B23-0288 - 31864 PASEO ADELANTO 10601/07/2025
-
Name
Address
City/State/Zip
TENANT NAME
Phone ( )
ACCESSORY DWELLING UNIT
QTY QTY QTY QTY
Light Fixtures/Fans
FAU < 100k BTU's
Fixtures/Hose Bibs
New/Setup
Outlets/Switches FAU > 100k BTU's
Water Heater
Carport
Meters/Main Panels
AC/Comp BTU=
Water Piping
Gas Systems
Awning
Signs
Exhaust Fans
Temp Power
Motors > than 1 HP
Motors < than 1 HP
Duct/Register/Grill
Pool/Spa
Pool/Spa
Extend Plumbing
APPLICANT SIGNATURE DATE
Porch
ISSUANCE
ELECTRICAL PLUMBINGMECHANICAL
ISSUANCEISSUANCE
Fireplace
ISSUANCE
Fire Sprinkler Heads
Miscellaneous
PROPERTY OWNER
Appliance Vent
CONSTRUCTION TYPE NO. OF STORIES
MOBILE HOME
PROJECT ADDRESS UNIT #:
Extend Electrical
Cabana
OCCUPANCY GROUP(S)
SPRINKLERS
PERMIT NUMBER
JOB VALUATION
Pool/Spa
Vent/Exhaust Hood
Miscellaneous
Grease Interceptor
Earthquake Bracing
Electrical Wiring
Gas Piping
Sewage Disposal
Water Piping
City of San Juan Capistrano
DeDevelopment Services Department
32400 Paseo Adelanto
SaSan Juan Capistrano, CA 92675
Phone: (949) 443-6347
Email: building@sanjuancapistrano.org
www.sanjuancapistrano.org/building
Building Sewer
ATTACHED DETACHED
NEW
CONSTRUCTION
CONVERSION OF
EXISTING STRUCTURE
JADU 1.
2.
OCCUPANCY CURRENT OCCUPANCY PROPOSED
INT. ALT.
ADDITION
PATIO
POOL/SPA
DEMOLITION
EXISTING BUILDING ____SQ.FT.____SQ.FT.____SQ.FT.____SQ.FT.____SQ.FT.
NEW BUILDING
____SQ.FT.____SQ.FT.____SQ.FT.____SQ.FT.
________________
OCC. GROUP
DESCRIPTION OF WORK
COMBINING OR SUBDIVIDING SUITES?
CHANGE OF OCCUPANCY USE?
YES NO
YES NO
YES NO
APPLICANT
CONTACT NAME
CONTACT PHONE ( )
EMAIL ADDRESS
$
PRINT NAME
As the applicant for this project, I am aware of the potential liabilities with undertaking construction within any private easement or use restriction area that may exist on this property. I acknowledge that I have or will review the Title Report for this property to ensure that this project does not impact any private easements or use restriction areas. By signing below, I CERTIFY THE ABOVE INFORMATION TO BE TRUE AND CORRECT.
CONTRACTOR State License #:
Name
Address
City/State/Zip
BUILDING PERMIT APPLICATION
LL 01/24/22
B23 0288
Letter of Transmittal
3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868
phone 714.568.1010 fax 714.568.1028 www.csgengr.com
To: City of San Juan Capistrano Date Completed: 6/12/2023 Review #:2
32400 Paseo Adelanto Date Received: 6/5/2023
San Juan Capistrano, Ca. 92675 CSG #: 4304869
Attn: Building Division Agency Plan Check #: B23-0288
Job Address: 31864 PASEO ADELANTO #106
Job Description:
DIGITAL EMAIL-255sf RETAIL T.I. TENANT: PICK ME FLOWERS
Status: Plan is ready for permit issuance for the following:
X Plan is approved. X Architectural Energy
Plan is approved with conditions. See remarks. X Structural Other:
Plan is approved with redlines. See remarks. X Plumbing
Plan is approved with redlines and conditions. See remarks. X Electrical
Plan requires corrections. See attached list. Mechanical
We have reviewed the following documents ( X Digital only):
X Plans Truss Calculations
Structural Calculations Energy Calculations
Soil Report Specifications
X Geotechnical Review Letter Special Inspection Form(s)
Other:
Special items to note:
Plan has been stamped and signed by CSG
Environmental Health Services approval required
Special inspection required for
Hardship Form included
Remarks:
TI space is not accessible to the public and is for employees only.
From:
Eric Haghani, S.E.
Mike Teemant, MCP
CSG Consultants Inc. (714) 568-1010
RIVER STREET MARKEPLACE LLC
31871 Los Rios Street
San Juan Capistrano, CA 92675
June 23, 2023
City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
RE: River Street Marketplace – Pick Me Flowers – Marketplace Building
31864 Paseo Adelanto #106, San Juan Capistrano, CA 92675
To Whom it May Concern:
Landlord has entered into an agreement with Pick Me Flowers in the Marketplace building at River
Street Marketplace.
Landlord is in receipt of Tenant’s proposed plans and has authorized Tenant to submit the plans to The
City of San Juan Capistrano and all other regulatory agencies for review and approval.
We appreciate your help in processing Pick Me’s plans. Please let us know if you have any questions.
Thank you,
Dan Almquist
Manager
River Street Marketplace LLC
949-302-1389
202300492
VD 07/05/2023
No equipment
Van Doan, 07/05/2023
202300492
8711 Monroe Court, Suite A
Rancho Cucamonga, CA 91730
(909) 980-6455 / (909) 980-6435 fax
SAN JOSE ▪ STOCKTON ▪ FRESNO ▪ BAKERSFIELD ▪ RANCHO CUCAMONGA▪ DALLAS
DALLAS, TX, ▪ DENVER, CO ▪ CHARLESTON, SC
May 9, 2023 Job No. 3-220-0314
Mr. Alex Osinski
River Street SJC, LLC.
23727 Hawthorne Boulevard, Suite 1
Torrance, CA 90505
SUBJECT: REVIEW OF FOUNDATION PLANS
PICK ME FLOWERS TENANT IMPROVEMENT
31864 PASEO ADELANTO, SUITE 106
SAN JUAN CAPISTRANO, CALIFORNIA
Dear Mr. Osinski:
In accordance with your request, Salem Engineering Group, Inc. has reviewed the Foundation Plans dated
January 4, 2023, prepared by STB Structural Engineers, Inc. for the proposed tenant improvements within
the existing shell building located at the subject site.
Based on our review, from a geotechnical point-of-view, the relevant geotechnical aspects of the
foundation plans, related details, and notes are in compliance with the geotechnical engineering
recommendations in the Geotechnical Reports prepared by Inland Engineering Technologies, Inc.
If you have any questions, or if we may be of further assistance, please do not hesitate to contact our
office at (909) 980-6455.
Respectfully submitted,
SALEM Engineering Group, Inc.
Clarence Jiang, GE
Senior Geotechnical Engineer
RGE 2477
CSG 06/12/23B23-0288 V2
JAN 04, 2023
&,&,&,&,&,&,&,7<7<7<7<7<7<7<&,7<2)2)2)2)2)2)2)6666666$1$1$1$1$1$$1$1 -8--8-8-8-8$1$11$1$1$1-8$1 &$&$$&$&$&$$3,3,33,3,33,67667676767675$5$5$5$5$5$5$121212121212&$3,675$12
$33529('$33529('
5(9,(:(')25&2'(&203/,$1&(
&%&7KHHLVVXDQFHRUJUDQWLQJRI D SHUPLWVKDOOQRWEHFRQVWUXHGWR
EH DSHUPLWIRUURUDQ DSSURYDO RI DQ\YLRODWLRQ RIDQ\IRI WKH SURYLVLRQV
RI WKLV FRGH RRU RI DQ\RWKHU RUGLQDQFH RI WKH FWLRQMXULVGLF 3HUPLWV
SUHVXPLQJ WR JLYH DXWKRULW\WR YLRODWH RU FDQFHO WKH RYLVLRQVSUR RI WKLV
FRGH RU RWKHU RUGLQDQFHV RI WKH MXULVGLFWLRQVVKDOO QRW EH YDOLG&%&
(YHU\SHUPLW LVVXHG VKDOO EHFRPH LQYDOLG QOHVVX ZRUN LV
FRPPHQFHG ZLLWKLQGD\V
'$7(ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ$33529('%<BBBBBBBBBBBBBBBBBBBBBB
3(50,77BBBBBBBBBBBBBBBBBBBBBB
Digitally signed by
Doug Thompson
Date: 2023.05.15
13:22:34 -07'00'
CSG 06/12/23
B23-0288 V2
PERMIT NUMBER
JOB ADDRESS
)252)),&(86(21/<
'(3$570(17$33529$/65(48,5('
%8,/',1*
PLANNING:
38%/,&:25.6:
60:':
2&)$
YES
YES
YES
<(6
<(6
NO
NO
NO
12
12
INSTRUCTIONS:
1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV
GRQRWVXEPLWFRPSOHWHVHWRISODQV
³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV
1RWHWKHSDJHQXPEHUVRQZKLFKWKHUHYLVLRQVRFFXU
3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV
DESCRIPTION OF PROPOSED CHANGES:
3$*(
1 .
2 .
3 .
4 .
5 .
APPLICANT SIGNATURE DATE
BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME:
$86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS
FOR OFFICE USE ONLY
APPROVED BY: DATE:
&203$1<1$0(
EMAIL ADDRESS
CONTACT PHONE #
$33/,&$17 NAME:
&LW\RI6DQ-XDQ&DSLVWUDQR
'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW
3DVHR$GHODQWR
6DQ-XDQ&DSLVWUDQR&$
3KRQH
(PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ
ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ
5(9,6,21'()(55('68%0,77$/
$'',1*1(:0(3"
3&7*4*0/
1-"/3&7*&8&3
46#.*55"-%"5&
5"3(&5%"5&
YES 12
)252)),&(86(21/<
Bickel Group B23-0288
Kelly Johnson
31864 Paseo Adelanto Suite 106
949 572-8030
kjohnson@bickelgrp.com
Please see attached memo.
05/24/24
✔
1
CSG/LAURA
06/12/24
06/20/24
X
X XXX
2.5
CSG 06/19/24
REVISIONS MEMO
Date: May 24, 2024
To: City of San Juan Capistrano
31904 Paseo Adelanto
San Juan Capistrano, CA 92675
Re: Revisions to Permit B23-0288 (Pick Me Flowers)
31864 Paseo Adelanto, Suite 106, San Juan Capistrano
Bickel Project #: 22840
Please see below an itemized list of the changes which are clouded. Any sheets not noted
below were included in the set for reference with no changes made since the permitter set:
A-2.0 3- Section: Rough opening/window type updated
4- Elevation: Window added in profile
5- Elevation: Window added in profile
6- Elevation: Windows added withing openings
Keyed notes 16 & 17 added
A-3.0 Detail 4: updated for rafter connection to wall
Detail 7: Shelf modified
Details 17 & 18: window styles added/updated
S-1.0 Partial Foundation Plan: Foundatiopns added at two posts
S-3.0 Detail 7: updated for rafter connection to wall
Please feel free to contact me directly for any clarifications.
Regards,
Kelly Johnson, AIA, LEED AP | Principal
bg | Bickel Group Architecture
P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com
Letter of Transmittal
3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868
phone 714.568.1010 fax 714.568.1028 www.csgengr.com
To: City of San Juan Capistrano Date Completed: 6/19/2024 Review #:1
32400 Paseo Adelanto Date Received: 6/12/2024
San Juan Capistrano, Ca. 92675 CSG #: 4407324
Attn: Building Division Agency Plan Check #: B23-0288 REV1
Job Address: 31864 PASEO ADELANTO #106
Job Description:
(DIGITIAL/EMAIL) REVISION TO CSG 4304869 - ADD WINDOWS. REVISE WINDOW STYLES. ADD POSTS.
UPDATE RAFTER CONNECTION TO WALL. 255sf RETAIL T.I. TENANT: PICK ME FLOWERS
Status: Plan is ready for permit issuance for the following:
X Plan is approved. X Architectural Energy
Plan is approved with conditions. See remarks. X Structural Other:
Plan is approved with redlines. See remarks. X Plumbing
Plan is approved with redlines and conditions. See remarks. X Electrical
Plan requires corrections. See attached list. Mechanical
We have reviewed the following documents ( X Digital only):
X Plans Truss Calculations
X Structural Calculations Energy Calculations
Soil Report Specifications
Geotechnical Review Letter Special Inspection Form(s)
Other:
Special items to note:
Plan has been stamped and signed by CSG
Environmental Health Services approval required
Special inspection required for
Hardship Form included
Remarks: PC1: 2.5 hrs
Per architect:
From: Eric Haghani, S.E.
CSG Consultants Inc. (714) 568-1010
PERMIT NUMBER
JOB ADDRESS
)252)),&(86(21/<
'(3$570(17$33529$/65(48,5('
%8,/',1*
PLANNING:
38%/,&:25.6:
60:':
2&)$
YES
YES
YES
<(6
<(6
NO
NO
NO
12
12
INSTRUCTIONS:
1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV
GRQRWVXEPLWFRPSOHWHVHWRISODQV
³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV
1RWHWKHSDJHQXPEHUVRQZKLFKWKHUHYLVLRQVRFFXU
3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV
DESCRIPTION OF PROPOSED CHANGES:
3$*(
1 .
2 .
3 .
4 .
5 .
APPLICANT SIGNATURE DATE
BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME:
$86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS
FOR OFFICE USE ONLY
APPROVED BY: DATE:
&203$1<1$0(
EMAIL ADDRESS
CONTACT PHONE #
$33/,&$17 NAME:
&LW\RI6DQ-XDQ&DSLVWUDQR
'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW
3DVHR$GHODQWR
6DQ-XDQ&DSLVWUDQR&$
3KRQH
(PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ
ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ
5(9,6,21'()(55('68%0,77$/
$'',1*1(:0(3"
3&7*4*0/
1-"/3&7*&8&3
46#.*55"-%"5&
5"3(&5%"5&
YES 12
)252)),&(86(21/<
Bickel Group B23-0288
Kelly Johnson
31864 Paseo Adelanto Suite 106
949 572-8030
kjohnson@bickelgrp.com
Please see attached memo.
08/22/24
✔
2
CSG/PLNG
08/26/24
09/03/24
X
XX
XX
1
CSG 09/03/24
REVISIONS MEMO
Date: August 22, 2024
To: City of San Juan Capistrano
31904 Paseo Adelanto
San Juan Capistrano, CA 92675
Re: Revisions to Permit B23-0288 (Pick Me Flowers)
31864 Paseo Adelanto, Suite 106, San Juan Capistrano
Bickel Project #: 22840
Please see below an itemized list of the changes which are clouded. Any sheets not noted
below were included in the set for reference with no changes made since the permitter set:
A-2.0 1- Plan: Door 103 revised to standard door rather than dutch door. 5’ turning circle moved
to opposite end of the space.
6-Elevation: Upper windows removed; framed opening will remain open.
7-Sink height revised to 34” to meet ADA
A-3.0 1- Door Schedule: Doors D101 and D102 revised to remove panic hardware note that is
not required and did not match the hardware schedule. Door D103 note to be a dutch door
removed.
18-Window style: Upper window removed and will remain open.
Please feel free to contact me directly for any clarifications.
Regards,
Kelly Johnson, AIA, LEED AP | Principal
bg | Bickel Group Architecture
P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com
Letter of Transmittal
3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868
phone 714.568.1010 fax 714.568.1028 www.csgengr.com
To: City of San Juan Capistrano Date Completed: 9/3/2024 Review #:PC1
32400 Paseo Adelanto Date Received:
San Juan Capistrano, Ca. 92675 CSG #: 4410823
Attn: Building Division Agency Plan Check #: B23-0288 REV2
Job Address: 31864 Paseo Adelanto #106
Job Description:
Revision – Revise door remove upper window Revise door schedule & window style
Status: Plan is ready for permit issuance for the following:
X Plan is approved. Architectural Energy
Plan is approved with conditions. See remarks. Structural Other:
Plan is approved with redlines. See remarks. Plumbing
Plan is approved with redlines and conditions. See remarks. Electrical
Plan requires corrections. See attached list. Mechanical
We have reviewed the following documents ( X Digital only):
X Plans Truss Calculations
Structural Calculations Energy Calculations
Soil Report Specifications
Geotechnical Review Letter Special Inspection Form(s)
Other:
Special items to note:
X Plan has been stamped and signed by CSG
Environmental Health Services approval required
Special inspection required for
Hardship Form included
Remarks:
Recommend approval of revisions
1st P/C – 1.0 Hr
From: Khoa Duong, P.E.
CSG Consultants Inc. (714) 568-1010
PERMIT NUMBER:
JOB ADDRESS:
FOR OFFICE USE ONLY
DEPARTMENT APPROVALS REQUIRED:
BUILDING:
PLANNING:
PUBLIC WORKS:
SMWD:
OCFA:
YES
YES
YES
YES
YES
NO
NO
NO
NO
NO
INSTRUCTIONS: 1.Submit 3 sets of only the revised sheets stapled into sets
(do not submit complete set of plans)
2.“CLOUD” the proposed changes on the drawings.
3.Note the page number(s) on which the revision(s) occur.
4.Provide description of proposed changes.
DESCRIPTION OF PROPOSED CHANGES:
PAGE #
1 .
2 .
3 .
4 .
5 .
APPLICANT SIGNATURE DATE
BUILDING REVISION FEE:TOTAL PLAN CHECKER REVIEW TIME:
$86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS
FOR OFFICE USE ONLY
APPROVED BY: DATE:
COMPANY NAME:
EMAIL ADDRESS
CONTACT PHONE #:
( )
APPLICANT NAME:
City of San Juan Capistrano
DeDevelopment Services Department
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Phone: (949) 443-6347
Email: building@sanjuancapistrano.org
www.sanjuancapistrano.org/building
REVISION / DEFERRED SUBMITTAL
ADDING NEW M/E/P? :
REVISION #:
PLAN REVIEWER:
SUBMITTAL DATE:
TARGET DATE:
YES NO
FOR OFFICE USE ONLY
Bickel Group B23-0288
Kelly Johnson 31864 Paseo Adelanto Suite 106
949 572-8030
kjohnson@bickelgrp.com
Fire sprinkler modifications not needed for this scope so noted added to cover sheet A-0.0
under deferred submittals to reference shell building permit.
10/11/24
4
X
XXXX
3
JW
10/14/24
10/22/24
1
JAMES WIATRAK 10/15/24