B21-1032 - 26115 FARM RD32400 Paseo Adelanto
San Juan Capistrano, CA 92675
(949) 493-1171
www.SanJuanCapistrano.org
March 24, 2025
Owner:
AG ESSENTIAL HOUSING CA 1 LP
8586 E HARTFORD DR #118
SCOTTSDALE, AZ 85256
MEMBERS OF THE CITY COUNCIL:
CERTIFICATE OF USE & OCCUPANCY
Troy Bourne
John Campbell
Sergio Farias
Howard Hart
John Taylor
HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT
TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND
APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY
CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY
CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING:
Permit Number:
B21-1032
Building Address:
26115 FARM RD
Tract:
19063
Lot:
156
Unit:
Building Use:
(2173sf SINGLE FAMILY DWELLING w/ (434sfl ATTACHED
GARAGE
Occupancy Classification:
R -3/U
Type of Construction:
VB
Occupant Load:
PER CBC SECTION 1004
Fire Sprinkler:
YES
Special Conditions:
CITY OF SAN JUAN CAPISTRANO
JAMES WIATRAK, CBO, CASp
Chief Building Official
POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE
CHIEF BUILDING OFFICIAL
THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER
3/24/2025
Plan Review History
Permit Number B21-1032
Type BUILDING
Subtype SFD DETACHED
Status FINALED
Owner AG ESSENTIAL HOUSING CA 1 LP,
Page 1
Applied 9/7/2021
LL1
Approved 9/27/2021
CJ5
Issued 9/27/2021
CJ55
Finaled 10/5/2023
WF1
Expired
Applicant LENNAR HOMES OF CALIFORNIA INC
Site Address City State Zip
26115 FARM RD SAN JUAN CAPISTRANO CA 92675
Subdivision Tract Block Lot No Parcel No
THE FARM -ANDALUSIA 19063 156 TRACT 19063 LOT
Zoning Construction Type Occupancy Type
VB R -3/U
Review Group: ALL REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
C & D RECYCLING PC APPROVED Counter Tech 8/31/21 9/17/21 9/14/21 14
Rnnln
Remarks and Notes:
Review Group: COO REVIEWS REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
CERTIFICATE OF COO APPROVED Dianna Flores 3/9/22 3/24/25 1,111
nrrl IPnnlrry
Remarks and Notes:
------------------•-•---•-------.----....._..-...----------- ----------- .._.......------------------------ •--............. ---- ----- ..
COO - BLDG FINAL COO APPROVED William Forsythe 1015/23 10/16/23 1x15/23 d
INCP
Remarks and Notes:
-----------------------------------•---•-•---------------••----•--•----- ._..._.._. ............................ ___ ------- ._........... --- --•--
COO - BUS COO APPROVED Amy Massey 3/10122 3121/22 3/14122 0
I Ir.FnICF
Remarks and Notes:
COO - NPDES COO APPROVED Madison LaScalza 3/9/22 311$/22 3115122 6
Remarks and Notes:
COO -PLANNING- COO APPROVED Laura Stokes 3/9/22
Nnl Munn,
Remarks and Notes:
COO - PLANNING - COO APPROVED David Contreras 3/9/22
PP() I KAAM
Remarks and Notes:
.....---•------........ -• . ...... ..............
-- -
3/18/22 3/15/22 6
. • --.............. ...............................
3/18/22 3/18/22 9
PERMIT REVIEWS
Report By:
CNIM5 YSTEMS
COO - PUB WRKS
COO APPROVED James Prather
3/9/22
3/18/22 3/15/22
6
rnnl Inlcp
Remarks and Notes:
COO - SMWD
...................................-........_..._...............................
COO APPROVED SMWD
3/9/22
3/18/22 3/17/22
........
8
Remarks and Notes:
...............................
COO - UTILITIES
.............__............._._..._..._.............._...........---...:._._._.
COO APPROVED Camilo Jimenez
3/9/22
3/18/22 4/20/22
..........
42
RFIFACFC
Remarks and Notes:
COO -BLDG
_-....._..-•------------•-
COO APPROVED William Forsythe
3/9/22
10/5/23
-•-•--------------
575
rRnnlnlriRnnln
Remarks and Notes:
COO -OCFA -
COO APPROVED William Forsythe
3/9/22
1015123
575
rnAAAAIIAInMAI II
Remarks and Notes:
PERMIT REVIEWS
Report By:
CRW , YSTEMS
Permit Number
CODE YEAR
ISSUED BY
SITE APN
SITE LOT NO
SITE TRACT
SITE SUBDIVISION
JOB VALUE
OCCUPANCY TYPE
PERMIT TYPE.
BUILDING SF
NO STORIES
NO UNITS
CITY OF SAN JUAN CAPISTRANO ISSUED
09/27/2021
BUILDING PERMIT
Permit No. B21-1032
SC PTP N
B21-1032
[ANDALUSIA MODEL. PLAN IBR. 21731fSFR .v/ 434sf ATT GARAGE.
2019
728102
CJ55
09/30/2022
TRACT 19063 LOT 156
156
ADDRESS
19063
CITY, ST, ZIP
THE FARM -ANDALUSIA
TENANT NAME
5283,750
FINAL
R -3/U
BUILDING
O
2,173
1
4J _
JOB ADDRESS: 26115 FARM RD
PHONE
MAiLINGADDRESS 8585 E HARTFORD DR
CITY,STATE,ZIP SCOTTSDALE, AZ 85255
CONTRACTOR NAME LENNAR HOMES OF CALIFORNIA INC
Total Mobile Home
I have carefully examined the completed permit application and do hereby certify under penalty of
perjury that all information hereon including the declarations are true and correct and 1 further
certify and agree if a permit is issued: to comply with all City, County, and State laws governing
building construction, whether specified herein or not. I also agree to save, indemnify and keep
harmless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses
which may in any way accrue against sard,City In con<cquenca of the tmmlimg of this permit.
Owner/Contractor
Print Name
ARCH PC = B21-0315
MODEL PRECISE GRADE PC = B21-0517
NEW RES OCCUPANCY GROUP R-3
728102
ST. LIC EXPIRE
09/30/2022
PHONE
(949) 789-1600
ADDRESS
15131 ALTON PKWY 4345
CITY, ST, ZIP
IRVINE, CA 92618
TENANT NAME
8.03
PHONE#
27.29
MAILING ADDR
66.44
CITY, ST, ZIP
11.79
Total Mobile Home
I have carefully examined the completed permit application and do hereby certify under penalty of
perjury that all information hereon including the declarations are true and correct and 1 further
certify and agree if a permit is issued: to comply with all City, County, and State laws governing
building construction, whether specified herein or not. I also agree to save, indemnify and keep
harmless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses
which may in any way accrue against sard,City In con<cquenca of the tmmlimg of this permit.
Owner/Contractor
Print Name
ARCH PC = B21-0315
MODEL PRECISE GRADE PC = B21-0517
NEW RES OCCUPANCY GROUP R-3
145.50
NEW RES OCCUPANCY GROUP U
13.02
SERVICES 600V OR LESS NOT OVER 200AWS
33.78
ELECTRICAL ISSUANCE FEE
27.24
Total Electrical 219.54
PLUMBING PERMIT
AMOUNT
PLUMBING ISSUANCE FEE
27.24
FIXTURES AND VENTS
173.60
WATER HEATER INCLUDING VENT
13.62
WATER PIPING SYSTEMS
5.26
# GAS SYSTEMS
8.03
BUILDING SEWER
27.29
FIRE INSTALL I TO 50
66.44
MECHANICAL PERMIT
AMOUNT
DUCT INSTALL/REPLACE/RELOC
96.36
APPLIANCE VENTS
8.03
VENTS AND EXHAUST HOOD/DUCTS
11.79
AC/BOILER/COMPR<3HP AND 1 OOK BTU
16.28
EXHAUST FAN W/ SINGLE DUCT
42.00
FURNACE FORCED AIR OR GRAVITY UP TO I OOK
16.39
MECHANICAL ISSUANCE FEES
27'24
FIREPLACE VENTS AND EXHAUST
11.79
piratiotr:: Every permit issued shall become invalid unless the work
on the site authorized bs
A permit is commenced within 12 months after its issuance, or if the work authorized on the
by such permit is suspended or abandoned for a period of 180 days after the time the work
An OSHA permit is required for excavations over 5'0" deep and demolition or construction of
structures over 3 stories in height.
,Applicant's signature / 1
Contractor: I hereby affirmhiarf atm license under provisions of Chapter 9 of Division 3 of the Business and Professions Code, and my license is in full force and effect_
4)wn�lcr: 1, as ner owof the property, of my employees with wages as their salt compansauon, will du the work and the stmaure is not intended of offered for sale {544.7044, Epusine5a and prnftSSi0rr5
Cade- the Coarraclor s License Laws docs not apply to and owner of property who builds or improves thereon, who docs such work himself or through his emplayccs, provided that such improvements are nor
intended or oPfncd for sols if however, the building of impravemenl is sold within ane year of completio(1, rhe owner -builder will have the burden of proving that he did riot build or improve for the purpose of sale]
[Inn!, as owner of the proper}, am cxefusivcly 4onmac[rng with Iicrnscd eonwactors to cnnsmrer the project ($ce. 7044, Business and professions Cadc. The Contractor's ti" asc Law does nor
ro an owner of propcny why builds or improves thnson and who contracts for such projects with a contraelor'sy Iicome pursuant to the Connartnr s Liccnse Law.
�Y a 7t'a -! hereby afftnn umdcr penalty of perjury omc of she Fallowing declat alions: I havc and will InAiMitt wnrl ets' compensation insurance, as required by Section 3700 of Al
edc, fat the periormauce of rhe work for which iltis permit Is issued. iuSy workers' compensation Insurance carries and policy number are: Carrier _(l.A REpl10LLC LOSLIJAN .F
policy vSWC3 i4_IdR21- (iiris secit0n needs to lrc campletcd i the permit rs far ane hundred dollars(S 100) or less)
F ICmmti9Tt- certify that in the performance of the work Cor which this pemut is issued, I shall not employ any person in any manner ra as to become subject to the worked compensation laws of
C.slifumia and agree that if 1 should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, l shall forthwith empty with those provisions.
)air Applicant
SHALL
T AN EMPLYERTI CRIMINAL PENALTIES AND CIVIL FINES UP TOONE
THOUS ANDIDO LAR (S 00 000) INR
ADD TIONATO THE COST OF COMPENSA
TION, ION, DAMAGEDS AS PROVIDED CFOR RN SECTED
TO SECUPEWOKERS'LIOIPENSATION COVERAGE IS ION 3706 OF THE LABOR CODE, INTEREST. AND ATTORNEYS EES
CITY OF SAN JUAN CAPISTRAND
BUILDING PERMIT FEES [�� J.
Date: 912912021 .
Permit No. B21-1032
Applicant: LENNAR 11ONICS OF C.A1.IFOR
Phone/E-Mail (949) 789-1600
oT E—oc—atonl 26115 FARM RD
Account #
Type
Cost
01-44221
Building Permit
$
2,229.78
01-44223
Mechanical
$
229.88
01-44224
Plumbing
$
321.48
01-44225
Electrical
$
219.54
01-44221
Mobile Home Permit
$
0.00
01144222
Grading Permit Fee
$
0.00
01-44231
Grading Plan Check
$
0.00
01-44222
On -Site Residential Permit
$
0.00
01-44231
On -Site Residential Plan Check
$
0.00
Subtotal
$
3,000.68
01-44230
Bond Processing
$
0.00
01-44230
Building Plan Check
$
0.00
01-44230
Additional Plan Check
$
0.00
01-44230
Digital Record Fee ($1.00 per sheet)
$
34.20
01-44221
C & D Administrative Fee
$
92.74
01-44221
Special Inspection -Reinspection
$
0.00
01-44222
On -Site Commercial/Tract Permit Fee
$
0.00
01-44231
On -Site Commercial/Tract Plan Check Fee
$
0.00
01-44214
Geotechnical Soils Plan Review
$
0.00
10-44320
Ordinance 211
$
50.00
1042510
Ordinance 364
$
2,837.50
01-45354
Copies @ .20 Each
$
0.00
$
36.89
90-23331
SMIP Fee
33-44370
H.O.P.E. Fee (Housing in Lieu)
$
0.00
Other Fees
$
7,989.90
1 -CA Fees Date ecelved
HOA Approval ate Receiwed
School ee5 ate; RecenteF
Engine ering ees ate ecelved
Water Division Fees Date Received
01-44221
Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check))
$
440.51
01144221
Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check)
$
0.00
014240
NPDES Permit Fee (10% Permit Subtotal)
$
300.07
90-23000
Refundable Bond/Deposit Posted by Owner Contractor Type
$
2,837.50
90-23000
Refundable Band/Deposit Posted by Owner Contractor type
TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO
$
17,619.99
Receipt # 83241 Date: 9/29/2021 Cashier:
City of San Juan Capistrano
Development Services Department
Building and Safety Division
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Phone: (949) 443-6347
Website: www.sanjuancapistrano.org
1 o•t' Project: Andalusia at The Farm
Structural Observation Report AArcth: WHA -19206121-2496
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for
general conformance to the approved construction documents at significant construction stages and at completion of the
structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC
Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC. Phase: Models
Homesite#156
This report includes all construction work through _ 6th day of October 20 21 . Report No.: Plan 1 BR Page No.: 1 of 1
Project Address:
Structural Observer of Record (SOR):
Professional Lic./Reg. No.: Phone No. of SOR:
26115 Farm Rd., San Juan Capistrano, CA 92675
Option One Consulting Engineers
(Ilia B. Sarad, PE, SE, SECS
S-3855 714-556-1916
Building Permit No.:
Structural Observer (SO), if not by SOR:
Professional Lic /Reg. No.: Phone No. of SO:
❑ Steel Moment Frame 1 ❑ Concrete
Luis Salas. EIT
1714-556-1916
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box)
FOUNDATIONS
WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
IF PORTION OF BLDG WAS
OBSERVED, INDICATE LOCATION
DATE
® Footing, Stem Wall
❑ Concrete
❑ Steel Moment Frame 1 ❑ Concrete
P. T. Founda.ficrLSy_s.tem:
10/6/21
❑ Mat Foundation,
❑ Masonry
❑ Steel Braced Frame
❑ Steel Deck
i.e., post -tension sables and
Pre -stressed Conc. Slab
I
accessories, anchor bolts,
❑ Caisson, Pile, Grade
❑ Wood Shear Wall
❑ Concrete Moment
❑ Wood
o own tFolls & Straps, post
bases,slab size/reinforcement
Beam
Panel
Frame
❑ Foundation Pad,
❑ Other:
❑ Masonry Wal( Frame
❑ Other:
size/reinforcement.
Anchor
❑ Other:
❑ Other:
❑ Other.
❑ Other:
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
X❑ OBSERVED DEFICIENCIES AND COMMENTS: NONE
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
I declare that the following statements are true to the best of my knowledge:
1. 1 am the Registered Design Professional retained by the Owner to be in responsible charge of the
structural observation in accordance with the requirements of the City of San Juan Capistrano;
2. I. or another Registered Design Professional whom I have designated above and is under my
responsible charge, has performed the required site visits at each significant construction stage to
verify that the structure is in general conformance with the approved con stfuctiorl documents:
3. 1 understand that all deficiencies which I have documented must be corrected and a new structural
observation report must be issued Clearing these deficiencies; and
4. 1 understand that final acceptance of the structural systems by the Building and Safety Division cannot
occur without the coif�pclion of all ob erve4AietiC)tIncies.
0
October 6, 2021
t OF RECORD DATE
Form - Structural Observation Report7v1.O.doc
Updated: 06-28-17
p,OFESS10
S4�9Q�y�'
w m
N0. S3855
* Up, 3/31/2022
S',,9TTRUCTu�p�~�
STAMP OF STRUCTURAL OBSERVER OF RECORD
Page 1 of 2
City of San Juan Capistrano
Development Services Department
Building and Safety Division
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Phone: (949) 443-6347
Website: www.sanjuancapistrano.org
Project: Andalusia at The Farm
21 2496
Structural Observation Report Arch WHA-; 206 -
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for
general conformance to the approved construction documents at significant construction stages and at completion of the
structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC
Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC. Phase: Models
Homesite#156
This report includes all construction work through 8th day of November, 20 21 . Report NO.: Plan 1 BR Page No.: 1 of
Project Address: Structural Observer of Record (SORy
Professional Lic.IReg. No.: Phone No. of SOR:
26115 Farm Rd , San Juan Capistrano, CA 92675
P
Option One Consulting Engineers
(Ilia B. Sarad, PE, SE, SECS)
S-3855 714-556-1916
Building Permit No.:
Structural Observer (SO), if not by SOR:
Professional Lic.iReg. No.: Phone No. of SO:
(Floor/Roof)
Luis Salas, EIT
1714-556-1916
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box)
FRAMES DIAPHRAGMS
IF PORTION OF BLDG WAS
DATE
FOUNDATIONS
WALLS
(Floor/Roof)
OBSERVED, INDICATE LOCATION
❑ Footing, Stem Wall
❑ Concrete
❑ Steel Moment Frame ❑ Concrete
lnfeelioerand Exterior
11/8/21
I
GeneraLSystem;
❑ Mat Foundation,
❑ Masonry
❑ Steel Braced Frame
❑ Steel Deck
i.e., roof trusses, roof
Pre -stressed Conc. Slab
sheathin she r element.
❑ Caisson, Pile, Grade
® Wood Shear Wall
❑ Concrete Moment
® Wood
holdowns, floor sheathing, floor
Beam
Panel
Frame a
trusses, beams, headers and
❑ Foundation Pad,
❑ Other:
❑ MasonryWall Frame
❑ Other:
Anchor
❑ Other:
❑ Other:
❑ Other:
❑ Other:
❑X ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
X❑ OBSERVED DEFICIENCIES AND COMMENTS: NONE
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
I declare that the following statements are true to the best of my knowledge:
I. I am the Registered Design Professional retained by the Owner to be in responsible charge of the
structural observation in accordance with the requirements of the City of San Juan Capistrano;
2. I, or another Registered Design Professional whom I have designated above and is under my
responsible charge, has performed the required site visits at each significant construction stage to
verify that the structure is in general conformance With the approved construction documents:
3. 1 understand that all deficiencies which I have documented must be corrected and a new structural
observation report must be issued clearing these deficiencies; and
4. 1 understand that final ac lance of the st etural Syste by the Building and Safety Division cannot
occur without the corre of ob ed ficien
November 8, 2021
pROFESSip
Q !
S4��4 E
w �
a N0. S 3855
*
pp. 3/31/2022
UCTv3'0"-
E OF CAO1
SIGNATURE OF ST UCTURAL Oa SER ER OFR CORO DATE STAMP OF STRUCTURAL OBSERVER OF RECORD
Form - Structural Observation Report v1.0. Page 1 of 2
Updated: 06-28-17
Cn111iuilnn hisperlion &• Materials Testing
SOUTHWEST AL..AL,&f....A...�j.i��..-
hispeclion & Testing, Inc. 441 Coninjerrial Way, La Habra, CA 90631-6169
(562) 941-2990 • (714) 526-8441
FAX (562) 946-0026
February 26,2025
Building Official
City of San Juan Capistrano
Department of Building & Safety
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
SPECIAL INSPECTOR'S FINAL REPORT
Project Name: Andalusia @ The Farm - Models
Address: Tract #19063, San Juan Capistrano
Owner: Lennar
Lot
Address
Permit#
154
26135 Farm Road
B21-1030
155
26125 Farm Road
B21-1031
156
26115 Farm Road
B21-1032
This is to certify that Southwest Inspection and Testing, Inc. was employed to perform
special inspection on the above mentioned project at the above address, which required
continuous inspection per section 1701 of The California Building Code.
Justin Parrish - Post Tensioned and Reinforced Concrete, Wood and Shear, ICC #1134401
Paul Dickinson - Post Tensioned and Reinforced Concrete, ICC #8257322
David Galaviz - Post Tensioned Concrete, Reinforced Concrete, ICC #5085715
Danny Estrada - DIA/Epoxy, HD Titens, Reinforced Concrete, ICC# 5093138
Based upon special inspection and materials testing written reports of this work, it is our
judgment that the inspected work was performed to the best of our knowledge, in accordance
with the approved plans, specifications and applicable workmanship provision of the California
Building Code.
Sincerely,
r.�
41
Reviewed E.
I UV4121y
E-rpZ-31, z4
CIVIL
Steven L. Godbey Ian R. Waddell, P.E.
President Principal Engineer
SLG/IRW: spg For inspection and testing only, no design
responsibility expressed or implied.
March 15, 2022
Mr. Brett Hamara
Lennar Corporation
15131 Alton Parkway, Suite 365
Irvine, CA 92618
Project No. 18182-01
Subject. Geotechnical Release of Posigrading for Lots 154 through 156, Model Phase,
Andalusia, Tract 19063, "The Farm" Residential Development, San Juan Capistrano,
California
In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Lots
154 through 156, Model Phase of Andalusia for "The Farm' residential development, Tract 19063,
located in the City of San Juan Capistrano, California. LGC Geotechnical field personnel have provided
part-time, on-call observation and field density testing of postgrading operations in order to form an
opinion of site earthwork. In general, postgrading operations observed and/or tested by LGC
Geotechnical included interior plumbing backfill, foundation footing excavations, utility house
connection backfill, and subgrade preparation. Refer to table below for lots and associated addresses.
Postgradin-a Release Lot Summary - A dalusia - Model Phas
Lot No.
Address
154
26135 Farm Road
155
26125 Farm Road
156
26115 Farm Road
Based on the results of our observation and testing, it is our opinion that the subject site earthwork
operations were completed in general accordance with project geotechnical recommendations. This
letter serves as a geotechnical release from postgrading operations for the subject lots at The Farm
residential development. In our opinion, the subject building pads are suitable for their intended use
from a geotechnical perspective.
Closure
Our services were performed using the degree of care and skill ordinarily exercised, under similar
circumstances, by reputable engineers and geologists practicing in this or similar localities. No other
warranty, expressed or implied, is made as to the conclusions and professional advice included in this
report.
Should you have any questions regarding this letter, please do not hesitate to contact our office. We
appreciate this opportunity to be of service.
Respectfully,
LGC Geotechnical, Inc. QQ�OFESS�p"7f
Na 3147
Ryan Douglas, GE 3147
Project Engineer
RLD/amm/klr
Distribution: (1) Addressee (electronic copy)
Project No. 18182-01 Page 2 March 15, 2022
PF-ROACTIVE
ENGINEERING CONSULTANTS
a different kind ofcompany
March 7, 2022
City of San Juan Capistrano
Building Department
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Attention: City Grading Inspector
Subject: CIVIL ENGINEERS'S VERIFICATION OF PRECISE GRADING
Project: Tract 19063, Lot(s) 154-156
Street Address(es) 26135, 26125 & 26115 Farm Road
I hereby approve the precise grading for the referenced project in accordance with my responsibilities as
the Engineer of Record. The precise grading has been completed substantially in conformance with the
approved grading plan which includes line and grade for all engineered drainage devices, staking of
property corners for proper building location, location and inclination of all slopes, and the construction
of earthen berms and positive building pad drainage.
Sincerely,
P tive Engineering Consultants
e angdon
Project Manager
R.C.E. Number C42429
W20.084.000NAWCert Letters\PG Certs\PG cert lots 166-168.doox
27042 Towne Centre Drive, Suite 110
Foothill Ranch. CA 92610
T 949-716-7460
www-proactiveengineerl ng. net
FESS,
O C L00.
9(
C7 m
No.42429 x
>w Exp.
Cf VIU ����
OF CAL\F�
++
(A
CD
cr
0)
c
a)
^m^,
AW
N�W/
Yc
^V
L
AmA
CL
V
V
O
C/
G
N
v
E
(6N
Z L bj E
ca �a
v E Z Z
o Z3 +�
p p u
7
>u
cu O O
ao
id
W
C:
al
m
E
ko
m
E
N
Z
LU
Q1
i�
W
C ru
ra
N
Q
m_0a)
Z
Q
c Z
U
CD
to
'� C
O
Q1
—
C. o
ii
I? >
aJ
m
C
va
cn o
O
1�
Z
l0
LL
-1
N
O
41
O
l0
M
M
Q�
Q
E
a)
N
O
U
T
Ln
(O
c
i
�
v
(U
a
v
ar
O
pp
=
=
Q
O
o
Ln
J
-
p
v
E
(6N
Z L bj E
ca �a
v E Z Z
o Z3 +�
p p u
7
>u
cu O O
id
W
C:
al
m
E
�o
m
E
a)
Z
LU
n
i�
W
C ru
ra
N
O
m_0a)
Z
Q
c Z
a1
CD
to
'� C
O
—
—
C. o
ii
I? >
aJ
m
m
va
cn o
v
E
(6N
Z L bj E
ca �a
v E Z Z
o Z3 +�
p p u
7
>u
cu O O
C:
m
V
a
a)
In
ra
N
O
U
E
O
N
O
1�
Z
l0
LL
-1
Z
O
41
O
M
__j
I c -I
Q
v
E
(6N
Z L bj E
ca �a
v E Z Z
o Z3 +�
p p u
7
>u
cu O O
St St
I N C O R P O R A T E D
environmental services
the face of a greener generation
Acct: 81-40635
Company: Lennar Homes - The Farm
Year: 2023 2nd Qtr
Address: 32382 Del Obispo
City: San Juan Capistrano
92675
Recycling Report
Date of Haul Bin Size Tonnage
Roll -Off Processed Loads
4/4/2023
40
4.29
4/4/2023
40
3.92
4/10/2023
40
5.97
4/12/2023
40
8.22
4/12/2023
40
8.39
5/12/2023
40
2.18
6/20/2023
40
5.3
6/20/2023
40
5.38
4/13/2023
40
3.67
4/13/2023
40
6.13
4/25/2023
40
4.03
4/25/2023
40
5.56
4/25/2023
40
4.57
4/25/2023
40
4.95
4/27/2023
40
4.64
4/28/2023
40
3.15
5/3/2023
40
3.65
5/10/2023
40
4.23
5/10/2023
40
2.78
5/11/2023
40
6.22
5/11/2023
40
6.52
5/17/2023
40
1.8
5/17/2023
40
5.04
6/20/2023
40
5.16
5/24/2023
40
5.36
5/24/2023
40
5.72
5/24/2023
40
6.3
5/31/2023
40
8.26
6/5/2023
40
4.75
6/13/2023
40
7.49
6/13/2023
40
7.04
6/13/2023
40
4.21
6/21/2023
40
10.3
6/21/2023
40
1.67
6/22/2023
40
6/27/2023
40
3.45
6/30/2023
40
3.04
6/30/2023
40
6.9
5.15
Total Collected
195.39
Percentage Diverted FROM Landfill:
Percentage Disposed
142. 73.00%
52.7766
Date of Haul
Bin Size
Tonnage
Roll -Off Processed Loads
- Lowboy
5/2/2023
10
5/2/2023
10
7.04
5/9/2023
10
5.73
5/9/2023
10
9.34
4/19/2023
10
9.02
4/19/2023
10
8.14
4/25/2023
10
8.13
4/25/2023
10
9.59
4/27/2023
10
8.32
4/27/2023
10
4.22
5/10/2023
10
5.63
5/10/2023
10
8.71
5/10/2023
10
3.89
5/11/2023
10
7.39
5/3/2023
10
8.08
5/3/2023
10
10.24
5/4/2023
10
9.67
5/4/2023
10
10.36
5/4/2023
10
4.05
5/6/2023
10
7.11
5/6/2023
10
3.7
5/6/2023
10
3.35
6/1/2023
10
10.01
6/1/2023
10
9.64
6/1/2023
10
6.49
6/2/2023
10
8.22
6/2/2023
10
8.94
6/2/2023
10
9.62
6/13/2023
10
9.54
6/21/2023
10
6.24
6/21/2023
10
10.2
6/30/2023
10
10.78
8.81
Total Collected 250.20
Percentage Diverted FROM Landfill:
Percentage Disposed 227.68 22.52 91.00%
Roll -Off Pure Loads of Material
0.00
Percentage Diverted FROM Landfill:
Percentage Disposed
Project Totals
Percentage Diverted FROM Landfill:
Percentage Disposed
00 0
370.32 83.11%
75.27
Craig Dibley July 13, 2023
Senior Sustainability Supervisor Date
CR&R Incorporated