B23-1374 - 27078 VIA CAMINATA 6630448 Rancho Viejo Road, Suite 110
San Juan Capistrano, CA 92675
(949) 493-1171
(949) 493-1053 Fax
www.SanJuanCapistrano.org
July 01, 2024
Owner:
ARROYO CAP II 1 LLC
18575 JAMBOREE RD #350
IRVINE, CA 92612
MEMBERS OF THE CITY COUNCIL:
CERTIFICATE OF USE & OCCUPANCY
Troy Bourne
John Campbell
Sergio Farias
Howard Hart
John Taylor
HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT
TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND
APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY
CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY
CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING:
Permit Number:
B23-1374
Building Address:
27078 VIA CAMINATA
Tract:
18148
Lot:
2
Unit:
66
Building Use:
(1840sD SINGLE FAMILY DWELLING w/ (422sD ATTACHED
GARAGE
Occupancy Classification:
R -3/U
Type of Construction:
VB
Occupant Load:
PER CBC SECTION 1004
Fire Sprinkler:
YES
Special Conditions:
CITY OF SAN JUAN CAPISTR_ANO
JAMES WIATRAK, CBO, CASp
Chief Building Official
POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE
CHIEF BUILDING OFFICIAL
THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER
6/28/2024
Permit Number B23-1374
Type BUILDING
Subtype SFD -ATTACHED
Status FINALED
Owner ARROYO CAP II 1 LLC,
Site Address
27078 VIA CAM INATA 66
Subdivision
AVELINA
Zoning
Page 1
Plan Review History
Review Group: ALL REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
C & D RECYCLING PC APPROVED Camilo Jimenez
Rnnin
Remarks and Notes:
10/11/23 11/21/23 41
Review Group: BUILDING REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
BUILDING 4+ PC APPROVED CSG
Remarks and Notes:
5/4/22 5/27/22 5/11/22 7
Review Group; COO REVIEWS REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
CERTIFICATE OF
Applied 10/11/202:
LL1
5/28/24 6/6/24
Approved 10/11/202:
LL1
COO - BUS
Issued 11/21/202:
CJ55
5/28/24 6/6/24
Finaled 6/19/2024
KH1
COO - NPDES
Expired
Remarks and Notes:
Applicant LANDSEA CONSTRUCTION LLC
COO APPROVED Laura Stokes
City
State Zip
SAN JUAN CAPISTRANO CA 92675
Tract
Block Lot No Parcel No
18148
2 TRACT 18148 UNI'
Construction Type
Occupancy Type
VB
R -3/U
Review Group: ALL REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
C & D RECYCLING PC APPROVED Camilo Jimenez
Rnnin
Remarks and Notes:
10/11/23 11/21/23 41
Review Group: BUILDING REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
BUILDING 4+ PC APPROVED CSG
Remarks and Notes:
5/4/22 5/27/22 5/11/22 7
Review Group; COO REVIEWS REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
CERTIFICATE OF
COO APPROVED Dianna Flores
n( --(--i ipnniry
5/28/24 6/6/24
5/28/24
Remarks and Notes:
COO - BUS
COO APPROVED Jocelyne Mejia
i ir.FnicF
5/28/24 6/6/24
5/30/24
Remarks and Notes:
COO - NPDES
COO APPROVED Noreen Swiontek
Remarks and Notes:
COO - PLANNING -
COO APPROVED Laura Stokes
N 0 icinir,
Remarks and Notes:
PERMIT REVIEWS
Repos. By:
5/28/24
7/1/24
34
5/28/24 6/6/24
5/28/24
0
5/28/24 6/6/24
6/13/24
16
5/28/24 6/6/24
5/30/24
2
COO -PLANNING- COO APPROVED PLANNING
PRC) I MAN
5/28/24 6/6/24 6/14/24 17
5/28/24 6/6/24 5/29/24 1
5/28/24 6/6/24 6/28/24 31
5/17/24 5/28/24 5/17/24 0
5/28/24 6/19/24 22
5/28/24 6/19/24 22
Review Group: PLANNING REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
PLANNING 2nd PC APPROVED Laura Stokes
Remarks and Notes:
PERMIT REVIEWS
Report By:
3/8/22 5/27/22 3/17/22 9
Remarks and Notes:
COO - PUB WRKS
COO APPROVED James Prather
rrnN INcp
Remarks and Notes:
COO - SMWD
COO APPROVED SMWD
Remarks and Notes:
COO - UTILITIES
COO APPROVED Dianna Flores
RFI FACFC
Remarks and Notes:
COO -BLDG
COO APPROVED Kevin Hughes
rrRnnwr:iRnnln
Remarks and Notes:
COO -OCFA -
COO APPROVED Kevin Hughes
rnnnnnnnlnrnnl u
Remarks and Notes:
5/28/24 6/6/24 6/14/24 17
5/28/24 6/6/24 5/29/24 1
5/28/24 6/6/24 6/28/24 31
5/17/24 5/28/24 5/17/24 0
5/28/24 6/19/24 22
5/28/24 6/19/24 22
Review Group: PLANNING REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
PLANNING 2nd PC APPROVED Laura Stokes
Remarks and Notes:
PERMIT REVIEWS
Report By:
3/8/22 5/27/22 3/17/22 9
CITY OF SAN JUAN CAPISTRANO ISSUED
11/21/2023
BUILDING PERMIT
Permit No. B23-1374
Permit Number B23-1374 DESCRIPTION
AVELINA PH 8. 5-PLEX. PLAN 3-END. 1840sf SFR. 422sfATT GAR.
ISSUED BY CJ55 8 ROOF MOUNTED SOLAR PANELS. 2.80kW DC SYSTEM. ARCH PC
SITE APN TRACT 18148 UNIT 66 B21-1320
SITE LOT NO 2 AL
SITE TRACT 18148
SITE SUBDIVISION AVELINA y
JOB VALUE $ 209,238
OCCUPANCY TYPE R-3/U
PERMIT TYPE. BUILDING E L ECTIUCA L PE HN IT ANMIUN
BUILDING SF 1,840
NO STORIES 3 NEW RES OCCUPANCY GROUP R-3 115.08
NO UNITS 1 NEW RES OCCUPANCY GROUP U 12.66
SERVICES 600V OR LESS NOT OVER 200AMPS 33.78
JOB ADDRESS: 27078 VIA CAMMATA 66 ELECTRICAL ISSUANCE FEE 27.24
OWNER NAME ARROYO CAP II i LLC,
PHONE
MAILING ADDRESS 18575 JAMBOREE RD
CITY,STATE,ZIP IRVINE, CA 92612 Total Electrical 188.76
CONTRACTOR NAME LANDSEA CONSTRUCTION LLC PLUMBING PERMIT AMOUNT
1042287 PLUMBING ISSUANCE FEE 27.24
ST. LIC EXPIRE 07/31/2024 FIXTURES AND VENTS 173.60
PHONE (949) 379-5289 WATER HEATER INCLUDING VENT 13.62
ADDRESS 660 NEWPORT CENTER DR #300 WATER PiPING SYSTEMS 5.26
CITY, ST, ZIP NEWPORT BEACH, CA 92660 # GAS SYSTEMS 6.81
TENANT NAME BUILDING SEWER 27.29
PHONE # FIRE INSTALL i TO 50 66.44
MAILING ADDR
CITY, ST, ZIP
N1091 F. HOME PERMIT AMOUNT MECHANICAL PERMIT AMOUNT
DUCT 1NSTALUREPLACE/RELOC 168.63
APPLIANCE VENTS 8.03
VENTS AND EXHAUST HOOD/DUCTS 11.79
AC/BOILER/COMPR<3HPAND 100K BTU 16.28
Total Mobile Home EXHAUST FAN W/ SINGLE DUCT 42.00
FURNACE FORCED AIR OR GRAVITY UP TO 100K 16.39
1 have carefully examined the completed permit application and do hereby certify under penally of MECHANICAL ISSUANCE FEES 27.24
perjury that all information hereon including the declarations are true and correct and I further Total Mechanical 290.36
certify and agree if a permit is issued: to comply with all City, County, and State laws governing
building construction, whether specified herein or not. I also agree to save, indemnify and keep :xpiration:: Every permit issued shall become invalid unless the work on the site authorized by
harmless the City of San Juan Capistrano against all liabilities, judgments, casts and expenses uch permit is commenced within 12 months after its issuance, or if the work authorized on the
which may in any way accrue against said City in consequence of the granting of this permit. ite by such permit is suspended or abandoned for a period of 180 days after the time the work
Owner/Contractor ( WI 1I&Y ammenced.
Print Name An OSHA permit is required for excavations over 5'0" deep and demolition or construction of
Jr structures over 3 stories in height.
Applicant's signature I R M
Contractor: I hereby affirm 11A I am licensed under pro I. irnsr of Chapter 9 of Division 3 of the Business and Professions Code, and my license is in full force and effect_
Ownar/9uilder. i, as owner of the property, or my employees with wages as their sole compensation, will do the work and the structwe is not intended or offered for sale (Sea 7044, Business and Professions
Code: the Contractor's License Laws does not apply to and owner of property who builds or improves thereon, who does such work himself or through his employees, provided that such improvements are not
intended or offered for sale If however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the puipose of sale)
9wnerfiluilder. 1, as owner of the property, am exclusively contracting with licensed connectors to construct the project (Sec 7044, Business and Professions Code: The Contractor's License Law does not
apply-la an owner of property who builds or improves thereon and who contracts for such projects with a contractor's) license pursuant to the Contractor's License Law
r. -
' ►'urt rs m w s tion-1 Itereby affmn under penalty of perjury arc of the following declaralions:l have and will maintain workers' compensation insurance, as required by Section 3700 of ilio
E al t dc, for the performance of the work for which [Itis pmmk is issued. My workers' compensation insurance carrier and policy number are: Carrier EVERrNI PRr&IIF.R NS ANC F
A ' 1' PolicyOCCI WC00078231 (This section needs to be completed if the permit is for one hundred dollars(S 100) or less)
Exemption- 1 certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject io the workers' compensation laws of
Colifomia and agree that if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions
etc Applicant
WARNiNGTAI LURE TO SECURE WORKERS'COMPENSATION COVERAGE 15 UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TI CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED
THOUSDAND DOLLARS(5100.000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES
rm
CITY OF SAN JUAN CAPISTRANO
BUILDING PERMIT FEES
TR
Phone/E-Mail (949) 379-5289 _
0—LOcatlon: 1 -YM712 Xnn rnnnirTA-rA rr.
Account #
Type
Cost
01-44221
Building Permit
$
1.786.52
01-44223
Mechanical
$
290.36
01144224
Plumbing
$
320.26
01-44225
Electrical
$
188.76
0144221
Mobile Home Permit
$
0.00
01-44222
Grading Permit Fee
$
0.00
01-44231
Grading Plan Check
$
0.00
01-44222
On -Site Residential Permit
$
0.00
0144231
On -Site Residential Plan Check
$
0.00
Subtotal
$
2,585.90
0144230
Bond Processing
$
0.00
01-44230
Building Plan Check
$
0.00
01-44230
01-44230
Additional Plan Check
Digital Record Fee ($1.00 per sheet)
$
$
0.00
34.20
0144221
C & D Administrative Fee
S
92.74
01-44221
Special Inspection -Reinspection
$
0.00
0144222
On -Site Commercial/Tract Permit Fee
S
0.00
01-44231
On -Site Commercial/Tract Plan Check Fee
$
0.00
01-44214
Geotechnical Soils Plan Review
$
0.00
1044320
Ordinance 211
$
50.00
10-42510
Ordinance 364
S
2,092.38
01145354
Copies @.20 Each
S
0.00
90-23331
SMIP Fee
$
27.20
33-44370
H.O.P.E. Fee (Housing in Lieu)
$
0.00
Other Fees
$
99.90
TCA Fees Date Received
HOA Approval ate Received
School Fees Date Received
Engineering Fees Date Received
Water Division Fees Date Received
0144221
Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check))
$
351.86
01-44221
Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check)
$
0.00
01114240
NPDES Permit Fee (10% Permit Subtotal)
$
258.59
90-23000
Refundable Bond/Deposit Posted by Owner Contractor Type
$
2,092.38
90-23000
Refundable Bond/Deposit Posted by Owner Contractor Type
TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO
$
7,685.15
Receipt # _97023
_ Date: 11/21/2023. Cashier:
BOARD OF DIRECTORS
LAURA FREESE
CHARLES T. GIBSON
SAUNDRA F. JACOBS
BETTY H. OLSON, PH.D
FRANK URY
ROBERT GRANTHAM
GENERAL MANAGER
June 28, 2024
City of San Juan Capistrano
Building Division
30448 Rancho Viejo Road, #110
San Juan Capistrano, CA 92675
Attention: Building Division
EAI
5ar2ta Mangarzita Waters District
Subject: Tract 18148, Avelina Lots 66-70, Phase 8 in ID 9 — 27062, 27066, 27070, 27074 and
27078 Via Caminata
The above referenced location(s) may be released as far as the District is concerned effective
June 14, 2024.
Developer: LandSea Homes
This release does not constitute authorization for you to release the water and sewer bonds for the
subject lots. This authorization will be a Resolution of the Board of Directors of the Santa
Margarita Water District. When the water and sewer facilities are formally accepted by the Board,
they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded
to you.
Should you have any questions please contact me at (949) 988-9505.
Sincerely,
SANTA MARGARITA WATER DISTRICT
Daniel Ward
Construction Manager
cc: Tony Gaetano, Inspector
Elena Wilson/email
Stephanie Avila/email
Mona Boers -Kort /email
Renee Chinchilla/email
Steve Skeffington/email
Larry Jeffery/email
File S\Eng\Tract Occupancy Release Letters
Santa Margarita Water District • 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688
www.SMWD.com 0 (949) 459-6420
Title-24/Energy Star Experts
Independent HERS Rater
Duct Testing Professionals
III BUILDER
SERVICES NETWORK
lcrr
2937 Veneman Ave Office: 209-618-4462
Suite C275 Fax: 209-846-9796
Modesto, CA 95356
Guaranteed Home buyer Comfort
HVAC problems corrected
Mechanical/Plumbing/MEP Engineering
LOT STATUS REPORT
Below is a status of all inspections/testing performed. For passed lots please allow up to 48 hours to receive your final
paperwork.
If there is a failure please see the issues listed below. Once all corrections have been made please reschedule by
emailing into scheduling@califliving.corn or faxing to 209-846-9796
Please Note: If we are not called out to finish testing, it may prevent the collection of rebates or incentives on the lot(s) in question.
Date Inspector
06/20/24 Adrian Hires
Builder I Subdivision I Superintendent
Landsea Homes Avelina
Chris
Spoke w/ super on-site ❑Called and spoke w/ super E] Left message for super [i] Emailed
Lot #
Description
66
Passed at final.
Range hood collected.
Passed at final.
Range hood collected.
67
Passed at final.
Range hood collected.
68
69
Passed at final.
Range hood collected.
70
Passed at final.
Range hood collected.
NOTE: EER/SEER TEST RESULTS WILL BE VERIFIED IN THE OFFICE
NOTE: DATA COLLECTED FOR RANGE HOOD VERIFICATION, HSPF VERIFICATION,
RATED HEAT PUMP CAPACITY WILL BE VERIFIED IN OFFICE FOR PASS/FAILURE
('nnlinnnu.c /it y cfilvn ,Cc Maio I'Vyling
SOLTrHWESr ALA, LALALAkALALALALALALA&ALAL
thispecholl c-K' Tcstillg, II1c. 441 C'nnuncrciiil Wuy. I.a Iluhr�i, ('A 90631-6108
(562) `1=11-2990 - (71-4) 526-84-11
1: AX ('S62) 940-0026
June 04, 2024
Building Official
City of San Juan Capistrano
Department of Building & Safety
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
SPECIAL INSPECTOR'S FINAL REPORT
Project Name: Avelina — Phase 8, Building #18
Address: Tract #18148, San Juan Capistrano
Owner: Landsea Homes
Lot#
Address
Permit#
66
27078 Via Caminata
B23-1374
67
27074 Via Caminata
B23-1375
68
27070 Via Caminata
B23-1376
69
27066 Via Caminata
B23-1377
70
27062 Via Caminata
B23-1378
House Meter
27078 Via Caminata
B23-1379
This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection
on the above-mentioned project at the above address, which required special inspection per section 1701
of the 2022 California Building Code.
Rob Langner - Reinforced Concrete, Post Tensioned Concrete,Shear Nailing ICC #1139855
Justin Parrish —Reinforced and Post Tensioned Concrete, Reinforced Masonry, ICC #1134401
Michael Rofaeil-Reinforced Concrete,ICC#10190743
Steve Skuljan- Reinforced Concrete,Post Tensioned Concrete,ICC #1140008
Steve C.Stai-Shear Nailing ,ICC #847829
Based upon special inspection and materials testing written reports of this work, it is our judgment that
the inspected work was performed to the best of our knowledge, in accordance with the approved plans,
specifications and industry standard of workmanship in accordance with the provision of the 2022
California Building Code.
Sincerely,
Steven L. Godbey
President
SLG/IRW: spg
Reviewed
Ian R. Wadden`
Principal Engine
For inspection and testing only, no design
responsibility expressed or implied. ied.
PLI
Z�G
Plumbing Concepts, Inc.
2445 Railroad St.
Corona, CA 92880
License No. 469996
Project Name: AVELINA
Tract No.18148
Project Location: SAN JUAN CAPISTRANO
ATTN: LANDSEA HOMES
RE: Sewer Camera BLD -I8 -LOTS- 66-67-68-69-70
BLD -I9 -LOTS- 61 -62 -63 -64 -65 -
To Whom it may concern,
G
6-11-24
Please allow this letter to serve as confirmation that the above referenced project
had the sewer lines video inspected, and they have been found to be free and
clear of debris.
If you have any questions, please feel free to contact us.
Yours truly,
Doug Muore
Director of Quality Assurance
(951) 520-8590 ext. 7142
Lr)cinG
June 17, 2024
City Engineer
City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, California 92675
Subject: Final Grade Certification Tract No. 18148, Lot 2 "Avelina", Building 18, Units 66 through
70, (Permit# B21-1365).
Dear Sir:
Finish grading operations have been completed for Tract No. 18148, Lot 2 "Avelina", Building 18,
Units 66 through 70 and have been inspected by the undersigned Professional Land Surveyor.
All grading was completed in substantial conformance with the final grading plan approved by the
City Engineer and no unauthorized deviations were made.
Sincerely,
Michael A. Baine, P.L.S.
VP - Survey
L.D. King, Inc. 975 N. Haven Avenue, Suite 200, Ontario, CA 91764 (909) 945-0526 Fax: (909) 945-0529
landscape architecture / land planning
June 14, 2024
Shannon Whittaker
Landsea Homes
7525 Irvine Center Drive
Suite 200
Irvine, CA 92618
RE: Conformance Letter
Tirador, Tract 18148
• Avelina Phase 8 — Building 17 (Units #66 through #70)
This letter is to certify that all items for the phase mentioned above has been completed to the
satisfaction of the landscape architect. I declare in my professional opinion and to the best of my
knowledge, available information, and belief. That the landscape plans for the above -referenced
project have been completed within the intent of the project and in accordance with the City of San
Juan Capistrano approved plans and specifications.
This conformance letter applies only to plant locations and quantities. SJA Inc. was not present for
the installation or observation of the irrigation system. SJA Inc. cannot certify conformance of below
grade materials, installation techniques, or irrigation pipe sizing.
Please do not hesitate to call my office if you should have any questions.
r
Sincerely,
31 2
Denny Simtl gall ,� s NAT e
Principal fp
01/90/26
7859 Sitio Coco, Carlsbad Califomia 92009 TEL 949.276.6500 I FAX 949.276.6506 1 WWW.SJAINC.COM
Lr)cinci
December 19, 2023
City Engineer
City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, California 92675
Subject: Tract 18148, Tract 18148, Lot 2 "Avelina", Building 18 (Permit# B21-1365).
Dear Sir:
This letter is to verify minimum setbacks and elevation of foundation forms for building 18 to within plus or
minus 0.1'.
Sincerely,
Michael A. Baine, P.L.S.
VP - Survey
L.D. King, Inc. 975 N. Haven Avenue, Suite 200, Ontario, CA 91764 (909) 945-0526 Fax: (909) 945-0529
VLGO
Geotechnical, Inc.
June 4, 2024
Ms. Shannon Whittaker
Project No. 20266-01
Landsea Homes
7525 Irvine Center Drive, Suite 200
Irvine, CA 92618
Subject. Geotechnical Release from Post -Grading, Phase 8, Building 18, 'Avelino" Residential
Development, Tract 18148, Southwest Corner of Calle Arroyo and Paseo Tirador, City
of San Juan Capistrano, .California
In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Phase
8, Building 18 of the "Avelina" residential development, Tract 18148, located in the city of San Juan
Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-call observation and
field density testing of postgrading operations in order to form an opinion of site earthwork. In general,
postgrading operations observed and/or tested by LGC Geotechnical included interior plumbing backfill,
foundation footing excavations, utility house connection backfill, and subgrade preparation. Refer to table
below for lots and associated addresses.
Postgrading Release Lot Summary - Avelina
Building No. Unit No.
Address
Permit No.
18 66
27078 Via Caminata
B23-1374
18 67
27074 Via Caminata
B23-1375
18 68
27070 Via Caminata
B23-1376
18 69
27066 Via Caminata
B23-1377
18 70
27062 Via Caminata
B23-1378
18 HM
27078 Via Caminata
B23-1379
Based on the results of our observation and testing, it is our opinion that the subject site earthwork
operations were completed in general accordance with project geotechnical recommendations. This letter
serves as a geotechnical release from postgrading operations for the subject lots at the "Avelina"
residential development. In our opinion, the subject building pads are suitable for their intended use from
a geotechnical perspective.
Closure
Our services were performed using the degree of care and skill ordinarily exercised, under similar
circumstances, by reputable engineers and geologists practicing in this or similar localities. No other
warranty, expressed or implied, is made as to the conclusions and professional advice included in this
report.
Should you have any questions regarding this letter, please do not hesitate to contact our office. We
appreciate this opportunity to be of service.
Respectfully,
LGC Geotechnical, Inc.
I -- mal
`- No. 2749
Barry Graham, CEG 2749
Project Geologist
BPG/amm
Distribution: (1) Addressee (electronic copy)
(1) X Engineering and Consulting, Inc. (electronic copy)
Attn: Mr. Selwyn Harsono
Project No. 20266-01 Page 2 June 4, 2024