Loading...
B23-0338 - 31999 PASEO DERIVA 5830448 Rancho Viejo Road, Suite 110 San Juan Capistrano, CA 92675 (949) 493-1171 (949) 493-1053 Fax www.SanJuanCapistrano.org April 22, 2024 Owner: ARROYO CAP II 1 LLC 18575 JAMBOREE RD #350 IRVINE, CA 92612 MEMBERS OF THE CITY COUNCIL: CERTIFICATE OF USE & OCCUPANCY Troy Bourne John Campbell Sergio Farias Howard Hart John Taylor HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING: Permit Number: B23-0338 Building Address: 31999 PASEO DERIVA Tract: 18148 Lot: 2 Unit: 58 Building Use: (1779sf) SINGLE FAMILY DWELLING w/ (413sf) ATTACHED GARAGE Occupancy Classification: R -3/U Type of Construction: VB Occupant Load: PER CBC SECTION 1004 Fire Sprinkler: YES Special Conditions: CITY OF SAN JUAN CAPISTRANO JAMES WIATRAK, CBO, CASp Chief Building Official POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE CHIEF BUILDING OFFICIAL THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER 4/22/2024 Page 1 Plan Review History Permit Number B23-0338 Type BUILDING Subtype SFD -ATTACHED Status FINALED Owner ARROYO CAP II 1 LLC, Site Address 31999 PASEO DERIVA 58 Subdivision AVELINA Zoning Review Group: ALL Applied 3/9/2023 LL3 3/21/24 3/25124 13 Approved 3/9/2023 LL3 Due Returned Issued 5/4/2023 DF5 3/9/23 Finaled 3/26/2024 KH1 Fznnin Expired Remarks and Notes: Applicant LANDSEA CONSTRUCTION LLC ------------------------ COO APPROVED Laura Stokes City State Zip Review Group: BUILDING SAN JUAN CAPISTRANO CA 92675 REVIEW DATES Tract Block Lot No Parcel No Sent 18148 2 TRACT 18148 UNI' Construction Type Occupancy Type 5/27/22 5/11/22 VB R -3/U Review Group: ALL COO APPROVED Dianna Flores REVIEW DATES 3/21/24 3/25124 13 Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Dianna Flores 3/9/23 3/12/24 369 Fznnin ------------------------ COO APPROVED Noreen Swiontek Remarks and Notes: Remarks and Notes: ------------------------ COO APPROVED Laura Stokes Nni icinir Review Group: BUILDING Remarks and Notes: ------------------------- -------------------------- REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed BUILDING 4+ PC APPROVED CSG 5/4/22 5/27/22 5/11/22 7 Remarks and Notes: Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF 3/12/24 COO APPROVED Dianna Flores nrrl IPANrV 3/21/24 3/25124 13 ------------------------------------------ ----------------------------------------.3112/24 3112/24 Remarks and Notes: COO - BUS COO APPROVED BUSINESS LICENSE 1 irFnicF Remarks and Notes: COO - NPDES ------------------------ COO APPROVED Noreen Swiontek Remarks and Notes: COO - PLANNING - ------------------------ COO APPROVED Laura Stokes Nni icinir Remarks and Notes: ------------------------- -------------------------- 3/12/24 4/22/24 41 3/12/24 3/21/24 3/25124 13 ------------------------------------------ ----------------------------------------.3112/24 3112/24 3/21124 3/15124 3 3/12/24 3/21/24 3/13/24 1 PERMIT REVIEWS Report By: Cf?W COO -PLANNING- COO APPROVED PLANNING 3/12/24 3/21/24 3/14/24 2 PR() I nnnnI Remarks and Notes: (3/14/2024 4:57 PM LS) Landscape Architect Letter provided 3/13/24 COO - PUB WRKS COO APPROVED James Prather 3/12/24 3/21/24 3/12/24 0 rnnl IKIRP Remarks and Notes: ----------------------------------•--....----------------- COO - SMWD -------- ._ COO APPROVED SMWD 3/12/24 3/21/24 412/24 21 Remarks and Notes: - COO - UTILITIES ---------..--•-------- COO APPROVED Camilo Jimenez 2/26/24 3/6/24 3/12/24 -- 15 RFI FaIQFC Remarks and Notes: COO -BLDG -.--•---•---------------------------------- COO APPROVED Kevin Hughes 3/12/24 --.—.__.......--.--._._..----..------------------- 3/26/24 14 rRanwr,,/Rnnln Remarks and Notes: COO -OCFA - ---------.. ..---------- ---------- COO APPROVED Kevin Hughes 3/12/24 3/26/24 14 r.oKA11A/INn1hA1 II Remarks and Notes: Regrew Group: PLANNING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed PLANNING 2nd PC APPROVED Laura Stokes 3/8/22 5/27/22 3/17/22 9 Remarks and Notes: PERMIT REVIEWS Report By: OWSYSTE&AS x • •_=� CITY OF SAN JUANCAPISTRANOISSUED DUCT INSTALL/REPLACE/RELOC 4 APPLIANCE VENTS 8.03 05/04/2023 " 'fl�1'^ _ BUILDING PERMIT 16.28 EXHAUST FAN W/ SINGLE DUCT Permit No. B23-0338 FURNACE FORCED AIR OR GRAVITY UP TO I OOK Permit Number B23-0338 UZRIPT1dN Total Mechanical 258.24 tirttiun.. Every permit issued shall become invalid unless the work AVELINA PH 5. 6-PLEX. PLAN 2 -FH, 1779sf SFR. 413sfATT GAR ISSUED BY DF5 8 ROOF MOUNTED SOLAR PANELS, 2.8OkW DC SYSTEM. ARCH PC SITE APN TRACT 18148 UNIT 58 1321-1320 SITE LOT NO 2 SITE TRACT 18148 FINA SITE SUBDIVISION AVELINA 4 JOB VALUE $ 202,384 OCCUPANCY TYPE R -3/U TYPE. PERMIBUILDING BUILDING BUILDING SF 1 779 ,EC.- RICA[. P Rltll'I' Al 1(]i' f NO STORIES 3 NEW RES OCCUPANCY GROUP R-3 110.88 NO UNITS I NEW RES OCCUPANCY GROUP U 12.39 SERVICES 600V OR LESS NOT OVER 200AWS 33.78 JOB ADDRESS: 31999 PASEO DERIVA 58 ELECTRICAL ISSUANCE FEE 27.24 OWNER NAME ARROYO CAP II I LLC, PHONE MAILING ADDRESS 18575 JAMBOREE RD CITY,STATE,ZIP IRVINE, CA 92612 Total Electrical CONTRACTOR NAME LANDSEA CONSTRUCTION LLC 184.29 1042287 PL BIND PERMIT AMOUNT ST. LIC EXPIRE 07/312024 PLUMBING ISSUANCE FEE 27.24 PHONE(949)FIXTURES 89 AND VENTS 173.60 ADDRESS 660 NEWPORT CENTER DR #300 WATER HEATER INCLUDING VENT 13.62 CITY, ST, ZIP NEWPORT BEACH, CA 92660 WATER PIPING SYSTEMS 5.26 # GAS SYSTEMS 6.81 TENANT NAME BUILDING SEWER 27.29 PHONE # FIRE INSTALL 1 TO 50 66.44 MAILING ADDR CITY, ST, ZIP Total Mobile Home 1 have carefully examined the completed permit WPI icalion and do hereby certify under penalty of peljuty that all information hereon including the declarmions aro true and Gamer and I further certify and agree if a permit is issued: to comply with all City. County, and State laws govemiog building construe Can, whether apoWled herein or not. 1215-0 agrcc In save, ill darn nify and keep harmless the City of San Juan Capistrano against all liabilities, judgmtenK costs and expenses which may in any way —nic against said Cily in r0QJCgaence of t1le e:r:tnring 0rthia Mrmit_ Owner/Contractor Print Name Applicant's signature MECHANICAL PERMIT AMOUNT DUCT INSTALL/REPLACE/RELOC 136.51 APPLIANCE VENTS 8.03 VENTS AND EXHAUST HOOD/DUCTS 11.79 AC/BOILER/COMPR<3HP AND IOOK BTU 16.28 EXHAUST FAN W/ SINGLE DUCT 42.00 FURNACE FORCED AIR OR GRAVITY UP TO I OOK 16.39 MECHANICAL ISSUANCE FEES 27.24 Total Mechanical 258.24 tirttiun.. Every permit issued shall become invalid unless the work on the site authorized Ir N permit is commenced within 12 months after its issuance, or if the work authorized on the by such permit is suspended or abandoned fora period of 180 days after the time the work I menced. An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. Contractor- I hereby affirm that 1 A licensed under Itruvisinl . cifChaptcri of Division 3 of the Business and Professions Code, and my license is in full farce and effect. �= w lie r til • I..rl Vrmcr of the propctly'. nr lny e[npl.nrc, with wages as (heir sol. cineP nso tion, will do the rsork and the structure ii not Intended or otrenrd for lair (Sec.7044, Business and f'roressions L »k to Contractor's Clean- LAA, dues nol apply io .md nwnet of property who builds or inrproi cs Oscreon, whn dr ,ouch we& himself ar Ihmugh his employees, provided that such improvements are not ndcd or oflercd fur r.rk If Isn++cvr/., the huihf�uer of 1mprove mcnl is cold within one }'car of completion, the cwner-Wider will have the burden of pi oving that he did nnl buitd w improve for the purpcm of sale) 11trItin ilder, I, as owner of the property, am exclusively contracting with Iicensed contractors to construct the protect (Sec. 7044, Business and Professions Code: The Contractor's License Law does not i>aJ wnerafproperty who builds or improves thereon and who contracts forsuch projects with a contractor's) licensepursuant to the Contractor's License Law_n-Iherebyaffirm under penalty ofper)uryOne ot'the folemnng dcclaratians:lhave and will maintain workers' compensation insurance, as required by Section 3700 of .alt , for the performance ofthework forwhich this permit is issued My workers'cormpensalion insurance carrierand policy number are. Carr er 57 Aii32 INpEtiSNiTY�I& 1AS1LfCY_ CLONJIIANi' Policy6I (1(X7004709 (This section needs to be completed if the permtl is for one hundred dnllars(S 100) or less} _ _ .xem t net I certify that in the performance of the work for which this permit is issued, i shall not employ any person in any manner so as to become subject to the workeri compensation laws of California and agree Char if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, t shall forthwith comply with those provisions. )ale Applicant WARNING:FAILURE TO SECURE WORKERS'COhs? EN SATI ON COVERA GI: IS UNLAWFUL, AND SHA 11 SUBJECT AN EMPLOYER TI CRIMINAL PENALTIES AND CI V1 FINES UP TO ONE HUNDRED THOUSDAND DOLLA RS(YI 00.000) 1N ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR N SECTION 3706 OF TI IF LABOR CO DF, INTEREST AND ATTORNEY'S FEES CITY OF SAN JUAN CAPIISTRANO BUILDING PERMIT FEES Account# Type Cost 01-44221 Building Permit $ 1,744.59 01-44223 Mechanical $ 258.24 01-44224 j Plumbing $ 320.26 01-44225 Electrical $ 184.29 01-44221 Mobile Home Permit $ 0.00 01-44222 Grading Permit Fee $ 0.00 01-44231 Grading Plan Check $ 0.00 01-44222 01-4231 On -Site Residential Permit On -Site Residential Plan Check $ $ 0.00 0.00 Subtotal $ 2,507.38 01-44230 Bond Processing $ 0.00 01-44230 Building Plan Check $ 0.00 01-44230 Additional Plan Check $ 0.00 01-14230 Digital Record Fee ($1.00 per sheet) $ 34.20 01-44221 C & D Administrative Fee $ 92.74 01-44221 Special Inspection -Reinspection $ 0.00 01-44222 On -Site Commercial/Tract Permit Fee $ 0.00 01-44231 On -Site Commercial/Tract Plan Check Fee $ 0.00 01-44214 Geotechnical Soils Plan Review $ 0.00 10-44320 Ordinance 211 $ 50.00 10-42510 Ordinance 364 $ 2,023.84 01-45354 Copies @ .20 Each $ 0.00 90-23331 SMIP Fee $ 26.31 33-44370 H.O.P.E. Fee (Housing in Lieu) $ 0.00 Other Fees $ 6,687.90 TCA Fees Date Receive ApprovalNUA ate Received 5choof ees !]ate Receive Engineering Fees ate eceive Water Division Fees Date Received 01-44221 Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check)) $ 343.47 01-44221 Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check) g 0_00 01-44240 NPDES Pen -nit Fee (10% Permit Subtotal) $ 250.744 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type $ 2,023.84 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type ITOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO $ 14.040.42 Receipt # 94610 Date: 5/4/2023 Cashier: BOARD OF DIRECTORS LAURA FREESE CHARLES T. GIBSON SAUNDRA F. JACOBS BETTY H. OLSON, PH.D FRANK URY DON BUNTS INTERIM GENERAL MANAGER April 1, 2024 City of San Juan Capistrano Building Division 30448 Rancho Viejo Road, #110 San Juan Capistrano, CA 92675 Attention: Building Division Santa Marzgapzita Water Distuict Subject: Tract 18148, Avelina, Phase 5, Bldg 2 -Lots 48-54 and Bldg 3 -Lots 55-60 in ID 9 – 31990, 31991, 31994, 31995, 31998, 31999, 32002, 32003, 32006, 32007, 32010, 32011 Paseo Deriva & 27101 Via Caminata The following referenced location(s) may be released as far as the District is concerned effective March 22, 2024. Developer: LandSea Homes This release does not constitute authorization for you to release the water and sewer bonds for the subject lots. This authorization will be a Resolution of the Board of Directors of the Santa Margarita Water District. When the water and sewer facilities are formally accepted by the Board, they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded to you. Should you have any questions please contact me at (949) 459-6504. Sincerely, SANTA MARGARITA WATER DISTRICT v6a:ti Patricia Butler, P.E. Chief Engineer CC'. Tony Gaetano, Inspector Elena Wilson/email Irma Lopez/email Mona Boers -Kort /email Renee Chinchilla/email Steve Skeffington/email Larry Jeffery/email File S\Eng\Tract Occupancy Release Letters Santa Margarita Water District • 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688 wwwSMWD.coni 0 (949) 459-6420 In landscape architecture / land planning March 12, 2024 Shannon Whittaker Landsea Homes 7525 Irvine Center Drive Suite 200 Irvine, CA 92618 RE: Conformance Letter Tirador, Tract 18148 Avelina Phase 5 — Building 2 (Units 448 through #54 and House Meter) and Building 3 (Units #55 through #60 and House Meter) This letter is to certify that all items for the phase mentioned above has been completed to the satisfaction of the landscape architect. I declare in my professional opinion and to the best of my knowledge, available information, and belief. That the landscape plans for the above -referenced project have been completed within the intent of the project and in accordance with the City of San Juan Capistrano approved plans and specifications. This conformance letter applies only to plant locations and quantities. SJA Inc. was not present for the installation or observation of the irrigation system. SJA Inc, cannot certify conformance of below grade materials, installation techniques, or irrigation pipe sizing. Please do not hesitate to call my office if you should have any questions. r jl Sincerely, VIT�;1_ 342 ` L Denny Smgall Principal �� Of/SOrx6 _e 7859 Sitio Coco, Carlsbad Califomia 92009 1 TEL 949.276.6500 I FAX 949.276.6506 1 WWW.SJAINC.COM PL(I G Plumbing Concepts, Inc. 2445 Railroad St. Corona, CA 92880 License No. 469996 Project Name: AVELINA Tract No.18148 Project Location: SAN JUAN CAPISTRANO ATTN: LANDSEA HOMES RE: Sewer Camera PH 5 LOTS- 55-56-57-58-59-60 To Whom it may concern, 3-21-24 Please allow this letter to serve as confirmation that the above referenced project had the sewer lines video inspected, and they have been found to be free and clear of debris. If you have any questions, please feel free to contact us. Yours truly, Doug Moore Director of Quality Assurance (951) 520-8590 ext. 7142 LOC;. Geotechnical, Inc. March 12, 2024 Project No. 20266-01 Ms. Shannon Whittaker Landsea Homes 7525 Irvine Center Drive, Suite 200 Irvine, CA 92618 Subject. Geotechnical Release from Post -Grading, Phase 5, Buildings 2 and 3, "Avelina" Residential Development, Tract 18148, Southwest Corner of Calle Arroyo and Paseo Tirador, City of San Juan Capistrano, California In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Phase 5, Building 2 and Building 3 of the "Avelina" residential development, Tract 18148, located in the city of San Juan Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-call observation and field density testing of postgrading operations in order to form an opinion of site earthwork. In general, postgrading operations observed and/or tested by LGC Geotechnical included interior plumbing backfill, foundation footing excavations, utility house connection backfill, and subgrade preparation. Refer to table below for lots and associated addresses. Postaradina Release .Lot Summa -- Avelina Building No. Unit No. Address Permit No. 2 48 31990 Paseo Deriva B23-0328 2 49 31994 Paseo Deriva B23-0329 2 50 31998 Paseo Deriva B23-0330 2 51 32002 Paseo Deriva B23-0331 2 52 32006 Paseo Deriva B23-0332 2 53 27101 Via Caminata B23-0333 2 54 32010 Paseo Deriva B23-0334 2 HM 31990 -HM Paseo Deriva B23-0375 3 55 32011 Paseo Deriva B23-0335 3 56 32007 Paseo Deriva B23-0336 3 57 32003 Paseo Deriva B23-0337 3 58 31999 Paseo Deriva B23-0338 Postgrading Release LatSummary - Avelina (Continued) Building No -T Unit No. Address Permit No. 3 59 31995 Paseo Deriva B23-0339 3 60 31991 Paseo Deriva B23-0340 3 HM 32011 -HM Paseo Deriva B23-0376 Based on the results of our observation and testing, it is our opinion that the subject site earthwork operations were completed in general accordance with project geotechnical recommendations. This letter serves as a geotechnical release from postgrading operations for the subject lots at the "Avelina" residential development. In our opinion, the subject building pads are suitable for their intended use from a geotechnical perspective. Closure Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. Should you have any questions regarding this letter, please do not hesitate to contact our office. We appreciate this opportunity to be of service. Respectfully, LGC Geotechnical, Inc. [Jeri 11 LU INo. 2749 U) Barry Graham, CEG 2749 Project Geologist BPG/ amm Distribution: (1) Addressee (electronic copy) (1) X Engineering and Consulting, Inc. (electronic copy) Attn: Mr. Selwyn Harsono Project No. 20266-01 Page 2 March 12, 2024 SOUTHWEST' & t•.1ing. 111c. 4-1I ('�murnr�ial \\n�, 1A Ilcthr.i,(' \'111G. 1-016-"\ o'(121041 -29,)(1 • r ,14 i -� 2(,-"- t44 I- 1 A I i62) Q-46-0010 March 12, 2024 Building Official City of San Juan Capistrano Department of Building & Safety 32400 Paseo Adelanto San Juan Capistrano, CA 92675 SPECIAL INSPECTOR'S FINAL REPORT Project Name: Avelina - Phase 5, Building 3 Address: Tract #18148, San Juan Capistrano Owner: Landsea Homes Lot# Address Permit# 55 32011 Paseo Deriva B23-0335 56 32007 Paseo Deriva B23-0336 57 32003 Paseo Deriva B23-0337 58 31999 Paseo Deriva B23-0338 59 31995 Paseo Deriva B23-0339 60 31991 Paseo Deriva B23-0340 House Meter 32011 Paseo Deriva B23-0376 This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection on the above-mentioned project at the above address, which required special inspection per section 1701 of the 2022 California Building Code. Jason Sharobeem - Post Tensioned Concrete, Reinforced Concrete, ICC #9662561 Mina Endrawes - Reinforced Concrete, Post Tensioned Concrete, ICC #9048532 Justin Parrish - Post Tensioned and Reinforced Concrete, Shear Nailing, Wood Framing, DIA/Epoxy, ICC #1134401 Based upon special inspection and materials testing written reports of this work, it is our judgment that the inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and industry standard of workmanship in accordance with the provision of the 2022 California Building Code. Sincerely, Steven L. Godbey President SLG/IRW: spg Reviek", (1 6v = titin _T. ' 4 ;0,4 ' 9 M ,zo Gr• ` `X'p 3_3_1-25 Ian R. Wt-ddell, Principal Engineer For inspection and testing only. no design responsibility expressed or implied.