Loading...
B23-1556 - 31931 PASEO TERRAZA 21040335 ALL BUILDING & CONSTRUCTION INC 9744 MAPLE #102 BELLFLOWER, CA 90706 ATTN: /(6/,(.1,77/( DATE:EMAIL: APPLICANT/OWNER NAME: JOB ADDRESS: DEVELOPMENT NAME: PHASE: TRACT(s): LOT(s): UNIT(s): CONTACT NAME: CONTACT PHONE: COMPANY NAME: TRACT LOT UNIT TOTAL SQUARE FOOTAGE PREPARED BY:&$0,/2-,0(1(= PHONE: 949-443-63 ADDRESS NEW RESIDENTIAL ROOM ADDIT,ONS CITY OF SAN JUAN CAPISTRANO SCHOOL FEES WORKSHEET COMMERCIAL/INDUSTRIAL CUSD FAX: (949) 493-3728 &-,0(1(=@SANJUANCAPISTRANO.ORG TOTAL SQUARE FOOTAGE PROJECT INFORMATION SQUARE FOOTAGEAPN JTK PACIFIC HOMES LLC 31931 PASEO TERRAZA #2 5996 2 JTK PACIFIC HOMES LLC 562-419-3292 5996 2 2 31931 PASEO TERRAZA #2 (ADU) 649-291-12 986 ✔ 986 986 4/11/24 1 Building Department From:Parkinson, Elizabeth <betsyp@smwd.com> Sent:Wednesday, November 29, 2023 9:16 AM To:Mce 2020; Building Department Cc:Webster, Tanner; engcounter Subject:Sanitation Clearance - 31931 Paseo Terraza, SJC [The e-mail below is from an external source. Please do not open attachments or click links from an unknown or suspicious origin.] Good morning, This address has been cleared by SMWD. The ADU connection to existing on site water and sewer is adequate. There are no impacts to the Public Water and Sewer. Thank you, Betsy Parkinson Administrative Assistant O: 949-459-6612 M: 949-433-6933 smwd.com From: Mce 2020 <mce2020@gmail.com> Sent: Wednesday, November 29, 2023 8:58 AM To: Webster, Tanner <tannerw@smwd.com> Subject: Re: Sanitation Clearance - 31931 Paseo Terraza, SJC ATTENTION: This email was sent from an external source. Please be careful when clicking links or attachments. Hello, The ADU will share the meter of the existing house. Let me know if you need anything else Thank you, Ihab On Tue, Nov 28, 2023 at 11:19 AM Webster, Tanner <tannerw@smwd.com> wrote: Good morning, Ihab, 2 In regard to your ADU project at the subject line address, can you advise where the ADU domestic water connection will be made on the property. In your application, you state where the ADU sewer will connect to the existing sewer later, but nothing regarding the water connection. Please advise. Thank you, Tanner Webster Engineering Technician O: 949-459-6648 M: 949-285-4248 smwd.com -- Mid Cities Engineering 9744 Maple Street, Suite #101 Bellflower, California 90706 MidCitiesEngineering.com P: (562) 866-3625 E: mce2020@gmail.com 3 ***** Please note that email correspondence with the City of San Juan Capistrano, along with attachments, may be subject to the California Public Records Act, and therefore may be subject to disclosure unless otherwise exempt. 1 CSG 06/25/2024 Letter of Transmittal 3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868 phone 714.568.1010 fax 714.568.1028 www.csgengr.com To: City of San Juan Capistrano Date Completed: 6/25/2024 Review #:1 32400 Paseo Adelanto Date Received: San Juan Capistrano, Ca. 92675 CSG #: 447906 Attn: Building Division Agency Plan Check #: B23-1556 Job Address: 31931 Paseo Terraza Job Description: REVISION TO APPROVED CSG 4316320 – (3) NEW WINDOWS, - 1 IN EACH BEDROOM Status: Plan is ready for permit issuance for the following: X Plan is approved. Architectural Energy Plan is approved with conditions. See remarks. Structural Other: Plan is approved with redlines. See remarks. Plumbing Plan is approved with redlines and conditions. See remarks. Electrical Plan requires corrections. See attached list. Mechanical We have reviewed the following documents ( X Digital only): X Plans Truss Calculations Structural Calculations X Energy Calculations Soil Report Specifications Geotechnical Review Letter Special Inspection Form(s) Other: Special items to note: Plan has been stamped and signed by CSG Environmental Health Services approval required Special inspection required for Hardship Form included Remarks: First review: Chi Yang 1.0 hour From: Chi Yang CSG Consultants Inc. (714) 568-1010