B23-1556 - 31931 PASEO TERRAZA 21040335
ALL BUILDING & CONSTRUCTION INC
9744 MAPLE #102
BELLFLOWER, CA 90706
ATTN: /(6/,(.1,77/(
DATE:EMAIL:
APPLICANT/OWNER NAME:
JOB ADDRESS:
DEVELOPMENT NAME:
PHASE:
TRACT(s):
LOT(s):
UNIT(s):
CONTACT NAME:
CONTACT PHONE:
COMPANY NAME:
TRACT LOT UNIT
TOTAL SQUARE
FOOTAGE
PREPARED BY:&$0,/2-,0(1(=
PHONE: 949-443-63
ADDRESS
NEW RESIDENTIAL
ROOM ADDIT,ONS
CITY OF SAN JUAN CAPISTRANO
SCHOOL FEES WORKSHEET
COMMERCIAL/INDUSTRIAL
CUSD FAX: (949) 493-3728
&-,0(1(=@SANJUANCAPISTRANO.ORG
TOTAL SQUARE FOOTAGE
PROJECT INFORMATION
SQUARE FOOTAGEAPN
JTK PACIFIC HOMES LLC
31931 PASEO TERRAZA #2
5996
2
JTK PACIFIC HOMES LLC
562-419-3292
5996 2 2 31931 PASEO TERRAZA #2 (ADU) 649-291-12 986
✔
986
986
4/11/24
1
Building Department
From:Parkinson, Elizabeth <betsyp@smwd.com>
Sent:Wednesday, November 29, 2023 9:16 AM
To:Mce 2020; Building Department
Cc:Webster, Tanner; engcounter
Subject:Sanitation Clearance - 31931 Paseo Terraza, SJC
[The e-mail below is from an external source. Please do not open attachments or click links from an unknown or
suspicious origin.]
Good morning,
This address has been cleared by SMWD. The ADU connection to existing on site water and sewer is adequate. There are
no impacts to the Public Water and Sewer.
Thank you,
Betsy Parkinson
Administrative Assistant
O: 949-459-6612
M: 949-433-6933
smwd.com
From: Mce 2020 <mce2020@gmail.com>
Sent: Wednesday, November 29, 2023 8:58 AM
To: Webster, Tanner <tannerw@smwd.com>
Subject: Re: Sanitation Clearance - 31931 Paseo Terraza, SJC
ATTENTION: This email was sent from an external source. Please be careful when clicking links or
attachments.
Hello,
The ADU will share the meter of the existing house. Let me know if you need anything else
Thank you,
Ihab
On Tue, Nov 28, 2023 at 11:19 AM Webster, Tanner <tannerw@smwd.com> wrote:
Good morning, Ihab,
2
In regard to your ADU project at the subject line address, can you advise where the ADU domestic water connection
will be made on the property.
In your application, you state where the ADU sewer will connect to the existing sewer later, but nothing regarding the
water connection.
Please advise.
Thank you,
Tanner Webster
Engineering Technician
O: 949-459-6648
M: 949-285-4248
smwd.com
--
Mid Cities Engineering
9744 Maple Street, Suite #101
Bellflower, California 90706
MidCitiesEngineering.com
P: (562) 866-3625
E: mce2020@gmail.com
3
***** Please note that email correspondence with the City of San Juan Capistrano, along with attachments, may be
subject to the California Public Records Act, and therefore may be subject to disclosure unless otherwise exempt.
1
CSG 06/25/2024
Letter of Transmittal
3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868
phone 714.568.1010 fax 714.568.1028 www.csgengr.com
To: City of San Juan Capistrano Date Completed: 6/25/2024 Review #:1
32400 Paseo Adelanto Date Received:
San Juan Capistrano, Ca. 92675 CSG #: 447906
Attn: Building Division Agency Plan Check #: B23-1556
Job Address: 31931 Paseo Terraza
Job Description:
REVISION TO APPROVED CSG 4316320 – (3) NEW WINDOWS, - 1 IN EACH BEDROOM
Status: Plan is ready for permit issuance for the following:
X Plan is approved. Architectural Energy
Plan is approved with conditions. See remarks. Structural Other:
Plan is approved with redlines. See remarks. Plumbing
Plan is approved with redlines and conditions. See remarks. Electrical
Plan requires corrections. See attached list. Mechanical
We have reviewed the following documents ( X Digital only):
X Plans Truss Calculations
Structural Calculations X Energy Calculations
Soil Report Specifications
Geotechnical Review Letter Special Inspection Form(s)
Other:
Special items to note:
Plan has been stamped and signed by CSG
Environmental Health Services approval required
Special inspection required for
Hardship Form included
Remarks:
First review: Chi Yang 1.0 hour
From: Chi Yang
CSG Consultants Inc. (714) 568-1010