Loading...
B25-0433 - 29681 WOODLAKE CTCITY OF SAN JUAN CAPISTRANO BUILDING PERMIT #: B25-0433 08/08/2025 ISSUED JOB VALUE: # OF UNITS: PERMIT NUMBER: ISSUED BY: APN #: TRACT: LOT: SUBDIVISION: PERMIT TYPE: OCCUPANCY: BUILDING SQ. FT.: STORIES: DF4 650-082-23 29 7671 $ 32,000 SOLAR PANEL INSTALLA 0 1 0 JOB ADDRESS: PEREZ, MAURICIO & ELISAOWNER NAME 29681 WOODLAKE CTMAILING ADDRESS CONTRACTOR NAME CSLB EXPIRATION ADDRESS TENANT NAME PHONE MAILING ADDRESS I have carefully examined the completed permit application and do hereby certify under penalty of perjury that all information hereon including the declarations are true and correct and I further certify and agree if a permit is issued: to comply with all City, County, and State laws governing building construction, whether specified herein or not. I also agree to save, indemnify and keep harmless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses which may in any way accrue against said City in consequence of the granting of this permit. SIGNATURE: PRINT FULL NAME: SOLAR SAVINGS DIRECT INC 3867 DIVIDEND DR STE A 05/31/2026 Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work commenced. An OSHA permit is required for excavations over 5’0” deep and demolition or construction of structures over 3 stories in height. I hereby affirm that I am licensed under provisions of Chapter 9 of Division 3 of the Business and Professions Code, and my license is in full force and effect. I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor’s License Law does not apply to an owner of property who builds or improves thereon and who contracts for such projects with a contractor’s) license pursuant to the Contractor’s License Law. DESCRIPTION OF WORK I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers’ compensation laws of California and agree that if I should become subject to the workers’ compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. WARNING:FAILURE TO SECURE WORKERS’COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TI CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSDAND DOLLARS($100,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES. B25-0433 1065773 , SHINGLE SPRINGS, CA 95682 SAN JUAN CAPISTRANO, CA 92675 (949) 795-3581 (530) 344-3237 PHONE PHONE DATE: _________________ SIGNATURE: _______________________________________ 23 ROOF MOUNTED SOLAR PANELS. 9.43kW DC SYSTEM. (2) BBU. CSLB # OWNER / CONTRACTOR DECLARATION ______ ______ I, as owner of the property, or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale. (Sec.7044, Business and Professions Code: the Contractor’s License Laws does not apply to and owner of property who builds or improves thereon, who does such work himself or through his employees, provided that such improvements are not intended or offered for sale. If however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale) I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain workers’ compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers’ compensation insurance carrier and policy number are: CARRIER: ACE AMERICAN INSURANCE COMPANY POLICY #: C58887651 (This section needs to be completed if the permit is for one hundred dollars ($100) or less) ______ ______ 29681 WOODLAKE CT ______ EXPIRATION CONTRACTOR: OSHA OWNER/BUILDER: OWNER/BUILDER: WORKER'S COMPENSATION: EXEMPTION: FINAL09/18/2025 From:Symbium Support To:Building Division Cc:guichoperezcruz@outlook.com; permits@solarsavingsdirect.com Subject:Symbium permit submission for Expedited Residential Solar Permit at 29681 Woodlake Ct Date:Wednesday, June 4, 2025 10:23:24 AM [The e-mail below is from an external source. Please do not open attachments or click links from an unknown or suspicious origin.] External Sender - From: (Symbium Support <permits@symbium.com>) This message came from outside your organization. Dear San Juan Capistrano’s Building & Safety Division, Please find attached the completed application for an Expedited Residential Solar Permit on 29681 Woodlake Ct submitted by contractor Leandra Tapia. Scope of Work Summary Install 23 PV modules (9.32KW) with 23 micro-inverters; install 2 ESS units on an exterior wall. The estimated job value, as provided by the applicant, is $33,000. Owner Details B25-0433 6.67kW AC Name. Maurico Perez Cruz Address. 29681 Woodlake Ct, San Juan Capistrano, CA 92675 Phone. (949) 795-3581 Email. guichoperezcruz@outlook.com Contractor Details Name. Leandra Tapia CSLB License. 1065773 Business License. 81579 Address. 3867 Dividend Dr Ste A, Shingle Springs, CA 95682 Phone. (530) 344-3237 Email. permits@solarsavingsdirect.com Project Documents Maurico Perez Cruz_Plans_03_15_2025_V2_Stamped (1).pdf (Complete set of Plans) specs.pdf (Specification sheet or installation manual) symbium-inspection-checklist.pdf (Symbium inspection checklist) symbium-scope-compliance.pdf (Symbium approval document) 2022 Electrical Load Calculation Worksheet 02-14- 24_202402141100317816 (1).pdf (Electrical load calculation) MSP.pdf (Main Service Panel & Subpanel Dead Front Cover Photos) Perez Cruz, Maurico Contract (1).pdf (Signed Solar Contract with Homeowner) The permit fees have not been collected for this application by Symbium. Please invoice the applicant directly. For any questions concerning the use of Symbium to generate this application, please contact us at support@symbium.com and use the project reference: project_b08b3522-9ce6-4ea3-a8d4-4bcd51b4824c. Best, Symbium Team ***** Please note that email correspondence with the City of San Juan Capistrano, along with attachments, may be subject to the California Public Records Act, and therefore may be subject to disclosure unless otherwise exempt. Questions? Contact us at support@symbium.com Project Scope and Compliance Details This document provides approval for a revision to issued permit B25-0433. This revision was requested at August 1, 2025, 10:45 AM PDT. Additional permit fees may apply. Document Guide Strikethrough indicates questions that the applicant did not respond affirmatively to. In these instances, an alternative method of compliance was specified by the applicant. This document is color-coded to show the type of changes made in this revision. Yellow is used to highlight edited responses. Green is used to highlight new responses. Project Location 29681 Woodlake Ct Symbium Project ID project_8998c378-91f2-4b24-b75e-dc241a43befc Description of Revisions module type change Rooftop Solar or Battery Storage Installation Site Ground Snow Load: 0 psf Design Wind Speed: 95 mph Extreme Annual Mean Min. Dry Bulb Temperature: 38.84 ℉ 1 Energy Storage Systems (ESS) 1 Manufacturer or Brand: Enphase Energy Inc. Model: IQBATTERY-5P-1P-NA [240V] Size: 5 kWh Total number of units: 1 Location: On an exterior wall Not selected: This installation involves adding additional ESS units to an existing system. Energy Storage Systems (ESS) 2 Manufacturer or Brand: Enphase Energy Inc. Model: IQBATTERY-5P-1P-NA [240V] Size: 5 kWh Total number of units: 1 Location: On an exterior wall Not selected: This installation involves adding additional ESS units to an existing system. Additional Details for Energy Storage Systems (ESS) Separation of ESS units Not selected: Individual units are no closer than 36 inches Units are installed in accordance with approved large-scale fire testing results (UL 9540a or equivalent approved tests) ESS Structural Requirements ESS installation exceeds 250 lbs. Additional details ESS is installed according to manufacturer’s installation instructions. Project Scope and Compliance Details 2 Rooftop Photovoltaic (PV) Module Manufacturer or Brand: Qcells North America Model: Q.PEAK DUO BLK ML-G10 410 Number of modules being installed: 23 Module Specifications Max. Power (Pmax): 410 W Max. open circuit voltage (Voc): 45.37 V Temperature coefficient of Voc: -0.2695 % per ℃ Source circuit current (ISC): 11.2 Amp Max. open circuit voltage (for module): 47.96 V UL-2703 fire rating: C The PV system meets the minimum required fire class rating of the roof. Array mounting system Array mounting system is UL 2703 certified for bonding and grounding. Array mounting system uses UL 2703 grounding devices to bond separate exposed metal parts together or to the equipment grounding conductor. Additional array mounting system details The solar module and mounting system is rated by the manufacturer to withstand the upward force of the local wind speed and evenly distribute load into the supporting structure at the proposed maximum spacing (validated through the UL 1703 or 61730 module rating for mechanical load rating, and UL 2703 mounting system mechanical load rating). Attachment points of the mounting system are staggered. PV array is flush-mounted, i.e. parallel to the roof. Max. distance of the PV array off the roof: 4 inches Max. spacing between adjacent attachment points: 72 inches Project Scope and Compliance Details 3 Source circuit wiring PV system circuits on buildings meet requirements for controlled conductors in CEC 690.12. All exposed PV source circuit wiring is not smaller than 12 AWG PV wire or MFG cable All PV source circuit wiring in raceway is not smaller than 12 AWG THWN-2, XHHW-2, or RHW-2 Height of source circuit wiring above roof surface: 3 inches Disconnecting means for PV systems The PV system disconnecting means meets the requirements of CEC 690.13. Additional Details for Rooftop Photovoltaic (PV) Module Additional details Is there an existing PV system installed? No System size of new PV installation: 9.43 KW Total system size: 9.43 KW Weight of the PV system: 2.29 psf Roof 1 Slope of roof surface: 22 : 127 Roof 2 Slope of roof surface: 20 : 127 Roof 3 Slope of roof surface: 20 : 307 Additional Details for Roof Additional roof details Project Scope and Compliance Details 4 Roof covering material: Asphalt (composite) shingles I understand that roof jack, roof covering and roof sheathing inspections will be required. Roof covering beyond the area of the array will require a separate roofing permit. Please verify that the individual roof structure is structurally sound There are no visually apparent disallowed rafter holes, notches and truss modifications. There are no visually apparent structural decay or un-repaired fire damage. Roof sag, measured in inches, is not more than the rafter or ridge beam length in feet divided by 20. Inverter Existing equipment. Is this an existing inverter?: No Manufacturer or Brand: Enphase Energy Inc. Model: IQ8PLUS-72-2-US [240V] Inverter type: Solar microinverter Rated Max. Input Voltage: 60 V Number of microinverters: 23 Max. number of modules per microinverter: 23 Max. number of microinverters per output circuit: 12 Number of microinverter circuits: 2 Interconnection details Method of interconnection to the electrical service: Load-side Is this inverter controlled by a Power Control System? (PCS): Yes Compliance Analysis for SOLAR RESIDENTIAL ONLINE Application Project Scope and Compliance Details 5 Permit Application Requirements ✓ Qualified personnel The project’s contractor must possess an active business license from the City of San Juan Capistrano and an active CSLB license with at least one of the following classifications: B - General Building Contractor C-46 - Solar Contractor C-10 - Electrical Contractor   Reference: CEC 690.4   ✓ AC Nameplate Rating of PV Modules As per Senate Bill 379, residential rooftop PV installations that are no larger than 38.4 KW AC nameplate rating may qualify for an express permit.   Reference: Senate Bill 379   ✓ Eligible projects To be eligible for an Approval Document from Symbium, a project must involve installation of a PV module or an ESS unit. Structural PV Array Mounting Requirements ✓ Weight of the PV System The 4 psf average self-weight limit of a PV array, including its support components, is easily met by virtually all PV systems. Even glass-on-glass modules, including bifacial modules, fit within this distributed weight limit. This limit is similar to the weight of roof overlays, which were usually allowed automatically in 1990s and earlier Building Codes. ✓ UL-2703 Fire Rating of the PV system The PV system meets the minimum required fire class rating of the roof.   Project Scope and Compliance Details 6 Reference: CBC 1505.9 and R 902.4   ✓ Attachment Points of the Mounting System By staying within the 4 psf distributed weight for the array, the point- loading of roof framing members is negligible. When the design snow load is 10 psf or less, staggering of attachments is not necessary since the combined load of the snow and the array is still within the point loading limits of the roof members. ✓ Maximum Spacing between Adjacent Attachment Points The standard distance between attachment points for most locations in the United States is 48 inches. This allows for snow loads up to 60 psf and wind loads as high as 150 mph. For low snow load (10 psf or less) and low wind load (120 mph or less) areas, an attachment distance of 72 inches is permitted without causing excessive loading of roof framing members. Also, these rules are contingent on the distributed weight of the array being no greater than 4 psf. ✓ Maximum Distance off the Roof Roof installations of PV arrays that are not parallel (or nearly parallel) to the roof structure present unique wind and snow loading issues that may need further review by a design professional. Most residential rooftop PV arrays are mounted between 4 inches and 6 inches off the surface of the roof and are parallel, or nearly parallel to the roof surface. A system on a flat roof will be mounted at a slight angle in most cases to prevent pooling of water on the surface of the solar panels. For parallel-to-roof arrays, the distance between the roof surface and underside of module needs to be limited to 10 inches to control wind uplift pressures and take advantage of the “Kopp factor”. Wind tunnel research (Stenabaugh et al, 2014) shows that this reduction factor is 0.80 or less for arrays up to 10 inches off the roof. ✓ Mechanical Load Rating This check is to ensure that the mechanical loading of the structural rails and attachments are being applied consistently with the manufacturer’s instructions and any listing requirements. The PV modules are listed to UL Project Scope and Compliance Details 7 1703 or UL 61730 and the manufacturer’s instructions dictate how the module is to be supported and held in place for various mounting methods. The mounting system may or may not be listed to UL 2703 for mechanical load rating. If the UL 2703 mechanical load rating is required by the manufacturer, then the installation must comply with any limitation that this load rating requires. ✓ Wood Shake Roofs PV installations on wood shake roofs are not eligible for an express solar permit. ✓ Roof is structurally sound Rafters that fail the above criteria should not be used to support solar arrays unless they are first strengthened. Excessive roof sag can indicate an originally under-designed roof, or subsequent deterioration of a correctly designed roof. Roof sag, measured in inches, is not to exceed span, measured in feet, divided by 20. This corresponds to a dead load deflection of span L/240. Per IBC, dead plus live load deflections are not to exceed L/180, and if dead load is 10 psf and live load is in the range of 12 to 20 psf, the expected original dead load design deflection is of the order of one third to one half of L/180, that is, L/360 to L/540. Hence a larger dead load deflection of L/240 could indicate problems, warranting further investigation. ESS Electrical Code Installation Requirements ✓ UL 9540 listed ESS UL 9540 is an umbrella standard in that it includes several standards as prerequisites to fulfill the requirements in UL 9540. An ESS is defined as, “Equipment that receives energy and then provides a means to store that energy in some form for later use in order to supply electrical energy when needed”. The most common type of UL 9540 ESS utilizes a lithium-ion battery to store the energy. That lithium-ion battery must be listed to UL 1973, Standard for Stationary and Locomotive Batteries. In addition to the certification for the batteries, the inverters must be certified to UL 1741, Standard for Inverters, Converters, and Controllers for use in Distributed Energy Systems. This is the same standard used for PV utility-interactive Project Scope and Compliance Details 8 inverters that must be specifically listed and labeled for this application [CEC 690.4(B)]. Without this specific identification process for ESS, an unacceptable amount of review would be necessary to approve the equipment used in these systems. ESS that pass UL 9540 meet the basic requirement in the CRC and the CEC for an ESS.   Reference: R 328.2   ✓ Installation of ESS Units ESS units must be installed according to manufacturer's installation instructions.   Reference: R 328.3   ESS Residential Code Installation Requirements ✓ Limitation on Size of Individual ESS Units This requirement limits the size of an individual ESS unit to 20 kWh. One reason for this basic limitation is to put an upper bound on the amount of energy that can be stored in one enclosure. Individual enclosures are limited to 20 kWh which is consistent with the language of the 2022 CRC.   Reference: R 328.5   ✓ Size and Location of ESS Units ESS shall be installed only in the following location: Detached garages and detached accessory structures. Attached garages separated from the dwelling unit living space in accordance with Section R302.6. Outdoors or on the exterior side of exterior walls located not less than 3 feet (914 mm) from doors and windows directly entering the dwelling unit. Enclosed utility closets, basements, storage or utility spaces within Project Scope and Compliance Details 9 dwelling units with finished or noncombustible walls and ceilings. Walls and ceilings of unfinished wood-framed construction shall be provided with not less than 5/8-inch (15.9 mm) Type X gypsum wallboard. The aggregate rating of the ESS shall not exceed: 40 kWh within utility closets, basements and storage or utility spaces. 80 kWh in attached or detached garages and detached accessory structures. 80 kWh on exterior walls. 80 kWh outdoors on the ground.   Reference: R 302.6   ✓ Separation of ESS Units The basic code requirement is for ESS units to be located 36 inches apart. For instance, two separate 20 kWh energy storage units could be installed on either side of an inverter that was processing the DC power from these storage units. If no additional large-scale fire testing is provided, these units could be installed as close to the inverter as permitted by the inverter’s instructions and no closer than 36 inches apart from each other. However, if large-scale fire testing showed that the units could be safely installed 12 inches apart, it would be permissible to install both units next to one another on one side of the inverter. PV System Electrical Code Installation Requirements ✓ Grounding and bonding of array mounting system This requirement is to simplify the process of ensuring that the exposed metal of a PV array is well-grounded. UL 2703 has numerous mounting system products on the market that are compatible with many of the PV modules on the market. One key aspect of these listings is that UL2703 certification for a particular mounting system is specific for the PV modules to which it has been evaluated. Generally, the specific type or family of PV Project Scope and Compliance Details 10 module from a specific manufacturer is provided with the installation instructions to show to which PV module products the mounting system has been evaluated. Alternatively, it is possible to install a PV array mounting system that is not fully listed to UL 2703. In this case, each separate exposed metal part would need to have a UL 2703 listed bonding device attached to it for it to be bonded to adjacent metal parts 690.43 [2022 CEC] or a UL 2703 listed bonding device to connect the metal to the EGC. The only exposed metal parts not specifically required to be grounded are the roof attachments that attach the mounting system to the roof. These roof attachments and flashings are not likely to be energized and are often not exposed. The roof attachments are treated in a similar way that other mechanical fittings are treated in the CEC. The definition in Article 100 of fitting in the CEC is as follows: “Fitting. An accessory such as a locknut, bushing, or other part of a wiring system that is intended primarily to perform a mechanical rather than an electrical function.”   Reference: CEC 690.43   ✓ Requirements for Controlled Conductors The 2022 CEC requires that PV system conductors on buildings be controlled to a safer condition when a rapid shutdown switch is operated. The controlled conductors outside 1 foot from the array must be shutdown to below 30 volts within 30 seconds and PV array wiring within the array be controlled to a safer condition when in rapid shutdown mode. Conductors in the array can meet the requirement by segmenting to 80 volt sections within 30 seconds or meet either of the other two requirements in 690.12(B)(2). As of 2021, a new array listing process is available called PV Hazard Control (UL 3741). This new process allows array systems to be evaluated and meet the requirements with the PV array as outlined in 690.12(B)(2)(1) and 690.12(B)(2)(a) [2022 CEC].   Reference: CEC 690.12   ✓ Field Installed PV Array Wiring Project Scope and Compliance Details 11 This requirement is to simplify PV array wiring. Residential PV system wiring can be reduced to two main categories: (a) exposed string wiring is 12 AWG PV Wire [CEC 690.31(C)(1)]; and, (b) PV source circuit wiring is 12 AWG THWN-2, XHHW-2, or RHW-2. These simple rules work for any PV system with four source circuits or less using PV modules with a rated short circuit current of no greater than 12.8 amps. Since the highest ISC for most PV modules commonly available are less than 12.8 amps, 12 AWG conductors will work for these modules regardless of location in the U.S. as long as there are no more than 9 current carrying conductors in the conduit and the conduit is at least 7/8 inches above the roof surface. For those PV modules with an ISC above 12.8 amps, 10 AWG conductors must be used.   Reference: CEC 690.31(c) and CEC 310.15(b)(3)(c)   ✓ Disconnecting Means The 2022 CEC requires that the PV system disconnecting means separates the PV system from all other systems in a building. Details in CEC 690.13(E) list the characteristics of a PV disconnect. Most commonly a PV system disconnecting means is a switch or circuit breaker. This switch or circuit breaker is marked “PV System Disconnect”, and must be installed in a readily accessible location CEC 690.13(A).   Reference: CEC 690.13(a)   ✓ Equipment is rated for the maximum DC voltage applied. This requirement addresses the need to check to make sure that all equipment that is connected together on the DC side of a PV system is properly configured to prevent equipment from having the DC voltage limits exceeded.   Reference: CEC 690.7   ✓ The PV array and inverters are correctly configured for safe operation This requirement addresses the need to ensure that: Project Scope and Compliance Details 12 Sufficient number of inverter strings, microinverters, or optimizers are available for the installed PV modules. The maximum number of PV modules that can be connected to a string inverter equals the number of inverter strings times the maxmimum number of modules per string. The maximum number of PV modules that can be connected to a microinverters equals the number of microinverters times the maximum number of modules per microinverter. The maximum number of PV modules that can be connected to optimizers equals the number of optimizers. Sufficient number of microinverter circuits are configured as needed. PV and ESS Electrical Code Interconnection Requirements ✓ Inverter Installation The inverter installation should meet the requirements of Article 705.   Reference: CEC Article 705   Applicant Acknowledgements The following statements have been acknowledged and agreed to by the Applicant on August 1, 2025, 10:45 AM PDT. By checking this box, I consent to Symbium’s Terms of Service and Privacy Policy. By checking this box, I consent to Symbium submitting my permit application(s) on my behalf and acknowledge that any Symbium service fees are non-refundable. I will be responsible for payment of government fees in full, for which I will receive an invoice via email from the Authority Having Jurisdiction. I understand that the applicable government office, and not Symbium, has the final authority to approve any permit applications, fees, or other material submissions. Symbium makes every effort to produce and publish Project Scope and Compliance Details 13 the most current and accurate information possible. No warranties, express or implied, are provided for the information on Symbium's site or via its services, its use, or its interpretation. Use of Symbium's website or services indicates an understanding and acceptance of this statement. Project Scope and Compliance Details 14 City of San Juan Capistrano Inspection Checklist This document provides an updated checklist for a revision to issued permit B25-0433. This revision was requested at August 1, 2025, 10:45 AM PDT. module type change Project Location 29681 Woodlake Ct Symbium Project ID project_8998c378-91f2-4b24-b75e-dc241a43befc Scope of Work Install 23 PV modules 9.43KW; Install 2 ESS units General All work done in a neat and workmanlike manner. [CEC 110.12] Equipment (e.g., ESS units, battery units, inverters, disconnects) is installed, listed, and labeled according to the submitted plan and manufacturers’ instructions. ESS units no greater than 20 kWh each. ESS units are spaced according to UL 9540 listing or with 3 feet spacing between units and between units and doors or windows entering the dwelling unit. ESS maximums are followed (40 kWh inside dwelling or 80 kWh in garage and elsewhere). Module manufacturer, make, model, and number of modules match 1 the submitted plans. [CBC 107.4] DC PV modules are listed to UL 1703. AC modules are listed to UL 1703 and UL 1741. Inverters are listed to UL 1741. [CEC 690.4, CRC R324.3.1] Modules are attached to the mounting structure according to the manufacturer’s instructions and the submitted plans. [CEC 110.3(B), CRC R324.3] Roof penetrations/attachments are properly flashed/sealed. [CRC R903, R324.4.3] System operating at 80 volts or greater is protected by listed dc arc fault protection. [CEC 690.11] Rooftop-mounted PV panels and modules have the proper fire classification rating. [CRC R324.4.2] Roofs with slopes greater than 2:12 have solar panel layouts with access pathways that comply with submitted roof plan. Unless otherwise approved by the fire service, the following shall apply. At least two 3-foot wide access pathways from the eave to the ridge with at least one of these pathways on the street or driveway side of the house. [CRC R324.6.1]. Panels/modules are located no higher than 18 inches from the top of the ridge where the PV array is less than 33% of the roof area or 66% of the roof area for sprinklered homes. For PV arrays greater than those allowed for an 18 inch ridge setback, a 3-foot space to the ridge is required. [CRC R324.6.2] Electrical Requirements Bonding and Grounding Grounding/bonding of ESS units, battery units, inverters, conduit and other electrical equipment according to the CEC and manufacturer’s instructions. A grounding electrode system is installed. [CEC 690.47] City of San Juan Capistrano Inspection Checklist 2 Modules and support structures are bonded and grounded in accordance with the manufacturer’s installation instructions with products certified to UL 2703. [CEC 690.43, 110.3(B)] Properly sized equipment grounding conductor is routed with the circuit conductors. [CEC 690.45] Grounding electrode conductors are properly connected. [CEC 690.47] Bonding fittings are used for ferrous metal conduits enclosing grounding electrode conductors. [CEC 250.64(E)] Conductors Conduit and other wiring methods installation according to the CEC and the submitted plan. Conductors, cables, and conduit types, sizes, and markings according to the submitted plan. Exposed single conductor cables are type USE-2 or PV Wire. [CEC 690.31(C)(1)] Conduit wiring is 90°C, wet-rated type RHW-2, THWN-2, or XHHW-2. [CEC 310.15] Only solidly grounded conductors marked white or gray (only ac neutral typically) [CEC 200.6] Open conductors are supported, secured, and protected. [CEC 334.30, 338.12(A)(3)] Cables are not in contact with the roof surface. [CEC 334.30] DC conductors inside a building are in a metal raceway or MC metal- clad cable that complies with 250.118(10), or metal enclosures. [CEC 690.31(G)] Where installed across ceiling or floor joists, Flexible metal conduit (FMC) smaller than 3/4 inches or Type MC cable smaller than 1 inch in diameter, containing PV system dc circuits, shall be protected by City of San Juan Capistrano Inspection Checklist 3 guard strips. [CEC 690.31(G)(2)]. For underground conductor installations, the burial depth is appropriate and warning tape is in place. [CEC 300.5(D)(3) & Table 300.5] Aluminum is not placed in direct contact with concrete. [CEC 250.120(B), 110.11] PV system conductors and premises wiring are separated. [CEC 690.31(B)] PV system conductors are grouped and identified. [CEC 690.31(B)] Overcurrent Protection Overcurrent protection devices are provided per the submitted plans. [CEC 690.9(A)] Overcurrent protection devices (OCPD) in PV system dc circuits are listed for use in PV systems. [CEC 690.9(B)] Combiner box, where used, is listed to UL 1741. [CEC 690.4(B)] Inverter output circuit breaker is located at opposite end of bus from utility supply at load center and/or service panelboard. If panel is center-fed, inverter output circuit breaker can be at either end of busbar [CEC 705.12(B)] (not required if the sum of the inverter and utility supply circuit breakers is less than or equal to the panelboard bus rating). Disconnects Disconnects are installed according to the submitted plan and properly located as required by the CEC. Disconnects used in DC circuits are listed for DC circuits. [CEC 110.3] Isolation devices are installed as required for PV equipment. [CEC 690.15] City of San Juan Capistrano Inspection Checklist 4 Load-break equipment disconnects are installed on all inverter and charge controller input circuits greater than 30 amps. [CEC 690.15] Where connectors are used as disconnecting means, they meet the ratings of the equipment to which they are connected. [CEC 690.33(E) & 690.15] A PV system disconnecting means, according to 690.13, provides disconnection of PV conductors from other conductors in the building. [CEC 690.13 Interconnection Requirements For grid-connected systems, documentation is provided to show that ESS meets utility interconnection requirements. PV system electrical interconnection point complies with the submitted plan. PV Modules and Array DC modules are properly marked and labeled. [CEC 110.3, 690.51] AC modules are properly marked and labeled. [CEC 110.3, 690.52] PV modules are in good condition (i.e., no broken glass or cells, no discoloration, frames not damaged, etc.). [CEC 110.12(B)] Maximum PV voltage of 600 volts for one- and two-family dwellings. [CEC 690.7] A rapid shutdown system is installed according to the submitted plan [CEC 690.12]. PV Source/Output Circuit Cable Management Cables are secured by staples, cable ties, straps, hangers or similar fittings at intervals that do not exceed 4.5 feet. [CEC 334.30, 338.12(A)(3)] City of San Juan Capistrano Inspection Checklist 5 Cables are secured within 12 inches of each box, cabinet, conduit body or other termination. [CEC 334.30, 338.12(A)(3)] Cable closely follows the surface of the building finish or of the running boards. [CEC 690.31(G)] Electrical Connections Crimp terminals are listed and installed using a listed tool specified for use in crimping those specific crimps. [CEC 110.14] Pressure terminals are listed for the environment and tightened to manufacturer recommended torque specifications. [CEC 110.11, 110.14] Connectors are listed for the voltage of the system and have appropriate temperature and ampere ratings. [CEC 110.14] Twist-on wire connectors are listed for the environment (i.e., wet, damp, direct burial, etc.) and installed per manufacturer’s instructions. [CEC 110.11, 110.14, 300.5(B)] Power distribution blocks are listed. [CEC 690.4, 314.28(E)] Terminals containing more than one conductor are listed for multiple conductors. [CEC 110.14(A)] Connectors and terminals used other than class B and C stranded conductors (fine stranded conductors) are listed and identified for use with specific conductor class or classes. [CEC 110.14(A)] Connectors that are readily accessible and over 30 volts require a tool for opening. [CEC 690.33(C)] All connectors are properly installed, fully engaged, and secure. [CEC 110.3(B), 110.12] Inverters Point of connection is at a dedicated breaker or disconnect (no loads). [CEC 705.12(B)(1)] City of San Juan Capistrano Inspection Checklist 6 Where a back-fed breaker is used as a utility interconnection means, the breaker is not marked “line and load.” [CEC 705.12(B)(4)] Any required barrier is installed between the ac, dc, or data wiring. [CEC 110.3(B), 110.27] Signs and Labels All interior and exterior dc conduit, enclosures, raceways, cable assemblies, junction boxes, combiner boxes and disconnects are marked. [CEC 690.31(G)(3), 690.31(G)(4), 690.53] The markings on the conduits, raceways and cable assemblies are every 10 feet, within one foot of all turns or bends and within one foot above and below all penetrations of roof/ceiling assemblies, walls and barriers. [CEC 690.31(G)(3), 690.31(G)(4)] The markings say “WARNING: PHOTOVOLTAIC POWER SOURCE” and have 3/8-inch (9.5 mm) minimum-sized white letters on a red background. The signs are made of reflective weather resistant material. [CEC 690.31(G)(3) & (G)(4)] Marking is placed adjacent to the main service disconnect in a location clearly visible from where the disconnect is operated. [CEC 705.10] Required labels shall be permanent and suitable for the environment. The labels in Table 1 are required where applicable. ESS Installation Requirements Access and working space for ESS equipment such as ESS units, battery units, inverters, disconnecting means, and panelboards [CEC 110.26]. City of San Juan Capistrano Inspection Checklist 7