Loading...
B22-1297 - 25863-MP STONEHILL DR10/05/23 25863 - MP Stonehill Drive Service Pedestal Installation 738518 Elecnor Belco Electric, Inc. 14320 Albers Way Chino, CA 91710 1 9/29/2022Melissa Ibarra Melissa Ibarra 909 993-5470 melissa.ibarra@elecnor.com B22 1297 Additional Address Info: PROCEDURE FOR INSTALLATION 1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES. 2. Phone Service Coordinator at 949-361-8066 for the following: - 3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process. - After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do not cover conduit without inspector's written approval to backfill. - When trench is backfilled and compacted, CALL FOR INSPECTION. - If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT. 3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection Metering: Self Contained. Test Bypass Facilities Reqd Meter Clips: 4 Utilities Maximum Contribution to Fault Current: 42000Phase: 1# of Wires: 3 Voltage: 120/240 Bend Info: 3" 90 DEG 36"R DB60Bend Type: TRANSFORMER Riser Quad: Stop Trench: from PoleLadder Arms: Standards Page: Handhole Lid Shall Read: Structure #: D239066Station ID #: 1073-889 Temp Service Charge due on First Bill $ 0.00 Assessor's Parcel Number: Additional Information: City/County inspection should be received prior to 2:00 p.m. on the same day as the disconnection of service to allow the SDG &E crew enough time for reconnection of the service on the same day. Number/Size of Main Switch: 1/200Service Panel Rating: 200 Conduit Size: 1-3"Conduit Installed By: Customer Phone #: 310-530-7277Customer POC: Alex Nikolakopulos Wanted Date: O/I Job #: ELECTRIC UNDERGROUND METER & SERVICE LOCATION Customer Copy Project Title: GANAHL LUMBER - TRAFFIC SIGNAL MP Notification #: 300000391884 Project Address: 25863 STONEHILL DR MP Customer Type: Commercial Date Prepared: 10/03/2022 Project City: SAN JUAN CAPISTRANO SDGE Contact: Service Coordinator Contact Info: SERVICE DESK,949-361-8066 Service Type: UG SERVICE NEW TB: 972-A5 SERVICE ATTACHMENT POINT AND/OR METER LOCATION: Customer to set new 200a meter ped at proposed location. Customer is responsible for trench, backfill, surface repair, Compaction, Pull tape and 3" PVC conduit from ex. sta. 1073-889 to new meter ped. Face meter towards driven way and permanently label with address " 25863-mp". Maintain a 3x3 clearance. CALL 949-361-8066 to schedule a pre trench meeting. JOB SKETCH provided X SDG&E Application Required-Call: 1-800-411-7343 Municipal Inspection required By: CITY OF SAN JUAN CAPISTRANO Bend Installed By: SDG&E Handhole Installed By: Traffic Control Permit Required Excavation/Encroachment Permits Required By: Customer Joint Trench With: Electric Gas Telco CATV Right of Way Required Meter height -- 4'0'' min. (3'0" min. for multiple installation) -- 6'3" max. From finish grade to centerline of meter base. Meters are required to be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition. Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address and unit number. If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of construction unless it is through negligence of SDG&E. Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements. Building address and/or houseline must be permanently identified prior to meter set. Per Rule 16.A.1.a. In compliance with Section 783 of the Public Utilities Code, SDG&E will apply only those construction and design specifications, standards, terms, and conditions that are applicable to a new extension of service project for the 18 months following the date the application for a new extension of service project is approved. Keep this notice with your building permit. Planned By: Albert LeDon Phone#: 6195789697 January 6, 2021 San Diego Gas & Electric 662 Camino De Los Mares San Clemente CA 92673 Re: Address Request for Meter Pedestal To those concerned: Per Ganahl Lumber’s request, the following address has been approved for a meter pedestal in the City of San Juan Capistrano. Please update your records accordingly. For further assistance, please contact James Fournier, GIS Specialist, at (949) 443-6355. Address as Listed: 25863-MP STONEHILL DR Thank you for your cooperation. Sincerely, _|át _t Lisa La Senior Permit Technician 949-443-6349 lla@sanjuancapistrano.org