Loading...
B25-0467 - 28189 VIA DEL MARFINALED12/22/25 Campanilla Community Association Managed by Optimum Professional Property Management, Inc. 230 Commerce, Suite 250, Irvine, CA 92602 Office (714) 508-9070 / Fax (714) 665-3000 www.optimumpm.com April 17, 2025 824 Elizabeth Gribben & Michael Meeker 28189 Via Del Mar San Juan Capistrano, CA 92675 Property:28189 Via Del Mar Regarding:Architectural Request ~ Landscape Dear Homeowner: The Architectural Review Committee reviewed your architectural application, received in our office for: Resubmit of arch application. Additional requested information is within 2nd pdf attached. I have attached the additional requested items: Renderings and specifications, color (pictures - honed nickle) for the Fire Pit. Renderings and Inspiration photos for the custom built in BBQ. Will be built to plan already submitted. Smooth White Stucco base, with concrete color top. (No surrounding tile) Turf samples for putting green and surrounding turf. https://smartturf.com Landscape plant list/legend for landscape plan previously submitted. (Mostly a mixture of Agave, Italian Cypress, Iceberg Roses and Olive Trees.) Hardscape will be concrete and porcelain tile as pictured in renderings. Designer - Yardzen. Customer Rep - Emma 817.697.0405 Contractor - still in process of gathering bids, most need HOA approval before moving forward. Please let me know if there is any additional information you need other than the two requested checks.. Your application has been approved as submitted. This modification must be completed within 90 days; failure to comply may result in you being required to resubmit your application. All work and future upkeep is to be done at your expense and shall be performed at a time and in a manner to minimize interference and inconvenience to other homeowners. You shall assume all liability and will be responsible for all damage and/or injury that may result from performance of this work. If applicable, the required architectural deposit will be held pending completion and a final inspection by the architectural committee to ensure all requirements were met and common area(s) of the association was not damaged. When the work is completed, please complete the attached “Notice of Completion” form and return to Optimum Professional Property Management, Inc. Upon Receipt of the Notice of Completion, the Architectural Committee will be notified that the above referenced modification has been completed and is ready for inspection. Furthermore, you are responsible for complying with all applicable federal, state and local laws, codes and regulations and requirements in connection with this work, and shall obtain any necessary governmental permits and approval for the work. The Board of Directors, its agent and the Committee have no responsibility with respect to such compliance and the Board of Directors or its designated Committee's approval of this request shall not be understood as making of any representation or warranty that the plans, specifications or work comply with any law, code, regulation or governmental requirement. Should you have any questions, please do not hesitate to contact us using your owner portal at http://portal.optimumpm.com. Click on “My Items” and leave a comment on the ARC. We appreciate the opportunity to be of assistance and thank you for working with us to ensure your community remains the best that it can be! At the Direction of the Architectural Committee Campanilla Community Association Campanilla Community Association NOTICE OF COMPLETION Architectural Approval for: Landscape must be completed within 90 days; failure to comply may result in losing your refundable deposit (if applicable). All work and future upkeep is to be done at your expense and shall be performed at a time and in a manner to minimize interference and inconvenience to other homeowners. You shall assume all liability and will be responsible for all damage and/or injury that may result from performance of this work. When the work is completed, please submit this “Notice of Completion” form along with PICTURES OF THE APPROVED MODIFICATIONS and return to Optimum Professional Property Management, Inc. 230 Commerce, Suite 250, Irvine, CA 92602. Upon Receipt of the Notice of Completion, the Architectural Review Committee will be notified that the above referenced modification has been completed and is ready for inspection. Please note: failure to return this form may result in a fine. Additional Comments: Follow Up - ARC Decision has been approved. Notice is hereby given that: The undersigned is the Owner of the property located at: Street Address City State Zip The modification for the above property was COMPLETED on ______ day of __________________, 20____, in accordance with the Architectural Review Committee’s written approval of the above owner’s Architectural Application and plans. _________________________________________ NAME OF PROPERTY OWNER _________________________________________ SIGNATURE OF PROPERTY OWNER: DATE: ____________________________ DO NOT WRITE BELOW THIS LINE Architectural Review Committee Approval Modification Verified and Deposit Released (if Applicable) Committee Member Date Committee Member Date Committee Member Date