B22-1429 - 32032 DEL OBISPO ST BLK 209/12/24
B22 1429
Letter of Transmittal
3707 W Garden Grove Blvd. Suite 100, Orange, CA 92868
phone 714.568-1010 fax 717-568-1028 www.csgengr.com ORA – BPR - 160801
To: City of San Juan Capistrano Date Completed: 1/19/23 Review #:PC2
32400 Paseo Adelanto Date Received: 1/9/23
San Juan Capistrano, CA 92675 CSG #: 4215970
Attn: Building & Safety Division Agency Plan Check #: B22-1429
Job Address: 32032 Del Obispo
Job Description:
New 16´x16´ shade structure on school campus
Status: Hours: (By Rate)
X Plan is approved.1.5 1st Plan Check
Plan is approved with conditions. See remarks.0.5 2nd Plan Check
Plan is approved with redlines. See remarks.3rd Plan Check
Plan is approved with redlines and conditions. See remarks.4th Plan Check
Plan requires corrections. See attached list.Total Hours
We have reviewed the following documents ( Digital only):
X Plans Truss Calculations
X Structural Calculations (2nd submittal) Energy Calculations
Soil Report Specifications
Geotechnical Review Letter Special Inspection Form(s)
Other:
Special items to note:
X Plan has been stamped and signed by CSG
Environmental Health Services approval required
Special inspection required for
Hardship Form included
Remarks:
From: Kirk Miya, P.E.
Phone: (714) 568-1010
Email: kirkm@csgengr.com
CSG Consultants Inc.
YES NO
INSTRUCTIONS:
ORAN GE COUNTY FI RE AUTHORI TY
Plan Submittal Criteria
COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects
and RESIDENTIAL TRACT developments
• Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place.
• Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section.
• If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA.
• In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations.
• Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding
requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602.
Address Suite City
Project Scope/Business Description
1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways,
curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within
300 feet of an active or proposed oil well? Fire Master Plan (PR145)
2. Property is adjacent to a wildland area or non-irrigated native vegetation?
Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124)
3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from
an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170)
4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving
private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475)
5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000
sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable
to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless
classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration
or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses
where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories
with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285)
6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card,
button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan
depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520)
7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment;
industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible
liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium
ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations?
Special Equipment Plan (PR315, PR340-PR382)
8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft
maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if
H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240)
9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard
commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330)
10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a
commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335)
Initial each of the following two items indicating that you have read and understand the statement:
11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is
required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed
Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications.
12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located
in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327—
Initials the building department will determine specific requirements.
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name Signature
Phone Number ( ) Date / /
Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA
review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the
applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the
appropriate plans and fees for OCFA review. 10-08-14 EE
COM
32032 Del Obispo
4
New 16x16 Shade Structure
4
4
4
4
4
4
4
4
4
Robert Williams
949 246-6980 10 31 2022
San Juan Capistrano
Premiere Christian Education Group, Inc. • 32032 Del Obispo Street, San Juan Capistrano, CA 92675
February 14, 2023
Barbara Schaffner
Capistrano Valley Christian Schools
32032 Del Obispo Street
San Juan Capistrano, CA 92675
Re:Lease Agreement by and between Capistrano Valley Christian Schools,
Inc. and Premiere Christian Education Group Inc. dated October 1, 2021
(the “Lease”).
Dear Barbara:
This letter is to serve as Premiere Christian Education Group Inc.’s approval under the
terms of the Lease for the proposed installation of shade structure over the Junior
Kindergarten play area. This approval is predicated on obtaining the requisite approvals
as may be required for this structure.
Should you have any questions regarding this approval, kindly contact me.
Yours truly,
Keri Sukut
President
Premiere Christian Education Group Inc.