Loading...
Resolution Number 00-6-20-4357 RESOLUTION NO. 00-6-20-4 ADOPTING REVISED DEVELOPMENT APPLICATION FEE/DEPOSIT AND ENGINEERING FEE SCHEDULES A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA, ADOPTING REVISED DEVELOPMENT APPLICATION FEEAND DEPOSITAND ENGINEERING FEE SCHEDULES AS AUTHORIZED BY TITTLE 9, CHAPTER 2, ARTICLE 3, SECTION 9-2.316 OF THE MUNICIPAL CODE; REPEALING RESOLUTION 90-11-6-2 AND AMENDING RESOLUTION NO. 99-2-16-2 WHEREAS, the Municipal Code states that the City Council may from time to time establish the amount of fees authorized by the provisions of section 9-2.316 of the Municipal Code; and, WHEREAS, the current schedule for Development Application Fees and Deposits was last established by City Council Resolution No. 99-2-16-2, adopted February 16, 1999; and, WHEREAS, the current schedule for Engineering Fees was last established by City Council Resolution No. 90-11-6-2, adopted November 6, 1990; and, WHEREAS, processing of Lot Line Adjustments is an Engineering Division function; and, WHEREAS, the engineering Division finds it appropriate to process costs for Lot Line Adjustments as an Engineering Fee, rather than as a Developer Deposit; and, WHEREAS, the Engineering Division has reviewed the current Engineering fee schedule and determined that it is appropriate to modify the fixed fee schedule to more accurately reflect costs associated with processing of plans, maps, reports and studies; and, WHEREAS, the City Council has conducted a duly -noticed public meeting to receive public testimony and has hereby considered the revised fee and deposit schedules at its regular meeting of June 20, 2000, after having provided additional notice as required by law to the Orange County Chapter of the Building Industry Association. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of San Juan Capistrano does hereby amend Resolution No. 99-2-16-2 deleting Lot Line Adjustments from Development Application Fees and Deposits as shown in Exhibit A attached hereto and made a part hereof. -1- 358 BE IT FURTHER RESOLVED, that the City Council of the City of San Juan Capistrano does hereby repeal Resolution No. 90-11-6-2 and establishes the Engineering Fee Schedule, previously approved with Resolution No. 90-11-6-2, as shown in Exhibit B attached hereto and made a part hereof. PASSED, APPROVED, AND ADOPTED this 20th day of June, 2000. ATTEST: CHERYL JOHNSON, CITY CLERK OLLE AMP ELL, VAYOR -2- 359 STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss CITY OF SAN JUAN CAPISTRANO ) I, CHERYL JOHNSON, City Clerk of the City of San Juan Capistrano, California, DO HEREBY CERTIFY that the foregoing is a true and correct copy of Resolution No. 00-6-20-4 adopted by the City Council of the City of San Juan Capistrano, California, at a regular meeting thereof held on the 20th day of June , 2000, by the following vote: AYES: Council Members Bathgate, Greiner, Hart, Swerdlin and Mayor Campbell NOES: None ABSTAIN: None ABSENT: None (SEAL) CHERYL JO , CITY CLERK -3- 360 DEVELOPMENT APPLICATION FEES AND DEPOSITS Exhibit A The fees and deposits listed below are required to be paid prior to any processing of a development application. The initial deposits are intended to provide funding for processing of an application. If the deposited funds are depleted during the processing of the application, additional funds will be required by the City. If the requested funds are not received, processing of the development application may be delayed or interrupted pending receipt of the funds. Any unused funds at project completion will be reimbursed to the applicant. Developer Deposit Applications 1. Schedule of Hourly Rates (Cily Staff) - The following staff positions shall charge actual hours expended on a project which has been assigned a developer deposit account: Principal Planner Building Official Senior Engineering Technician Senior Planner Senior Engineer Associate Civil Engineer Assistant Planner Senior Civil Engineer Engineering Assistant Associate Planner Engineering Technician Community Services Supervisor Planning Technician Traffic Engineer Management Analyst I (Planning) Hourly rates of City staff positions shall be determined from the current salary schedule adopted by City Council resolution each fiscal year. Overhead costs shall be added to the staffs hourly rate. Overhead shall be calculated and published bi-annually (January 15 and July 15) by the Director of Administrative Services in accordance with the Office of Management and Budget Circular A-87 (Cost Principles for State and Local Governments). 2. Schedule of Hourly Rates (Outside Consultants) - Consultants' actual cost shall be charged against the developer deposit account. The consultant contracts are determined by the Planning Director and agreement executed by the City Manager. A ten percent (10%) administration fee is charged against the applicable developer deposit account for any consultant invoices processed on a developer deposit account applications. 3. Developer Deposit Applications (Initial Deposit) - The following applications are subject to processing under the provisions of the Developer Deposit System. The Initial Deposit for each application is set forth below. The Planning Director may adjust the initial deposit for a given project applicant upon a determination that the initial deposit will be substantially above or below the amount estimated to complete the project review. Architectural Control Application ................ Certificate of Compliance ...................... Conditional Use Permits ..................... . Floodplain Development Permit ................. General Plan Amendment ..................... Hillside Management ......................... Ridgeline Exception .......................... Tentative Parcel Map ......................... Tentative Parcel Map Waiver ................... Tentative Subdivision (Tract) Map ............... Zone Change ............................... Zone Change with CDP's, SDP's, Code Amendment Modifications to above development applications or conditions of approval (except Zone Change) ... .. I ..... $4,000 ........ $1,000 ........ $2,500 ........ $1,500 .... I ... $5,000 ........ $3,000 ........ $3,000 ........ $3,000 ........ $1,500 ........ $5,000 ........ $3,000 Amendments ........ $1,000 361 Fixed Fee Schedule - The following is a list of development applications that have a fixed fee. This fee shall be paid at the time of application. Appeals.................................................. I LINE DENSITY $100 Environmental Review (State Fish and Game Department) D at 1" = 40' scale Negative Declaration ..................................... good $1,300 Environmental Impact Report ............................... low $900 Exceptions per Title 9 of the Municipal Code ..................... D at 1" = 40' scale $750 Exceptions for Radio and Satellite and Dish Antennas .............. $123.75 $100 Home Occupation Permit ...................................... bad $50 Land Use Adjustment ........................................ $300 Modification to CC&R's (homeowner association) ...... I .......... $150 Sign, Monument (not part of Architectural Control application) ........ $300 SignPermit ................................................ $100 Site Plan Review ........................................... $500 Special Activities Permits Non -Profit Profit Temporary Banners/Signs ............. $10 ..... $25 Merchant Events ............................. $50 Center -wide Events ........................... $75 Christmas Tree Lots .................. $35 ..... $50 Special Events (by attendance) 1-100 .......................... $35 ..... $50 101-500 ........................ $50 ..... $75 501+ .......................... $65 .... $100 Temporary Sign Permit ....................................... $25 Temporary Use Permit ....................................... $150 Tree Removal Permit .................................... No charge Zone Variance ............................................. $750 Pre -application consultation and preliminary review ................ $150 DIGITAL SUBMISSION FEES The following fees shall be charged in addition to the normal plan check fees if the development applicant does not have the capability to provide improvements plans that are not submitted in a digital format. All development improvement plans that are submitted in a digital format in accordance with the adopted digital Submission Standards will not be subject to this fee. The applicable fee is as follows: SIZE PLAN SHEET I LINE DENSITY CLARITY COST/SHEET D at 1" = 40' scale low good $41.25 D at 1" = 40' scale low bad $82.50 D at 1" = 40' scale high good $123.75 D at 1" = 40' scale high bad $165.00 -2- 362 Exhibit B ENGINEERING FEES Engineering Documents and Records - Microfilm/Digital Storage* .............................. $1.00 per sheet - Document and Record Retrieval/Research/Review ......... $40.00 per hour (Minimum Charge - One Hour) - Digital Ortho Photo Imaging ............................ $500 per foot tile (Includes $400 per foot tile + 2 hour mim staff time @ $50 per hour) - GIS Information Requests ............................. As determined byCity Engineer *Each person, firm or corporation shall pay a microfiche or digital storage fee for permit applications, plans, specifications, calculations, soils reports, and all pertinent data required to be maintained by state regulations, per sheet. Lot Line Adjustment - Submittal and Processing ............................. S1,750 Map Processing - Tract maps ......................................... $1,000, plus $100 per lot or unit up to 25, plus $50 per lot or unit over 25 - Parcel maps ........................................ $1,000, plus $100 per lot/unit - Records of survey ................................... $500, plus $50 per lot - CC&R'sI ......................................... $500 Improvement Plan Processing Public improvement plans -Submittal .......................................... $1,000 - Checking .......................................... 3% of construction costs - Hydrology/Hydraulic Studies (0-20 Acres) ................. $4.50 per0.1 acre (5450 min) - Hydrology/Hydraulic Studies (Over 20 Acres) .............. $1,200, plus $1 per 0.1 acre over 20 acres ($4,000 max) - Sewer Studies (0-20 Acres) ............................ $4.50 per 0.1 acre (5450 min) - Sewer Studies (Over 20 Acres) ......................... $1,200, plus $1 per 0.1 acre over 20 acres ($4,000 max) Private Improvement Plan Processing -Submittal .......................................... $500 - Checking .......................................... 3% of construction costs Map/Plan Processing Administration Includes the preparation and processing of agreements, ...... 3 1/2% of improvement costs resolutions, City Council and Commission agenda reports, ($500 min). Payable prior to presentation to commissions/boards, field investigation improvement plan approval) (D�:;s not include advertising & recording fees) Easements (Modification/Processing) ................... . As determined by City Engineer (Does not include advertising & recording fees) ($500 min) Street cut deposit for less than 500 square feet** ............ $500 to $1,000 Street cut deposit - over 500 square feet** ................. As determined by City Engineer **Refundable Deposit (upon completion of work) 1 363 Permit Issuance Fee .................................. $40 Engineering Inspection Fee ............................. $50 per hour Elevation Certificates (FEMA) ........................... $40 Miscellaneous Fees ................................... As determined by City Engineer Development Inspections Improvement costs up to $100,000 ....................... 31/2% of improvement costs, with a minimum of $100 Improvement costs $100,000 and over .................... $3,500, plus 3% of improve- ment costs over $100,000 Sureties and Deposits Faithful performance surety (released one year after the notice of completion) .......... 100% of construction costs Labor and material surety (released upon the completion of the project) ............. 100% of construction costs Monumentation surety (released upon the Engineer's certification of work) ......... 100% ofmonumentationcosts Water surety ......................................... As required by Capistrano Valley Water District OA