B23-0864 - 26064 WAGON DR30448 Rancho Viejo Road, Suite 110
San Juan Capistrano, CA 92675
(949) 493-1171
(949) 493-1053 Fax
www,SanJuanCapistrano.org
March 8, 2024
Owner:
AG ESSENTIAL HOUSING CA 1 LP
8585 E HARTFORD DR #118
SCOTTSDALE, AZ 85255
MEMBERS OF THE CITY COUNCIL:
CERTIFICATE OF USE & OCCUPANCY
Troy Bourne
John Campbell
Sergio Farias
Howard Hart
John Taylor
HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT
TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND
APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY
CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY
CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING:
Permit Number: B23-0864
Building Address: 26064 WAGON DR
Tract: 19063
Lot: 10
Unit:
Building Use: (2555so SINGLE FAMILY DWELLING w/ (438sfl ATTACHED
GARAGE
Occupancy Classification: R -3/U
Type of Construction: VB
Occupant Load: PER CBC SECTION 1004
Fire Sprinkler: YES
Special Conditions:
CITY QF SAN JUAN CAPISTRANO
JAMES WIAT K, CBO, CASp
Chief Building Official
POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE
CHIEF BUILDING OFFICIAL
THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER
3/8/2024
Plan Review History
Page 1
Permit Number B23-0864
Applied 6/8/2023 LL1
Approved 6/8/2023 LL1
Type BUILDING
Issued 6/29/2023 CJ5
Subtype SFD DETACHED
Finaled 1/25/2024 WF1
Status FINALED
Expired
Owner AG ESSENTIAL HOUSING CA 1 LP,
Applicant
LENNAR HOMES OF CALIFORNIA INC
Site Address City
State Zip
26064 WAGON DR SAN JUAN CAPISTRANO
CA 92675
Subdivision Tract
Block
Lot No Parcel No
THE FARM - CASPIAN 19063
10 TRACT 19063 LOT
Zoning Construction
Type
Occupancy Type
VB
R -3/U
Review Group: ALL
REVIEW DATES
Review Type Status Reviewer
Sent
Due Returned Days Elapsed
C & D RECYCLING PC APPROVED Camilo Jimenez
6/8/23
6/29/23 21
Rmmn
Remarks and Notes:
REVIEW DATES
Review Group: COO REVIEWS
Review Type Status Reviewer
Sent
Due Returned Days Elapsed
CERTIFICATE OF COO APPROVED Dianna Flores
1/12/24
3/8/24 56
nrri 1Pntir.Y
Remarks and Notes:
COO - BUS COO APPROVED BUSINESS LICENSE
1/12/24
1/24/24 1/19/24 7
i ir.FticF
Remarks and Notes:
-.....................-•---•---•--------------------
-------------------- ------------------ - --------------
COO -NPDES COOAPPROVED NoreenSwiontek
- -- ..
1/12/24
1/24/24 1/19/24 7
Remarks and Notes:
-------------------•---- .----.................
COO - PLANNING - COO APPROVED Laura Stokes
....•-•-•---------•------------------------------•----------..._._...
1/12/24
1124J24 1118124.. 6•
Nni iciNr,
Remarks and Notes:
------- - ------ .......---------------
COO- PLANNING - COOAPPROVED PLANNING
... .......
1/12/24
----- •---------- -----••--••--••---------------
1/24124 1/18124 6
PRn I nnnN
Remarks and Notes:
----------
COO - PUB WRKS COO APPROVED James Prather
1112/24
1124/24 1/17/24 5
rnN iNCP
Remarks and Notes:
---- ......................... — ----------- .------•--........_...---------------------
COO - SMWD COO APPROVED SMWD
-----------
1/12/24
- ------------------------ -- --
1124/24 &&24 56
Remarks and Notes:
PERMIT REVIEWS
Report By:
40NWSYSTEh)S
COO - UTILITIES COO APPROVED Dianna Flores
RFI FARPR
Remarks and Notes:
COO -BLDG COO APPROVED William Forsythe
r.RAnINr,/Rr)mn
Remarks and Notes:
COO -OCFA - COO APPROVED William Forsythe
rnnnnnnnlninnl u
Remarks and Notes:
PERMIT REVIEWS
Report By:
1/10/24 1/22/24 1/10/24 0
1/12/24 1/25/24 13
1/12/24
1/25/24 13
CME YS TEM S
CITY OF SAN JUAN CAPISTRANO
-~LrF4rs'' BUILDING PERMIT
Permit No. B23-0864
ISSUED
06/29/2023
Permit Number B23-0864
DESCRIPTION
CASPIAN PH 13. PLAN 2B, 2555sf SFR w/ 438sf ATT GARAGE.
ARCH PC= B21-0314
ISSUED BY 05
SITE APN TRACT 19063 LOT 10
SITE LOT NO 10
SITE TRACT 19063
SITE SUBDIVISION THE FARM - CASPIAN
JOB VALUE $ 333,632 FiNf
OCCUPANCY TYPE R -3/U
PERMIT TYPE. BUILDING
� -5
ELEC IO 'AL RM f AM U
--01
BUILDING SF 2,555 L
NO STORIES 2
NEW RES OCCUPANCY GROUP R-3 177.96
NEW RES OCCUPANCY GROUP U 13.14
NO UNITS I
SERVICES 600V OR LESS NOT OVER 200AWS 33.78
ELECTRICAL ISSUANCE FEE 27.24
JOB ADDRESS: 26064 WAGON DR
OWNER NAME AG ESSENTIAL HOUSING CA 1 LP,
PHONE
MAILING ADDRESS 8585 E HARTFORD DR
CITY,STATE,ZIP SCOTTSDALE, AZ 85255
Total Electrical 252.12
CONTRACTOR NAME LENNAR HOMES OF CALIFORNIA INC
PLUMBING PERMIT AMOUNT
728102
PLUMBING ISSUANCE FEE 27.24
ST. LIC EXPIRE 09/30/2022
FIXTURES AND VENTS 184.45
PHONE (949) 789-1600
WATER HEATER INCLUDING VENT 13.62
ADDRESS 15131 ALTON PKWY #345
WATER PIPING SYSTEMS 5.26
CITY, ST, ZIP IRVINE, CA 92618
# GAS SYSTEMS 8.03
BUILDING SEWER 27.29
TENANT NAME
PHONE #
FIRE INSTALL 1 TO 50 66.44
MAILING ADDR
BACKFLOW PROTECTION NON ATM >21N 27.29
CITY, ST, ZIP
MECHANICAL PERMIT AMOUNT
MOBILE HOME PERMIT AMOUNT
DUCT INSTALL/REPLACE/RELOC 104.39
APPLIANCE VENTS 8.03
VENTS AND EXHAUST HOOD/DUCTS 11.79
AC/BOILER/COMPR<3HP AND 100K BTU 16.28
EXHAUST FAN W/ SINGLE DUCT 42.00
Total Mobile Home
FURNACE FORCED AIR OR GRAVITY UP TO 100K 16.39
MECHANICAL ISSUANCE FEES 27.24
I have carefully examined the completed permit application and do hereby certify under penalty of
perjury that all information hereon including the declarations are true and correct and I further
Total Mechanical 226.12
certify and agree if a permit is issued: to comply with all City, County, and Slate laws governing
expiration:: Every permit issued shall become invalid unless the work on the site authorized bt
building construction, whether specified herein or not. I also agree to save, indemnify and keep
harmless Ilse City of San Juan Capistrano against all liabilities, judgments, costs and expenses
uch permit is commenced within 12 months after its issuance, or if the work authorized on the
which may in any way accrue against said City in c uqucnce of the gr.mw t f this permit,
rte by such permit is suspended or abandoned for a period of 180 days after the time the work
Owner/Contractor C �•�y"I�,l� , ; r
ammemeed.
An OSHA permit is required for excavations over 5'0" deep and demolition or construction of
Print Name
structures over 3 stories in height
licant's signature
Cunlrnr[nr I hereby nlTtnn that 75r7teensed nrider prgvisiuns of Ch.iill cr'I u Division 3 of the Businces and Professions Crile, and my license is in fill force and effect-
- OwnerBuilder: I, as owner of the property, or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec 7044, Business and Professions
Code: the Contractor's License laws does not apply to and owner of property who builds or improves thereon, who does such work himself or through his employees, provided that such improvements are not
intended or offered Cor sale. If however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale)
_ ShrnerrRuilder: 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not
owner of taoperty who builds or improves thereon and who contracts for such projects with a contractor's) license pursuant to the Contractor's License Law,
Workers Comnemation-I hereby affirm under penalty of perjury one of the following declarations:[ have and will maintain workers' compensation insurance, as required by Section 3700of III
LAP,kr Code, for the performance of 1he work for which this permit is issued. My workers' compensation insurance tamer and policy number are: Carrier_ QLD_R LIC INSU F ANY
Policy#MWC31414821 (This section needs to be completed if the permit is for one hundred dollars(S100) or less)
F.xemntiow I certify, that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workeis' compensation latus of
California and agree that if] should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.
)ate __ Applicant
1VA RNING:FAILURE TO SECURE wORKERS'COMPGNSATION COVERAGE 1S UNLAWFUL, AND SHALL SUBJECT AN E\[PLOYERTI CRIMINAL PENALTIES AND CIVIL F(NrS UPTO ONE HUNDRED
THOUSDAND DOLLARS(S 100,000) IN AUDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVI DED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES
CITY OF SAN JUAN CAPISTRANO
BUILDING PERMIT FEES
LLMNAR HOMES OF C:ALI17OR
(949) 789-1600
Account #
Type
Cost
01144221
i
Building Permit
$
2.529.28
01-04223
Mechanical
$
226.12
01-04224
Plumbing
359.62
01144225
Electrical
$
252.12
01-44221
1 Mobile Home Permit
S
0.00
01-44222
/Grading Permit Fee
$
0.00
01-44231
Grading Plan Check
$
0.00
01-44222
On -Site Residential Permit
$
0.00
01-44231
On -Site Residential Plan Check
$
0.00
Subtotal
$
3,367.14
01144230
Bond Processing
S
0.00
01 44230
Building Plan Check
S
0.00
01-04230
Additional Plan Check
S
0.00
01144230
Digital Record Fee ($1.00 per sheet)
$
34.20
01-44221
C & D Administrative Fee
$
92.74
01114221
Special Inspection -Reinspection
$
0.00
01-44222
On -Site Commercial/Tract Permit Fee
S
0.00
01-44231
On -Site Commercial/Tract Plan Check Fee
$
0.00
01-44214
Geotechnical Soils Plan Review
S
0.00
10114320
Ordinance 211
S
50.00
10-42510
Ordinance 364
$
3.336.32
01-45354
Copies @ .20 Each
S
0.00
90-23331
SMIP Fee
$
43.37
33144370
H.O P.E. Fee (Housing in Lieu)
S
0.00
Other Fees
$
7,991.90
TCA Fees Date Received
HOA Appro\ral Date Received
Schoo ees Date Received
Engineering Fees Date Received
Water Division Fees Date Received
01-44221
Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check))
$
500.41
01-44221
Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check)
S
0.00
01-44240
90-23000
90-23000
NPDES Permit Fee (10% Permit Subtotal) _
Refundable Bond/Deposit Posted by Owner Contractor Type
Refundable Bond/Deposit Posted by Owner Contractor Type
$
$
336.71
3.336.32
TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO
$
19,089.11
Receipt # 95284 Date: 6/29/2023 Cashier:
■
�~ City of San Juan Capistrano 32400 Paseo Adelanto
Development Services Department San Juan Capistrano, CA 92675
Phone: (949) 443-6347
Building and Safety Division Website: www.sanjuancapistrano.org
o' Project: Caspian at The Farm
Option One J.N: 0121-2495
Structural Observation Report Arch: WHA -19206
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for
general conformance to the approved construction documents at significant construction stages and at completion of the
structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC
Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC. Phase: 13
HS#: 10
This report includes all construction work through 3rd day of August 20 23 . Report No.: Plan: 2B Page No.: 1 of 1
Project Address: Structural Observer of Record (SOR): Professional Lic./Reg. No.: Phone No. of SOR:
26064 Wagon Dr., San Juan Capistrano, CA 92675 Option One Consulting Engineers
Ilia B. Sarad, PE. SE. SECS) S-3855 714-556-1916
Building Permit No.. Structural Observer (SO), if not by SOR: Professional Lic./Reg. No.: Phone No. of SO:
B23-0864 Erik Torres EIT 714-556-1916
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box(
FOUNDATIONS WALLS FRAMES DIAPHRAGMS IF PORTION OF BLDG WAS DATE
(FloodRooQ OBSERVED, INDICATE LOCATION
® Footing, Stem Wall
❑ Concrete
❑ Steel Moment Frame
❑ Concrete
P. L..EouQdat-v�System,
8/3/23
❑ Mat Foundation,
❑ Masonry
❑ Steel Braced Frame
❑ Steel Deck
i.e. post -tension cables and
Pre -stressed Conc Slab
❑ Caisson, Pile, Grade
❑ Wood Shear Wall
❑ Concrete Moment
❑ Wood
accesscnes, anchor boas, noldown
Beam
Panel
FrameCL
bolls & straps, post bases slab
Pad,
❑ Other:
El Masonry Wall Frame
El Other:
AnchorFoundation
❑ Other:
❑ Other:
size/reinforcement and footing &
pad size/reinforcement.
❑ Other: ❑ Other:
U ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
OBSERVED DEFICIENCIES AND COMMENTS:
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
I declare that the following statements are true to the best of my knowledge:
1. 1 am the Registered Design Professional retained by the Owner to be in responsible charge of the
structural observation in accordance with the requirements of the City of San Juan Capistrano;
2. I, or another Registered Design Professional whom I have designated above and is under my
responsible charge, has performed the required site visits at each significant construction stage to
verify that the structure is in general conformance with the approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected and a new structural
observation report must be issued Gearing ese deficiencies; and
4. 1 understand that final aripptance of the su tural s�[7�s by the Building and Safety Division cannot
occur without the correc n of all observed r cies.
r August 3, 2023
P S4g�elr
N0. S 3855
UP. 3/31/2024
�TRUCTU��,
�'aA
SIGNATURE d 4UCTLRAL oBgERVER OF ACORD DATE STAMP OF STRUCTURAL OBSERVER OF RECORD
Fogn - Structural Observation Report v1.0.13ilc_� Pagel of 2
Updated: 06-28-17
City of San Juan Capistrano
Development Services Department
Building and Safety Division
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Phone: (949) 443-6347
Website: www.sanjuancapistrano.org
Project: Caspian at The Farm
Option One J -N: 0121-2495
Structural Observation Report Arch: WHA -19206
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for
general conformance to the approved construction documents at significant construction stages and at completion of the
structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC
Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC. Phase: 13
Homesite: 10
This report includes all construction work through 6th day of November2023 Report No.: Plan 213 Page No: 1 of 1
Project Address:
Structural Observer of Record (SOR):
Professional Lic./Reg. No._
Phone No. of SOR:
260V Wagon Dr., San Juan Capistrano, CA 92675
OaOne Consulting Engineers
(Ilia BB_ . Sa2d. PE, SE, SECB)
5-3855
714-556-1916
Building Permit No.:
Structural Observer (SO), if not by SOR: I
Professional Lic./Reg. No.:
Phone No. of SO:
B23-0864
Erik Torres, E.I.T
❑ Concrete
714-556-1916
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box(
FOUNDATIONS WALLS
FRAMES
DIAPHRAGMS
IF PORTION OF BLDG WAS
DATE
(Floor/Roof)
OBSERVED, INDICATE LOCATION
❑ Footing, Stem Wall
❑ Concrete
❑ Steel Moment Frame
❑ Concrete
Interior and Exterior._
Gen_er_aLSy_stem;
11/6/23
❑ Mat Foundation,
❑ Masonry
❑ Steel Braced Frame
❑ Steel Deck
i.e., roof trusses, roof
Pre -stressed Conc. Slab
sheathin shear element_
El Caisson, Pile, Grade
® Wood Shear Wall
❑ Concrete Moment
® Wood
holdowns, floor sheathing, floor
Beam
Panel
Frame EL
trusses, beams, headers and
❑ Foundation Pad,
❑ Other:
❑ Masonry Wall Frame
❑ Other:
Anchor
❑ Other.
❑ Other:
❑ Other:
❑ Other:
LXJ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
U OBSERVED DEFICIENCIES AND COMMENTS:
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
I declare that the following statements are true to the best of my knowledge:
1. I am the Registered Design Professional retained by the Owner to be in responsible charge of the
structural observation in accordance with the requirements of the City of San Juan Capistrano;
2. I, or another Registered Design Professional whom I have designated above and is under my
responsible charge, has performed the required site visits at each significant construction stage to
verify that the structure is in general conformance with the approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected and a new structural
observation report must be issued clearing these deficiencies; and
4. 1 understand that tnal acceptance of the structural systems by the Building and Safety Division cannot
occur without the 9diachon of all otfserved deficiencies.
OF RECORD
Form - Structural Observation
Updated: 06-28-17
November 6, 2023
DATE
Sq+
N0. S 3855
* Exp. 3/31/2024
gpr�'UCT
STAMP OF STRUCTURAL OBSERVER OF RECORD
Page 1 of 2
BOARD OF DIRECTORS
LAURA FREESE
CHARLES T. GIBSON
SAUNDRA F. JACOBS
BETTY H. OLSON, PH.D
FRANK URY
DON BUNTS Santa Margarita Water District
INTERIM GENERAL MANAGER
March 8, 2024
County of Orange
Planning and Development
601 North Ross Street
Santa Ana, CA 92701
Attention Release Desk: Renee.Chinchi 11a0ocpwxcv�ov.com;
Subject: Tract 19063, Phase 13 Caspian, Lots 9-13 in ID 9 —26034, 26044, 26054, 26064
and 26074 Wagon Drive
The above referenced lots may be released for occupancy as far as the District is concerned
effective January 24, 2024.
Developer: Lennar Homes
This release does not constitute authorization for you to release the water and sewer bonds for the
subject lots. This authorization will be a Resolution of the Board of Directors of the Santa
Margarita Water District. When the water and sewer facilities are formally accepted by the Board,
they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded
to you.
Should you have any questions or desire additional information please contact me at (949)
459-6504.
Sincerely,
SANTA MARGARITA WATER DISTRICT
Pc,t,
Patricia Butler, P. E.
Chief Engineer
cc: Tony Gaetano, Inspector
CSJC Building\email
Tracy Costello\email
Elena Wilson\email
Irma Lopez\email
Eric Smith\email
Mona Boers-Kort\email
Steve Skeffington\cmail
Larry Jeffery\email
File S\Eng\Tract Occupancy Release Letters
Santa Margarita Water District • 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688
www.SMWD.com • (949) 459-6420
LGO
I .i—;;•-zn1. 17-,C
December 27, 2023
Mr. Brett Hamara
Lennar Corporation
15131 Alton Parkway, Suite 365
Irvine, CA 92618
Project No. 18182-01
Subject. Geotechnical Release of Postgrading for Lots 9 throughl3, Phase 13, Caspian, Tract
19063, "The Farm" Residential Development, San Juan Capistrano, California
In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Lots
9 through 13, Phase 13 of Caspian for "The Farm" residential development, Tract 19063, located in the
City of San Juan Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-call
observation and field density testing of postgrading operations in order to form an opinion of site
earthwork. In general, postgrading operations observed and/or tested by LGC Geotechnical included
interior plumbing backfill, foundation footing excavations, utility house connection backfill, and
subgrade preparation. Refer to table below for lots and associated addresses.
Postgradina Release Lot Summa - Caspian - Phase 13
Lot No,
Address
Permit
9
26074 Wagon Drive
B23-0863
10
26064 Wagon Drive
B23-0864
11
26054 Wagon Drive
B23-0865
12
26044 Wagon Drive
B23-0866
13
26034 Wagon Drive
B23-0867
Based on the results of our observation and testing, it is our opinion that the subject site earthwork
operations were completed in general accordance with project geotechnical recommendations. This
letter serves as a geotechnical release from postgrading operations for the subject lots at The Farm
residential development. In our opinion, the subject building pads are suitable for their intended use
from a geotechnical perspective.
Closure
Our services were performed using the degree of care and skill ordinarily exercised, under similar
circumstances, by reputable engineers and geologists practicing in this or similar localities. No other
warranty, expressed or implied, is made as to the conclusions and professional advice included in this
report.
Should you have any questions regarding this letter, please do not hesitate to contact our office. We
appreciate this opportunity to be of service.
Respectfully,
LGC Geotechnical, Inc.
Ryan D�-a-s:�,-�,G�3147
Project Engineer
RLD/amm
TIA
Distribution: (1) Addressee (electronic copy)
Project No. 18182-01 Page 2 December 27, 2023
(1) F=I M Fq
Recycling Report
Date of Haul Bin Size Tonnage
Roll -Off Processed Loads
I N C O R P O R A T E D
environmental services
40
the face of a greener generation
Acct:
81-40635
Company:
Lennar Homes - The Farm
Year:
2023 2nd Qtr
Address:
32382 Del Obispo
City:
San Juan Capistrano
40
92675
Recycling Report
Date of Haul Bin Size Tonnage
Roll -Off Processed Loads
4/4/2023
40
4.29
4/4/2023
40
3.92
4/10/2023
40
5.97
4/12/2023
40
8.22
4/12/2023
40
8.39
5/12/2023
40
2.18
6/20/2023
40
5.3
6/20/2023
40
5.38
4/13/2023
40
3.67
4/13/2023
40
6.13
4/25/2023
40
4.03
4/25/2023
40
5.56
4/25/2023
40
4.57
4/25/2023
40
4.95
4/27/2023
40
4.64
4/28/2023
40
3.15
5/3/2023
40
3.65
5/10/2023
40
4.23
5/10/2023
40
2.78
5/11/2023
40
6.22
5/11/2023
40
6.52
5/17/2023
40
1.8
5/17/2023
40
5.04
6/20/2023
40
5.16
5/24/2023
40
5.36
5/24/2023
40
5.72
5/24/2023
40
6.3
5/31/2023
40
8.26
6/5/2023
40
4.75
6/13/2023
40
7.49
6/13/2023
40
7.04
6/13/2023
40
4.21
6/21/2023
40
10.3
6/21/2023
40
1.67
6/22/2023
40
3.45
6/27/2023
40
3.04
6/30/2023
40
6.9
6/30/2023
40
5.15
Total Collected
10
195.39
Percentage Diverted FROM Landfill:
10
142.63 73.00%
Percentage Disposed
10
52.76
Date of Haul
Bin Size
Tonnage
Roll -Off Processed
Loads - Lowboy
5/2/2023
10
7.04
5/2/2023
10
5.73
5/9/2023
10
9.34
5/9/2023
10
9.02
4/19/2023
10
8.14
4/19/2023
10
8.13
4/25/2023
10
9.59
4/25/2023
10
8.32
4/27/2023
10
4.22
4/27/2023
10
5.63
5/10/2023
10
8.71
5/10/2023
10
3.89
5/10/2023
10
7.39
5/11/2023
10
8.08
5/3/2023
10
10.24
5/3/2023
10
9.67
5/4/2023
10
10.36
5/4/2023
10
4.05
5/4/2023
10
7.11
5/6/2023
10
3.7
5/6/2023
10
3.35
5/6/2023
10
10.01
6/1/2023
10
9.64
6/1/2023
10
6.49
6/1/2023
10
8.22
6/2/2023
10
8.94
6/2/2023
10
9.62
6/2/2023
10
9.54
6/13/2023
10
6.24
6/21/2023
10
10.2
6/21/2023
10
10.78
6/30/2023
10
8.81
Total Collected 250.20
Percentage Diverted FROM Landfill: 227.68 91.00%
Percentage Disposed 22.52
Roll -Off Pure Loads of Material
0.00
Percentage Diverted FROM Landfill: 0.00 100.00%
Percentage Disposed
Project Totals
Percentage Diverted FROM Landfill: 370.32 83.11%
Percentage Disposed 75.27
Craig Dibley Date
Senior Sustainability Supervisor
CR&R Incorporated
13, 2023
('�vuh 111%1n r III III ,1 ,lkrtr'ii ;1
hisliccli+o[1 'K. Tv"011g, Inc. •1 -II ('unin101-tial Wil\. I'll Kthri. ('.1'111h31-hl(.,�
1 �h� 1 941 -?` 90 • C 141 520-'N441
[-AX 1502)940-0020
December 28, 2023
Building Official
City of San Juan Capistrano
Department of Building & Safety
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
SPECIAL INSPECTOR'S FINAL REPORT
Project Name: Caspian @ The Farm - Phase 13
Address: Tract #19063, San Juan Capistrano
Owner: Lennar
Lot
Address
Permit#
9
26074 Wagon Drive
B23-0863
10
26064 Wagon Drive
B23-0864
11
26054 Wagon Drive
B23-0865
12
26044 Wagon Drive
B23-0866
13
26034 Wagon Drive
B23-0867
This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special
inspection on the above-mentioned project at the above address, which required continuous
inspection per section 1701 of the California Building Code.
Jason Sharobeem - Reinforced Concrete, ICC #9662561
Frank Begg - Reinforced Concrete, Post Tensioned Concrete, ICC #0885047
David Galaviz - Reinforced Concrete, Post Tensioned Concrete, ICC #5085715
Danny Estrada - Shear Nailing, Wood Framing, ICC# 5093138
Based upon special inspection and materials testing written reports of this work, it is our judgment
that the inspected work was performed to the best of our knowledge, in accordance with the
approved plans, specifications and applicable workmanship provision of the California Building Code.
Sincerely,
Re
Steven L. Godbey Ian R. Waddefl, P.E.
President Principal Engineer
SLG/IRW: spg For inspection and testing only, no design
responsibility expressed or impiied,
PROACTIVE
ENGINEERING CONSULTANTS
a different kind ofcompany
January 24, 2024
City of San Juan Capistrano
Building Department
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Attention: City Grading Inspector
Subject: CIVIL ENGINEERS'S VERIFICATION OF PRECISE GRADING
Project: Tract 19063, Lot(s) 9-13 (Caspian Phase 13)
Street Address(es) 26074, 26064, 26054, 26044, 26034, Wagon Dr
I hereby approve the precise grading for the referenced project in accordance with my responsibilities as
the Engineer of Record. The precise grading has been completed substantially in conformance with the
approved grading plan which includes line and grade for all engineered drainage devices, staking of
property corners for proper building location, location and inclination of all slopes, and the construction
of earthen berms and positive building pad drainage.
Sincerely,
Proactive Engineering Consultants 'qVQOFESSI,
Z rn
No.42429
*1effreygdon Exp. «
RCE 42429CI0L g��P
OF CAL�v
NA20.084.000WIAMCert LettersWG Certs1PG Cert Caspian Phase 13 docx
/"Tww27042 Towne Centre Drive. Suite 110
Foothill Ranch, CA 92610
-proactiveengineering.net
949-716-7460