B25-0611 - 31791 VIA GRANADACITY OF SAN JUAN CAPISTRANO
BUILDING PERMIT #:
B25-0611
09/04/2025
ISSUED
JOB VALUE:
# OF UNITS:
PERMIT NUMBER:
ISSUED BY:
APN #:
TRACT:
LOT:
SUBDIVISION:
PERMIT TYPE:
OCCUPANCY:
BUILDING SQ. FT.:
STORIES:
DF4
664-253-21
135
16634
RANCHO SAN JUAN
$ 21,000
ELECTRICAL
0
0
0
JOB ADDRESS:
MONROE, JASON & SHANNONOWNER NAME
31791 VIA GRANADAMAILING ADDRESS
CONTRACTOR NAME
CSLB EXPIRATION
ADDRESS
TENANT NAME
PHONE
MAILING ADDRESS
I have carefully examined the completed permit application and do
hereby certify under penalty of perjury that all information hereon
including the declarations are true and correct and I further certify
and agree if a permit is issued: to comply with all City, County, and
State laws governing building construction, whether specified herein
or not. I also agree to save, indemnify and keep harmless the City of
San Juan Capistrano against all liabilities, judgments, costs and
expenses which may in any way accrue against said City in
consequence of the granting of this permit.
SIGNATURE:
PRINT FULL NAME:
TESLA ENERGY OPERATIONS INC
901 PAGE AVE
12/31/2026
Every permit issued shall become invalid unless the work on the
site authorized by such permit is commenced within 12 months after
its issuance, or if the work authorized on the site by such permit is
suspended or abandoned for a period of 12 months after the time
the work commenced.
An OSHA permit is required for excavations over 50 deep and
demolition or construction of structures over 3 stories in height.
I hereby affirm that I am licensed under provisions of Chapter 9 of Division 3 of the Business and Professions
Code, and my license is in full force and effect.
I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business
and Professions Code: The Contractors License Law does not apply to an owner of property who builds or improves thereon
and who contracts for such projects with a contractors) license pursuant to the Contractors License Law.
DESCRIPTION OF WORK
I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as
to become subject to the workers compensation laws of California and agree that if I should become subject to the workers
compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.
WARNING:FAILURE TO SECURE WORKERSCOMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TI CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED
THOUSDAND DOLLARS($100,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEYS FEES.
B25-0611
888104
,
FREMONT, CA 94538
SAN JUAN CAPISTRANO, CA 92675
(949) 322-3698
(844) 837-5201
PHONE
PHONE
DATE: _________________ SIGNATURE: _______________________________________
(2) TESLA BATTERY BACKUPS. ADDING ON TO
EXISTING SOLAR SYS.
TOTAL PANELS = 30 PANELS
CSLB #
OWNER / CONTRACTOR DECLARATION
______
______
I, as owner of the property, or my employees with wages as their sole compensation, will do the work and the structure is not
intended or offered for sale. (Sec.7044, Business and Professions Code: the Contractors License Laws does not apply to and
owner of property who builds or improves thereon, who does such work himself or through his employees, provided that such
improvements are not intended or offered for sale. If however, the building or improvement is sold within one year of
completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale)
I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain workers compensation
insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers compensation insurance carrier and policy number are:
CARRIER: ZURICH AMERICAN INSURANCE COMPANY POLICY #: EWS107458507
(This section needs to be completed if the permit is for one hundred dollars ($100) or less)
______
______
31791 VIA GRANADA
______
EXPIRATION
CONTRACTOR:
OSHA
OWNER/BUILDER:
OWNER/BUILDER:
WORKER'S
COMPENSATION:
EXEMPTION:
FINAL
09/30/2025
From:Symbium Support
To:Building Division
Cc:jasonmonroe111@gmail.com; orangecountypermits@tesla.com
Subject:Symbium permit submission for Expedited Residential Solar Permit at 31791 Via Granada, San Juan Capistrano,
CA 92675
Date:Monday, July 21, 2025 12:15:14 PM
[The e-mail below is from an external source. Please do not open attachments or click
links from an unknown or suspicious origin.]
External Sender - From: (Symbium Support
<permits@symbium.com>)
This message came from outside your organization.
Dear San Juan Capistrano’s Building & Safety Division,
Please find attached the completed application for an Expedited
Residential Solar Permit on 31791 Via Granada, San Juan Capistrano,
CA 92675 submitted by contractor Jonah Fisher.
Scope of Work Summary
Install 2 ESS units on an exterior wall. The estimated job value, as
provided by the applicant, is $21,000.
Owner Details
Name. Jason Monroe
B25-0611
1 TESLA POWERWALL 3
1 TESLA EXPANSION UNIT
Address. 31791 Via Granada, San Juan Capistrano, CA 92675
Phone. (949) 322-3698
Email. jasonmonroe111@gmail.com
Contractor Details
Name. Jonah Fisher
CSLB License. 888104
Business License. 77086
Address. 2102 Alton Pkwy Suite B, Irvine, CA 92675
Phone. (949) 812-9325
Email. orangecountypermits@tesla.com
Project Documents
Plans.pdf (Complete set of Plans)
Spec Sheets.pdf (Specification sheet or installation manual)
symbium-inspection-checklist.pdf (Symbium inspection
checklist)
symbium-scope-compliance.pdf (Symbium approval document)
Load Calcs - San Juan Capistrano New Version.pdf (Electrical
load calculation)
Bolt_msp_photos_1_2025-06-05_18-33-22-609_0-3.jpeg (Main
Service Panel & Subpanel Dead Front Cover Photos)
Bolt_msp_photos_1_2025-06-05_18-33-24-888_0-2.jpeg (Main
Service Panel & Subpanel Dead Front Cover Photos)
Bolt_msp_photos_1_2025-06-05_18-33-25-783_0-1.jpeg (Main
Service Panel & Subpanel Dead Front Cover Photos)
Contract.pdf (Signed Solar Contract with Homeowner)
The permit fees have not been collected for this application by
Symbium. Please invoice the applicant directly.
For any questions concerning the use of Symbium to generate this
application, please contact us at support@symbium.com and use the
project reference: project_8ada9c7f-a303-43f1-94df-bdff6ab22f80.
Best,
***** Please note that email correspondence with the City of San Juan Capistrano, along
with attachments, may be subject to the California Public Records Act, and therefore may
be subject to disclosure unless otherwise exempt.
Symbium Team
Questions? Contact us at support@symbium.com
Review the electrical loads in the table below and check all that exist in the (be sure to include the
proposed Level 2 EVCE and/or Photovoltaic System).
Fill in the corresponding wattage for each item checked, and then add up all the checked items to
determine total wattage used.
attages shown are estimates use actual values based on nameplate ratings
or consult with an electrical .
_______________________________________________________________________________
By my signature, I attest that the information provided is true and accurate.
__________ __________________________________
(Signature of Applicant) (Date)
RESIDENTIAL ELECTRICAL
LOAD A
This form is
of this electrical load calculation worksheet is at the user’srisk and carries no
implied guarantee of accuracy. Users of this form are advised to seek professional assistance in
determining the electrical of a service
SYMBIUM 08/22/2025
B25-0611
SUBJECT TO FIELD
INSPECTION
Page 2 of 2
Enter All Applicable Appliances Description of Load Volt-Amps (Watts) on Nameplate Rating
Total VA (Watts)
General Lighting/Power Load
Required Total Square footage of building times 3 sf x 3 volt-amp
Required Kitchen Small Appliance Branch Circuits (min. 2) x 1,500 volt-amps/circuit
Required Laundry Circuit (min. 1) x 1,500 Volt-Amps
Appliances and Equipment Except Air Conditioner(s)
Microwave or 1,400 VA
Trash Compactor or 1,000 VA
Dishwasher or 1,500 VA
Disposal or 1,000 VA
Electric Oven or 2,000 VA
Electric Range or 5,000 VA
Induction Range or 10,000 VA
Electric Clothes Dryer or 5,000 VANP =
Electric Water Heater NP =
Electric Heat Pump Water Heater NP =
Electric Vehicle Charging Equipment NP =
NP =Pool or Spa Pumps Motors or 2,000 VAea. motor
Other:
Other:
Other:
Sub-Total Volt-Amps Used (add up V-A used for everything checked)
- 10,000 V-A
Subtotal (A)
x .40
Subtotal (B)
+ 10,000 V-A
Subtotal (C)
Heating and Air-Conditioning (Add the largest of the following): +
1. Air conditioning and cooling (100% of nameplate (NP) rating) =
2. Heat pump without supplemental heating (100% NP Rating) =
3. Heat pump with supplemental electric heat (100% NP plus 65%) =
4. Electrical space heating , 4 separate units (65% NP rating) =
5. Electrical space heating > 4 separate units (40% NP rating) =
6. Electrical thermal storage and other 100% NP rating =
Total Current Demand (Volt-Amps) =
Divided by 240 Volts = Amps
Total Amps Required for Service Conductors and Main Panel =
Rating of Existing Electrical Service or Subpanel (Amps)=
Panel Upgrade Required? (YES OR NO)
Rating of Proposed Main Service Panel Buss (IF YES ABOVE)=
VA
VA
VA
DF 02/14/24
7.Other:
Number of Appliances or Equipment
NP =
NP =
NP =
NP =
NP =
NP =
NP =
NP =
NP =
NP =
NP =
NP =
VA
VA
Other:
Other:
VA
VA
VA
DWELLING UNIT LOAD CALCULATION BASED ON CEC ART. 220 AND ANNEX D.
NP = NAME PLATE RATING Total VA (Watts)
PROJECT ADDRESS: PERMIT #:B -Symbium Project Id: project
Uploaded on July 21, 2025, 12:04 PM PDT
Single Family Dwelling Load Calculation
Step-by-Step Example
(Optional Method)
CEC 220.82
Given:
Square foot area of home – 1700 square feet (sf)
1.5 kW (1,500 watts) dishwasher
10 kW range
15 kW central heat
4 kW water heater
29 amp, 240 volt air conditioning
4 kW clothes dryer
Instructions:
Step 1: Multiply the sf area by 3 volt-amperes (VA) per sf 1700 sf X 3 VA = 5,100 VA
Step 2: Add 1,500 VA for each 2-wire, 20-amp small appliance branch circuit and the laundry circuit
1,500 VA X 3 = 4,500 VA
Step 3: Add in the appliance loads at nameplate value or given on table (whichever is greater). Range
10,000 VA, Water heater 4,000 VA, Clothes dryer 4,000 VA, Dishwasher 1,500 VA
Step 4: Add all appliance loads together: 5,100+ 4,500 + 10,000 + 4,000 + 4,000 + 1,500 = 29,100 VA
Step 5: Subtract 10,000 VA from the total VA (this will be added back in later) 29,100 – 10,000 = 19,100
VA
Step 6: Multiply the remainder (19,100 VA) times 40%. 19,100 X .40 = 7,640 VA
Step 7: Add the 10,000 VA value from step 5 and the 7,640 VA from step 6 together to find the general
load. 10,000 + 7,640 = 17,640 VA
Step 8: Compare the heating load to the AC load and take the larger of the two loads AC load at 100% =
29 amps X 240 volts = 6,960 VA, Heat load at 65% = 15,000 VA X .65 = 9,750 VA (largest load)
Step 9: Add the general load to the largest of the AC or heating load. General load (17,640 VA) +
Heating load (9,750 VA) = Total load (27,390 VA)
Step 10: Divide the total load in VA by the voltage 27,390 / 240 = 114 amps
(114 amps would equal minimum panel capacity)
DF 02/14/24
Symbium Project Id: project
Uploaded on July 21, 2025, 12:04 PM PDT
Project Scope and
Compliance Details
Strikethrough indicates questions that the applicant did not respond affirmatively to. In
these instances, an alternative method of compliance was specified by the applicant.
Project Location
31791 Via Granada, San Juan Capistrano, CA 92675
Symbium Project ID
project_8ada9c7f-a303-43f1-94df-bdff6ab22f80
Rooftop Solar or Battery Storage Installation
Site
Ground Snow Load: 0 psf
Design Wind Speed: 95 mph
Extreme Annual Mean Min. Dry Bulb Temperature: 38.84 ℉
Energy Storage Systems (ESS) 1
Manufacturer or Brand: Tesla Inc.
Model: 1707000-XX-Y [11.5kW]
Size: 13.5 kWh
Total number of units: 1
Location: On an exterior wall
Not selected: This installation involves adding additional ESS units to an
existing system.
Energy Storage Systems (ESS) 2
1
Manufacturer or Brand: Tesla Inc.
Model: 1807000-XX-Y
Size: 13.5 kWh
Total number of units: 1
Location: On an exterior wall
Not selected: This installation involves adding additional ESS units to an
existing system.
Additional Details for Energy Storage Systems (ESS)
Separation of ESS units
Not selected: Individual units are no closer than 36 inches
Units are installed in accordance with approved large-scale fire testing
results (UL 9540a or equivalent approved tests)
ESS Structural Requirements
ESS installation exceeds 250 lbs.
Additional details
ESS is installed according to manufacturer’s installation instructions.
The battery and inverter pairing being installed is approved and
compatible as per manufacturer’s installation instructions.
Inverter
Existing equipment. Is this an existing inverter?: No
Manufacturer or Brand: Tesla Inc.
Model: 1707000-XX-Y [240V, 11.5kW]
Inverter type: Hybrid string inverter
Rated Max. Input Voltage: 600 V
Strings per inverter input: 0
Strings per inverter: 0
Project Scope and Compliance Details
2
Max. number of modules per string: 0
Interconnection details
Method of interconnection to the electrical service: Load-side
Is this inverter controlled by a Power Control System? (PCS): Yes
Compliance Analysis for SOLAR RESIDENTIAL ONLINE
Application
Permit Application Requirements
✓ Qualified personnel
The project’s contractor must possess an active business license from the
City of San Juan Capistrano and an active CSLB license with at least one of
the following classifications:
B - General Building Contractor
C-46 - Solar Contractor
C-10 - Electrical Contractor
Reference: CEC 690.4
✓ Specification sheets and installation manuals
Specification sheets and installation manuals (if available) for all major PV
system components. These uploads must include specifications for all of
the following:
ESS components
Inverters
Reference: CEC 690.4
✓ Eligible projects
Project Scope and Compliance Details
3
To qualify for an online solar permit, a project must involve installation of a
PV module or an ESS unit.
ESS Electrical Code Installation Requirements
✓ UL 9540 listed ESS
UL 9540 is an umbrella standard in that it includes several standards as
prerequisites to fulfill the requirements in UL 9540. An ESS is defined as,
“Equipment that receives energy and then provides a means to store that
energy in some form for later use in order to supply electrical energy when
needed”. The most common type of UL 9540 ESS utilizes a lithium-ion
battery to store the energy. That lithium-ion battery must be listed to UL
1973, Standard for Stationary and Locomotive Batteries. In addition to the
certification for the batteries, the inverters must be certified to UL 1741,
Standard for Inverters, Converters, and Controllers for use in Distributed
Energy Systems. This is the same standard used for PV utility-interactive
inverters that must be specifically listed and labeled for this application
[CEC 690.4(B)].
Without this specific identification process for ESS, an unacceptable
amount of review would be necessary to approve the equipment used in
these systems. ESS that pass UL 9540 meet the basic requirement in the
CRC and the CEC for an ESS.
Reference: R 328.2
✓ Installation of ESS Units
ESS units must be installed according to manufacturer's installation
instructions.
Reference: R 328.3
✓ Approved pairings of batteries and inverters
Battery and inverter pairings must be approved per the manufacturer’s
installation instructions.
✓ Installation of Battery Inverters
Project Scope and Compliance Details
4
Electrochemical battery systems must be paired with a battery or a hybrid
inverter.
If your ESS comes with an inverter, please remember to specify the inverter
separately when submitting your details.
ESS Residential Code Installation Requirements
✓ Limitation on Size of Individual ESS Units
This requirement limits the size of an individual ESS unit to 20 kWh. One
reason for this basic limitation is to put an upper bound on the amount of
energy that can be stored in one enclosure. Individual enclosures are
limited to 20 kWh which is consistent with the language of the 2022 CRC.
Reference: R 328.5
✓ Size and Location of ESS Units
ESS shall be installed only in the following location:
Detached garages and detached accessory structures.
Attached garages separated from the dwelling unit living space in
accordance with Section R302.6.
Outdoors or on the exterior side of exterior walls located not less than 3
feet (914 mm) from doors and windows directly entering the dwelling
unit.
Enclosed utility closets, basements, storage or utility spaces within
dwelling units with finished or noncombustible walls and ceilings. Walls
and ceilings of unfinished wood-framed construction shall be provided
with not less than 5/8-inch (15.9 mm) Type X gypsum wallboard.
The aggregate rating of the ESS shall not exceed:
40 kWh within utility closets, basements and storage or utility spaces.
80 kWh in attached or detached garages and detached accessory
structures.
Project Scope and Compliance Details
5
80 kWh on exterior walls.
80 kWh outdoors on the ground.
Reference: R 302.6
✓ Separation of ESS Units
The basic code requirement is for ESS units to be located 36 inches apart.
For instance, two separate 20 kWh energy storage units could be installed
on either side of an inverter that was processing the DC power from these
storage units. If no additional large-scale fire testing is provided, these
units could be installed as close to the inverter as permitted by the
inverter’s instructions and no closer than 36 inches apart from each other.
However, if large-scale fire testing showed that the units could be safely
installed 12 inches apart, it would be permissible to install both units next
to one another on one side of the inverter.
PV and ESS Electrical Code Interconnection Requirements
✓ Inverter Installation
The inverter installation should meet the requirements of Article 705.
Reference: CEC Article 705
Applicant Acknowledgements
The following statements have been acknowledged and agreed to by the Applicant
on July 21, 2025, 12:11 PM PDT.
By checking this box, I consent to Symbium’s Terms of Service and Privacy
Policy.
By checking this box, I consent to Symbium submitting my permit
application(s) on my behalf and acknowledge that any Symbium service
fees are non-refundable. I will be responsible for payment of government
Project Scope and Compliance Details
6
fees in full, for which I will receive an invoice via email from the Authority
Having Jurisdiction.
I understand that the applicable government office, and not Symbium, has
the final authority to approve any permit applications, fees, or other
material submissions. Symbium makes every effort to produce and publish
the most current and accurate information possible. No warranties, express
or implied, are provided for the information on Symbium's site or via its
services, its use, or its interpretation. Use of Symbium's website or
services indicates an understanding and acceptance of this statement.
Project Scope and Compliance Details
7
City of San Juan Capistrano
Inspection Checklist
Project Location
31791 Via Granada, San Juan Capistrano, CA 92675
Symbium Project ID
project_8ada9c7f-a303-43f1-94df-bdff6ab22f80
Scope of Work
Install 2 ESS units
General
All work done in a neat and workmanlike manner. [CEC 110.12]
Equipment (e.g., ESS units, battery units, inverters, disconnects) is
installed, listed, and labeled according to the submitted plan and
manufacturers’ instructions.
ESS units no greater than 20 kWh each.
ESS units are spaced according to UL 9540 listing or with 3 feet
spacing between units and between units and doors or windows
entering the dwelling unit.
ESS maximums are followed (40 kWh inside dwelling or 80 kWh in
garage and elsewhere).
Electrical Requirements
Bonding and Grounding
Grounding/bonding of ESS units, battery units, inverters, conduit and
1
other electrical equipment according to the CEC and manufacturer’s
instructions.
Conductors
Conduit and other wiring methods installation according to the CEC
and the submitted plan.
Conductors, cables, and conduit types, sizes, and markings
according to the submitted plan.
Overcurrent Protection
Overcurrent protection devices are provided per the submitted
plans. [CEC 690.9(A)]
Disconnects
Disconnects are installed according to the submitted plan and
properly located as required by the CEC.
Interconnection Requirements
For grid-connected systems, documentation is provided to show
that ESS meets utility interconnection requirements.
PV system electrical interconnection point complies with the
submitted plan.
ESS Installation Requirements
Access and working space for ESS equipment such as ESS units,
battery units, inverters, disconnecting means, and panelboards [CEC
110.26].