Loading...
B23-0422 - 32921 CALLE DEL TESOROFINAL 11/22/2023 Additional Address Info: PROCEDURE FOR INSTALLATION 1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES. 2. Phone Service Coordinator at 949-361-8061 for the following: - 3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process. - After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do not cover conduit without inspector's written approval to backfill. - When trench is backfilled and compacted, CALL FOR INSPECTION. - If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT. 3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection Metering: Self-Contained Meter Clips: 4 Utilities Maximum Contribution to Fault Current: 10000Phase: 1# of Wires: 3 Voltage: 120/240 Bend Info: 3" 90 DEG 36"R DB60Bend Type: HANDHOLE Riser Quad: Stop Trench: from PoleLadder Arms: Standards Page: Handhole Lid Shall Read: Structure #: SH731883Station ID #: 793-570 Temp Service Charge due on First Bill $ 0.00 Assessor's Parcel Number: Additional Information: To minimize the electrical outage, you are advised to schedule a morning disconnect with an afternoon reconnect. There is no charge for this service. Before you change out your meter consider (1) SDG&E needs 10 working days advance notice to schedule a crew and (2) SDG&E will not reconnect the service without municipal approval on the new panel. Please contact the City of San Juan Capistrano regarding permits and inspections. City inspection should be received prior to 2:00 p.m. on the same day as the disconnection of service to allow the SDG&E crew enough time for reconnection of the service on the same day. Number/Size of Main Switch: 1/200Service Panel Rating: 200 Conduit Size: 3" CONDUITConduit Installed By: CUSTOMER Customer Phone #: 818-373-0077Customer POC: LA Solar Group Wanted Date: O/I Job #: 530000324395 ELECTRIC UNDERGROUND METER & SERVICE LOCATION Customer Copy Project Title: SOT OC 32921 CL DEL TEROSO SJ DR US Notification #: 300000580140 Project Address: 32921 CALLE DEL TESORO Customer Type: Residential(1-2 Units) Date Prepared: 07/07/2023 Project City: SAN JUAN CAPISTRANO SDGE Contact: Service Coordinator Contact Info: TRENCH DESK,949-361-8061 Service Type: UG SERVICE REWIRE/RELOCATION TB: 0972-A3 SERVICE ATTACHMENT POINT AND/OR METER LOCATION: Install 200amp panel outside the cabinet on West wall. (See Sketch) Customer is to provide all excavation, trench, 3"pvc conduit, backfill, compaction, 3/4" pulling and measuring tape in conduit and surface repair from H/H (SH731883) to new meter panel. Take conduit within distance as instructed by SDG&E inspector. If selected, CALL (949)361-8061 to set up Pre-Trench meeting - SDGE Trench Inspection and Crew "On City Inspection". IMPORTANT: "Should the Customer cancel the Crew work less than 24hrs of the scheduled date or onsite, the Requestor will be billed a non-refundable fee to cover the Lost Crew time caused by the lack of adequate notice." SDG&E Application Required-Call: 1-800-411-7343 Municipal Inspection required By: CITY OF SAN JUAN CAPISTRANO Bend Installed By: SDG&E Handhole Installed By: Traffic Control Permit Required Excavation/Encroachment Permits Required By: Customer Joint Trench With: Right of Way Required Meter height -- 4'0'' min. (3'0" min. for multiple installation) -- 6'3" max. From finish grade to centerline of meter base. Meters are required to be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition. Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address and unit number. If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of construction unless it is through negligence of SDG&E. Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements. Building address and/or houseline must be permanently identified prior to meter set. Barrier posts may be required based on field conditions at any time prior to meter set as determined by the SDG&E Representative. Per Rule 16.A.1.a. In compliance with Section 783 of the Public Utilities Code, SDG&E will apply only those construction and design specifications, standards, terms, and conditions that are applicable to a new extension of service project for the 18 months following the date the application for a new extension of service project is approved. Keep this notice with your building permit. All installations performed under this order must meet SDG&E standards unless a written deviation has been approved. Planned By: Edward Salsido Phone#: 9493618081