building and
the Director of Planning. The developer shall install the emergency
access and equestrian trail in conjunction with installation of the project
street improvements.
7. Drainage Improvements - As determined by the Director of Engineering
and Building, the developer shall either: 1) increase the capacity of the 5
foot by 6.5 foot drainage culvert that crosses beneath Camino La Ronda
to accommodate project runoff; or 2) construct drainage basins on-site
that will retain water within the project area and reduce peak flows to
the point that downstream impacts are negligible. All hydrologic
calculations and drainage facility design shall be reviewed and approved
by the Director of Engineering and Building. In addition, the developer
shall install drainage facilities along the northern boundary of the project
to intercept runoff from the natural open space. The drainage facility
design shall be approved by the Director of Engineering and Building
prior to approval of the final map. The latter improvements shall be
made by the developer in conjunction with the Los Corrales equestrian
trail and the emergency access road construction.
8. Downdrains - Open downdrains shall be placed at angles to the slope
wherever possible and earthtone colored gunite shall be used for all
drainage swales.
-5-
�i
9. Equestrian and Hiking Trail System - Prior to issuance of building
permits, the developer shall be responsible for installing the dedicating
to the City as public use easements the Los Corrales General Plan Trail
and the General Plan Trail that has been rerouted by the developer and
which now climbs up the eastern ridge and continues along the hilltop to
a point on the southern ridgeline as shown in Exhibit A of this resolution.
10. Trail Improvements - Prior to issuance of building permits, the developer
shall install the General Plan Trail leading up to the eastern ridge from
the Los Corrales Trail. For this short stretch, the trail width may be
reduced and a steeper grade permitted to avoid substantial hillside
grading. With the exception of this area, all trails shall be constructed
to meet the current design standards in the Municipal Code and the
Equestrian and Hiking Trail Design Manual.
11. Equestrian Crossing - Prior to issuance of building permits, the developer,
shall construct an equestrian street crossing at the oject entrance at
Camino La Ronda. The crossing shall be construct accordance with
Sections 9-4.106 and 9-3.620 of the Municipal Code. ,A the Equestrian
and Hiking Trail Design Manual. The project entry statement shall be
coordinated with the equestrian crossing. Final plans for the crossing
shall be reviewed by the Equestrian Commission and Traffic and
Transportation Commission and approved by the Director of Engineering
and Building prior to issuance of grading permits for the tract.
12. Trail Fencing - Prior to issuance of building permits, the developer shall
be required to fence and complete the 20 -foot General Plan trail next to
the Los Corrales tract, known as the Los Corrales Trail.
13. Trail Barriers - Prior to issuance of building permits, the developer shall
place barriers to keep our motorized vehicles where the trail crosses the
street at Camino La Ronda. These shall be designed per the Equestrian
and Hiking Trail Design Manual.
14. Final Landscape Plans - Prior to issuance of a grading permit, final
landscape plans, including slope landscaping and erosion control,
irrigation, street trees, equestrian and hiking trails, and fuel
modification shall be approved by the Director of Engineering and
Building. Street trees shall also be approved as part of the Street
Improvement Plans by the Director of Engineering and Building.
15. Fuel Modification - A fuel modification plan shall be submitted in
conjunction with the final project landscape plans prior to approval of
the final map, and shall be designed and installed by the developer in
accordance with Ordinance No. 682, Section 9-3.628 of the Municipal
Code.
16. Landscaping Installation - Landscaping shall be installed by the developer
as follows:
a. Installation of erosion -control landscaping and irrigation for all
manufactured slopes shall be approved b'% the Director of
;ZZ9
Engineering and Building and installed immediately after City
certification of rough grading.
b. Installation of street trees and all non -erosion -control landscaping
and irrigation shall be approved by the Director of Engineering and
Building prior to the first occupancy. At the same time fuel
modification zones shall be established and approved by the
Director of Engineering and Building and the Fire Marshal.
17. Landscape Maintenance - The developer shall be responsible for
adequately installing and maintaining all landscaping and fuel
modification zones until such maintenance is assumed by the homeowners
association. The developer shall prepare, for approval by the Director of
Engineering and Building prior to final map approval, criteria for the
maintenance of manufactured slopes, natural slopes, and fuel
modification zones by the homeowners association.
18. Project and Street Names - The name of the project and all street names
shall be proposed by the developer and approved by the Director of
Planning prior to approval of a final map.
19. Final Grading Plans - The developer shall submit a final grading plan to
the Director of Engineering and Building, including hydrology
calculations prepared by a civil engineer, at the time of submittal of
street improvement plans and/or a final tract map. All manufactured
slopes shall be designed and constructed per Municipal Code Sections 9-
3.505 and 9-4.112. The final grading plan shall be approved by the
Directors of Engineering and Building and the Director of Planning prior
to the final map.
20. Other Dedications - The following dedications shall be made to the City
of San Juan Capistrano on the final map:
a. Public utility easements throughout the project as necessary.
b. All equestrian/hiking trails.
C. Necessary easements for the emergency access road and public
security ingress and egress.
d. Easements to allow City access for maintenance of drainage
facilities and fuel modification zones within the homeowners
association jurisdiction.
e. Access rights except at approved driveways and street
intersections.
I. Dedication of land between the fuel modification zones and the
current City open space, as shown on Tentative Tract Map 13726,
for use as public open space.
-7-
21. Affordable Housing - Prior to approval of Final Tract Map 13726, the
developer shall comply with the affordable housinz requirements for the
Glendale Federal Planned Community as outlined in Section 2.9 of
Comprehensive Development Plan 81-2, and in accordance with the
Housing Element of the General Plan. In the alternative, should the City
adopt a Housing Impact Fee Program, the developer may choose that
option in -lieu of the requirements of Section 2.9 of Comprehensive
Development Plan 81-2. If the developer complies with the
Comprehensive Development Plan option, the required fees shall be paid
at the time of building permit issuance.
22. Parks - Prior to approval of Final Map 13726, the developer shall satisfy
the public parkland requirements for the Glendale Federal Planned
community as stated in Section 2.6 of Comprehensive Development Plan
81-2. The 13.3 acre requirement may be met 1hrough land dedication
and/or in lieu fees. Fees paid for Area H shalt made in accordance
with the 1991 Engineering Development Fee Sch, attached as Exhibit
B.
23. Street Improvement Plans - The developer shall submit street
improvement plans, prepared by a civil engineer and conforming to the
Municipal Code Section 9-4.103, at the time of submittal of the final
map. Said plans shall be approved by the Director of Engineering and
Building Services prior to approval of the Final Map. Street
improvement plans shall include the following to be furnished and
installed by the developer:
a. Wheelchair ramps on all street corners.
b. Street lights with Mission Bell fixtures on marbelite poles, or other
decorative street lights conforming to City standards.
C. Street trees consistent with final landscape plans.
24. Water and Sewer Improvements - Water and sewer improvements shall be
designed and constructed per Municipal Code Section 9-4.109 and 9-4.111
respectively.
25. Storm Drains - Drainage facilities shall be designed and constructed per
City Master Drainage Plan and City standards. The storm drain system
shall also be designed to accommodate occasional waterflows, such as
overflow discharges, from the Reed Reservoir.
26. Utility Undergrounding - Utilities shall be placed underground per the
Municipal Code. All utility undergrounding and all driveways,
pedestrianways, street lights, and drainage facilities shall be located and
constructed per Municipal Code Article 9-4.1.
27. Soil Subsidence - The developer shall implement a soils subsidence
program for all residential lots. The program shall be approved by the
Director of Engineering and Building prior to approval of the Final Map.
231
28. Environmental Review Fees - In accordance with Assembly Bill 3158,
Chpater 1706 of the State Statutes of 1990, the developer is required to
pay $875.00 to the County Clerk (plus a $25.00 processing fee) or to the
State Office of Planning and Research, for review of the environmental
impact report by the State Department of Fish and Game. The fee must
be paid at the time of the filing of a Notice of Determination. The
project shall not be considered valid or final until the applicant furnishes
proof to the City that the fee has been paid.
29. Setbacks - One-story structures shall be setback 20 feet from the front
property line. Two-story elements of structures shall be setback a
minimum of 25 feet from the front property line. Front yard setbacks
shall be staggered to avoid a "line of homes" appearance.
30. Height Restriction - The residence on Lot 63 shall be limited to one
story, not to exceed 20 feet in height.
31. Street Trees - On both sides of the street within the subdivision, street
trees shall be placed in a 5 -foot -wide landscaped parkway between the
sidewalk and the street. The parkways and sidewalks are included within
the public right-of-way. The parkway shall be installed by the developer
and maintained by the homeowners association. If there is a conflict
between a parkway street tree and a proposed driveway access for a lot,
then the lot owner must obtain permission from the City Engineering and
Building Department to relocate the tree.
32. Architectural Design Guidelines - The Architectural Design Guidelines
shall include Conditions #29 and #30, and shall be reviewed and approved
by the Community Design Commission prior to approval of the final
map. The approved Guidelines shall be incorporated as part of the
project CC&Rs (Refer to Condition #2(h).
33. Alternative Construction Access - Prior to the recordation of the final
map, the applicant shall process an exception to the Ridgeline
Preservation Ordinance (Section 9-3.510 of the Municipal Code) for the
purpose of building a second construction/emergency access route over
the southern ridgeline which will connect to Via Entrada in Areas C & D,
owned by The Lusk Company. The route shall be an all-weather surface
and designed and constructed to accommodate, to the extent possible, all
of the construction vehicles that could be made to use it, including
access for emergency purposes, and shall conform to the conceptual
design presented at the 6/18/91 City Council meeting as Attachment 2,
Exhibit C to the staff report. The developer shall be responsible for
funding and constructing that portion of the access road that lies outside
the City -owned open space. The developer shall maintain the roadway
until such time maintenance responsibility is transferred to another
entity as approved by the Director of Engineering and Building Services.
34. Mitigation Monitoring Program - Prior to approval of the final map, the
applicant shall be required to pay for the cost of implementing the
adopted Mitigation Monitoring Program for Area H. This may include
the cost of hiring personnel to monitor the project and report back to the
City throughout the project's development and construction.
PASSED, APPROVED, AND ADOPTED this 18th _ day
of June ,1991.
C
l
KENNETH E. FRIESS, Y R
ATTEST:
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF SAN JUAN CAPISTRANO )
1, CHERYL JOHNSON, City Clerk of the City of San Juan Capistrano,
California, DO HEREBY CERTIFY that the foregoing is a true and correct copy of
Resolution No. 91-6-18-4 adopted by the City Council of the City of San Juan
Capistrano, California, at a regular meeting thereof held on the 18th day
of June , 1991, by the following vote:
AYES: Councilmen Jones, Hausdorfer, Buchheim,
Vasquez and Mayor Friess
NOES: None
ABSTAIN: None
ABSENT: None
(SEAL) �iYCd l�� ��Jir1i2=
CHERYL CITY CLERK
-10-
DLFNDALE: FED"
PLANNED COMMUNIry
EXH1131T A
CIVV CO ... IL 1,�,
LZGEND-
.... . . I . .......... ....
A14 I
. ..... ....
Ttw ET. 40V
AL vp A
13
6?!M
m
V
New trail
to be
H
improrved by
Glenfed
c
d"
PCOrl
to
oint on
A. southern
ricrgeline
-17
(WE
HIKING RAlt
k S.
-a CDP
UM
EXHIBIT B
Lngineerin. ar,u Development Fees
Development map checking
Tract maps 1,000.00, plus 100.00
per lot or unit up to
25, plus 50.00 per lot
or unit over 25
Parcel maps 1,000.00, plus 100.00 per
lot or unit
Records of survey 500.00, plus 50.00 per lot
Improvement plan -checking
Public improvement plans
Submittal
1,000.00
Checking
3% of construction costs
Private improvement plans
Submittal
500.00
Checking
3% of construction costs
Development inspections
Improvement costs up to $100,000.00 3-1/2% of improvement
costs, with a minimum
of 35.00
Improvement costs $100,000.00 and over 3,500.00, plus 3% of
improvement costs over
100,000.00
Administrative Fees, Sureties, and Deposits
Street cut deposits for less than 500 500.00 to 1,000.00
square feet Refundable Deposit (upon
completion of the work)
Faithful performance surety (released 100% of construction costs
one year after the notice of completion)
Labor and material surety (released upon 100% of construction costs
the completion of the project)
Monumentation surety (released upon the 100% of monumentation costs
Engineer's certification of the work
Water surety As required by the
Capistrano Valley
Water District
Administrative permit fee 5.00 each