Loading...
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†<(6  †12 7(1$17 3RRO6SD 0HFKQLFDO+RRG 0LVFHOODQHRXV *UHDVH,QWHUFHSWRU (DUWKTXDNH%UDFLQJ (OHFWULFDO:LULQJ *DV3LSLQJ 6HZDJH'LVSRVDO :DWHU3LSLQJ 3325 + 3785 + 40 740,798.16 A-2 & M 956 Kelly Johnson 949 757-0411 ext.224 kjohnson@ bickelgrp.com Greenhouse -31880 PASEO ADELANTO THIS IS A SHELL AND CORE BUILDING PERMIT ONLY FOR NEW SINGLE STORY RESTAURANT & RETAIL BUILDING. TENANT 1 - RESTAURANT, A-2 OCC: 1,165 SF TENANT 2 - RETAIL, M OCC: 1,130 SF TENANT 3 - RETAIL, M OCC: 1,260 SF TENANT 4 - RETAIL, M OCC: 1,395 SF TENANT 5 - RESTAURANT, A-2 OCC: 2,160 SF Pump Closet: 40 SF, Covered Walkway: 956 SF T.B.D.River Street SJC, LLC 31791 Los Rios Street San Juan Capistrano, Ca 92675 949 354-5600 Jim Bickel 3600 Birch Street Ste. 120 Newport Beach, CA 92660 949 757-0411 C-20925 T.B.D. 23 6 6 1 19 9 9 1 1 4 1 1 B20 0537 Letter of Transmittal 3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868 phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801 To: City of San Juan Capistrano Date Completed: 6/15/21 Review #: PC03 32400 Paseo Adelanto Date Received: San Juan Capistrano, CA 92675 CSG #: 409070 Attn: Building & Safety Division Agency Plan Check #: B20-0537 Job Address: 31880 Paseo Adelanto Job Description: Shell and core building permit for restaurant - Greenhouse Status: Hours: (By Rate) X Plan is approved. 6.0 1st Plan Check Plan is approved with conditions. See remarks. 1.0 2nd Plan Check Plan is approved with redlines. See remarks. 0.5 3rd Plan Check Plan is approved with redlines and conditions. See remarks. 4th Plan Check Plan requires corrections. See attached list. Total Hours We have reviewed the following documents ( X Digital only): X Plans Truss Calculations X Structural Calculations Energy Calculations X Soil Report Specifications Geotechnical Review Letter Special Inspection Form(s) Other: Special items to note: X Plan has been stamped and signed by CSG Environmental Health Services approval required Special inspection required for Hardship Form included Remarks: Recommend for approval From: Jensen Ku S.E. (ginsun@csgengr.com) CSG Consultants Inc. H. COX 12/23/20212021-923 2021-923HAND APPLICATION OF PAINTS12/23/2021per SCAQMD Rule 219(l)(10) ATTN: Karla Dalla Torre DATE: EMAIL: APPLICANT/OWNER NAME: JOB ADDRESS: DEVELOPMENT NAME: PHASE: TRACT(s): LOT(s): UNIT(s): CONTACT NAME: CONTACT PHONE: COMPANY NAME: TRACT LOT UNIT TOTAL SQUARE FOOTAGE PREPARED BY:LISA LA PHONE: 949-443-6349 ADDRESS NEW RESIDENTIAL ROOM ADDITIONS CITY OF SAN JUAN CAPISTRANO SCHOOL FEES WORKSHEET COMMERCIAL/INDUSTRIAL CUSD FAX: (949) 493-3728 LLA@SANJUANCAPISTRANO.ORG TOTAL SQUARE FOOTAGE PROJECT INFORMATION SQUARE FOOTAGEAPN April 8, 2022 Via Email and Personal Delivery: City of San Juan Capistrano Building Department 32400 Paseo Adelanto San Juan Capistrano, California 92675 Attention: Subject: Project: Steve Salcedo, Senior City Grading Inspector Email: ssalcedo@sanjuancapistrano.org LINE AND GRADE BUILDING PAD CERTIFICATION BY PROFESSIONAL LAND SURVEYOR River Street Marketplace Tract: N TR 103 BLK LOT 56 TR 103 LOT 56 WLY 1/3 -INC POR OF RIVER ST ADJ- Street Addresses: 31880 Paseo Adelanto, San Juan Capistrano, California 92675 (the, “Greenhouse”) Building Permit: #B20-0537 Dear Mr. Salcedo, On March 25th, 2022, upon completion of the building pad at the Building Address, a field survey was performed by Based on the pad elevations shown in the “Precise Grading Plan” prepared by Blue Peak Engineering, Inc., dated 12/15/2021 and approved by the Joe Parco, City Engineer for the City of San Juan Capistrano on 12/20/2021 as City Permit No. B20-0545, we do hereby certify the building pad is built to within substantial conformance to the designed pad elevation. The line and grade building certification exhibit is attached hereto as Exhibit A. PROFESSIONAL LAND SURVEYOR SIGNATURE AND SEAL: RIDGELINE ENGINEERING By: ______________________________ Jordan Baldwin, President Professional Land Surveyor 8513 (Expiration December 31, 2022) EXHIBIT A LINE AND GRADE BUILDING CERTIFICATION EXHIBIT INFILTROMETER TESTING FOR THE SAN JUAN RIOS DISTRICT LOCATED AT PASEO ADELANTO & RIVER STREET, SAN JUAN CAPISTRANO, CALIFORNIA. Project No. 16-3371 Dated: July 8, 2016 Prepared For: Mr. Ryan Carstenesen Frontier Real Estate Investments 610 Newport Center Drive, Suite 400 Newport Beach, CA 92660 Inland Engineering July 8, 2016 Mr. Ryan Carstenesen Frontier Real Estate Investments 610 Newport Center Drive, Suite 400 Newport Beach, CA 92660 Technologies Inc. 41655 Reagan Way Ste. E Murrieta. CA. 92562 Ph: (951) 894-6464 Fax: (951) 894-6491 Project No. 16-3371 Subject: Infiltrometer Testing for the San Juan Rios District Located at Paseo Adelanto & River Street, San Juan Capistrano, California. 1.0 INTRODUCTION Pursuant to your request, Inland Engineering Technologies, Inc. (IET) is providing this report presenting the infiltrometer testing for the San Juan Rios District located at Paseo Adelanto & River Street, San Juan Capistrano, California. The purpose of our infiltrometer testing was to determine the infiltration rates and physical characteristics of the subsurface soils existing within the subject site. It is our understanding that a storm water infiltration system is preliminarily proposed at the site. 2.0 INFILTRATION TESTING On June 30, 2016 infiltrometer testing was initiated at the site to evaluate the infiltration rate in general accordance with ASTM D 3385-03 -Standard Test Method for infiltration rate of soils in field using Double- Ring Infiltrometer. Infiltration testing elevation was approximately 5 feet below ground surface. The infiltration testing was initiated by filling both inner and outer rings with water to approximately 6 inches and allowed to drain. Before recording each set of reading, both outer and inner rings were filled again with water to approximately 6 inches. Initial and final water levels were recorded every 15 minutes for the first hour and every 30 minutes thereafter. The infiltration test data recorded in the field are presented in Table 1 below. FEB 04, 2021 CSG 6/15/21B20-0537 PERMIT NUMBER JOB ADDRESS )252)),&(86(21/< '(3$570(17$33529$/65(48,5(' %8,/',1* PLANNING: 38%/,&:25.6: 60:': 2&)$ ††YES †YES †YES †<(6 †<(6 †NO †NO †NO †12 †12 INSTRUCTIONS: 1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV GRQRWVXEPLWFRPSOHWHVHWRISODQV ³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV 1RWHWKHSDJHQXPEHU V RQZKLFKWKHUHYLVLRQ V RFFXU 3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV DESCRIPTION OF PROPOSED CHANGES: 3$*( 1 . 2 . 3 . 4 . 5 . APPLICANT SIGNATURE DATE BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME: $86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS FOR OFFICE USE ONLY APPROVED BY: DATE: &203$1<1$0( EMAIL ADDRESS CONTACT PHONE #    $33/,&$17 NAME: &LW\RI6DQ-XDQ&DSLVWUDQR 'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW 3DVHR$GHODQWR 6DQ-XDQ&DSLVWUDQR&$ 3KRQH   (PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ 5(9,6,21'()(55('68%0,77$/ $'',1*1(:0(3" 3&7*4*0/ 1-"/3&7*&8&3 46#.*55"-%"5& 5"3(&5%"5& ††YES †12 )252)),&(86(21/< Bickel Group B20-0537 Kelly Johnson 31880 Paseo Adelanto 949 572-8030 kjohnson@bickelgrp.com Please see attached memo. 05/17/22 ✔ 1 CSG/DAVID 05/17/22 05/25/22 XX XXX 3 CSG 06/26/22 REVISIONS MEMO Date: May 17, 2022 To: City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Re: Revisions to Permit B20-0537 31880 Paseo Adelanto, San Juan Capistrano Bickel Project #: 15091 Due to some coordination with tenant and owner requirements, there are a few revisions to the approved set of plans. Please see below an itemized list of the changes which are clouded. Architectural – A-1.0 Updated sheet index to add sheet A-4.2. A-1.0 Updated doors/windows layout for Tenant 4. Slab left only at perimeter 2 feet at Tenant 4. Keyed notes 28, 29, & 30 added Tenant 3 location for future tenant restroom added for reference. A-1.1 Updated doors/windows layout. A-2.0 Updated West, South, and East elevations per new layout. Keyed note 27 added. A-3.0 Section 1 is revised to depict slab leave out and removal of second BOH door for Tenant 4. A-4.2 New sheet including new sections thru revised openings and corresponding details. A-6.0 Door schedule revised as follows: Door 102, 105 are edited Door 102a, 114 & 115 added Door 107 removed. Door styles updated. Door hardware # 5 is updated. Structural – S-1.0 Revised foundation plan at Tenant 4. S-3.0 Revised Section 8, 9, 10, 16, and Section 18A added. S-5.1 Details 19 & 20 added. SD-1.1 Detail 9 added. SD-2 Details 11,12,13 added. SD-5.0 Detail 7 added. Electrical – E3.1 Plan note 25 added. Conducts to be run behind 2nd post from North to South of the patio trellis. Added Plan note 26 for new direction to provide conduit and feeders to Tenant 3 E4.1 Updated Single line diagram, Feeder schedule and Single diagram plan notes. Mechanical – M1.0 Updated layout for Tenant 4. M2.0 Revised Title 24. May 17, 2022 Revisions Memo B20-0537 Page 2 M2.1 Revised Title 24. Plumbing – P-2.0 Plumbing Floor Plan: Sewer Stub to future tenant restroom added in Tenant 3. Please feel free to contact me directly for any clarifications. Regards, Kelly Johnson, AIA, LEED AP | Director of Production bg | Bickel Group Architecture P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com Letter of Transmittal 3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868 phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801 To: City of San Juan Capistrano Date Completed: 6/26/2022 Review #:PC02 32400 Paseo Adelanto Date Received: San Juan Capistrano, CA 92675 CSG #: 426652 Attn: Building & Safety Division Agency Plan Check #: B20-0537 Job Address: 31880 Paseo Adelanto Job Description: Revision - Shell and core building permit for restaurant - Greenhouse Status: Hours: (By Rate) X Plan is approved. 1.5 1st Plan Check Plan is approved with conditions. See remarks. 1.5 2nd Plan Check Plan is approved with redlines. See remarks. 3rd Plan Check Plan is approved with redlines and conditions. See remarks. 4th Plan Check Plan requires corrections. See attached list. Total Hours We have reviewed the following documents ( X Digital only): X Plans Truss Calculations Structural Calculations Energy Calculations Soil Report Specifications Geotechnical Review Letter Special Inspection Form(s) Other: Special items to note: X Plan has been stamped and signed by CSG Environmental Health Services approval required Special inspection required for Hardship Form included Remarks: Recommend for approval of revision From: Jensen Ku S.E. (ginsun@csgengr.com) CSG Consultants Inc. PERMIT NUMBER JOB ADDRESS )252)),&(86(21/< '(3$570(17$33529$/65(48,5(' %8,/',1* PLANNING: 38%/,&:25.6: 60:': 2&)$ ††YES †YES †YES †<(6 †<(6 †NO †NO †NO †12 †12 INSTRUCTIONS: 1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV GRQRWVXEPLWFRPSOHWHVHWRISODQV ³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV 1RWHWKHSDJHQXPEHU V RQZKLFKWKHUHYLVLRQ V RFFXU 3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV DESCRIPTION OF PROPOSED CHANGES: 3$*( 1 . 2 . 3 . 4 . 5 . APPLICANT SIGNATURE DATE BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME: $86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS FOR OFFICE USE ONLY APPROVED BY: DATE: &203$1<1$0( EMAIL ADDRESS CONTACT PHONE #    $33/,&$17 NAME: &LW\RI6DQ-XDQ&DSLVWUDQR 'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW 3DVHR$GHODQWR 6DQ-XDQ&DSLVWUDQR&$ 3KRQH   (PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ 5(9,6,21'()(55('68%0,77$/ $'',1*1(:0(3" 3&7*4*0/ 1-"/3&7*&8&3 46#.*55"-%"5& 5"3(&5%"5& ††YES †12 )252)),&(86(21/< Bickel Group B20-0537 Kelly Johnson 31880 Paseo Adelanto 949 572-8030 kjohnson@bickelgrp.com Please see attached memo. 09/12/22 ✔ 1 CSG/DAVID/OCFA 09/12/22 09/21/22 XX XXX 2 CSG 09/23/22 REVISIONS MEMO Date: September 12, 2022 To: City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Re: Revisions to Permit B20-0537 31880 Paseo Adelanto, San Juan Capistrano Bickel Project #: 15091 Due to some coordination with tenant and owner requirements, there are a few revisions to the approved set of plans. Please see below an itemized list of the changes which are clouded. A-0.0 Code Summary: Tenants 1 & 2 combined and totals updated accordingly A-0.5 Detail 5: Detail for ADA entry relocated here from door schedule sheet A-1.0 Floor Plan: Tenants 1 & 2 combined, demising wall removed. Entry storefronts at Tenant 1 and 3 revised. Wall Legend: Drywall to be provided at interior side of exterior walls, typ. A-1.1 Egress Plan: Totals revised for combined Tenant 1 & 2 A-2.0 West Elevation: Glazing revised as clouded. South Elevation: Tag updated to 28 for sliding door as was shown in plan A-3.0 Elevation beyond in building section revised to match new storefront condition A-6.0 1- Door Schedule: Doors 100 & 108 revised, doors 103 & 104 removed 14-Detail added for door 108 only, door frame to be set within framed opening and gyp. Bd. Continued across interior side as door will not be used by the tenant at this time. Please feel free to contact me directly for any clarifications. Regards, Kelly Johnson, AIA, LEED AP | Principal bg | Bickel Group Architecture P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com Letter of Tra nsmittal 3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868 phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801 To: City of San Juan Capistrano Date Completed: 9/23/2022 Review #: PC01 32400 Paseo Adelanto Date Received: San Juan Capistrano, CA 92675 CSG #: 4213262 Attn: Building & Safety Division Agency Plan Check #: B20-0537 Job Address: 31880 Paseo Adelanto Job Description: Revision – Revision - Shell and core building permit for restaurant - Greenhouse Status: Hours: (By Rate) X Plan is approved. 2 1st Plan Check Plan is approved with conditions. See remarks. 2nd Plan Check Plan is approved with redlines. See remarks. 3rd Plan Check Plan is approved with redlines and conditions. See remarks. 4th Plan Check Plan requires corrections. See attached list. Total Hours We have reviewed the following documents ( X Digital only): X Plans Truss Calculations Structural Calculations Energy Calculations Soil Report Specifications Geotechnical Review Letter Special Inspection Form(s) Other: Special items to note: X Plan has been stamped and signed by CSG Environmental Health Services approval required Special inspection required for Hardship Form included Remarks: Recommend for approval of revision From: Jensen Ku S.E. (ginsun@csgengr.com) CSG Consultants Inc. PERMIT NUMBER JOB ADDRESS )252)),&(86(21/< '(3$570(17$33529$/65(48,5(' %8,/',1* PLANNING: 38%/,&:25.6: 60:': 2&)$ ††YES †YES †YES †<(6 †<(6 †NO †NO †NO †12 †12 INSTRUCTIONS: 1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV GRQRWVXEPLWFRPSOHWHVHWRISODQV ³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV 1RWHWKHSDJHQXPEHU V RQZKLFKWKHUHYLVLRQ V RFFXU 3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV DESCRIPTION OF PROPOSED CHANGES: 3$*( 1 . 2 . 3 . 4 . 5 . APPLICANT SIGNATURE DATE BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME: $86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS FOR OFFICE USE ONLY APPROVED BY: DATE: &203$1<1$0( EMAIL ADDRESS CONTACT PHONE #    $33/,&$17 NAME: &LW\RI6DQ-XDQ&DSLVWUDQR 'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW 3DVHR$GHODQWR 6DQ-XDQ&DSLVWUDQR&$ 3KRQH   (PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ 5(9,6,21'()(55('68%0,77$/ $'',1*1(:0(3" 3&7*4*0/ 1-"/3&7*&8&3 46#.*55"-%"5& 5"3(&5%"5& ††YES †12 )252)),&(86(21/< Bickel Group B20-0537 Kelly Johnson 31880 Paseo Adelanto 949 572-8030 kjohnson@bickelgrp.com Please see attached memo. 02/20/23 ✔ 3 CSG/DAVID 02/20/23 03/14/23 X X X X X REMOVE STEEL MESH & ADD LIGHTS CSG 03/14/2023 1 REVISIONS MEMO Date: February 20, 2023 To: City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Re: Revisions to Permit B20-0537 31880 Paseo Adelanto, San Juan Capistrano Bickel Project #: 15091 Due to some coordination with tenant and owner requirements, there are a few revisions to the approved set of plans. Please see below an itemized list of the changes which are clouded. A-2.0 1- West Elevation: Keyed note 22 for the stainless-steel mesh removed to coordination with approved landscape plans. A2.1 1- Lighting Plan: Lights added at north and south of the building to coordinate with the tenant’s signage. E5.1 Lighting Fixture Schedules: Light fixture K3 added Please feel free to contact me directly for any clarifications. Regards, Kelly Johnson, AIA, LEED AP | Principal bg | Bickel Group Architecture P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com Letter of Transmittal 3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868 phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801 To: City of San Juan Capistrano Date: 3/14/2023 32400 Paseo Adelanto CSG #: 433518 San Juan Capistrano, CA 92675 Agency Plan Check #: B20-0537 Attn: Building Department Job Address: 31880 Paseo Adelanto Status: Hours: X Plan is approved. 1st plan check Plan is approved with conditions. See remarks. 2nd plan check Plan is approved with redlines. See remarks. 3rd plan check Plan is approved with redlines and conditions. See remarks. 4th plan check Plan requires corrections. See attached list. Total: Other: We have reviewed the following documents ( Digital review only): X Plans Energy Calculations Structural Calculations Specifications Soil Report Special Inspection Form(s) Geotechnical Letter Truss Calculations Special items to note: X Plan has been stamped and signed by CSG Environmental Health Services approval required Special inspection required for Hardship Form included Remarks: Recommend for approval From: Jensen Ku S.E. CSG Consultants 1 1 PERMIT NUMBER JOB ADDRESS )252)),&(86(21/< '(3$570(17$33529$/65(48,5(' %8,/',1* PLANNING: 38%/,&:25.6: 60:': 2&)$ ††YES †YES †YES †<(6 †<(6 †NO †NO †NO †12 †12 INSTRUCTIONS: 1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV GRQRWVXEPLWFRPSOHWHVHWRISODQV ³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV 1RWHWKHSDJHQXPEHU V RQZKLFKWKHUHYLVLRQ V RFFXU 3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV DESCRIPTION OF PROPOSED CHANGES: 3$*( 1 . 2 . 3 . 4 . 5 . APPLICANT SIGNATURE DATE BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME: $86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS FOR OFFICE USE ONLY APPROVED BY: DATE: &203$1<1$0( EMAIL ADDRESS CONTACT PHONE #    $33/,&$17 NAME: City of San Juan Capistrano 'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW 3DVHR$GHODQWR 6DQ-XDQ&DSLVWUDQR&$ 3KRQH   (PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ ZZZ.VDQMXDQFDSLVWUDQRRUJEXLOGLQJ REVISION'()(55('68%0,77$/ $'',1*1(:0(3" 3&7*4*0/ 1-"/3&7*&8&3 46#.*55"-%"5& 5"3(&5%"5& ††YES †12 )252)),&(86(21/< Bickel Group B20-0537 Kelly Johnson 31880 Paseo Adelanto 949 572-8030 kjohnson@bickelgrp.com Please see attached memo. 04/23/23 ✔ CSG 04/25/23 05/03/23 4 X XXXX 2 CSG 04/29/23 REVISIONS MEMO Date: April 23, 2023 To: City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Re: Revisions to Permit B20-0537 31880 Paseo Adelanto, San Juan Capistrano Bickel Project #: 15091 Due to some coordination with tenant and owner requirements, there are a few revisions to the approved set of plans. Please see below an itemized list of the changes which are clouded. E2.1 Lighting Plan: ‘Z3’ lighting for signage removed from middle tenant; provide j-box sign connection E4.1 Panel Schedule: Circuit added for tenant sign E4.2 Lighting Control Panel: Circuit added for tenant sign Please feel free to contact me directly for any clarifications. Regards, Kelly Johnson, AIA, LEED AP | Principal bg | Bickel Group Architecture P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com Letter of Transmittal 3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868 phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801 To: City of San Juan Capistrano Date Completed: 4/29/2023 Review #:PC01 32400 Paseo Adelanto Date Received: San Juan Capistrano, CA 92675 CSG #: 436063 Attn: Building & Safety Division Agency Plan Check #: B20-0537 Job Address: 31880 Paseo Adelanto Job Description: Revision 4 - Shell and core building permit for restaurant - Greenhouse Status: Hours: (By Rate) X Plan is approved. 2 1st Plan Check Plan is approved with conditions. See remarks. 2nd Plan Check Plan is approved with redlines. See remarks. 3rd Plan Check Plan is approved with redlines and conditions. See remarks. 4th Plan Check Plan requires corrections. See attached list. Total Hours We have reviewed the following documents ( X Digital only): X Plans Truss Calculations Structural Calculations Energy Calculations Soil Report Specifications Geotechnical Review Letter Special Inspection Form(s) Other: Special items to note: X Plan has been stamped and signed by CSG Environmental Health Services approval required Special inspection required for Hardship Form included Remarks: Recommend for approval of revision 4 From: Jensen Ku S.E. (ginsun@csgengr.com) CSG Consultants Inc. PERMIT NUMBER JOB ADDRESS )252)),&(86(21/< '(3$570(17$33529$/65(48,5(' %8,/',1* PLANNING: 38%/,&:25.6: 60:': 2&)$ ††YES †YES †YES †<(6 †<(6 †NO †NO †NO †12 †12 INSTRUCTIONS: 1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV GRQRWVXEPLWFRPSOHWHVHWRISODQV ³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV 1RWHWKHSDJHQXPEHU V RQZKLFKWKHUHYLVLRQ V RFFXU 3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV DESCRIPTION OF PROPOSED CHANGES: 3$*( 1 . 2 . 3 . 4 . 5 . APPLICANT SIGNATURE DATE BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME: $86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS FOR OFFICE USE ONLY APPROVED BY: DATE: &203$1<1$0( EMAIL ADDRESS CONTACT PHONE #    $33/,&$17 NAME: &LW\RI6DQ-XDQ&DSLVWUDQR 'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW 3DVHR$GHODQWR 6DQ-XDQ&DSLVWUDQR&$ 3KRQH   (PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ 5(9,6,21'()(55('68%0,77$/ $'',1*1(:0(3" 3&7*4*0/ 1-"/3&7*&8&3 46#.*55"-%"5& 5"3(&5%"5& ††YES †12 )252)),&(86(21/< Bickel Group B20-0537 Kelly Johnson 31880 Paseo Adelanto 949 572-8030 kjohnson@bickelgrp.com Please see attached memo. 09/11/23 ✔ 6 CSG/LAURA 09/11/23 09/19/23 X XX XX 1 CSG 09/17/23 REVISIONS MEMO Date: September 11, 2023 To: City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Re: Revisions to Permit B20-0537 31880 Paseo Adelanto, San Juan Capistrano Bickel Project #: 15091 Due to some coordination with tenant and owner requirements, there are a few revisions to the approved set of plans. Please see below an itemized list of the changes which are clouded. A-1.0 Floor Plan: Door 108 noted with keyed note 32 to be closed and locked in place (as door not needed per separate TI set). Furring added over door per keyed note 33. E-4.1 Feeder Schedule: Spare conduit noted to match final from SDGE Please feel free to contact me directly for any clarifications. Regards, Kelly Johnson, AIA, LEED AP | Principal bg | Bickel Group Architecture P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com Letter of Transmittal 3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868 phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801 To: City of San Juan Capistrano Date Completed: 9/17/2023 Review #:PC01 32400 Paseo Adelanto Date Received: San Juan Capistrano, CA 92675 CSG #: 4312817 Attn: Building & Safety Division Agency Plan Check #: B20-0537 REV6 Job Address: 31880 Paseo Adelanto Job Description: Revision 6 – Shell and core building permit for restaurant - Greenhouse Status: Hours: (By Rate) X Plan is approved. 1 1st Plan Check Plan is approved with conditions. See remarks. 2nd Plan Check Plan is approved with redlines. See remarks. 3rd Plan Check Plan is approved with redlines and conditions. See remarks. 4th Plan Check Plan requires corrections. See attached list. Total Hours We have reviewed the following documents ( X Digital only): X Plans Truss Calculations Structural Calculations Energy Calculations Soil Report Specifications Geotechnical Review Letter Special Inspection Form(s) Other: Special items to note: X Plan has been stamped and signed by CSG Environmental Health Services approval required Special inspection required for Hardship Form included Remarks: Recommend for approval of revision 6 From: Jensen Ku S.E. (ginsun@csgengr.com) CSG Consultants Inc. PERMIT NUMBER JOB ADDRESS )252)),&(86(21/< '(3$570(17$33529$/65(48,5(' %8,/',1* PLANNING: 38%/,&:25.6: 60:': 2&)$ ††YES †YES †YES †<(6 †<(6 †NO †NO †NO †12 †12 INSTRUCTIONS: 1.6XEPLWVHWVRIRQO\WKHUHYLVHGVKHHWVVWDSOHGLQWRVHWV GRQRWVXEPLWFRPSOHWHVHWRISODQV ³&/28'´WKHSURSRVHGFKDQJHVRQWKHGUDZLQJV 1RWHWKHSDJHQXPEHU V RQZKLFKWKHUHYLVLRQ V RFFXU 3URYLGHGHVFULSWLRQRISURSRVHGFKDQJHV DESCRIPTION OF PROPOSED CHANGES: 3$*( 1 . 2 . 3 . 4 . 5 . APPLICANT SIGNATURE DATE BUILDING REVISION FEE:727$/3/$1&+(&.(5 REVIEW TIME: $86.93/HOUR - 1 HOUR MINIMUM – Per table 3.A.1 HOURS FOR OFFICE USE ONLY APPROVED BY: DATE: &203$1<1$0( EMAIL ADDRESS CONTACT PHONE #    $33/,&$17 NAME: &LW\RI6DQ-XDQ&DSLVWUDQR 'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW 3DVHR$GHODQWR 6DQ-XDQ&DSLVWUDQR&$ 3KRQH   (PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ 5(9,6,21'()(55('68%0,77$/ $'',1*1(:0(3" 3&7*4*0/ 1-"/3&7*&8&3 46#.*55"-%"5& 5"3(&5%"5& ††YES †12 )252)),&(86(21/< -:   ;;;;;  -$0(6:,$75$. Bickel Group B20-0537 Kelly Johnson 31880 Paseo Adelanto 949 572-8030 kjohnson@bickelgrp.com Please see attached memo. 03/04/24 ✔ REVISIONS MEMO Date: March 10, 2024 To: City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Re: Revisions to Permit B20-0537 (Greenhouse) 31880 Paseo Adelanto, San Juan Capistrano Bickel Project #: 15091 Per direction from the building department, we have updated the plans to include an anchor detail for the installed switchgear. There is also one door that will be locked in the closed position similar to the middle tenant for the future TI. Please see below an itemized list of the changes which are clouded. A-1.0 Keyed note 4 modified to reference added detail 3/A-1.0 Floor Plan: Keyed note 32 added at door 110 to match the TI plans. Detail 3 for switchgear anchorage added. Detail 4 added to this sheet from detail 25/A-0.4 for reference Please feel free to contact me directly for any clarifications. Regards, Kelly Johnson, AIA, LEED AP | Principal bg | Bickel Group Architecture P: 949.757.0411 x224 | C: 949.572.8030 kjohnson@bickelgrp.com From:James Wiatrak To:Lisa La Subject:RE: River Street - Revisions Submittal Date:Wednesday, March 20, 2024 10:49:38 AM Attachments:image001.png image002.png Lisa, I have reviewed the attachments and they are ready to stamp approved and issue. Regards, James “JW” Wiatrak, CBO, CASp Building Official City of San Juan Capistrano 30448 Rancho Viejo Rd., Suite 110 San Juan Capistrano, CA 92675 (949) 234-4568 jwiatrak@sanjuancapistrano.org www.sanjuancapistrano.org ** City Hall administrative offices have moved to 30448 Rancho Viejo Road** From: Kelly Johnson <kjohnson@bickelgrp.com> Sent: Wednesday, March 20, 2024 10:32 AM To: James Wiatrak <JWiatrak@sanjuancapistrano.org>; Building Department <building@sanjuancapistrano.org>; Lisa La <LLa@sanjuancapistrano.org> Cc: Alex Osinski <AOsinski@almquist.com>; Andrew Barrett - CM Corp <abarrett@cmcorp.co> Subject: RE: River Street - Revisions Submittal [The e-mail below is from an external source. Please do not open attachments or click links from an unknown or suspicious origin.] Hi JW and Lisa, I have updated the links below to address the last comment from JW for special inspection on each anchorage detail and renumbered the revision number per Lisa’s last email. Please let us know if you need anything else. Greenhouse B20-0537 REV 7 V1 Hayloft B20-0536 REV 7 V1 Marketplace B20-0535 REV 8 V1 Mercantile B20-0539 REV 8 V1 Red Barn B20-0534 REV 5 V1 Site B20-0546 REV3 V1 Workshop B20-0538 REV 7 V1 Farmstead B20-0540 REV 5 V1 Kelly Johnson, AIA, LEED AP | Principal bg | Bickel Group Architecture P: 949.757.0411 x224 | C: 949.572.8030 | kjohnson@bickelgrp.com From: James Wiatrak <JWiatrak@sanjuancapistrano.org> Sent: Wednesday, March 13, 2024 8:17 AM To: Kelly Johnson <kjohnson@bickelgrp.com>; Building Department <building@sanjuancapistrano.org>; Lisa La <LLa@sanjuancapistrano.org> Cc: Alex Osinski <AOsinski@almquist.com>; Andrew Barrett - CM Corp <abarrett@cmcorp.co> Subject: RE: River Street - Revisions Submittal Hi Kelley, No, if these are interior locations, the structural slabs are noted on the foundations plan and acceptable as is. Regards, James “JW” Wiatrak, CBO, CASp Building Official City of San Juan Capistrano 30448 Rancho Viejo Rd., Suite 110 San Juan Capistrano, CA 92675 (949) 234-4568 jwiatrak@sanjuancapistrano.org www.sanjuancapistrano.org ** City Hall administrative offices have moved to 30448 Rancho Viejo Road** Pacific Electric Inc 42640 Rio Nedo Temecula CA, 92590 951-296-1562 3/6/24 REF: River Street Switchboard To Whom It May Concern, Pacific Electric switchboards leave the factory seismically braced, requiring no additional field bracing. Please refer to the seismic anchoring page for guidance in floor mounting switchboard sections. Sincerely, Victor Herrada Pacific Electric, Inc. Manufacturer of Electrical Distribution Equipment 951-296-1562 951-296-1563 Fax vherrada@pacificelectric.biz www.pacificelectric.biz Pacific Electric, Inc.42640 Rio Nedo Temecula, Ca. 92590(951) 296-15621 A-AAASEISMIC BOLT DOWN INSTRUCTIONS (NEMA 3R SECTIONS)USE 1/2" OR 5/8" GR. 5 HEX HEAD BOLTS(FURNISHED BY OTHERS)TOP VIEWSIDE VIEWFRONT1/2" HIGH X 4" WIDE WET SILLSSWITCHBOARD FRAME1/2" HIGH X 4" WIDE WET SILLS*****DRAWING SBDI-N3R FRAMING . CONCRETE. ELECTRICAL slt/2023 Subject: Torque Verification of Electrical Lugs Project Address: River Street Marketplace - Greenhouse Building 3L880 Paseo Adelanto San Juan Capistrano, CA92675 Permit Number: 820-0537 Electrical Gear: MSB-G, 2000AMP Switchgear & HPGH house panel To whom it may concern, This letter is a statement of declaration that Millcreek Electrical lnc. has torqued the electrical landing lugs inside the 2000AMP electricalswitchgear and the House panel at the project address listed above to the manufacturer specified torque values. Jonathan Kehler, General Manager California License Type: C10 California License Number: 1011154 California License Expiration: 2/ 2812024 B20-0537 REV 7 Lockout Procedure Lockout Procedure for: River Street Marketplace - Greenhouse Building 31880 Paseo Adelanto San Juan Capistrano , CA 92675 City of San Juan Capistrano Building Permit #820-0537 SDG&E Job Notification No: 3-366604 Siemens Main Switch Board (MSB-GH). 20004 Pull Section"' Main Circuit Breaker & Sub Panel HPGH Purpose This procedure establishes the minimum requirements for the lockout of Siemens Main Switch Board (MSB-GH), 20004 Pull Section and corresponding Main Circuit Breaker to include sub panel HPGH to ensure equipment is isolated from all potentially hazardous energy sources and locked out from unexpected energization. Responsible Party Millcreek Electrical, Inc. assumes full responsibility for the process of lockouts, tag outs and safe off of all equipment denoted above. Accessibility to Electrical Room/Equipment Access to the electrical room, Siemens Main Switch Board (MSB-GH), 2000A Pull Section, Main Circuit Breaker and sub panel HPGH will be limited to Millcreek Electrical, Inc. employees only. Millcreek Electrical, Inc. will possess the lock out keys at all times and furthermore, will ensure that locks are not be removed from any equipment/breakers until approved by the City of San Juan Capistrano Electrical Inspector. Preparing Equipment for Energization When the servicing is completed and the machine or equipment is ready for normal operating condition, the following steps shall be taken. ( 1 ) Secure approval from City of San Juan Capistrano Electrical Inspector for removal of lock(s) from energy isolating device(s) to include but not limited to the Siemens Main Switch Board (MSB-GH), 20004 Pull Section, Main Circuit Breaker and sub panel HPGH. (2) Check the machine or equipment and the immediate area around the machine to ensure that nonessential items have been removed and that the machine or equipment components are operationallyintact. (3) Check the work area to ensure that all employees have been safely positioned or removed from thearea. (4) Verifu that the controls are in neutral. (5) Remove the lockout devices and energize the machine orequipment. MILLCREEK B20-0537 REV 7 Jonathan Kehler California License Type. C1 O-Electrical California License Number: 101 1 1 54 California Llcense Expiration : 2129 12024 B20-0537 REV 7 September 30, 2022 TO: CITY OF SAN JUAN CAPISTRANO FROM: SAN DIEGO GAS & ELECTRIC Subject: SECONDARY SHORT-CIRCUIT CURRENT Project: 3-356495 RIVER STREET The serving voltages for this project is as follows per each address: 1. Farmstead: 31904 Paseo Adelanto 1200 amps 4 wire. Three  phase, 120/208 volts. 2. Greenhouse: 31880 Paseo Adelanto 2000 amps 4 wire. Three  phase, 120/208 volts. 3. Hayloft: 31872 Paseo Adelanto 1200 amps 4 wire. Three  phase, 120/208 volts. 4. Marketplace: 31864 Paseo Adelanto 2000 amps 4 wire. Three  phase, 120/208 volts. 5. Mercantile: 31896 Paseo Adelanto 2500 amps 4 wire. Three  phase, 120/208 volts. 6. Red Barn: 31856 Paseo Adelanto 2000 amps 4 wire. Three  phase, 120/208 volts. 7. Workshop: 31888 Paseo Adelanto 1200 amps 4 wire. Three  phase, 120/208 volts. The ultimate available fault current (ISC) for this installation will not exceed 42,000 amperes at the point of connection of SDG&E’ s service conductors to the customer’s facilities. This value is stated in RMS symmetrical amperes. Victoria Cronk SDG&E Customer Project Planner – Orange County (949) 361-8078 B20-0537 REV 7 B20-0537 REV 7