Loading...
B23-0340 - 31991 PASEO DERIVA 6030448 Rancho Viejo Road, Suite 110 San Juan Capistrano, CA 92675 (949) 493-1171 (949) 493-1053 Fax www.SanJuanCapistrano.org April 22, 2024 Owner: ARROYO CAP II 1 LLC 18575 JAMBOREE RD #350 IRVINE, CA 92612 MEMBERS OF THE CITY COUNCIL: CERTIFICATE OF USE & OCCUPANCY Troy Bourne John Campbell Sergio Farias Howard Hart John Taylor HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING: Permit Number: B23-0340 Building Address: 31991 PASEO DERIVA Tract: 18148 Lot: 2 Unit: 60 Building Use: (1840sf SINGLE FAMILY DWELLING w/ (422sf ATTACHED GARAGE Occupancy Classification: R -3/U Type of Construction: VB Occupant Load: PER CBC SECTION 1004 Fire Sprinkler: YES Special Conditions: CITY OF SAN JUAN CAPISTRANO QXY--" JAMES WIATRAK, CBO, CASp Chief Building Official POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE CHIEF BUILDING OFFICIAL THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER 4/22/2024 Page 1 Plan Review History Permit Number B23-0340 Applied 3/9/2023 LL3 Approved 3/9/2023 LL3 Type BUILDING Issued 5/4/2023 DF5 Subtype SFD -ATTACHED Finaled 3/26/2024 KH1 Status FINALED Expired Owner ARROYO CAP II 1 LLC, Applicant LANDSEA CONSTRUCTION LLC Site Address City State Zip 31991 PASEO DERIVA 60 SAN JUAN CAPISTRANO CA 92675 Subdivision Tract Block Lot No Parcel No AVELINA 18148 2 TRACT 18148 UNI Zoning Construction Type Occupancy Type VB R -3/U Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Dianna Flores 3/9/23 3/12/24 369 Renin Remarks and Notes: ----------------------------------------------------------- ----•--------- .-...-------------------------------. COO - UTILITIES COO APPROVED Camilo Jimenez 2/26/24 3/6/24 3/12/24 15 RFI FACFC Remarks and Notes: -------------------------------------------- ..... .. .. ..... Review Group: BUILDING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed BUILDING 4+ PCAPPROVED CSG 5/4/22 5/27/22 5/11/22 7 Remarks and Notes: Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF COO APPROVED Dianna Flores nrrrrl Ipnnl�v Remarks and Notes: COO - BUS COO APPROVED BUSINESS LICENSE I IrFnICF Remarks and Notes: COO - NPDES COO APPROVED Noreen Swiontek Remarks and Notes: PERMIT REVIEWS Report By: 3/12/24 4/22/24 41 3/12124 3/21124 3/25124 13 .. .. .. .. .. 3/12/24 3/21/24 3/15/24 3 CRW COO - PLANNING - COO APPROVED Laura Stokes 3/12/24 3/21/24 3/13/24 1 Remarks and Notes: COO - PLANNING - COO APPROVED PLANNING 3/21124 3/14124 2 PPn-i MAN Remarks and Notes: (3/1412024 4:56 PM LS) Landscape Architect Letter provided 3/13/24 ----------- COO - PUB WRKS ------- COO APPROVED James Prather 3/12124 3121124 3/12/24 0 rnnl W-RP Remarks and Notes: COO - SMWD ------------ COO APPROVED SMWD 3/12/24 3/21/24 4/2/24 21 Remarks and Notes: ------- •• ------ - COO -BLDG COO APPROVED Kevin Hughes 3/12/24 3/26/24 14 r_RAnintriRnnin Remarks and Notes: COO -OCFA - COO APPROVED Kevin Hughes 3/12/24 3/26/24 14 rnnnnnnntnrnni n Remarks and Notes: Review Group: PLANNING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed PLANNING 2nd PC APPROVED Laura Stokes 3/8/22 5/27/22 3/17/22 9 Remarks and Notes: PERMIT REVIEWS Report By: 43MS YS TE NI S Permit Number B23-0340 CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT Permit No. B23-0340 ISSUED BY DF5 NEW RES OCCUPANCY GROUP U SITE APN TRACT 18148 UNIT 60 07/31/2024 SITE LOT NO 2 FINAL 660 NEWPORT CENTER DR #300 CITY, ST, ZIP SITE TRACT 18148 6.81 SITE SUBDIVISION AVELINA MAILING ADDR JOB VALUE $ 209,238 site authorized hi OCCUPANCY TYPE R -3/U the time the work PERMIT TYPE, BUILDING BUILDING SF 1,840 NO STORIES 3 NO UNITS 1 JOB ADDRESS: 31991 PASEO DERIVA 60 DWNER NAME ARROYO CAP]] I LLC_ PHONE MAILING ADDRESS 18575 JAMBOREE RD CITY,STATE,ZIP IRVINE, CA 92612 CONTRACTOR NAME LANDSEA CONSTRUCTION LLC NEW RES OCCUPANCY GROUP U 1042287 ST. LIC EXPIRE 07/31/2024 PHONE (949) 379-5289 ADDRESS 660 NEWPORT CENTER DR #300 CITY, ST, ZIP NEWPORT BEACH, CA 92660 TENANT NAME 6.81 PHONE# 27.29 MAILING ADDR 66.44 CITY, ST, ZIP site authorized hi Total Mobile Home I have carefully examined the completed permit application and do hereby certify under penalty of perjury that all information hereon including the declarations are true and correct and I further certify and agree ifa permit is issued: to comply with all City, County, and State laws governing building construction, whether specified herein or not. I also agree to save, indemnify and keep tearless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses which may in any way accrue against said City in consequence of the grartiTig of this perriil Owner/Contractor Print Name :ant's signature Contractor, I hereby affirm I am licensed under ptrrvtsiunz ISSUED 05/04/2023 AVELINA PH 5. 6-PLEX. PLAN 3 -END. 1840sf SFR. 422sfATT GAR. 8 ROOF MOUNTED SOLAR PANELS. 2.80kW DC SYSTEM. ARCH PC B21-1320 NEW RES OCCUPANCY GROUP R-3 115.08 NEW RES OCCUPANCY GROUP U 12.66 SERVICES 600V OR LESS NOT OVER 200ANMS 33,78 ELECTRICAL ISSUANCE FEE 27.24 Total Electrical 188.76 PLUUMBING PERMIT AMOUNT PLUMBING ISSUANCE FEE 27.24 FIXTURES AND VENTS 173.60 WATER HEATER INCLUDING VENT 13.62 WATER PIPING SYSTEMS 5.26 # GAS SYSTEMS 6.81 BUILDING SEWER 27.29 FIRE INSTALL I TO 50 66.44 MECI-IAAL PERMIT AMOUNT DUCT INSTALL/REPLACE/RELOC 168.63 APPLIANCE VENTS 8.03 VENTS AND EXHAUST HOOD/DUCTS 11.79 AC/BOILER/COMPR13HPAND 100K BTU 16.28 EXHAUST FAN W/ SINGLE DUCT 42.00 FURNACE FORCED AIR OR GRAVITY UP TO 100K 16.39 MECHANICAL ISSUANCE FEES 27.24 Total Mechanical 290.36 iiratiow: Every permit issued shall become invalid unless the work on the site authorized hi h permit is commenced within 12 months after its issuance, or if the work authorized on the by such permit is suspended or abandoned for a of I FW days period after i m cncrd. the time the work An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. 9 of Division 3 of the Business and Professions Code, and my license is in full force and effect war u • I, as owner of The property, or my employees with wages ns their sole eemlirnsa;ian, -iII do the work and the structure is not intended or offered for sale. (See.7044, Business and Professions Code: the Contractor's license Laws dors not apply io and owner of property who builds or improves thercum, who does such work himself or through his employees, provided that such improvements are not in[cndcd or offered for sale. iihawevcr, dtc building or improvement is.sold withht one sear of completioo, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale) Own All mild r, I, as owner of the property, am exclusively contracting ssith licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not taharC wner ofproperty who builds of improves thereon and who cootructs far such projects with :t contractor's) license pursuant to the Contractor's License Lew. nhereby afiiTm under penally urperjuly one of the following declaratiuns:l have aad will maintain workers'compensation iasuranco, as required by Section 3700 of for the performance of the work for vvItich ibis permit is issued My wtrriters' cornpertsalion insurance carrier mid policy number are: CamerSTARR II�)DEIvIPirf'{¢c ILrFY PolicyN 00 04709 {This seed an needs to be comple[cd if the perm rl is for one htmdred doll ars(S100) or Iess) Exemption- I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California and agree The if f should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, i shall forthwith comply wish those provisions. Applicant WARN ING: FA[LURE TO SECURE WORKERS' COM PEN SATION COVERAGE IS UNLAWFUL, AND SI IALL SUBJECT AN EMPLOYER TI CRIMINAL PENAL77ES AND CIVIL FINES I T TO ONE HUNDRED THOUSDAN D DOL LARS(SI 00,000) IN ADDITION TO THE COST OF COMPENSATION, DANIAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST AND ATTORNEY'S FEES CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT FEES Date Permit o. p Scant LAN sr n cniusrizu nQN 1.1 Phone/E-Mail io3�r, x�czc�so Account # Type Cost 01-44221 Building Permit $ 1,786.52 01-44223 Mechanical $ 290.36 01.44224 Plumbing $ 320.26 01-44225 Electrical $ 188.76 0144221 Mobile Home Permit S 0.00 0144222 Grading Permit Fee $ 0.00 01-44231 Grading Plan Check S 0.00 01-44222 0144231 On -Site Residential Permit On -Site Residential Plan Check $ $ 0.00 0.00 Subtotal $ 2,585.90 0144230 Bond Processing $ 0.00 01-44230 01-44230 Building Plan Check Additional Plan Check $ $ 0.00 0.00 01-44230 01-44221 Digital Record Fee ($1.00 per sheet) C & D Administrative Fee $ ' $ 34.20 92.74 0144221 0144222 Special Ins pection-Reinspect ion On -Site Commercial/Tract Permit Fee $ S 0.00 0.00 0144231 01-44214 10-44320 On -Site Commercial/Tract Plan Check Fee Geotechnical Soils Plan Review Ordinance 211 S $ S 0.00 0.00 50.00 1042510 0145354 Ordinance 364 Copies @ .20 Each S S 2,092.38 0.00 90-23331 SMIP Fee S 2720 33-44370 H.O.P.E. Fee (Housing in Lieu) $ 0.00 Other Fees $ 6,687.90 ees tngineenng 1-ees ate eceewd Water Division Fess date Received 0144221Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check)) S 351.86 01-44221 Title 24 ADA Fee (10% Pen -nit Subtotal & Bldg Plan Check) S 0.00 01-44240 NPDES Permit Fee (10% Permit Subtotal) $ 258.59 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type $ 2.092.38 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Ty{ TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO $ 14,273.15 Receipt * 94610 Date: 5/4/2023 Cashier: BOARD OF DIRECTORS LAURA FREESE CHARLES T. GIBSON SAUNDRA F. JACOBS BETTY H. OLSON, PH.D FRANK URY DON BUNTS Santa Mannal2ita Water Distnict INTERIM GENERAL MANAGER April 1, 2024 City of San Juan Capistrano Building Division 30448 Rancho Viejo Road, #110 San Juan Capistrano, CA 92675 Attention: Building Division Subject: Tract 18148, Avelina, Phase 5, Bldg 2 -Lots 48-54 and Bldg 3 -Lots 55-60 in ID 9 — 31990, 31991, 31994, 31995, 31998, 31999, 32002, 32003, 32006, 32007, 32010, 32011 Paseo Deriva & 27101 Via Caminata The following referenced location(s) may be released as far as the District is concerned effective March 22, 2024. Developer: LandSea Homes This release does not constitute authorization for you to release the water and sewer bonds for the subject lots. This authorization will be a Resolution of the Board of Directors of the Santa Margarita Water District. When the water and sewer facilities are formally accepted by the Board, they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded to you. Should you have any questions please contact me at (949) 459-6504. Sincerely, SANTA MARGARITA WATER DISTRICT f 6v:�' Patricia Butler, P.E. Chief Engineer CC'. Tony Gaetano, Inspector Elena Wilson/email Irma Lopez/email Mona Boers -Kort /email Renee Chinchilla/email Steve Skeffington/email Larry Jeffery/email File S\Eng\Tract Occupancy Release Letters Santa Margarita Water District • 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688 www.SMWD.coni 0 (949) 4S9-6420 landscape architecture / land planning March 12, 2024 Shannon Whittaker Landsea Homes 7525 Irvine Center Drive Suite 200 Irvine, CA 92618 RE: Conformance Letter Tirador, Tract 18148 • Avelina Phase 5 — Building 2 (Units #43 through #54 and House Meter) and Building 3 (Units #55 through #60 and House Meter) This letter is to certify that all items for the phase mentioned above has been completed to the satisfaction of the landscape architect. I declare in my professional opinion and to the best of my knowledge, available information, and belief. That the landscape plans for the above -referenced project have been completed within the intent of the project and in accordance with the City of San Juan Capistrano approved plans and specifications. This conformance letter applies only to plant locations and quantities. SJA Inc. was not present for the installation or observation of the irrigation system. SJA Inc. cannot certify conformance of below grade materials, installation techniques, or irrigation pipe sizing. Please do not hesitate to call my office if you should have any questions. r 1 Sincerely, Denny 5mit1 Bail Principal * s ON" 01r30n6 7859 Sitio Coco, Carlsbad California 92009 1 TEL 949.276.6500 I FAX 949.276.6506 1 WWW.SJAINC.COM PL(i-1NINC G Plumbing Concepts, Inc. 2445 Railroad St. Corona, CA 92880 License No. 469996 Project Name: AVELINA Tract No.18148 Project Location: SAN JUAN CAPISTRANO ATTN: LANDSEA HOMES RE: Sewer Camera PH 5 LOTS- 55-56-57-58-59-60 To Whom it may concern, 3-21-24 Please allow this letter to serve as confirmation that the above referenced project had the sewer lines video inspected, and they have been found to be free and clear of debris. If you have any questions, please feel free to contact us. Yours truly, Doug Moore Director of Quality Assurance (951) 520-8590 ext. 7142 LGO Geotechnical, Inc. March 12, 2024 Ms. Shannon Whittaker Landsea Homes 7525 Irvine Center Drive, Suite 200 Irvine, CA 92618 Project No. 20266-01 Subject. Geotechnical Release from Post -Grading, Phase 5, Buildings 2 and 3, "Avelino" Residential Development, Tract 18148, Southwest Corner of Calle Arroyo and Paseo Tirador, City of San Juan Capistrano, California In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Phase 5, Building 2 and Building 3 of the "Avelina" residential development, Tract 18148, located in the city of San Juan Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-call observation and field density testing of postgrading operations in order to form an opinion of site earthwork. In general, postgrading operations observed and/or tested by LGC Geotechnical included interior plumbing backfill, foundation footing excavations, utility house connection backfill, and subgrade preparation. Refer to table below for lots and associated addresses. Postgrading Release Lot 5ummary - Avelina Building No. Unit No. Address Permit No. 2 48 31990 Paseo Deriva B23-0328 2 49 31994 Paseo Deriva B23-0329 2 50 31998 Paseo Deriva B23-0330 2 51 32002 Paseo Deriva B23-0331 2 52 32006 Paseo Deriva B23-0332 2 53 27101 Via Caminata B23-0333 2 54 32010 Paseo Deriva B23-0334 2 HM 31990 -HM Paseo Deriva B23-0375 3 55 32011 Paseo Deriva B23-0335 3 56 32007 Paseo Deriva B23-0336 3 57 32003 Paseo Deriva B23-0337 3 58 31999 Paseo Deriva B23-0338 Postgrading Release Lot Summaa - Avelina (Continug0j Building No. Unit No. Address Permit No. 3 59 31995 Paseo Deriva B23-0339 3 60 31991 Paseo Deriva B23-0340 3 HM 32011 -HM Paseo Deriva B23-0376 Based on the results of our observation and testing, it is our opinion that the subject site earthwork operations were completed in general accordance with project geotechnical recommendations. This letter serves as a geotechnical release from postgrading operations for the subject lots at the "Avelina" residential development. In our opinion, the subject building pads are suitable for their intended use from a geotechnical perspective. Closure Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. Should you have any questions regarding this letter, please do not hesitate to contact our office. We appreciate this opportunity to be of service. Respectfully, LGC Geotechnical, Inc. q2�2L Barry Graham, CEG 2749 Project Geologist BPG/ amm r No. 2749 Distribution: (1) Addressee (electronic copy) (1) X Engineering and Consulting, Inc. (electronic copy) Attn: Mr. Selwyn Harsono Project No. 20266-01 Page 2 March 12, 2024 ( .'??fimuurN IMJ?n lr,n ,l /( t!'.111spc0ion fi Te still„ Inc. .441 c March 12, 2024 Building Official City of San Juan Capistrano Department of Building & Safety 32400 Paseo Adelanto San Juan Capistrano, CA 92675 SPECIAL INSPECTOR'S FINAL REPORT Project Name: Avelina - Phase 5, Building 3 Address: Tract #18148, San Juan Capistrano Owner: Landsea Homes Lot# Address Permit# 55 32011 Paseo Deriva B23-0335 56 32007 Paseo Deriva B23-0336 57 32003 Paseo Deriva B23-0337 58 31999 Paseo Deriva B23-0338 59 31995 Paseo Deriva B23-0339 60 31991 Paseo Deriva B23-0340 House Meter 32011 Paseo Deriva B23-0376 This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection on the above-mentioned project at the above address, which required special inspection per section 1701 of the 2022 California Building Code. Jason Sharobeem - Post Tensioned Concrete, Reinforced Concrete, ICC #9662561 Mina Endrawes - Reinforced Concrete, Post Tensioned Concrete, ICC #9048532 Justin Parrish - Post Tensioned and Reinforced Concrete, Shear Nailing, Wood Framing, DIA/Epoxy, ICC #1134401 Based upon special inspection and materials testing written reports of this work, it is our judgment that the inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and industry standard of workmanship in accordance with the provision of the 2022 California Building Code. Sincerely, Civ:, C04 19 EXP33�. k Steven L. Godbey Ian R. Vlroddeli, P. �. President Principal Eng ,neer SLG/IRW: spg For inspection and testing only, no design responsibility expressed or implied.