Loading...
B22-0342 - 31400 EL CAMINO REAL 21 Plan Review History Page12/4/2024 B22-0342 ADU - ATTACHED FINALED Permit Number Type Subtype Status 3/8/2022 CJ55 4/5/2023 CJ55 4/5/2023 CJ5 9/23/2024 SS2 Owner Applicant Site Address City Tract Construction Type Block Lot No Parcel No Zoning Subdivision State Zip DAIGNEAULT, ARTHUR & AMYDAIGNEAULT, ARTHUR & AMY 31400 EL CAMINO REAL 2 SAN JUAN CAPISTRANO CA 92675 808 5 8 124-202-25 VB R3 Occupancy Type Applied Approved Issued Finaled Expired BUILDING Due Days ElapsedSentReturnedReviewerReview Type Review Group: 1ST REVIEWS Status REVIEW DATES 3/21/22BUILDING 1st 133/24/22CORRECTIONS REQUIRED 3/8/22CSG Remarks and Notes: Due Days ElapsedSentReturnedReviewerReview Type Review Group: ADMIN Status REVIEW DATES 3/28/23RESTAMP 14/3/23CORRECTIONS REQUIRED 3/27/23PLANNING Remarks and Notes: 4/4/23RESTAMP 04/11/23PC APPROVED 4/4/23Justin Poley Remarks and Notes: Due Days ElapsedSentReturnedReviewerReview Type Review Group: ALL Status REVIEW DATES 9/7/22BUILDING 2nd 139/6/22CORRECTIONS REQUIRED 8/25/22CSG Remarks and Notes: 8/29/22PLANNING 2nd 49/6/22PC APPROVED 8/25/22PLANNING Remarks and Notes: Report By: PERMIT REVIEWS Due Days ElapsedSentReturnedReviewerReview Type Review Group:AUTO Status REVIEW DATES 4/20/23ADDRESS ASSIGNMENT 4083/29/22PC APPROVED 3/8/22Camilo Jimenez Remarks and Notes: 8/29/22ADU TITLE DEED PLANNING 1744/19/22PC APPROVED 3/8/22Laura Stokes Remarks and Notes: 4/4/23C & D RECYCLING BOND 3923/24/22PC APPROVED 3/8/22 Remarks and Notes: 12/4/24CERTIFICATE OF OCCUPANCY 1,002COO APPROVED 3/8/22Dianna Flores Remarks and Notes: 3/9/22HOA 13/24/22N/A 3/8/22Camilo Jimenez Remarks and Notes: 1/30/23OCFA 3283/24/22PC APPROVED 3/8/22OCFA Remarks and Notes: (1/30/2023 4:41 PM CJ5) SR#: 538030 RES SITE REVIEW - APPROVED 4/5/23SCHOOL FEES 3933/24/22PAID 3/8/22 Remarks and Notes: (4/4/2023 3:12 PM LL1) EMAILED KARLA WORKSHEET 8/29/22SMWD 174PC APPROVED 3/8/22SMWD Remarks and Notes: 4/5/23TCA FEES 3933/24/22PAID 3/8/22 Remarks and Notes: Due Days ElapsedSentReturnedReviewerReview Type Review Group: BUILDING Status REVIEW DATES 11/4/22BUILDING 3rd 411/9/22CORRECTIONS REQUIRED 10/31/22Camilo Jimenez Remarks and Notes: 2/9/23BUILDING 4+102/8/23CORRECTIONS REQUIRED 1/30/23CSG Remarks and Notes: 3/20/23BUILDING 4+73/22/23PC APPROVED 3/13/23CSG Remarks and Notes: (3/27/2023 4:41 PM LL1) TITLE SHEET NEEDS TO BE REVISED WITH APPROPRIATE SQUARE FOOTAGES FOR APPROVAL & FEE CALCULATION. PLANNING TO NOTIFY APPLICANT. 9/8/23BUILDING REVISION 19/18/23PC APPROVED 9/7/23James Wiatrak Remarks and Notes: Report By: PERMIT REVIEWS 11/8/23BUILDING REVISION 011/20/23PC APPROVED 11/8/23James Wiatrak Remarks and Notes: (11/8/2023 9:50 AM CJ5) CONVERT BEDROOM TO DEN. RELOCATE SKYLIGHT Due Days ElapsedSentReturnedReviewerReview Type Review Group: COO REVIEWS Status REVIEW DATES 12/4/24CERTIFICATE OF OCCUPANCY 106COO APPROVED 8/20/24Dianna Flores Remarks and Notes: 9/23/24COO - BLDG FINAL INSP 010/2/24COO APPROVED 9/23/24Steve Salcedo Remarks and Notes: 8/29/24COO - BUS LICENSE 98/29/24N/A 8/20/24BUSINESS LICENSE Remarks and Notes: 8/21/24COO - NPDES 18/29/24N/A 8/20/24Noreen Swiontek Remarks and Notes: 8/21/24COO - PLANNING - HOUSING 18/29/24COO APPROVED 8/20/24Laura Stokes Remarks and Notes: 8/21/24COO - PLANNING - PROJ MAN 18/29/24COO APPROVED 8/20/24PLANNING Remarks and Notes: 8/22/24COO - PUB WRKS CON INSP 28/29/24N/A 8/20/24James Prather Remarks and Notes: 8/29/24COO - SMWD 98/29/24N/A 8/20/24SMWD Remarks and Notes: 9/23/24COO - UTILITIES RELEASES 348/29/24N/A 8/20/24Camilo Jimenez Remarks and Notes: 9/23/24COO -BLDG GRADING/BOND 34COO APPROVED 8/20/24Steve Salcedo Remarks and Notes: 8/29/24COO -OCFA- F/S 9COO APPROVED 8/20/24Steve Salcedo Remarks and Notes: Due Days ElapsedSentReturnedReviewerReview Type Review Group: OCFA Status REVIEW DATES 6/15/23OCFA - FIRE SPRINKLERS 07/11/23PC APPROVED 6/15/23OCFA Report By: PERMIT REVIEWS Remarks and Notes:(6/22/2023 11:54 AM LL3) (1) OCFA SET IN RACK FOR CUSTOMER. FEES DUE. LEFT VM FOR AMY. FIRE SPRINKLER CONTRACTOR VOICEMAIL FULL. CITY SET FILED. (6/22/2023 1:09 PM LL1) ISSUED TO AMY& ARTHUR Due Days ElapsedSentReturnedReviewerReview Type Review Group:PLANNING Status REVIEW DATES 3/8/22PLANNING 1st 03/24/22CORRECTIONS REQUIRED 3/8/22Paul Garcia Remarks and Notes: (3/8/2022 3:27 PM PG2) Floor plans need to be revised to indicate the interior door into the primary residence (from the exterior patio door) being replaced with a wall, resulting in an independent exterior access for the ADU. This change would result in the ADU being a Building Permit only review Report By: PERMIT REVIEWS 09/23/24 Letter of Transmittal 3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868 phone 714.568.1010 fax 714.568.1028 www.csgengr.com ORA – BPR - 160801 To: City of San Juan Capistrano Date Completed: 3/20/2023 Review #: 5 32400 Paseo Adelanto Date Received: San Juan Capistrano, CA 92675 CSG #: 422939 Attn: Building & Safety Division Agency Plan Check #: B22-0342 Job Address: 31400 E Camino Real Job Description: Convert attic to 3rd story ADU Status: Hours: (By Rate) X Plan is approved. 1st Plan Check Plan is approved with conditions. See remarks. 2nd Plan Check Plan is approved with redlines. See remarks. 3rd Plan Check Plan is approved with redlines and conditions. See remarks. 4th Plan Check Plan requires corrections. See attached list. Total Hours We have reviewed the following documents ( Digital only): X Plans Truss Calculations X Structural Calculations Energy Calculations Soil Report Specifications Geotechnical Review Letter Special Inspection Form(s) Other: Special items to note: Plan has been stamped and signed by CSG Environmental Health Services approval required Special inspection required for Hardship Form included Remarks: From: 1st-2nd Michael Leiendecker 3rd-5th Joseph Valete CSG Consultants Inc. ATTN: Karla Dalla Torre DATE: EMAIL: APPLICANT/OWNER NAME: JOB ADDRESS: DEVELOPMENT NAME: PHASE: TRACT(s): LOT(s): UNIT(s): CONTACT NAME: CONTACT PHONE: COMPANY NAME: TRACT LOT UNIT TOTAL SQUARE FOOTAGE PREPARED BY:LISA LA PHONE: 949-443-6349 ADDRESS NEW RESIDENTIAL ROOM ADDITIONS CITY OF SAN JUAN CAPISTRANO SCHOOL FEES WORKSHEET COMMERCIAL/INDUSTRIAL CUSD FAX: (949) 493-3728 LLA@SANJUANCAPISTRANO.ORG TOTAL SQUARE FOOTAGE PROJECT INFORMATION SQUARE FOOTAGEAPN 1 Lisa La From:engcounter <engcounter@smwd.com> Sent:Monday, August 29, 2022 8:57 AM To:Amy Daigneault; engcounter; Building Department Cc:Webster, Tanner; Cornish, Trisha Subject:RE: Sanitation Clearance-31400 El Camino Real SJC Attachments:CCF_000039.pdf [The e‐mail below is from an external source. Please do not open attachments or click links from an unknown or  suspicious origin.]  Good morning, This address has been cleared by SMWD. There are no impacts to public water and sewer. Thanks,          Betsy Parkinson Administrative Assistant  O: 949-459-6612 M: 949-433-6933   smwd.com                From: Amy Daigneault <jdaigneault@cox.net>   Sent: Friday, August 26, 2022 6:27 PM  To: engcounter <engcounter@smwd.com>  Subject: Sanitation Clearance    ATTENTION: This email was sent from an external source. Please be careful when clicking links or attachments.            ***** Please note that email correspondence with the City of San Juan Capistrano, along with attachments, may be  subject to the California Public Records Act, and therefore may be subject to disclosure unless otherwise exempt.   From:Bullum, Ivana To:jdaigneault@cox.net; Building Department Cc:engcounter; Marti, Pablo Subject:RE: Sanitation Clearance - 31400 El Camino Real SJC-ADU Date:Thursday, August 29, 2024 9:56:28 AM Attachments:image001.png image002.png image003.png image004.png [The e-mail below is from an external source. Please do not open attachments or click links from an unknown or suspicious origin.] Address 31400 Camino Real, San Juan Capistrano has been cleared by SMWD. ADU connection to existing on site water and sewer is adequate. No impacts to the Public Water and Sewer. The above referenced address has been cleared by SMWD. ADU connection to existing on site water and sewer is adequate. No impacts to the Public Water and Sewer. Thank you, Ivana​​​​ Bullum Temporary Eng Tech O: 949-459-6648 M: 949-804-8986 smwd.com From: Parkinson, Elizabeth <betsyp@smwd.com> Sent: Tuesday, August 27, 2024 5:05 PM To: Bullum, Ivana <ivanab@smwd.com>; Marti, Pablo <pablom@smwd.com> Cc: engcounter <engcounter@smwd.com> Subject: Sanitation Clearance - 31400 El Camino Real SJC-ADU We received this Sanitation Clearance. Thanks! Betsy Parkinson​​​​​ Administrative Assistant O: 949-459-6612 M: 949-433-6933 smwd.com ***** Please note that email correspondence with the City of San Juan Capistrano, along with attachments, may be subject to the California Public Records Act, and therefore may be subject to disclosure unless otherwise exempt.