Loading...
B23-1222 - 31222 VIA QUEBRADAFINALED 02.22.24 FINALED 02.22.24 - Name Address City/State/Zip TENANT NAME Phone ( ) ACCESSORY DWELLING UNIT QTY QTY QTY QTY Light Fixtures/Fans FAU < 100k BTU's Fixtures/Hose Bibs New/Setup Outlets/Switches FAU > 100k BTU's Water Heater Carport Meters/Main Panels AC/Comp BTU= Water Piping Gas Systems Awning Signs Exhaust Fans Temp Power Motors > than 1 HP Motors < than 1 HP Duct/Register/Grill Pool/Spa Pool/Spa Extend Plumbing APPLICANT SIGNATURE DATE Porch ISSUANCE ELECTRICAL PLUMBINGMECHANICAL ISSUANCEISSUANCE Fireplace ISSUANCE Fire Sprinkler Heads Miscellaneous PROPERTY OWNER Appliance Vent CONSTRUCTION TYPE NO. OF STORIES MOBILE HOME PROJECT ADDRESS UNIT #: Extend Electrical Cabana OCCUPANCY GROUP(S) SPRINKLERS PERMIT NUMBER JOB VALUATION Pool/Spa Vent/Exhaust Hood Miscellaneous Grease Interceptor Earthquake Bracing Electrical Wiring Gas Piping Sewage Disposal Water Piping City of San Juan Capistrano DeDevelopment Services Department 32400 Paseo Adelanto SaSan Juan Capistrano, CA 92675 Phone: (949) 443-6347 Email:building@sanjuancapistrano.org www.sanjuancapistrano.org/building Building Sewer ATTACHED DETACHED NEW CONSTRUCTION CONVERSION OF EXISTING STRUCTURE JADU 1. 2. OCCUPANCY CURRENT OCCUPANCY PROPOSED INT. ALT. ADDITION PATIO POOL/SPA DEMOLITION EXISTING BUILDING ____SQ.FT.____SQ.FT.____SQ.FT.____SQ.FT.____SQ.FT. NEW BUILDING ____SQ.FT.____SQ.FT.____SQ.FT.____SQ.FT. ________________ OCC. GROUP DESCRIPTION OF WORK COMBINING OR SUBDIVIDING SUITES? CHANGE OF OCCUPANCY USE? YES NO YES NO YES NO APPLICANT CONTACT NAME CONTACT PHONE ( ) EMAIL ADDRESS $ PRINT NAME As the applicant for this project, I am aware of the potential liabilities with undertaking construction within any private easement or use restriction area that may exist on this property. I acknowledge that I have or will review the Title Report for this property to ensure that this project does not impact any private easements or use restriction areas. By signing below, I CERTIFY THE ABOVE INFORMATION TO BE TRUE AND CORRECT. CONTRACTOR State License #: Name Address City/State/Zip BUILDING PERMIT APPLICATION LL 06/28/23 WARNING: THIS PERMIT APPLICATION WILL EXPIRE 180 DAYS FROM THE DATE SHOWN BELOW UNLESS THE PERMIT HAS BEEN ISSUED OR AN EXTENSION IS APPROVED BY THE BUILDING OFFICAL PRIOR TO APPLICATION EXPIRATION. ____/____/____ : B23 1222 08 31 23 NO LONGER DOING DERATE NO BBU 225A MPU 1 1 INSTALL EV CHARGER FINALED 02.22.24 GENERAL REQUIREMENTS Y N Y N Y N Y N 1.System size is 10 kW  rating or less 2.Solar array is roof mounted on a one or two family dwelling OR accessory dwelling unit (ADU) 3.Solar panels/module arrays will not exceed the maximum legal building height 4.Solar system is utility interactive and without battery storage 5. New roofing material directly below the solar array may be installed by a separate roofing contractor or the solar installation contractor. Any roofing outside of the array footprint will require a separate permit from a licensed roofing contractor. RESIDENTIAL PHOTOVOLTAIC ELIGIBILITY CHECKLIST Solar Photovoltaic (PV) Checklist for Detached One- or Two- Family Dwellings Instructions: The licensed contractor of record shall fill in the address of the project, contractor’s licensing information and answer each statement with Y or N. Complete and sign the certification section. ** If any items are checked NO, plan check shall be required ** Project Address: ___________________________________________________ Contractor Company Name: ____________________________________________________ Contractor State License Number: ____________________________________________________ City of SJC Business License Number: _________________________________ City of San Juan Capistrano DeDevelopment Services Department 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Phone: (949) 443-6347 Email: building@sanjuancapistrano.org www.sanjuancapistrano.org/building 07/03/23 LL 1.Permit Application (Completed & Attached) 2.Signed Contract or letter of intent with the homeowner is provided with submittal 3.Structural Roof Criteria and supporting documentation is attached and stamped by a licensed design professional 4.Electrical load calculation is required for all installations. (MUST BE COMPLETED ON CITY STANDARD TEMPLATE) 5.SDG&E Work Order is required for all Main Panel Upgrades 6.Clear photographs required of existing main service panel and subpanels showing ALL circuit breakers/ loads and panel board/bus ratings. 7.Manufacturers Specifications required for ALL electrical components that will be installed Y N Y N Y N Y N Y N Y N Y N STRUCTURAL REQUIREMENTS 1.A completed Structural Criteria and supporting documentation is attached and stamped by a licensed design professional for solar array attachment and/or any separate structure or racking supporting array or equipment. Y N Y N CITY SPECIFIC REQUIREMENTS FINALED 02.22.24 FIRE SAFETY REQUIREMENTS 1.Clear access pathways provided per OCFA and CRC guidelines 2.Fire classification solar system is provided (Class A) 3.All required markings and labels are provided 4.Diagram of the roof layout of all panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points is completed and attached **Renewable Meter Adapter (RMA) installations must be approved by SDG&E and have a separate GEC. Any and all grounding work not performed by SDG&E, including but not limited to the RMA disconnect, will be performed by the Solar Contractor. I certify under penalty of perjury under the laws of the State of California that the above is true and correct. I understand that all approvals are subject to field inspection. Field corrections may require a formal revision submitted for plan review. A re-inspection fee may be assessed when work is not ready, inspection card and/or approved plans are not available, no access has been provided or there is any deviation from the approved plans.: Print Name: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Date: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ  Signature: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Phone Number:ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Email Address: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ ELECTRICAL REQUIREMENTS 1.The PV system is interconnected to a single-phase AC service panel of nominal 120/220 Vac with a bus bar rating of 225A or greater 2.The PV system is connected to the load side of the utility distribution equipment** 3.A Solar PV Standard Plan and supporting documentation is completed and attached Y N Y N Y N Y N Y N Y N Y N FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24 FINALED 02.22.24