Loading...
B23-0404 - 31944 VIA REFRESCAR 4230448 Rancho Viejo Road, Suite 110 San Juan Capistrano, CA 92675 (949) 493-1171 (949) 493-1053 Fax www.SanJuanCapistrano.org December 05, 2023 Owner: ARROYO CAP II 1 LLC 18575 JAMBOREE RD #350 IRVINE, CA 92612 MEMBERS OF THE CITY COUNCIL: CERTIFICATE OF USE & OCCUPANCY Troy Bourne John Campbell Sergio Farias Howard Hart John Taylor HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING: Permit Number: B23-0404 Building Address: 31944 VIA REFRESCAR Tract: 18148 Lot: 1 Unit: 42 Building Use: (1759sf SINGLE FAMILY DWELLING w/ (455sD ATTACHED GARAGE Occupancy Classification: R -3/U Type of Construction: VB Occupant Load: PER CBC SECTION 1004 Fire Sprinkler: YES Special Conditions: CITY SAN JUAN CAP ISTRAN0 JAMS ATRAK, CBO, CASp Chief Building Official POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE CHIEF BUILDING OFFICIAL THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER 12/5/2023 Page 1 Plan Review History Permit Number B23-0404 Type BUILDING Subtype SFD DETACHED Status FINALED Owner ARROYO CAP II 1 LLC, Site Address 31944 VIA REFRESCAR 42 Subdivision COO - NPDES PETRA Zoning Applicant LANDSEA CONSTRUCTION LLC Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Dianna Flores 3/21/23 5/17/23 57 Rnnin Remarks and Notes: Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF Applied 3/21/2023 LL1 Approved 3/21/2023 LL1 COO - BUS Issued 5/17/2023 DF5 Finaled 11/16/202; KH1 COO - NPDES Expired Remarks and Notes: Applicant LANDSEA CONSTRUCTION LLC COO APPROVED Laura Stokes City State Zip SAN JUAN CAPISTRANO CA 92675 COO - PLANNING - Tract Block Lot No Parcel No 18148 1 TRACT 18148 UNI' Construction Type Occupancy Type r.nN iNcp VB R -3/U Remarks and Notes: Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Dianna Flores 3/21/23 5/17/23 57 Rnnin Remarks and Notes: Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF COO APPROVED Dianna Flores nr'fJ IPAKir Y Remarks and Notes: COO - BUS COO APPROVED Jocelyne Mejia 1 1rrFNCF Remarks and Notes: COO - NPDES COO APPROVED Noreen Swiontek Remarks and Notes: COO - PLANNING - COO APPROVED Laura Stokes Hni iciNr: Remarks and Notes: COO - PLANNING - COO APPROVED PLANNING PP() I MAN Remarks and Notes: COO - PUB WRKS COO APPROVED James Prather r.nN iNcp Remarks and Notes: PERMIT REVIEWS Report By: 10/31/23 12/5/23 35 10/31/23 11/9/23 10/31/23 0 10/31/23 11/9/23 11/2/23 2 10/31/23 11/9/23 10/31/23 0 10/31/23 11/9/23 11/6/23 6 10/31/23 11/9/23 10/31/23 0 CR'WSY5 T E,MS COO - SMWD COO APPROVED SMWD Remarks and Notes: COO - UTILITIES COO APPROVED Dianna Flores RFIFACFC Remarks and Notes: COO -BLDG COO APPROVED Kevin Hughes r_RAnInIr/Rrwn Remarks and Notes: COO -OCFA - COO APPROVED Kevin Hughes rnnnnnnnlmm�l II Remarks and Notes: PERMIT REVIEWS Report By: 10/31/23 11/9/23 11/17/23 17 14/13/23 10/24/23 10/13/23 0 10/31/23 11/16123 16 COMs yrs rams CITY OF SAN JUAN CAPiSTRANO `r►`' BUILDING PERMIT Permit No. B23-0404 ISSUED 05/17/2023 Permit Number B23-0404 DESCRIPTION PETRA PH 6. PLAN 1. 1759sf SFR W/ 455sf ATT GARAGE vv/ SOLAR 9 ROOF MOUNTED SOLAR PANELS. 3.15kW SYSTEM. ISSUED BY DF5 SITE APN TRACT 18148 UNIT 42 SITE LOT NO 1 y L SITE TRACT 18148 I SITE SUBDIVISION PETRA-71 JOB VALUE $ 202,051 OCCUPANCY TYPE R -3/U PERMIT TYPE. BUILDING ELECTRICAL PERMIT AMOUNT BUILDING SF 1,759 NEW RES OCCUPANCY GROUP R-3 109.98 NO STORIES 2 NEW RES OCCUPANCY GROUP U 13,65 NO UNITS 1 SERVICES 600V OR LESS NOT OVER 200AMPS 33.78 ELECTRICAL ISSUANCE FEE 27.24 JOB ADDRESS: 31944 VIA REFRESCAR 42 OWNER NAME ARROYO CAP III LLC. PHONE MAILING ADDRESS 18575 JAMBOREE RD CiTY,STATE.ZIP IRVINE, CA 92612 Total Electrical 184.65 CONTRACTOR NAME LANDSEA CONSTRUCTION LLC PLUMBING PERMIT AMOUNT 1042287 PLUMBING ISSUANCE FEE 27.24 ST. LIC EXPIRE 07/31/2024 FIXTURES AND VENTS 162.75 PHONE (949) 379-5289 WATER HEATER INCLUDING VENT 13.62 ADDRESS 660 NEWPORT CENTER DR 4300 WATER PIPING SYSTEMS 5.26 CITY- ST, ZiP NEWPORT BEACH, CA 92660 # GAS SYSTEMS 6.81 BUILDING SEWER 27.29 TENANT NAME PHONE # FIRE INSTALL I TO 50 66.44 MAILING ADDR CITY, ST, ZIP MECHANICAL PERMIT AMOUNT MOBILE HOME PERMIT AMOUNT DUCT INSTALL/REPLACE/REI,OC 200.75 APPLIANCE VENTS 8.03 FIREPLACE VENTS AND EXHAUST 11.79 VENTS AND EXHAUST HOOD/DUCTS 11.79 AC/BOILER/COMPR<3HPAND 100K BTU 16.28 Total Mobile Home EXHAUST FAN W/ SINGLE DUCT 42.00 FURNACE FORCED AIR OR GRAVITY UP TO I OOK 16.39 I have carefully examined the completed permit application and do hereby certify under penalty of perjury that all information hereon including the declarations are true and correct and I further MECHANICAL ISSUANCE FEES 2724 certify and agree if a permit is issued: to comply with all City, County, and State laws governing ixpiration:: Every permit issued shall become invalid unless the work on the site authorized by building construction, whether specified herein or not. I also agree to save, indemnify and keep harmless the City of San Juan Capistrano against all liabilities, jtrdgmenK costs and expenses uch permit is commenced within 12 months after its issuance, or if the work authorized on the which may in any way accrue against satin City in consequence of the 8rattting art Sic perm�it,/ r ite by such permit is suspended or abandoned for a period of 180 days after the time the work �.j11 1(i t1l ommenced. Owner/Contractor `Y � An OSHA permit is required for excavations over 5'0" deep and demolition or construction of Print Name structures over 3 stories in height Applicant's signature �t Contractor: I hereby affirm L'u]i : am licensed under pr-wisrons f Chapter of Division 3 of the Business and Professions Code, and my license is in full force and effect. Pkr2 I. as owner of the property, or my employees with usages ns their sole compensation, will do the stork and the structure is not intended at offered for sale. (Sec.7044, Business and Professions 'nnirnstnr'r ih License Lau. docs not apply to and owner of property who builds or improves thereon, who docs such work himself or through his employees, provided that such improvements are not urn u or oRcred fur sale. Iflrowm•ee, the building or improvement is sold within one year of completion, the ow•ne,-builder will have the burden of proving that he did not build or improve for the purpose of sale) fk.�narlBuild . - ],as owner of the property, am exclushely contracting with licensed contractors to construct the project (Sec, 7044, Business and Professions Code: The Contrnctor's License Law docs not .0 Tlv an awner ofpropart) who builds or improves thereon and who contracts for such projects with a contractor's) license pursuant to the Contractor's License Law. 7 Y rk 1\ i'A! 1 u ns in -S hereby affirm under penalty of perjury one of the following declarations:) have and will maintain workers' compensation insurance, as required by Section 3700 of1k, alter vdc, far the performance of Ute work for which this permit is issued. My workers' compensation insurance carrier arid policy number are: Carrier_, SiARR,I'4DE',INITY S i-lAfiILITY Ce. 1 JE,_�RY, PolicyR100000.1709 (This section needs to be completed if the permit is for one hundred dollars($100) or less) Exemption: I certify that in the performance of the work for which this permit is issued, l shall not employ any person in any manner so as to become subject to the workers' compensation lows of California and agiec that if I should become subject to the workers' compensation provisions of Section 2700 of the Labor Code, I shall forthwith comply with those provisions )atc Applicant w'ARNIN'G:FAILORF. TO SECURE WORKERS'CONIPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBIECTAN EMPLOYER TI CRINIINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOIISDAND DOLLARS(S 100,000) INA DDITION TO TI IE COST OF CONTPENS.NTIOV, DAMAGESAS PROVIDED FOR IN SEC TION 3706 OF THE LABOR CODE, INTEREST, AND AFTORNEY'S FEES Ph CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT FEES Date: VT70011 I No. 04 scan . 1 AMnQTC 'A (-nTJCTDI Tr-ri IT.f i f 1944 V[ Account # I Type Cost 01-44221 01-44223 1 Building Permit Mechanical $ $ 1,744.59 334.27 01-44224 Plumbing $ 309.41 01-44225 Electrical $ 184.65 01-44221 01-44222 01-44231 Mobile Home Permit Grading Permit Fee Grading Plan Check $ $ $ 0.00 0.00 0.00 01-44222 On -Site Residential Permit $ 0.00 01-44231 On -Site Residential Plan Check $ 0.00 Su btota I $ 2.572.92 01-44230 Bond Processing $ 0.00 01-44230 Building Plan Check $ 0.00 01-44230 Additional Plan Check $ 0.00 01-44230 Digital Record Fee ($1.00 per sheet) $ 34.20 01-44221 C & D Administrative Fee $ 92.74 01-44221 Special Inspection -Reinspection $ 0.00 01-44222 On -Site Commercial/Tract Permit Fee $ 0.00 01-44231 On -Site Commercial/Tract Plan Check Fee $ 0.00 01-44214 Geotechnical Soils Plan Review $ 0.00 10-44320 Ordinance 211 $ 50.00 10-42510 Ordinance 364 $ 2.020.51 01-45354 Copies @.20 Each $ 0.00 90-23331 S M I P Fee $ 26.27 33A4370 H. 0. P. E. Fee (Housing in Lieu) $ 0.00 Other Fees $ 7,986.90 TCA Fees Date Received -TTUA Approval Date Received c ool ees Date Receive Engineering Fees Date Received Water Division Fees Date Received 01-44221 Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check)) $ 343.47 01-44221 Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check) $ 0.00 01-44240 NPDES Permit Fee (10% Permit Subtotal) $ 257.29 90-23000 90-23000 Refundable Bond/Deposit Posted by Owner Refundable Bond/Deposit Posted by Owner Contractor Type Contractor Type $ 2,020.51 TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO $ 15.404.81 Receipt # 94771 Date: 5/17/2023 Cashier: BOARD OF DIRECTORS LAURA FREESE CHARLES T. GIBSON SAUNDRA F. JACOBS BETTY H. OLSON, PH.D FRANK URY DANIEL R. FERONS Santa Maagaalta Watea D1Str2ict GENERAL MANAGER November 15, 2023 City of San Juan Capistrano Building Division 30448 Rancho Viejo Road, #110 San Juan Capistrano, CA 92675 Attention: Building Division Subject: Tract 18148, Petra Lots 35-43, Phase 6 in ID 9 — 31938, 31944, 31956, 31962, 31968, 13974, 13980, 31986 and 31992 Via Refrescar The following referenced location(s) may be released as far as the District is concerned effective November 15, 2023. Developer: LandSea Homes This release does not constitute authorization for you to release the water and sewer bonds for the subject lots. This authorization will be a Resolution of the Board of Directors of the Santa Margarita Water District. When the water and sewer facilities are formally accepted by the Board, they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded to you. Should you have any questions please contact me at (949) 459-6504. Sincerely, SANTA MARGARITA WATER DISTRICT Patricia Butler, P.E. Chief Engineer cc: Tony Gaetano, Inspector Elena Wilson/email Irma Lopez/email Mona Boers -Kort /email Renee Chinchilla/email Steve Skeffington/email Larry Jeffery/email File S1EnglTract Occupancy Release Letters Santa Margarita Water District • 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688 www.SMWD.com 0 (949) 459-6420 DATE ISSUED: May 17, 2023 Inspection Job Card PERMIT NUMBER JOB DESCRIPTION: B23-0404 PE i'RA PH 6. PLAN 1. 1759sf SFR w/ 455sf ATT GARAGE w/ SOLAR 31944 VIA REFRESCAR 42 9 ROOF MOUNTED SOLAR PANELS. 3.15kW SYSTEM. ARROYO CAP 11 I LLC, -Owner TRACT 18148. LOT 1. UNIT 42. PETRA PHASE 6 SCHEDULE INSPECTIONS or VIEW RESULTS at www.sanjuancapistrano.org/inspectit W INSPECTION REQUEST LINE (949) 493-3172 You must furnish PERMIT NUMBER, JOB ADDRESS and the TYPE OF INSPECTION at the time of inspection request Inspection requests received before4:00 pm will be scheduled on the next business day JOB CARD AND APPROVED PLANS MUST BE PRESENT ON JOBSITE IN ORDER TO PERFORM INSPECTION SEE BACK FOR ADDITIONAL INSPECTION INFORMATION DO NOT COVER OR CONCEAL THE WORK BELOW UNTIL THE FOLLOWING APPLICABLE ITEMS HAVE BEEN SIGNE UNDERGROUND / FOUNDATIONS DATE/ SIGNATURE Rough Grade Underground Plumbing Underground Water Supply Underground Electrical Underground Gas Line Ufer Ground Pre - Slab Footings / Form / Steel Drainage DO NOT COVER OR POUR CC ROUGH -)or 5neatning a -Insulation ear Walls / Ha of Sheathinq / Electrical Plumbing Framinq l � r L UN TIL A13OVE SIGNET] OFF DATE/ SIGNATUB DO NOT COVER OR CONCEAL THE WORK ABOVE UNTIL THE FOLLOWING APPLICABLE ITEMS HAVE BEEN SIGNED ERIQR /, EXTERIOR _ DATE/ SIGNATURE Interior1,?I. DO NOT COVER OR CONCEAL THE WORK ABOVE UNTIL THE FOLLOWING APPLICABLE ITEMS HAVE BEEN SIGNED MASONRY I DATE / SIGNATURE ,cundation 1 st Grout Lift 2nd Grout Lift Wall Drainage GENERAL I MISCELLANEOUS I DATE/ SIGNATURE Tem ora Power(released) Electrical Release to Sewer Connection Water Service Gas Test (Final) ti 1 'e-cy,� Roof Drains / Gutters o ne ome up i l les Grease Interceptor Grease Receptacle POOL & SPA J1 DATE/SIGNATURE Pre-Gunite - Steel / Rock Feature Steel Pool Equipment & Location Rough Piumbinq & Pressure Test i �v„uUP. - � ,.«,sI. Ul IU Gas Pipe - Underground - Test --Backwash - Lines - P-Tra❑ DO NOTAPPLY PLASTER COAT UNTIL THE FOLLOWING APPLICABLE I Fencing / Pool Alarms / Preplaster I I TMS IMPERATIVE THAT A FINALAPPROVAL BE OBTAINED PRIOR TO USING THE SWIMMING POOL COVERS MUST BE ON POOLS AT THE TIME OF FINAL INSPECTION. I Air Gap/ Back Flow Preventer I I I I Pool/ Spa - Systems Final I I I BUSINESS LICENSE SUB -LIST VERIFICATION FORM MUST BE SUBMITTED AND APPROVED PRIOR TO FINAL INSPECTION FINAL INSPECTIONS DATE / SIGNATURE (CARBON MONOXIDE/SMOKE DETECTORS AFIRE DEPT FINAL (714) 573-6150 11 (HEALTH DEPT FINAL ( 714) 433-6074 �d1ECHANICAL FINAL (949) 493-3172 t !ELECTRICAL FINAL (949) 493-3172 14 11 (PLUMBING FINAL (949) 493-3172 GRADING FINAL (949) 493-3172 ISMWD (949) 459-6505 ; j -1S- y BUILDING FINAL 943 493-3172 N l G liziI� All applicable finals above must be signed off before building final. I S .4 Lr)cinG November 6, 2023 City Engineer City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, California 92675 Subject: Tract 18148, Lot 1 "Petra" Final Grading Certification, Units 37 through 43, (Permit# B21-1365). Dear Sir: Finish grading operations have been completed for Tract No. 18148, Lot 1, Units 37 through 43 and have been inspected by the undersigned Professional Land Surveyor. All grading was completed in substantial conformance with the final grading plan approved by the City Engineer and no unauthorized deviations were made. Sincerely, �C� Michael A. Baine, P.L.S. VP - Survey L.D. King, Inc. 975 N. Haven Avenue, Suite 200, Ontario, CA 91764 (909) 945-0526 Fax: (909) 945-0529 1 4 LGO Geotechnical, Inc. October 24, 2023 Ms. Shannon Whittaker Landsea Homes 7525 Irvine Center Drive, Suite 200 Irvine, CA 92618 Project No. 20266-01 Subject: Geotechnical Release from Post -Grading, Units 37 through 43, Phase 6, 'Petra" Residential Development, Tract 18148, Southwest Corner of Calle Arroyo and Paseo Tirador, City of San Juan Capistrano, California In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Units 37 through 43, Phase 6 of the "Petra" residential development, Tract 18148, located in the City of San Juan Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-call observation and field density testing of postgrading operations in order to form an opinion of site earthwork In general, postgrading operations observed and/or tested by LGC Geotechnical included interior plumbing backfill, foundation footing excavations, utility house connection backfill, and subgrade preparation, Refer to table below for lots and associated addresses. Pos Fading Release Lot Summary - Petra - Phase 6 Unit No. Address Permit No. 37 31980 Via Refrescar B23-0399 38 31974 Via Refrescar B23-0400 39 31968 Via Refrescar B23-0401 40 31962 Via Refrescar B23-0402 41 31956 Via Refrescar B23-0403 42 31944 Via Refrescar B23-0404 43 31938 Via Refrescar B23-0405 Based on the results of our observation and testing, it is our opinion that the subject site earthwork operations were completed in general accordance with project geotechnical recommendations. This letter serves as a geotechnical release from postgrading operations for the subject units at the "Petra" residential development. In our opinion, the subject building pads are suitable for their intended use firom a geotechnical perspective. 31 Calle l9lesia, Suite 200, San Clemente. CA 9267 119 Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. Should you have any questions regarding this letter, please do not hesitate to contact our office. We appreciate this opportunity to be of service. Respectfully, LGC Geotechnical, Inc. r Barry Graham, CEG 2749 Project Geologist BPG/amm No. 70705 Distribution: (1) Addressee (electronic copy) (1) Landsea Homes (electronic copy) Attn: Mr. Thomas Ralph, Senior Superintendent (1) X Engineering and Consulting, Inc. (electronic copy) Attn: Mr. Selwyn Harsono Project No. 20266-01 Page 2 October 24, 2023 Title-24/Energy Star Experts Independent HERS Rater Duct Testing Professionals CALIFORNIA LIVING & ENERGY,", A division of William Lilly and Assoc. Inc. Title 24 Compiiance-F<esidential/Non-ResidentiaI Ceres, CA 95307 Ph: 209-538-2879 Southern California Office: Riverside, CA 92530 Ph: 800-498-4110 Guaranteed Home buyer Comfort HVAC problems corrected Mechanical/Plumbing/MEP Engineering LOT STATUS REPORT Below is a status of all inspections/testing performed. For passed lots please allow up to 48 hours to receive your final paperwork. If there is a failure please see the issues listed below. Once all corrections have been made please reschedule by emailing into schedulina@califlivina.corn or faxing to 209-538-2885 Please Note: If we are not called out to finish testing, it may prevent the collection of rebates or incentives on the lot(s) in Date Inspector Builder Subdivision Superintendent 11/9/23 Daniel Diaz I Landsea Petra Tom CI Spoke w/ super on-site ❑ Called and spoke w/ super ❑ Left message for super ® Emailed Lot # I Description 37 Passed at final 38 Passed at final 39 Passed at final 40 Passed at final 41 Passed at final 42 Passed at final 43 Passed at final NOTE: EER/SEER TEST RESULTS WILL BE VERIFIED IN THE OFFICE 0A JLA UULLEU _11. ED F OR RMN Gh HUM V ETUF 1CX1 TON, VERIFICATION RATED HEAT PUMP CAPACITY WILL BE VERIFIED IN OFFICE FOR PASS/FAILURE $,SOUTHWEST I %/fi /1l al: �?!• Ili �rh c i(r'!i h i1.+:r 1:11!1 I1 Iilf7_! 11sil rrlioll ,K- -Fi-:lilt};. lily. -341 (1,minrrcial Wax. I a ILihra. ('A 14,10' FAX :'621 0-4r-of0f, September 22, 2023 Building Official City of San Juan Capistrano Department of Building & Safety 32400 Paseo Adelanto San Juan Capistrano, CA 92675 SPECIAL INSPECTOR'S FINAL REPORT Project Name: Petra - Phase 6 Address: Tract #18148, San Juan Capistrano Owner: Landsea Homes Lot Address Permit# 37 31938 Via Refrescar B23-0399 38 31944 Via Refrescar B23-0400 39 31956 Via Refrescar 823-0401 40 31962 Via Refrescar B23-0402 41 31968 Via Refrescar 623-0403 42 31974 Via Refrescar B23-0404 43 31980 Via Refrescar B23-0405 This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection on the above-mentioned project at the above address, which required continuous inspection per section 1701 of The California Building Code. Rob Langner - Reinforced Concrete, Post Tensioned Concrete, ICC #1139855 David Letterman - Post Tensioned Concrete, Reinforced Concrete, ICC #8833481 David Galaviz - Post Tensioned Concrete, Reinforced Concrete, ICC #5085715 Justin Parrish - Reinforced Concrete, DIA/Epoxy, Shear Nailing, Wood Framing, ICC #1134401 Based upon special inspection and materials testing written reports of this work, it is our judgment that the inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and applicable workmanship provision of the California Building Code. Sincerely, Steven L. Godbey President SLG/IRW: spg Principal Engineer For inspection and testing only, no design responsibility expressed or implied.