Loading...
B23-0335 - 32011 PASEO DERIVA 5530448 Rancho Viejo Road, Suite 110 San Juan Capistrano, CA 92675 (949) 493-1171 (949) 493-1053 Fax www.SanJuanCapistrano.org April 22, 2024 Owner: ARROYO CAP II 1 LLC 18575 JAMBOREE RD #350 IRVINE, CA 92612 MEMBERS OF THE CITY COUNCIL: CERTIFICATE OF USE & OCCUPANCY Troy Bourne John Campbell Sergio Farias Howard Hart John Taylor HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING: Permit Number: B23-0335 Building Address: 32011 PASEO DERIVA Tract: 18148 Lot: 2 Unit: 55 Building Use: (1840sf) SINGLE FAMILY DWELLING w/ (422sf) ATTACHED GARAGE Occupancy Classification: R -3/U Type of Construction: VB Occupant Load: PER CBC SECTION 1004 Fire Sprinkler: YES Special Conditions: CITY OF SAN JUAN CAPI_STRANO JAMES WIATRA , CBO, CASp Chief Building Official POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE CHIEF BUILDING OFFICIAL THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER 4/22/2024 Permit Number B23-0335 Type BUILDING Subtype SFD -ATTACHED Status FINALED Owner ARROYO CAP II 1 LLC, Site Address 32011 PASEO DERIVA 55 Subdivision AVELINA Zoning Page 1 Plan Review History Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Dianna Flores 3/9/23 3/12/24 369 Rnnin Remarks and Notes: Review Group: BUILDING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed BUILDING 4+ PCAPPROVED CSG Remarks and Notes: 5/4/22 5/27/22 5/11/22 7 Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF Applied 3/9/2023 LL3 3/12/24 Approved 3/9/2023 LL3 COO - BUS Issued 5/4/2023 DF5 3/12124 Finaled 3/26/2024 KH1 COO - NPDES Expired Remarks and Notes: Applicant LANDSEA CONSTRUCTION LLC COO APPROVED Laura Stokes City State Zip SAN JUAN CAPISTRANO CA 92675 Tract Block Lot No Parcel No 18148 2 TRACT 18148 U N I Construction Type Occupancy Type VB R -3/U Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Dianna Flores 3/9/23 3/12/24 369 Rnnin Remarks and Notes: Review Group: BUILDING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed BUILDING 4+ PCAPPROVED CSG Remarks and Notes: 5/4/22 5/27/22 5/11/22 7 Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF COO APPROVED Dianna Flores nrri 1pnn1r1V 3/12/24 3/21/24 3/12/24 Remarks and Notes: COO - BUS COO APPROVED BUSINESS LICENSE i irFnicF 3/12124 3121/24 3/13124 Remarks and Notes: COO - NPDES COO APPROVED Noreen Swiontek Remarks and Notes: COO - PLANNING - COO APPROVED Laura Stokes Nni icinirr Remarks and Notes: PERMIT REVIEWS Report By: 3/12/24 4/22/24 41 3/12/24 3/21/24 3/12/24 0 3112124 --------------------- - - 3121/24 3115/24 --- ---- -- -- -------- 3 3/12124 3121/24 3/13124 1 CWWSrSTEMS COO - PLANNING - COO APPROVED PLANNING pRn I MAIV 0 --------_- 3/12/24 Remarks and Notes: (3/1412024 4:58 PM LS) ----- 4/2/24 Landscape Architect Letter provided 3/13/24 COO - PUB WRKS ------- --- - -------- COO APPROVED James Prather rnti inicp Days Elapsed 3/8/22 Remarks and Notes: COO - SMWD COO APPROVED SMWD Remarks and Notes: 3/12/24 3/21/24 3/14/24 2 3/12/24 3/21/24 3/12/24 0 --------_- 3/12/24 ------- -- ---------- 3/21/24 ----- 4/2/24 21 ------- COO - UTILITIES COO APPROVED Camilo Jimenez 2/26/24 3/6/24.......... .. --------- --- 3/12/24 15 nrrnr�rr. Remarks and Notes: COO -BLDG COO APPROVED Kevin Hughes rRnniniriRnnm Remarks and Notes: COO -OCFA - COO APPROVED Kevin Hughes rnnnnn11n1n1RA1 u Remarks and Notes: Review Group: PLANNING Review Type Status Reviewer PLANNING 2nd PC APPROVED Laura Stokes Remarks and Notes: PERMIT REVIEWS Report By: 3/12/24 -------- 3/26/24 -- -------------- 14 3/12/24 3/26/24 14 REVIEW DATES Sent Due Returned Days Elapsed 3/8/22 5/27/22 3/17/22 9 CXWSYSTEPAS Permit Number ISSUED BY SITE APN SITE LOT NO SITE TRACT SITE SUBDIVISION JOB VALUE OCCUPANCY TYPE PERMIT TYPE. BUILDING SF NO STORIES NO UNITS CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT Permit No. B23-0335 B23-0335 DF5 TRACT 18148 UNIT 55 2 Pat 18148 AVELINA $ 209,238 Y" R -3/U BUILDING 1,840 3 1 I JOB ADDRESS: 32011 PASEO DERIVA 55 PHONE MAILING ADDRESS CITY,STATE,ZIP CONTRACTOR NAME ST. LIC EXPIRE PHONE ADDRESS CITY, ST, ZIP TENANT NAME PHONE# MAILING ADDR CITY, ST, ZIP Total Mobile Home 18575 JAMBOREE RD IRVINE, CA 92612 LANDSEA CONSTRUCTION LLC 1042287 07/31/2024 (949)379-5289 660 NEWPORT CENTER DR #300 NEWPORT BEACH, CA 92660 I have carefully examined site complctad permit application and d hereby Certify under penalty of perjury that all information hereon including dee declarations are Me and correct and I furter certify and a9w if a permit is issued: m comply with 311 City, County, and State laws governing building construction, wherherspecified Itorein or not I also agree to save, indemnify and keep harmless the City of San Jl,an Capistrano against all 1inbilities, indgmeni%costs and expenses which may in any way accrue ugam i !City in cgrsegmencc of I wn ng of h Item t. Owner/Contractor Y�' Print Name j2L-� , Applicant's signature ) !► Contractor: I hereby affirm at I am licensed under ISSUED 05/04/2023 AVELINA PH 5. 6-PLEX. PLAN 3 -END. 1840sf SFR, 422sfATT GAR. 8 ROOF MOUNTED SOLAR PANELS. 2.8OkW DC SYSTEM. ARCH PC B21-1320 NEW RES OCCUPANCY GROUP R-3 115.08 NEW RES OCCUPANCY GROUP U 12.66 SERVICES 600V OR LESS NOT OVER 200AMPS 33.78 ELECTRICAL ISSUANCE FEE 27.24 Total Electrical 188.76 PL MS G PERMIT AMOUNT PLUMBING ISSUANCE FEE 27.24 FIXTURES AND VENTS 173.60 WATER HEATER INCLUDING VENT 13.62 WATER PIPING SYSTEMS 5.26 # GAS SYSTEMS 6.81 BUILDING SEWER 27.29 FIRE INSTALL 1 TO 50 66.44 BACKFLOW PROTECTION NON ATM >2IN 27.29 MECHANICAL PERMIT AMOUNT DUCT INSTALL/REPLACE/RELOC 168.63 APPLIANCE VENTS 8.03 VENTS AND EXHAUST HOOD/DUCTS 11.79 AC/BOILER/COMPR<3HPAND 100K BTU 16.28 EXHAUST FAN W/ SINGLE DUCT 42.00 FURNACE FORCED AIR OR GRAVITY UP TO IOOK 16.39 MECHANICAL ISSUANCE FEES 27.24 Total Mechanical 290.36 Bratton:: Every permit issued shall become invalid unless the work •,a the site authorized h, It permit is commenced within 12 months after its issuance, or if the work authorized on the by such permit is suspended or abandoned for a period of 180 days after the time the work An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height_ of Ot:ipT& 9 of Division 3 of the Business and Professions Code, and my license is in fiill force and effect l I, as 05tmcr of the property, of my employees with wages as thcif sale cumptnsation, will du the work and the structure is not intended or offered for sale (Sec.7044, Business and Professions Ilx Contmctor's License Laws does not apply [a and owner of property who builds or improves Ihocon, lvho docs such work himself or through his employees, provided that such improvements arc not intended or offered for sale. If however, the building ar imprnvemem is sold wi[hin one yam of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale) Owner/Builder. I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not a h• n an owner of property who builds or improves thereon and who contracts for such projects with a to license pursuant to the Contractor's License Law. u 11'u - :n antro -1 hereby affirm under penalty of perjury one or the following declaration5:l have and will Mai Our n workers' compensation msuranee, as requited by Section 3700 of Code, for the perfartnance of rhe work for which this permit is issterd. Afy workers*ramlxnsaiion insurance comer and policy numbcrare Garner STARK rNDEMb}]lY& LSABL1T QMPAN Policykl(H10004709 {This sedan needs to be completed if the peF.1. is for one hundred dollaNS 100) or less) iY_ Ex notion, I certify that in the performance of the work ror which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California and agree that if 1 should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, l shall fodhwith comply with those provisions Applicant %VARNfi';G:FAiLLFAF'r0 SECURE w•ORR.ERS'COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER Tl CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSDAND DOLLARS(SI00,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF TIDE LABOR CODE, INTEREST, AND ATTORNEY'S FEES CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT FEES Hppiicant: Phone/E-Mail Account # Type Cost 01-44221 Building Permit $ 1,786.52 01-44223 Mechanical $ 290.36 01-44224 Plumbing $ 347.55 01-44225 Electrical $ 188.76 01-44221 Mobile Home Permit $ 0.00 01-44222 Grading Permit Fee $ 0.00 01-44231 Grading Plan Check $ 0.00 01-44222 On -Site Residential Permit 01-44231 On -Site Residential Plan Check $ 0.00 $ 0.00 Subtotal $ 2,613.19 01-44230 Bond Processing $ 0.00 01-44230 Building Plan Check nal Plan Check $ 000 EEEF $ 0.00 Record Fee ($1.00 per sheet) 01- 4221 dministrative Fee $ 34.20 $ 92.74 01-44221 Special Inspection -Reinspection 01-44222 On -Site Commercial/Tract Permit Fee $ 0.00 $ 0.00 01-44231 On -Site Commercial/Tract Plan Check Fee $ 0.00 01-44214 Geotechnical Soils Plan Review 10-44320 Ordinance 211 0.00 50.00 10-42510 Ordinance 364 x,49}.380145354 Copies @.20 Each0 V$s 0090-23331 SMIP Fee 27 2033-44370 H. O. P. E. Fee (Housing in Lieu) 0.00 Other Fees 6,687.90 ees �cnovi rees "DaR ceivea Engineering ees ce1ved Water Division Fees ceirr d 01-44221 Title - -Energy Provision (20% Permit Subtotal & Bldg Plan Check)) $ 351.86 01-44221 Title 24 ADA Fee (10% Permit Subtotal & Bid g Plan Check) $ 0.00 01-44240 NPDES Permit Fee (10% Permit Subtotal) $ 261.32 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type $ 2,092.38 90-23000 Refundable Bond/Deposit Posted by --Owner Contractor Type TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO $ 14.303.17 Receipt # 94610 Date: 7,4 X023 Cashier: BOARD OF DIRECTORS LAURA FREESE CHARLES T. GIBSON SAUNDRA F. JACOBS BETTY H. OLSON, PH.D FRANK URY DON BUNTS Santa Marzgarzita Waterz Distuict INTERIM GENERAL MANAGER April 1, 2024 City of San Juan Capistrano Building Division 30448 Rancho Viejo Road, #110 San Juan Capistrano, CA 92675 Attention: Building Division Subject: Tract 18148, Avelina, Phase 5, Bldg 2 -Lots 48-54 and Bldg 3 -Lots 55-60 in ID 9 — 31990, 31991, 31994, 31995, 31998, 31999, 32002, 32003, 32006, 32007, 32010, 32011 Paseo Deriva & 27101 Via Caminata The following referenced location(s) may be released as far as the District is concerned effective March 22, 2024. Developer: LandSea Homes This release does not constitute authorization for you to release the water and sewer bonds for the subject lots. This authorization will be a Resolution of the Board of Directors of the Santa Margarita Water District. When the water and sewer facilities are formally accepted by the Board, they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded to you. Should you have any questions please contact me at (949) 459-6504. Sincerely, SANTA MARGARITA WATER DISTRICT v6os�' Patricia Butler, P.E. Chief Engineer cc: Tony Gaetano, Inspector Elena Wilson/email Irma Lopezlemail Mona Boers -Kort /email Renee Chinchilla/email Steve Skeffington/email Larry Jeffery/email File S\EnglTract Occupancy Release Letters Santa Margarita Water District • 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688 wwwSMWD.coni 0 (949) 459-6420 In landscape architecture / land planning March 12, 2024 Shannon Whittaker Landsea Homes 7525 Irvine Center Drive Suite 200 Irvine, CA 92618 RE: Conformance Letter Tirador, Tract 18148 Avelina Phase 5 — Building 2 (Units #48 through #54 and House Meter) and Building 3 (Units #55 through #60 and Housj� Meter) This letter is to certify that aII items for the phase mentioned above has been completed to the satisfaction of the landscape architect. I declare in my professional opinion and to the best of my knowledge, available information, and belief. That the landscape plans for the above -referenced project have been completed within the intent of the project and in accordance with the City of San Juan Capistrano approved plans and specifications. This conformance letter applies only to plant locations and quantities. SJA Inc. was not present for the installation or observation of the irrigation system. SJA Inc. cannot certify conformance of below grade materials, installation techniques, or irrigation pipe sizing. Please do not hesitate to call my office if you should have any questions. r jl Sincerely, Y11 ti 91 2 Denny Smi gall Principal # s A E ,4 01/3V26 ~�I 7859 Sitio Coco, Carlsbad Califomia 92009 TEL 949.276.6500 I FAX 949.276.6506 I WWW.SJAINC.COM PLUG M��-N Plumbing Concepts, Inc. 2445 Railroad St. Corona, CA 92880 License No. 469996 Project Name: AVELINA Tract No.18148 Project Location: SAN JUAN CAPISTRANO ATTN: LANDSEA HOMES RE: Sewer Camera PH 5 LOTS- 55-56-57-58-59-60 To Whom it may concern, 3-21-24 Please allow this letter to serve as confirmation that the above referenced project had the sewer lines video inspected, and they have been found to be free and clear of debris. If you have any questions, please feel free to contact us. Yours truly, Doug M6ore Director of Quality Assurance (951) 520-8590 ext. 7142 # LGO Geotechnical, Inc. March 12, 2024 Ms. Shannon Whittaker Landsea Homes 7525 Irvine Center Drive, Suite 200 Irvine, CA 92618 Project No. 20266-01 Subject. Geotechnical Release from Post -Grading, Phase 5, Buildings 2 and 3, 'Avelino" Residential Development, Tract 18148, Southwest Corner of Calle Arroyo and Paseo Tirador, City of San Juan Capistrano, California In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Phase 5, Building 2 and Building 3 of the "Avelina" residential development, Tract 18148, located in the city of San Juan Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-call observation and field density testing of postgrading operations in order to form an opinion of site earthwork. In general, postgrading operations observed and/or tested by LGC Geotechnical included interior plumbing backfill, foundation footing excavations, utility house connection backfill, and subgrade preparation. Refer to table below for lots and associated addresses. Postgradirr8 Release Lot Summary - Avelina Building No. Unit No. Address Permit No. 2 48 31990 Paseo Deriva B23-0328 2 49 31994 Paseo Deriva B23-0329 2 50 31998 Paseo Deriva B23-0330 2 51 32002 Paseo Deriva B23-0331 2 52 32006 Paseo Deriva B23-0332 2 53 27101 Via Caminata B23-0333 2 54 32010 Paseo Deriva B23-0334 2 HM 31990 -HM Paseo Deriva B23-0375 3 55 32011 Paseo Deriva B23-0335 3 56 32007 Paseo Deriva B23-0336 3 57 32003 Paseo Deriva B23-0337 3 58 31999 Paseo Deriva B23-0338 Post rading Release LotSumm i Continued Building No. Unit No. Address Permit No. 3 59 31995 Paseo Deriva B23-0339 3 60 31991 Paseo Deriva B23-0340 3 HM 32011 -HM Paseo Deriva B23-0376 Based on the results of our observation and testing, it is our opinion that the subject site earthwork operations were completed in general accordance with project geotechnical recommendations. This letter serves as a geotechnical release from postgrading operations for the subject lots at the "Avelina" residential development. In our opinion, the subject building pads are suitable for their intended use from a geotechnical perspective. Closure Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. Should you have any questions regarding this letter, please do not hesitate to contact our office. We appreciate this opportunity to be of service. Respectfully, LGC Geotechnical, Inc. 1J r p No. 2749 ur—, + *) Barry Graham, CEG 2749 Project Geologist BPG/ amm Distribution: (1) Addressee (electronic copy) (1) X Engineering and Consulting, Inc. (electronic copy) Attn: Mr. Selwyn Harsono Project No. 20266-01 Page 2 March 12, 2024 (,4n(il(lfinIN hINIr( ( Iinii ,( II.,aI rid IN I" v(rr: SOUTHWEST A&AL:Akk Ahk Ai, A&ALA6...LAL,&SAL I El sl)e c'I I��EI �l I �'Sl t 13r:. I I1C. .4-11 CunnnrroaI \1';i\. 1.0 IIobra, ('.\ 90631-0I ON (SO-') 941--'990. 17 14 ) X20-8441 I---\ X (i(12) 040-0020 March 12, 2024 Building Official City of San Juan Capistrano Department of Building & Safety 32400 Paseo Adelanto San Juan Capistrano, CA 92675 SPECIAL INSPECTOR'S FINAL REPORT Project Name: Avelina - Phase 5, Building 3 Address: Tract #18148, San Juan Capistrano Owner: Landsea Homes Lot# Address Permit# 55 32011 Paseo Deriva B23-0335 56 32007 Paseo Deriva B23-0336 57 32003 Paseo Deriva B23-0337 58 31999 Paseo Deriva B23-0338 59 31995 Paseo Deriva B23-0339 60 31991 Paseo Deriva B23-0340 House Meter 32011 Paseo Deriva B23-0376 This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection on the above-mentioned project at the above address, which required special inspection per section 1701 of the 2022 California Building Code. Jason Sharobeem - Post Tensioned Concrete, Reinforced Concrete, ICC #9662561 Mina Endrawes - Reinforced Concrete, Post Tensioned Concrete, ICC #9048532 Justin Parrish - Post Tensioned and Reinforced Concrete, Shear Nailing, Wood Framing, DIA/Epoxy, ICC #1134401 Based upon special inspection and materials testing written reports of this work, it is our judgment that the inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and industry standard of workmanship in accordance with the provision of the 2022 California Building Code. . •5l�;; Sincerely, Pevie�r-[t 6" r'0A153 cYF 3r Steven L. Godbey Ian R. President Principal Engineer SLG/IRW: spg For inspection and testing only, no design responsibility expressed or implied.