Loading...
B23-0336 - 32007 PASEO DERIVA 5630448 Rancho Viejo Road, Suite 110 San Juan Capistrano, CA 92675 (949) 493-1171 (949) 493-1053 Fax www.SanJuanCapistrano.org April 22, 2024 Owner: ARROYO CAP II 1 LLC 18575 JAMBOREE RD #350 IRVINE, CA 92612 MEMBERS OF THE CITY COUNCIL: CERTIFICATE OF USE & OCCUPANCY Troy Bourne John Campbell Sergio Farias Howard Hart John Taylor HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING: Permit Number: B23-0336 Building Address: 32007 PASEO DERIVA Tract: 18148 Lot: 2 Unit: 56 Building Use: (1801sf SINGLE FAMILY DWELLING w/ (422so ATTACHED GARAGE Occupancy Classification: R -3/U Type of Construction: VB Occupant Load: PER CBC SECTION 1004 Fire Sprinkler: YES Special Conditions: CITY OF SAN JUAN CAPISTRANO JAMES WIATRAK, CBO, CASA Chief Building Official POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE CHIEF BUILDING OFFICIAL THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER 4/22/2024 Page 1 Plan Review History Permit Number B23-0336 Type BUILDING Subtype SFD -ATTACHED Status FINALED Owner ARROYO CAP II 1 LLC, Site Address 32007 PASEO DERIVA 56 Subdivision AVELINA Zoning Review Group: ALL Applied 3/9/2023 LL3 4/22/24 Approved 3/9/2023 LL3 Due Returned Issued 5/4/2023 DF5 3/9/23 Finaled 3/26/2024 KH1 Rnnin Expired - -- -- --- -- -- ------------- COO - BUS Applicant LANDSEA CONSTRUCTION LLC 3/12124 City State Zip Review Group: BUILDING SAN JUAN CAPISTRANO CA 92675 REVIEW DATES Tract Block Lot No Parcel No Sent 18148 2 TRACT 18148 U N I Construction Type Occupancy Type 5/27/22 5/11/22 VB R -3/U -- 3121/24 3115124 Review Group: ALL COO APPROVED Dianna Flores REVIEW DATES 4/22/24 Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Dianna Flores 3/9/23 3/12/24 369 Rnnin - -- -- --- -- -- ------------- COO - BUS Remarks and Notes: 3/12124 3/21124 3/25124 13 Review Group: BUILDING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed BUILDING 4+ PCAPPROVED CSG 5/4/22 5/27/22 5/11/22 7 Remarks and Notes: -- 3121/24 3115124 3 Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF COO APPROVED Dianna Flores 3/12/24 4/22/24 41 nrrl IPAK1rV Remarks and Notes: - -- -- --- -- -- ------------- COO - BUS ---- --- ---- --- --- --- -- COO APPROVED BUSINESS LICENSE 3/12124 3/21124 3/25124 13 i irFni�F Remarks and Notes: COO - NPDES ------------------ COO APPROVED Noreen Swiontek -------------------------------------------- 3/12124 -- 3121/24 3115124 3 Remarks and Notes: COO - PLANNING - ------------------------------ COO APPROVED Laura Stokes 3112/24 3/21/24 3/13124 1 Nni icinir_ Remarks and Notes: PERMIT REVIEWS ----- -- -- ------------------ -- - -- Report By: CRW - COO -PLANNING- COO APPROVED PLANNING 3/12/24 3/21/24 3/14/24 2 PRr) I MAN Remarks and Notes: (3/14/2024 4:57 PM LS) Landscape Architect Letter provided 3/13/24 ..-------- ---- —... COO - PUB WRKS COO APPROVED James Prather 3112124 3121124 3112/24 0 rrlr%l IKICp Remarks and Notes: COO - SMWD COO APPROVED SMWD 3/12124 3/21124 4=.4 21 Remarks and Notes: COO - UTILITIES --------- COO APPROVED Dianna Flores 3/12124 - 3/21.124 - 3112/24 ......... 0 RFI FACFC Remarks and Notes: COO -BLDG COO APPROVED Kevin Hughes 3/12/24 3/26/24 14. r:RAnlnlrriRnnln Remarks and Notes: COO -OCFA - COO APPROVED Kevin Hughes 3/12/24 3/26/24 14 rnnnnnnnlmmAl II Remarks and Notes: Review Group: PLANNING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed PLANNING 2nd PC APPROVED Laura Stokes 3/8/22 5/27/22 3/17/22 9 Remarks and Notes: PERMIT REVIEWS Report By: Cfi W . YSTE&tS Permit Number ISSUED BY SITE APN SITE LOT NO SITE TRACT SITE SUBDIVISION JOB VALUE OCCUPANCY TYPE PERMIT TYPE. BUILDING SF NO STORIES NO UNITS CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT Permit No. B23-0336 B23-0336 DF5 112.62 TRACT 18148 UNIT 56 2 SERVICES 600V OR LESS NOT OVER 200AMPS 18148 FINAL AVEL 4 $ 205,115050 y� -�— R -3/U # GAS SYSTEMS BUILDING BUILDING SEWER 1,801 FIRE INSTALL I TO 50 3 1 BACKFLOW PROTECTION NON ATM >21N JOB ADDRESS: 32007 PASEO DERIVA 56 1AVNER NAME PHONE MAILING ADDRESS CITY,STATE,ZIP CONTRACTOR NAME ST LIC EXPIRE PHONE ADDRESS CITY_ ST, ZIP TENANT NAME PHONE# MAILING ADDR CITY, ST, ZIP Total Mobile Home 18575 JAMBOREE RD IRVINE, CA 92612 LANDSEA CONSTRUCTION LLC 1042287 07/31/2024 (949)379-5289 660 NEWPORT' CENTER DR #300 NEWPORT BEACH, CA 92660 I have careful Ey examined the completed permit appiicalion and do hereby cerli fy under pemalty of perjury flint all information hereon including the declarations are true and cvrrael and I NO her Certify and agree if a permit is issued: to comply will' all City. County, and State laws governing building construefion, whether specified herein or not I also agree to save, indemnify and keep harmless the City of San Juati Captsrrano against all lfabilitles, judg-ments, costs and expenses which may in any way accrue against said City in canecquenca of the I.-umi ne of thIN nennit Owner/Contractor Print Name Applicant's signature F� Contractor, I hereby affirm fat lain licensed ISSUED 05/04/2023 AVELINA PH 5. 6-PLEX. PLAN 3. 1801sf SFR. 422sf ATT GAR 8 ROOF MOUNTED SOLAR PANELS. 2.80kW DC SYSTEM. ARCH PC B21-1320 NEW RES OCCUPANCY GROUP R-3 112.62 NEW RES OCCUPANCY GROUP U 12.66 SERVICES 600V OR LESS NOT OVER 200AMPS 33.78 ELECTRICAL ISSUANCE FEE 27.24 Total Electrical 186.30 PLUMBING PERMIT AMOUNT PLUMBING ISSUANCE FEE 27.24 FIXTURES AND VENTS 173.60 WATER HEATER INCLUDING VENT 13.62 WATER PIPING SYSTEMS 5.26 # GAS SYSTEMS 6.81 BUILDING SEWER 27.29 FIRE INSTALL I TO 50 66.44 BACKFLOW PROTECTION NON ATM >21N 27.29 MEC [�PERMIT AMOUNT DUCT INSTALL/REPLACE/RELOC 168.63 APPLIANCE VENTS 8.03 VENTS AND EXHAUST HOOD/DUCFS 11.79 AC/BOILER/COMPR<3HPAND 100K BTU 16.28 EXHAUST FAN W/ SINGLE DUCT 42.00 FURNACE FORCED AIR OR GRAVITY UP TO 100K 16.39 MECHANICAL ISSUANCE FEES 27.24 Total Mechanical 290.36 iiroliom: Every permit issued shall become invalid unless the work on the site authorized li h permit is commenced within 12 months after its issuance, or if the work authorized on iln• by such permit is suspended or abandoned for a period of 180 days after the time the work An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height 9 of Division 3 of tie Business and Professions Code, and my license is in full force and effect t uTW r• I, u usvacr of dre Prnpcn}•. „r my cmPln}tcs with Rages as their sale mmpensatiall, w111 d,i llu work and the structure is not intended of offered for sale (Sec 7044, Business and Professions c L""�ntrattar's Llcrnse Laws does ttnl appy- to and owner of pmperry t4hv builds or improves dierenn. whir aloes such work himself or through his cmpin� ccs. provided that such improvements are not inlerrded ar olfcrrd [or sale Tf huwrvrr, etre building or impravemenl is sold within ane year of completion, The owner-bullder will have the burden ofproving that he did not build or improve foi the purpose of sale) Idri r. es owner of rhe prop rn. ani eticlusrvcly contracri i) with ]!tensed contractors to L'nnhrl'Uet the project (See. 7044, Business and Professions Code: The Contractor's License Law does not Ul;ih' n owiur of property wtw builds m isiipt„s cs thereon and who tontracls for such prajecrs with n license pursuant to the Contractor's License Law. k •r. ri m:i i -I hereby affirm under penalty ofperjury one of tlic following declarations:[ have and will maintain workers' compensation insurance, as required by Section 3700 of a nJr, for the performance of the work for which this permit is issued. My workers compensation insurance carrier and policy number are: Carrier ST,�i R R_(NDEls1i LAITY d: T.IARTT TTY CL7AiPANl1' Policy#1000004709 (This section needs to be completed if the permit is for one hundred dollars($100) or less) ion: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the woikets' compensation laws of Ca lfomin and agree that if 1 should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions Applicant wAKNTNC.i FAILURE TO SECURE WORKERS'CONIPEksATlE71ti COVERAGE tS UNLAW I—, AND SHALL SUBJECTAN E-AdPLOYER Tl CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOL'SDAND DOLLARS(S 100,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INI ERESI AND Al FORNEY'S FEES CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT FEES Pho Account #RElectrical Type Cost 01-44221 mit $ 1,762.56 01-44223 01-44224 290.36 $ 347.55 01-44225 $ 186.30 01 44221 Permit 01-44222 it Fee 0.00 01-44231 Grading Plan Check $ 0.00 $ 0.00 01-44222 On -Site Residential Permit 01-44231 On -Site Residential Pian Check $ 0.00 $ 0.00 Subtotal $ 2.58r1.77 014230 Bond Processing 0144230 Building Plan Check $ 0.00 0144230 Additional Plan Check $ 0.00 $ 0.00 01-44230 Digital Record Fee ($1.00 per sheet) 01-44221 C & D Administrative Fee $ 34.20 01-44221 Special Inspection -Reinspection $ 92.74 01-44222 On -Site Commercial/Tract Permit Fee $ 0.00 0144231 On -Site Commercial/Tract Plan Check Fee $ 0.00 0144214 Geotechnical Soils Plan Review $ 0.00 $ 0.00 10-44320 Ordinance 211 10-42510 Ordinance 364 $ 50.00 01-45354 Copies @ .20 Each $ 2,051.50$ 90-23331 SMIP Fee 0.00 334 4370 H.O.P.E. Fee (Housing in Lieu) $ 2667 6.00 $ Other Fees $ 6,687.90 Fees ees ng 01-44221 Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check)) $ 347.06 0144221 Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check) $ 0.00 01-44240 NPDES Permit Fee (10% Permit Subtotal) 258.68 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type $ 2,051.50 90-23000 Refundable Bond/Dep0sit Posted by Owner Contractor Type TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO S 14.187.02 Receipt # 94610 Date: 5/4/2023 Cashier: BOARD OF DIRECTORS LAURA FREESE CHARLES T. GIBSON SAUNDRA F. JACOBS BETTY H. OLSON, PH.D FRANK URY DON BUNTS INTERIM GENERAL MANAGER April 1, 2024 City of San Juan Capistrano Building Division 30448 Rancho Viejo Road, #110 San Juan Capistrano, CA 92675 Attention: Building Division Santa Marzgarzita Waterz Distuict Subject: Tract 18148, Avelina, Phase 5, Bldg 2 -Lots 48-54 and Bldg 3 -Lots 55-60 in ID 9 — 31990, 31991, 31994, 31995, 31998, 31999, 32002, 32003, 32006, 32007, 32010, 32011 Paseo Deriva & 27101 Via Caminata The following referenced location(s) may be released as far as the District is concerned effective March 22, 2024. Developer: LandSea Homes This release does not constitute authorization for you to release the water and sewer bonds for the subject lots. This authorization will be a Resolution of the Board of Directors of the Santa Margarita Water District. When the water and sewer facilities are formally accepted by the Board, they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded to you. Should you have any questions please contact me at (949) 459-6504. Sincerely, SANTA MARGARITA WATER DISTRICT ?6cctl Patricia Butler, P.E. Chief Engineer cc: Tony Gaetano, Inspector Elena Wilson/email Irma Lopez/email Mona Boers -Kort /email Renee Chincbilla/email Steve Skeffington/email Larry Jeffery/email File S\Eng\Tract Occupancy Release Letters Santa Margarita Water District' 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688 wwwSMtiVD,coni 0 (949)4S9-6420 landscape architecture / land planning March 12, 2024 Shannon Whittaker Landsea Homes 7525 Irvine Center Drive Suite 200 Irvine, CA 92618 RE: Conformance Letter Tirador, Tract 18148 10 Avelina Phase 5 — Building 2 (Units #48 through #54 and House Meter) and Building 3 (Units #55 through #60 and House Meter) This letter is to certify that all items for the phase mentioned above has been completed to the satisfaction of the landscape architect. I declare in my professional opinion and to the best of my knowledge, available information, and belief. That the landscape plans for the above -referenced project have been completed within the intent of the project and in accordance with the City of San Juan Capistrano approved plans and specifications. This conformance letter applies only to plant locations and quantities. SJA Inc. was not present for the installation or observation of the irrigation system. SJA Inc. cannot certify conformance of below grade materials, installation techniques, or irrigation pipe sizing. Please do not hesitate to call my office if you should have any questions. J +t Sincerely, If �I crioi Denny Smit gall Principal 7859 Sitio Coco, Carlsbad California 92009 1 TEL 949.276.6500 1 FAX 949.276.6506 1 WWW.SJAINC.COM PLU NG Plumbing Concepts, Inc. 2445 Railroad St. Corona, CA 92880 License No. 469996 Project Name: AVELINA Tract No.18148 Project Location: SAN JUAN CAPISTRANO ATTN: LANDSEA HOMES RE: Sewer Camera PH 5 LOTS- 55-56-57-58-59-60 To Whom it may concern, 3-21-24 Please allow this letter to serve as confirmation that the above referenced project had the sewer lines video inspected, and they have been found to be free and clear of debris. If you have any questions, please feel free to contact us. Yours truly, Doug Mbore Director of Quality Assurance (951) 520-8590 ext. 7142 LGO Geotechnical, Inc. March 12, 2024 Ms. Shannon Whittaker Landsea Homes 7525 Irvine Center Drive, Suite 200 Irvine, CA 92618 Project No. 20266-01 Subject. Geotechnical Release from Post -Grading, Phase 5, Buildings 2 and 3, "Avelina" Residential Development, Tract 18148, Southwest Corner of Calle Arroyo and Paseo Tirador, City of San Juan Capistrano, California In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Phase 5, Building 2 and Building 3 of the "Avelina" residential development, Tract 18148, located in the city of San Juan Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-call observation and field density testing of postgrading operations in order to form an opinion of site earthwork. In general, postgrading operations observed and/or tested by LGC Geotechnical included interior plumbing backfill, foundation footing excavations, utility house connection backfill, and subgrade preparation. Refer to table below for lots and associated addresses. Postgrading Release LotSummary - Avelina Building No. Unit No. 48 Address Permit No. 2 31990 Paseo Deriva B23-0328 2 49 31994 Paseo Deriva B23-0329 2 50 31998 Paseo Deriva B23-0330 2 51 32002 Paseo Deriva B23-0331 2 52 32006 Paseo Deriva B23-0332 2 53 27101 Via Caminata B23-0333 2 54 32010 Paseo Deriva B23-0334 2 HM 31990 -HM Paseo Deriva B23-0375 3 55 32011 Paseo Deriva B23-0335 3 56 32007 Paseo Deriva B23-0336 3 57 32003 Paseo Deriva B23-0337 3 58 31999 Paseo Deriva B23-0338 Postgrading Release LotSummary - Ay -g ina (Continued) Building No. Unit No. Address Permit No. 3 59 31995 Paseo Deriva B23-0339 3 60 31991 Paseo Deriva B23-0340 3 HM 32011 -HM Paseo Deriva B23-0376 Based on the results of our observation and testing, it is our opinion that the subject site earthwork operations were completed in general accordance with project geotechnical recommendations. This letter serves as a geotechnical release from postgrading operations for the subject lots at the "Avelina" residential development. In our opinion, the subject building pads are suitable for their intended use from a geotechnical perspective. Closure Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. Should you have any questions regarding this letter, please do not hesitate to contact our office. We appreciate this opportunity to be of service. Respectfully, LGC Geotechnical, Inc. L; No. 2749 Barry Graham, CEG 2749 '9a Project Geologist BPG/ amm Distribution: (1) Addressee (electronic copy) (1) X Engineering and Consulting, Inc. (electronic copy) Attn: Mr. Selwyn Harsono Project No. 20266-01 Page 2 March 12, 2024 T 1111imuIln h �/P, ( li(ui .l Will, rirl� It N11 SOV ST�Ak�AkAkAlk Ak AL A& AL AL Ak AL AL AIL tIll"peclion & cstillg'. Inc. 441 Conmirrcial \Va� 1.0 fhhra. CA'll 631-01 OS I �o I'?41-11)') • 171-11 5_h ti -1-11 f \ \ 946-0026 March 12, 2024 Building Official City of San Juan Capistrano Department of Building & Safety 32400 Paseo Adelanto San Juan Capistrano, CA 92675 SPECIAL INSPECTOR'S FINAL REPORT Project Name: Avelina - Phase 5, Building 3 Address: Tract #18148, San Juan Capistrano Owner: Landsea Homes Lot# Address Permit# 55 32011 Paseo Deriva B23-0335 56 32007 Paseo Deriva B23-0336 57 32003 Paseo Deriva B23-0337 58 31999 Paseo Deriva B23-0338 59 31995 Paseo Deriva B23-0339 60 31991 Paseo Deriva B23-0340 House Meter 32011 Paseo Deriva B23-0376 This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection on the above-mentioned project at the above address, which required special inspection per section 1701 of the 2022 California Building Code. Jason Sharobeem - Post Tensioned Concrete, Reinforced Concrete, ICC #9662561 Mina Endrawes - Reinforced Concrete, Post Tensioned Concrete, ICC #9048532 Justin Parrish - Post Tensioned and Reinforced Concrete, Shear Nailing, Wood Framing, DIA/Epoxy, ICC #1134401 Based upon special inspection and materials testing written reports of this work, it is our judgment that the inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and industry standard of workmanship in accordance with the provision of the 2022 California Building Code. Sincerely, Revie�, _o C04 19 EXF. 3333 Steven L. Godbey Ian R. ►'��sCle 1, P.' . President Principal Engineer SLG/IRW: spg For inspection and testing only, no design responsibility expressed or implied.