B20-0540 - 31904 PASEO ADELANTOSEE REV 1 ABOVE 10/23/2024
%8,/',1*'(3$570(17
3(50,7$33/,&$7,21
3DVHR$GHODQWR
6DQ-XDQ&DSLVWUDQR&$
-2%9$/8$7,21 '(6&5,37,212):25.
1DPH
$GGUHVV
&LW\6WDWH=LS
1DPH
$GGUHVV
&LW\6WDWH=LS
3KRQH3KRQH
$5&+,7(&7(1*,1((5'(6,*1(5 &2175$&725
1DPH
$GGUHVV
&LW\6WDWH=LS
3KRQH
6WDWH/LFHQVH 6WDWH/LFHQVH
47< 47< 47< 47<
/LJKW)L[WXUHV)DQV
)$8N%78
V
)L[WXUHV+RVH%LEV
1HZ6HWXS
2XWOHWV6ZLWFKHV
)$8!N%78
V
:DWHU+HDWHU
&DUSRUW
0HWHUV0DLQ3DQHO
$&&RPS%78
:DWHU3LSLQJ
6XE3DQHOV
*DV6\VWHPV
$ZQLQJ
6LJQV
([KDXVW)DQV
%XLOGLQJ6HZHU
7HPS3RZHU
0RWRUV!WKDQ+3
0RWRUVWKDQ+3
'XFW5HJLVWHU*ULOO
3RRO6SD
3RRO6SD
([WHQG3OXPELQJ
6,*1$785('$7(
3RUFK
,668$1&(
(/(&75,&$/3/80%,1*
3KRQH
0(&+$1,&$/
1DPH
&LW\6WDWH=LS
,668$1&(,668$1&(
)LUHSODFH
,668$1&(
)LUH6SULQNOHU+HDGV
0LVFHOODQHRXV
3523(57<2:1(5
$GGUHVV
$SSOLDQFH9HQW
0,&52),/(
,17$/76) $'',7,216) 322/63$6)
02%,/(+20(
-2%$''5(66
$33/,&$171$0(
&217$&73+21(
(0$,/$''5(66
([WHQG(OHFWULFDO
&DEDQD
2&&83$1&<7<3( 3$7,26)
3(50,7180%(5
+2$5(48,5('7$5*(7'$7(
<(6
12
7(1$17
3RRO6SD
0HFKQLFDO+RRG
0LVFHOODQHRXV
*UHDVH,QWHUFHSWRU
(DUWKTXDNH%UDFLQJ
(OHFWULFDO:LULQJ
*DV3LSLQJ
6HZDJH'LVSRVDO
:DWHU3LSLQJ
4619
420,476.16 A-2 2060
Kelly Johnson
949 757-0411 ext.224
kjohnson@ bickelgrp.com
Farmstead - 31904 PASEO ADELANTO
THIS IS A SHELL AND CORE BUILDING PERMIT ONLY FOR
NEW SINGLE STORY RESTAURANT BUILDING.
Restaurant (A2 occupancy): 4460 SF
Covered Porches: 714 SF
Utility Room: 158 SF
Uncovered Patio: 1610 SF
T.B.D.River Street SJC, LLC
31791 Los Rios Street
San Juan Capistrano, 92675
949 354-5600
Jim Bickel
3600 Birch Street Ste. 120
Newport Beach, CA 92660
949 757-0411
C-20925
T.B.D.
28
7
2
1
6
145000 2 1
1
4
1
1
B20 0540
Letter of Transmittal
3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868
phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801
To: City of San Juan Capistrano Date Completed: 6/15/21 Review #: 3
32400 Paseo Adelanto Date Received:
San Juan Capistrano, CA 92675 CSG #: 409084
Attn: Building & Safety Division Agency Plan Check #: B20-0540
Job Address: 31904 Paseo Adelanto
Job Description:
Shell and core building permit for restaurant - Farmstead
Status: Hours: (By Rate)
X Plan is approved. 3.0 1st Plan Check
Plan is approved with conditions. See remarks. 1.0 2nd Plan Check
Plan is approved with redlines. See remarks. 0.5 3rd Plan Check
Plan is approved with redlines and conditions. See remarks. 4th Plan Check
Plan requires corrections. See attached list. Total Hours
We have reviewed the following documents ( X Digital only):
X Plans Truss Calculations
X Structural Calculations Energy Calculations
X Soil Report Specifications
Geotechnical Review Letter Special Inspection Form(s)
Other:
Special items to note:
X Plan has been stamped and signed by CSG
Environmental Health Services approval required
Special inspection required for
Hardship Form included
Remarks:
Recommend for approval
From: Jensen Ku, S.E. (ginsun@csgengr.com)
CSG Consultants Inc.
2021-922H. COX 12/23/2021
HAND APPLICATION OF PAINTS2021-92212/23/2021
ATTN: Karla Dalla Torre
DATE: EMAIL:
APPLICANT/OWNER NAME:
JOB ADDRESS:
DEVELOPMENT NAME:
PHASE:
TRACT(s):
LOT(s):
UNIT(s):
CONTACT NAME:
CONTACT PHONE:
COMPANY NAME:
TRACT LOT UNIT
TOTAL SQUARE
FOOTAGE
PREPARED BY:LISA LA
PHONE: 949-443-6349
ADDRESS
NEW RESIDENTIAL
ROOM ADDITIONS
CITY OF SAN JUAN CAPISTRANO
SCHOOL FEES WORKSHEET
COMMERCIAL/INDUSTRIAL
CUSD FAX: (949) 493-3728
LLA@SANJUANCAPISTRANO.ORG
TOTAL SQUARE FOOTAGE
PROJECT INFORMATION
SQUARE FOOTAGEAPN
March 25, 2022
Via Email and Personal Delivery:
City of San Juan Capistrano
Building Department
32400 Paseo Adelanto
San Juan Capistrano, California 92675
Attention: Steve Salcedo, Senior City Grading Inspector
Email: ssalcedo@sanjuancapistrano.org
Subject: LINE AND GRADE BUILDING PAD CERTIFICATION BY
PROFESSIONAL LAND SURVEYOR
Project:
River Street Marketplace
Tract: N TR 103 BLK LOT 56 TR 103 LOT 56 WLY 1/3 -INC POR OF
RIVER ST ADJ-
Street Addresses: 31904 Paseo Adelanto, San Juan Capistrano, California
92675 (the, “Farmstead”)
Building Permit: #B20-0540
Dear Mr. Salcedo,
On March 25th, 2022, upon completion of the building pad at the Building Address, a field
survey was performed by
Based on the pad elevations shown in the “Precise Grading Plan” prepared by Blue Peak
Engineering, Inc., dated 12/15/2021 and approved by the Joe Parco, City Engineer for the City
of San Juan Capistrano on 12/20/2021 as City Permit No. B20-0545, we do hereby certify the
building pad is built to within substantial conformance to the designed pad elevation.
The line and grade building certification exhibit is attached hereto as Exhibit A.
PROFESSIONAL LAND SURVEYOR SIGNATURE AND SEAL:
RIDGELINE ENGINEERING
By: ______________________________
Jordan Baldwin, President
Professional Land Surveyor 8513 (Expiration December 31, 2022)
EXHIBIT A
LINE AND GRADE BUILDING CERTIFICATION EXHIBIT
(ATTACHED)
MAR 22, 2021
CSG 06/15/21B20-0540 V3
PERMIT NUMBER
JOB ADDRESS
)252)),&(86(21/<
'(3$570(17$33529$/65(48,5('
%8,/',1*
PLANNING:
38%/,&:25.6:
60:':
2&)$
YES
YES
YES
<(6
<(6
NO
NO
NO
12
12
INSTRUCTIONS:
1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV
GRQRWVXEPLWFRPSOHWHVHWRISODQV
³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV
1RWHWKHSDJHQXPEHUVRQZKLFKWKHUHYLVLRQVRFFXU
3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV
DESCRIPTION OF PROPOSED CHANGES:
3$*(
1 .
2 .
3 .
4 .
5 .
APPLICANT SIGNATURE DATE
BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME:
$86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS
FOR OFFICE USE ONLY
APPROVED BY: DATE:
&203$1<1$0(
EMAIL ADDRESS
CONTACT PHONE #
$33/,&$17 NAME:
&LW\RI6DQ-XDQ&DSLVWUDQR
'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW
3DVHR$GHODQWR
6DQ-XDQ&DSLVWUDQR&$
3KRQH
(PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ
ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ
5(9,6,21'()(55('68%0,77$/
$'',1*1(:0(3"
3&7*4*0/
1-"/3&7*&8&3
46#.*55"-%"5&
5"3(&5%"5&
YES 12
)252)),&(86(21/<
Bickel Group B20-0540
Kelly Johnson
31904 Paseo Adelanto
949 572-8030
kjohnson@bickelgrp.com
Please see attached memo.
10/3/22
✔
1
CSG/DAVID
10/03/2210/13/22
ADD 114sf TO 4346sf BUILDING. NEW SF = 4460sf
ADD 321sf TO 1739sf PATIO. NEW SF = 2060sf
X
X
X
X
X
4.5
CSG 12/09/22
Letter of Transmittal
3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868
phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801
To: City of San Juan Capistrano Date Completed: 12/09/2022 Review #:PC03
32400 Paseo Adelanto Date Received:
San Juan Capistrano, CA 92675 CSG #: 4214573
Attn: Building & Safety Division Agency Plan Check #: B20-0540
Job Address: 31904 Paseo Adelanto
Job Description:
Revision - Shell and core building permit for restaurant – Farmstead
Status: Hours: (By Rate)
X Plan is approved. 3.0 1st Plan Check
Plan is approved with conditions. See remarks. 1.0 2nd Plan Check
Plan is approved with redlines. See remarks. 0.5 3rd Plan Check
Plan is approved with redlines and conditions. See remarks. 4th Plan Check
Plan requires corrections. See attached list. Total Hours
We have reviewed the following documents ( X Digital only):
X Plans Truss Calculations
X Structural Calculations Energy Calculations
Soil Report Specifications
Geotechnical Review Letter Special Inspection Form(s)
Other:
Special items to note:
X Plan has been stamped and signed by CSG
Environmental Health Services approval required
Special inspection required for
Hardship Form included
Remarks:
Recommend for approval
From: Jensen Ku S.E. (ginsun@csgengr.com)
CSG Consultants Inc.
REVISIONS MEMO
Date: August 31, 2022
To: City of San Juan Capistrano
31904 Paseo Adelanto
San Juan Capistrano, CA 92675
Re: Revisions to Permit B20-0540
31872 Paseo Adelanto, San Juan Capistrano
Bickel Project #: 15091
Due to tenant requirements, there are a few revisions to the approved set of plans. Please see
below an itemized list of the changes which are clouded.
A-0.0 Code Summary: Area breakdown revised
Sheet Index: Sheet SD-5 removed
A-0.4 Farmstead patio and area revised
A-0.4A Farmstead patio and area revised
A-1.0 1-Floor Plan: Windows on southeast and southwest corners removed. Slab left out. Patio
area and all openings to patio on north side revised
2-Window Level Floor Plan: Windows on north side revised
A-1.1 1- Egress Plan: Revised for new area totals and patio layout
2-Reflected Ceiling Plan: Skylights added. Patio open trellis cover added
3-Roof Plan: Skylights added. Patio open trellis cover and bar area pop-out added
A-2.0 1- South Elevation: Windows removed and sill added at remaining windows
2- East Elevation: Window removed. Patio open trellis cover added.
3-North Elevation: Skylights added. Bar area pop-out added. Window and door openings
revised.
4-West Elevation: Window removed. Patio open trellis cover added. Bar area pop-out
added.
Keyed note 4: Color of window frames revised
Keyed notes 29-32 added
Color ‘D’ added
A-3.0 3- Section: Sill at window revised and door and clerestory revised at patio side. Trellis
open patio cover added
A-3.1 1- Section: Bar pop-out at patio added. Rail added in front of porch area.
A-4.0 Sections 3 & 4 added/revised
A-4.1 1- Wall Section: Rail added at porch
2-Wall Section: Rail added at porch and sill added at windows
A-4.2 Sections 1 and 2 revised
October 3, 2022
Revisions Memo
B20-0540
Page 2
A-6.0 1- Door Schedule: Doors 101-103 and 107-109 revised/added
10-Door Types: Door type ‘D’ added
A-6.1 1- Window Schedule: Revised
5-Window Styles: Type G revised
11-Details added
14-Detail added
S-1.0 Foundation Plan: Openings revised throughout, slab left out, trellis cover added at patio,
framing for bar area pop-out added.
Low Roof Framing Plan: Headers revised through and framing for added bar area pop-out
added.
S-2.0 Flat Roof Framing Plan: Headers revised through and framing for added bar area pop-out
added.
Sloped Roof Framing Plan: Skylights added and trellis cover at patio added
S-3.0 Details 1-5 and 16-17 revised/added
S-3.1 Details 18 and 20 revised
S-3.2 Details 17-18 revised
S-4.0 Detail 20 revised
S-4.1 All details revised/added
SD-1.0 Seismic Design Criteria: Updated
SD-1.1 Detail 6 added
Detail 14 revised
Detail 17: GB-1 removed
SD-7 Detail 7 and 17 revised/added
E2.1 Lighting Plan: Lighting at northern patio revised
E3.1 Power added to operable folding doors
E3.2 Roof Plan: Background updated
E4.1 Panel schedule for folding doors added
M1.0 Building footprint background and openings revised to match architectural
M2.0 T24 energy forms revised
M2.1 T24 energy forms revised
P-1.0 Pipe schedule for gas revised
P-2.0 Plumbing Floor Plan: Gas to patio heaters added. Gas meter relocated to match dry utility
plan
October 3, 2022
Revisions Memo
B20-0540
Page 3
Plumbing Roof Plan: Condensate and roof hose bib updated
Please feel free to contact me directly for any clarifications.
Regards,
Kelly Johnson, AIA, LEED AP | Principal
bg | Bickel Group Architecture
P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com
OCT 27, 2022
CSG 12/09/22B20-0540 REV 1
PERMIT NUMBER
JOB ADDRESS
)252)),&(86(21/<
'(3$570(17$33529$/65(48,5('
%8,/',1*
PLANNING:
38%/,&:25.6:
60:':
2&)$
YES
YES
YES
<(6
<(6
NO
NO
NO
12
12
INSTRUCTIONS:
1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV
GRQRWVXEPLWFRPSOHWHVHWRISODQV
³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV
1RWHWKHSDJHQXPEHUVRQZKLFKWKHUHYLVLRQVRFFXU
3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV
DESCRIPTION OF PROPOSED CHANGES:
3$*(
1 .
2 .
3 .
4 .
5 .
APPLICANT SIGNATURE DATE
BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME:
$86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS
FOR OFFICE USE ONLY
APPROVED BY: DATE:
&203$1<1$0(
EMAIL ADDRESS
CONTACT PHONE #
$33/,&$17 NAME:
&LW\RI6DQ-XDQ&DSLVWUDQR
'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW
3DVHR$GHODQWR
6DQ-XDQ&DSLVWUDQR&$
3KRQH
(PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ
ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ
5(9,6,21'()(55('68%0,77$/
$'',1*1(:0(3"
3&7*4*0/
1-"/3&7*&8&3
46#.*55"-%"5&
5"3(&5%"5&
YES 12
)252)),&(86(21/<
Construct & Maintain Corp dba CM Corp B20-0540
Andrew Barrett
31904 Paseo Adelanto
949 292-6462
abarrett@cmcorp.co
1-19 Deferred Submittal - AOR/Structural EOR Approved Truss Shop Drawings
Andrew Barrett Digitally signed by Andrew Barrett
Date: 2022.12.22 09:36:30 -08'00'12/22/2022
✔
2
X
X
X
X
X
CSG12/23/22
01/10/23
1
CSG 01/11/23
Letter of Transmittal
3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868
phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801
To: City of San Juan Capistrano Date Completed: 1/11/2023 Review #: PC01
32400 Paseo Adelanto Date Received:
San Juan Capistrano, CA 92675 CSG #: 4300069
Attn: Building & Safety Division Agency Plan Check #: B20-0540
Job Address: 31904 Paseo Adelanto
Job Description:
Revision – Trusses - Shell and core building permit for restaurant – Farmstead
Status: Hours: (By Rate)
X Plan is approved. 1.0 1st Plan Check
Plan is approved with conditions. See remarks. 2nd Plan Check
Plan is approved with redlines. See remarks. 3rd Plan Check
Plan is approved with redlines and conditions. See remarks. 4th Plan Check
Plan requires corrections. See attached list. Total Hours
We have reviewed the following documents ( X Digital only):
Plans X Truss Calculations
Structural Calculations Energy Calculations
Soil Report Specifications
Geotechnical Review Letter Special Inspection Form(s)
Other:
Special items to note:
X Plan has been stamped and signed by CSG
Environmental Health Services approval required
Special inspection required for
Hardship Form included
Remarks:
Recommend for approval for deferred trusses
From: Jensen Ku S.E. (ginsun@csgengr.com)
CSG Consultants Inc.
PERMIT NUMBER
JOB ADDRESS
)252)),&(86(21/<
'(3$570(17$33529$/65(48,5('
%8,/',1*
PLANNING:
38%/,&:25.6:
60:':
2&)$
YES
YES
YES
<(6
<(6
NO
NO
NO
12
12
INSTRUCTIONS:
1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV
GRQRWVXEPLWFRPSOHWHVHWRISODQV
³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV
1RWHWKHSDJHQXPEHUVRQZKLFKWKHUHYLVLRQVRFFXU
3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV
DESCRIPTION OF PROPOSED CHANGES:
3$*(
1 .
2 .
3 .
4 .
5 .
APPLICANT SIGNATURE DATE
BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME:
$86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS
FOR OFFICE USE ONLY
APPROVED BY: DATE:
&203$1<1$0(
EMAIL ADDRESS
CONTACT PHONE #
$33/,&$17 NAME:
&LW\RI6DQ-XDQ&DSLVWUDQR
'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW
3DVHR$GHODQWR
6DQ-XDQ&DSLVWUDQR&$
3KRQH
(PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ
ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ
5(9,6,21'()(55('68%0,77$/
$'',1*1(:0(3"
3&7*4*0/
1-"/3&7*&8&3
46#.*55"-%"5&
5"3(&5%"5&
YES 12
)252)),&(86(21/<
Bickel Group B20-0540
Kelly Johnson
31904 Paseo Adelanto
949 572-8030
kjohnson@bickelgrp.com
Please see attached memo.
04/23/23
✔
1
CSG/LAURA
04/25/23
05/03/23
XX XXX
2
CSG 04/29/23
REVISIONS MEMO
Date: April 23, 2023
To: City of San Juan Capistrano
31904 Paseo Adelanto
San Juan Capistrano, CA 92675
Re: Revisions to Permit B20-0540
31872 Paseo Adelanto, San Juan Capistrano
Bickel Project #: 15091
Due to tenant requirements, there are a few revisions to the approved set of plans. Please see
below an itemized list of the changes which are clouded.
A-1.0 Floor Plan – Window Level: Clerestory windows removed and replaced with wood shutters
per added keyed note 28. Window types at exterior bar revised where clouded. Note 30
add for two sections of patio fencing to be installed with TI. Detail call out added at jamb of
folding door 108.
Keyed notes 29 and 30 added
A-1.1 2- Reflected Ceiling Plan: Wall Sconce on west side of exterior bar removed where
clouded. T&G ceiling removed in vaulted entry area, leave as batt insulation with finish to
come in separate TI. Batt insulation in main building area was called out in sections to have
a black scrim, this has been revised to white scrim.
A-2.0 1- South Elevation: Clerestory windows removed and replaced with wood shutters per
added keyed note 34 with trim per keyed note 33. Top of windows under porch lowered to
8’.
2-East Elevation: Window type at exterior bar revised
3-North Elevation: Window types revised; see door schedule. Added details around folding
doors
4-West Elevation: Window type at exterior bar revised and new wall section tag added
A-2.1 4- Trim Detail: Revised trim to 2x4 instead of 2x6
A-3.0 2- Section: Windows revised; see wall section
Keyed note 9: Revised to call out white scrim instead of black
A-3.1 1- Section: Details added at bar window. Keyed note for T&G walls and ceiling removed in
high pitched roof area; all finishes will be under separate TI permit
Keyed note 9: Revised to call out white scrim instead of black
A-4.1 4- Wall Section: Clerestory windows removed and replaced with wood shutters per added
keyed note 43 and window heights revised.
A-4.2 1- Wall Section: Detail added at sill condition
2-Wall Section: Window type revised and wall furring below window added
Keyed note 9: Revised to call out white scrim instead of black
April 23, 2023
Revisions Memo
B20-0540
Page 2
A-4.3 Added sheet
A-5.0 3- Outdoor Counter Detail: Layer of bituthene added below counter
19- Outdoor Counter Detail: Layer of bituthene added below counter
A-6.0 1- Door Schedule: Hollow metal doors revised to wood and doors 102, 103 and 107
revised type
10- Door Types: ,Dorr type A updated to match elevation, door type C revised to note wood
door
Details 16 and 24 removed as no longer used
A-6.1 1- Window Schedule: W9 removed, Specs for window types W3 and W6 revised. Notes 4
and 5 revised/added.
5- Window styles: Size of window ‘A’ revised, Type H revised and type I added
Details 14, 19 and 21 added for flashing around folding door/windows.
E2.1 Lighting Plan: Lighting removed/added as clouded
E3.1 Power Plan: Power added for additional signage
Please feel free to contact me directly for any clarifications.
Regards,
Kelly Johnson, AIA, LEED AP | Principal
bg | Bickel Group Architecture
P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com
Letter of Tra nsmittal
3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868
phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801
To: City of San Juan Capistrano Date Completed: 4/29/2023 Review #:PC01
32400 Paseo Adelanto Date Received:
San Juan Capistrano, CA 92675 CSG #: 436062
Attn: Building & Safety Division Agency Plan Check #: B20-0540
Job Address: 31904 Paseo Adelanto
Job Description:
Revision 3 - Shell and core building permit for restaurant – Farmstead
Status: Hours: (By Rate)
X Plan is approved. 1st Plan Check
Plan is approved with conditions. See remarks. 2nd Plan Check
Plan is approved with redlines. See remarks. 3rd Plan Check
Plan is approved with redlines and conditions. See remarks. 4th Plan Check
Plan requires corrections. See attached list. Total Hours
We have reviewed the following documents ( X Digital only):
X Plans Truss Calculations
Structural Calculations Energy Calculations
Soil Report Specifications
Geotechnical Review Letter Special Inspection Form(s)
Other:
Special items to note:
X Plan has been stamped and signed by CSG
Environmental Health Services approval required
Special inspection required for
Hardship Form included
Remarks:
Recommend for approval of revision 3
From: Jensen Ku S.E. (ginsun@csgengr.com)
CSG Consultants Inc.
2
2
PERMIT NUMBER
JOB ADDRESS
)252)),&(86(21/<
'(3$570(17$33529$/65(48,5('
%8,/',1*
PLANNING:
38%/,&:25.6:
60:':
2&)$
YES
YES
YES
<(6
<(6
NO
NO
NO
12
12
INSTRUCTIONS:
1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV
GRQRWVXEPLWFRPSOHWHVHWRISODQV
³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV
1RWHWKHSDJHQXPEHUVRQZKLFKWKHUHYLVLRQVRFFXU
3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV
DESCRIPTION OF PROPOSED CHANGES:
3$*(
1 .
2 .
3 .
4 .
5 .
APPLICANT SIGNATURE DATE
BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME:
$86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS
FOR OFFICE USE ONLY
APPROVED BY: DATE:
&203$1<1$0(
EMAIL ADDRESS
CONTACT PHONE #
$33/,&$17 NAME:
&LW\RI6DQ-XDQ&DSLVWUDQR
'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW
3DVHR$GHODQWR
6DQ-XDQ&DSLVWUDQR&$
3KRQH
(PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ
ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ
5(9,6,21'()(55('68%0,77$/
$'',1*1(:0(3"
3&7*4*0/
1-"/3&7*&8&3
46#.*55"-%"5&
5"3(&5%"5&
YES 12
)252)),&(86(21/<
Bickel Group B20-0540
Kelly Johnson
31904 Paseo Adelanto
949 572-8030
kjohnson@bickelgrp.com
Please see attached memo.
12/4/23
✔
4
CSG/LAURA
12/04/23
12/13/23
X
X XXX
2.5
CSG 12/11/23
REVISIONS MEMO
Date: December 4, 2023
To: City of San Juan Capistrano
31904 Paseo Adelanto
San Juan Capistrano, CA 92675
Re: Revisions to Permit B20-0540
31872 Paseo Adelanto, San Juan Capistrano
Bickel Project #: 15091
Due to tenant requirements, there are a few revisions to the approved set of plans. Please see
below an itemized list of the changes which are clouded.
A-1.0 Floor Plan: Depths of counters at exterior bar revised per tenant’s health comments (these
match previous dimensions provided to the field.
A-1.1 Reflected Ceiling Plan: Trellis spacing updated (maintain min. 50% open per previous
design)
Roof Plan: Trellis spacing updated (maintain min. 50% open per previous design)
A-2.0 Patio cover spacing updated. Detail call-out added at patio beams at east (2) and West (4)
elevations.
A-2.1 Detail 1- Truss detail updated
Detail 5 at patio beams added
A-3.0 2-Section: Patio framing updated
A-5.0 Details 3 and 19 updated to match counter depth
S2.0 Sloped Roof Framing Plan: Updated at patio area, Detail 2/S4.1 reference added at patio
post/beam connections
S4.1 Details 2, 3 and 9 added/revised
Detail 7 updated for new patio “truss” and framing layout
P-1.0 Gas Piping sleeve detail updated
P-2.0 Plumbing floor plan: Gas for two future fire pits on patio removed and one at bar area
shifted to underground
Please feel free to contact me directly for any clarifications.
Regards,
Kelly Johnson, AIA, LEED AP | Principal
bg | Bickel Group Architecture
P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com
Letter of Transmittal
3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868
phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801
To: City of San Juan Capistrano Date Completed: 12/11/2023 Review #:PC01
32400 Paseo Adelanto Date Received:
San Juan Capistrano, CA 92675 CSG #: 4316882
Attn: Building & Safety Division Agency Plan Check #: B20-0540
Job Address: 31904 Paseo Adelanto
Job Description:
Revision 7 & 8 - Shell and core building permit for restaurant – Farmstead
Status: Hours: (By Rate)
X Plan is approved. 2.5 1st Plan Check
Plan is approved with conditions. See remarks. 2nd Plan Check
Plan is approved with redlines. See remarks. 3rd Plan Check
Plan is approved with redlines and conditions. See remarks. 4th Plan Check
Plan requires corrections. See attached list. Total Hours
We have reviewed the following documents ( X Digital only):
X Plans Truss Calculations
Structural Calculations Energy Calculations
Soil Report Specifications
Geotechnical Review Letter Special Inspection Form(s)
Other:
Special items to note:
X Plan has been stamped and signed by CSG
Environmental Health Services approval required
Special inspection required for
Hardship Form included
Remarks:
Recommend for approval of revisions 7 & 8
From: Khoa Duong, P.E
CSG Consultants Inc.
OCT 30, 2023
CSG 12/11/23B20-0540 4
PERMIT NUMBER
JOB ADDRESS
PLANNING:
:
:
YES
YES
YES
NO
NO
NOINSTRUCTIONS:
1.
DESCRIPTION OF PROPOSED CHANGES:
1 .
2 .
3 .
4 .
5 .
APPLICANT SIGNATURE DATE
BUILDING REVISION FEE:REVIEW TIME:
$86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS
FOR OFFICE USE ONLY
APPROVED BY: DATE:
EMAIL ADDRESS
CONTACT PHONE #
NAME:
YES
5
JW/LAURA03/11/24
03/20/24
X
X XXX
1
JAMES WIATRAK 03/20/24
REVISIONS MEMO
Date: March 10, 2024
To: City of San Juan Capistrano
31904 Paseo Adelanto
San Juan Capistrano, CA 92675
Re: Revisions to Permit B20-0540 (Farmstead)
31872 Paseo Adelanto, San Juan Capistrano
Bickel Project #: 15091
Per direction from the building department, we have updated the plans to include an anchor
detail for the installed switchgear and power added for one roll-up door. Please see below an
itemized list of the changes which are clouded.
A-1.0 Keyed note 5 modified to reference added detail 3/A-1.0
Detail 3 for switchgear anchorage added.
E2.1 Lighting Plan: K3A light fixture removed on south elevation (J-box kept for signage) and
two K3A lights added to west elevation. Wiring/circuits updated accordingly.
E3.1 Power Plan: Power added to bar area fold up door.
E4.1 Panel Schedule: Circuit added for bar area foldup door power.
E4.2 Building Sign added to Lighting Control Panel Schedule.
Please feel free to contact me directly for any clarifications.
Regards,
Kelly Johnson, AIA, LEED AP | Principal
bg | Bickel Group Architecture
P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com
From:James Wiatrak
To:Lisa La
Subject:RE: River Street - Revisions Submittal
Date:Wednesday, March 20, 2024 10:49:38 AM
Attachments:image001.png
image002.png
Lisa,
I have reviewed the attachments and they are ready to stamp approved and issue.
Regards,
James “JW” Wiatrak, CBO, CASp
Building Official
City of San Juan Capistrano
30448 Rancho Viejo Rd., Suite 110
San Juan Capistrano, CA 92675
(949) 234-4568
jwiatrak@sanjuancapistrano.org
www.sanjuancapistrano.org
** City Hall administrative offices have moved to 30448 Rancho Viejo Road**
From: Kelly Johnson <kjohnson@bickelgrp.com>
Sent: Wednesday, March 20, 2024 10:32 AM
To: James Wiatrak <JWiatrak@sanjuancapistrano.org>; Building Department
<building@sanjuancapistrano.org>; Lisa La <LLa@sanjuancapistrano.org>
Cc: Alex Osinski <AOsinski@almquist.com>; Andrew Barrett - CM Corp <abarrett@cmcorp.co>
Subject: RE: River Street - Revisions Submittal
[The e-mail below is from an external source. Please do not open attachments or click
links from an unknown or suspicious origin.]
Hi JW and Lisa,
I have updated the links below to address the last comment from JW for special inspection on each
anchorage detail and renumbered the revision number per Lisa’s last email. Please let us know if you
need anything else.
Greenhouse B20-0537 REV 7 V1
Hayloft B20-0536 REV 7 V1
Marketplace B20-0535 REV 8 V1
Mercantile B20-0539 REV 8 V1
Red Barn B20-0534 REV 5 V1
Site B20-0546 REV3 V1
Workshop B20-0538 REV 7 V1
Farmstead B20-0540 REV 5 V1
Kelly Johnson, AIA, LEED AP | Principal
bg | Bickel Group Architecture
P: 949.757.0411 x224 | C: 949.572.8030 | kjohnson@bickelgrp.com
From: James Wiatrak <JWiatrak@sanjuancapistrano.org>
Sent: Wednesday, March 13, 2024 8:17 AM
To: Kelly Johnson <kjohnson@bickelgrp.com>; Building Department
<building@sanjuancapistrano.org>; Lisa La <LLa@sanjuancapistrano.org>
Cc: Alex Osinski <AOsinski@almquist.com>; Andrew Barrett - CM Corp <abarrett@cmcorp.co>
Subject: RE: River Street - Revisions Submittal
Hi Kelley,
No, if these are interior locations, the structural slabs are noted on the foundations plan and
acceptable as is.
Regards,
James “JW” Wiatrak, CBO, CASp
Building Official
City of San Juan Capistrano
30448 Rancho Viejo Rd., Suite 110
San Juan Capistrano, CA 92675
(949) 234-4568
jwiatrak@sanjuancapistrano.org
www.sanjuancapistrano.org
** City Hall administrative offices have moved to 30448 Rancho Viejo Road**
Pacific Electric Inc
42640 Rio Nedo
Temecula CA, 92590
951-296-1562
3/6/24
REF: River Street Switchboard
To Whom It May Concern,
Pacific Electric switchboards leave the factory seismically braced, requiring no additional field bracing.
Please refer to the seismic anchoring page for guidance in floor mounting switchboard sections.
Sincerely,
Victor Herrada
Pacific Electric, Inc.
Manufacturer of Electrical Distribution Equipment
951-296-1562
951-296-1563 Fax
vherrada@pacificelectric.biz
www.pacificelectric.biz
Pacific Electric, Inc.42640 Rio Nedo Temecula, Ca. 92590(951) 296-15621 A-AAASEISMIC BOLT DOWN INSTRUCTIONS (NEMA 3R SECTIONS)USE 1/2" OR 5/8" GR. 5 HEX HEAD BOLTS(FURNISHED BY OTHERS)TOP VIEWSIDE VIEWFRONT1/2" HIGH X 4" WIDE WET SILLSSWITCHBOARD FRAME1/2" HIGH X 4" WIDE WET SILLS*****DRAWING SBDI-N3R
September 30, 2022
TO: CITY OF SAN JUAN CAPISTRANO
FROM: SAN DIEGO GAS & ELECTRIC
Subject: SECONDARY SHORT-CIRCUIT CURRENT
Project: 3-356495 RIVER STREET
The serving voltages for this project is as follows per each address:
1. Farmstead: 31904 Paseo Adelanto
1200 amps 4 wire. Three phase, 120/208 volts.
2. Greenhouse: 31880 Paseo Adelanto
2000 amps 4 wire. Three phase, 120/208 volts.
3. Hayloft: 31872 Paseo Adelanto
1200 amps 4 wire. Three phase, 120/208 volts.
4. Marketplace: 31864 Paseo Adelanto
2000 amps 4 wire. Three phase, 120/208 volts.
5. Mercantile: 31896 Paseo Adelanto
2500 amps 4 wire. Three phase, 120/208 volts.
6. Red Barn: 31856 Paseo Adelanto
2000 amps 4 wire. Three phase, 120/208 volts.
7. Workshop: 31888 Paseo Adelanto
1200 amps 4 wire. Three phase, 120/208 volts.
The ultimate available fault current (ISC) for this installation will not exceed 42,000
amperes at the point of connection of SDG&E’ s service conductors to the customer’s
facilities. This value is stated in RMS symmetrical amperes.
Victoria Cronk
SDG&E
Customer Project Planner – Orange County
(949) 361-8078
FRAMING o CONCRETE.ELECTRICAL
elLl2O23
Subject:
Torque Verification of Electrical Lugs
Project Address:
River Street Marketplace - Farmstead Building
31904 Paseo Adelanto
San Juan Capistrano, CA92675
Permit Number: 820-0540
Electrical Gear: MSB-F, L200AMP Switchgear & HPF house panel
To whom it may concern,
This letter is a statement of declaration that Millcreek Electrical lnc.
lugs inside the 1200AMP electrical switchgear and the House panel
the manufacturer specified torque values.
California License Number: 1011154
California License Expiration: 2128 /2024
has torqued the electrical landing
at the project address listed above to
Millcreek E
ionathan Kehler, General Manager
California License Type: C10
IC.gtE(IRICAL
Lockout Procedure
Lockout Procedure for:
River Street Marketplace - Farmstead Building
31904 Paseo Adelanto
San Juan Capistrano , CA92675
City of San Juan Capistrano Building Permit #820-0540
SDG&E Job Notification No: 3-366604
Siemens Main Switch Board (MSB-F). 1200,4 Pull Section.' Main Circuit Breaker & Sub Panel HPF
Purpose
This procedure establishes the minimum requirements for the lockout of Siemens Main Switch Board (MSB-F), 1200A
Pull Section and corresponding Main Circuit Breaker to include sub panel HPF to ensure equipment is isolated from all
potentially hazardous energy sources and locked out from unexpected energization.
Responsible Party
Millcreek Electrical, Inc. assumes full responsibility for the process of lockouts, tag outs and safe off of all equipment
denoted above.
Accessibility to Electrical Room/Equipment
Access to the electrical room, Siemens Main Switch Board (MSB-F), 1200A Pull Section, Main Circuit Breaker and sub
panel HPF will be limited to Millcreek Electrical, Inc. employees only. Millcreek Electrical, Inc. will possess the lock out
keys at all times and furthermore, will ensure that locks are not be removed from any equipmenflbreakers until approved
by the City of San Juan Capistrano Electrical Inspector.
Preparing Equipmenl for Energization
When the servicing is completed and the machine oi equip*ent is ready for normal operating condition, the following
steps shall be taken.
(1) Secure approval from City of San Juan Capistrano Electrical Inspector for removal of lock(s) from energy
isolating device(s) to include but not limited tothe Siemens Main Switch Board (MSB-F), 1200A Pull Section, Main
Circuit Breaker and sub panel HPF.
(2) Check the machine or equipment and the immediate area around the machine to ensure that nonessential items
have been removed and that the machine or equipment components are operationallyintact.
(3) Check the work area to ensure that all employees have been safely positioned or removed from thearea.
(4) Verifl, that the controls are in neutral.
(5) Remove the lockout devices and energize the machine orequipment.
MILLCREEK E
Jonathan Kehler
California License Type: C10-Electrical
California License Number: 101 1 1 54
California License Expiration: 212912024
PERMIT NUMBER
JOB ADDRESS
)252)),&(86(21/<
'(3$570(17$33529$/65(48,5('
%8,/',1*
PLANNING:
38%/,&:25.6:
60:':
2&)$
YES
YES
YES
<(6
<(6
NO
NO
NO
12
12
INSTRUCTIONS:
1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV
GRQRWVXEPLWFRPSOHWHVHWRISODQV
³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV
1RWHWKHSDJHQXPEHUVRQZKLFKWKHUHYLVLRQVRFFXU
3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV
DESCRIPTION OF PROPOSED CHANGES:
3$*(
1 .
2 .
3 .
4 .
5 .
APPLICANT SIGNATURE DATE
BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME:
$86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS
FOR OFFICE USE ONLY
APPROVED BY: DATE:
&203$1<1$0(
EMAIL ADDRESS
CONTACT PHONE #
$33/,&$17 NAME:
&LW\RI6DQ-XDQ&DSLVWUDQR
'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW
3DVHR$GHODQWR
6DQ-XDQ&DSLVWUDQR&$
3KRQH
(PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ
ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ
5(9,6,21'()(55('68%0,77$/
$'',1*1(:0(3"
3&7*4*0/
1-"/3&7*&8&3
46#.*55"-%"5&
5"3(&5%"5&
YES 12
)252)),&(86(21/<
Bickel Group B20-0540
Kelly Johnson
31904 Paseo Adelanto
949 572-8030
kjohnson@bickelgrp.com
Please see attached memo.
05/07/24
✔
6
CSG/LAURA
05/07/24
05/15/24
X
X X
X
X
1
CSG 05/13/24
REVISIONS MEMO
Date: May 7, 2024
To: City of San Juan Capistrano
31904 Paseo Adelanto
San Juan Capistrano, CA 92675
Re: Revisions to Permit B20-0540 (Farmstead)
31872 Paseo Adelanto, San Juan Capistrano
Bickel Project #: 15091
Please see below an itemized list of the changes which are clouded:
E2.1 Lighting Plan: K3A light fixtures added to west elevation for a total of 5. Single light
added in mansard roof attic space.
E5.3 Title 24 updated accordingly.
Please feel free to contact me directly for any clarifications.
Regards,
Kelly Johnson, AIA, LEED AP | Principal
bg | Bickel Group Architecture
P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com
Letter of Transmittal
3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868
phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801
To: City of San Juan Capistrano Date Completed: 5/13/24 Review #:1
32400 Paseo Adelanto Date Received:
San Juan Capistrano, CA 92675 CSG #: 4405846
Attn: Building & Safety Division Agency Plan Check #: B20-0540 REV 6
Job Address: 31904 Paseo Adelanto
Job Description:
(DIGITAL/EMAIL) RIVER STREET-FRAMSTEAD - REVISION TO CSG 4009084-ADD EXTERIOR LIGHTS & ATTIC
LIGHT.
Status: Hours: (By Rate)
X Plan is approved. 1 1st Plan Check
Plan is approved with conditions. See remarks. 2nd Plan Check
Plan is approved with redlines. See remarks. 3rd Plan Check
Plan is approved with redlines and conditions. See remarks. 4th Plan Check
Plan requires corrections. See attached list. Total Hours
We have reviewed the following documents ( Digital only):
X Plans Truss Calculations
Structural Calculations Energy Calculations
Soil Report Specifications
Geotechnical Review Letter Special Inspection Form(s)
Other:
Special items to note:
X Plan has been stamped and signed by CSG
Environmental Health Services approval required
Special inspection required for
Hardship Form included
Remarks:
Electrical Review Hours: 1 HR
From: Mike Teemant MCP CBO
CSG Consultants Inc.