Loading...
B23-0303 - 32045 PASEO VIENTA 11230448 Rancho Viejo Road, Suite 110 San Juan Capistrano, CA 92675 (949) 493-1171 (949) 493-1053 Fax www.SanJuanCapistrano.org January 03, 2023 Owner: ARROYO CAP II 1 LLC 18575 JAMBOREE RD #350 1RVI NE, CA 92612 MEMBERS OF THE CITY COUNCIL: CERTIFICATE OF USE & OCCUPANCY Troy Bourne John Campbell Sergio Farias Howard Hart John Taylor HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING: Permit Number: B23-0303 Building Address: 32045 PASEO VIENTA Tract: 18148 Lot: 2 Unit: 112 Building Use: (1779so SINGLE FAMILY DWELLING w/ (413so ATTACHED GARAGE Occupancy Classification: R -3/U Type of Construction: VB Occupant Load: PER CBC SECTION 1004 Fire Sprinkler: YES Special Conditions: CITY OF SAN JUAN CAPIST NO JAMES WIATRAK, CBO, CASp Chief Building Official POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE CHIEF BUILDING OFFICIAL THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER 1/3/2024 Permit Number B23-0303 Type BUILDING Subtype SFD -ATTACHED Status FINALED Owner ARROYO CAP II 1 LLC, Site Address 32045 PAS EO VIENTA 112 Subdivision AVELINA Zoning Page 1 Plan Review History Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Camilo Jimenez Renin Remarks and Notes: 2/22/23 3/20/23 26 Review Group: BUILDING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed BUILDING 4+ PC APPROVED CSG 5/4/22 5/27/22 5/11/22 7 Remarks and Notes: Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF Applied 3/6/2023 LL3 Approved 3/6/2023 LL3 COO - BUS Issued 3/20/2023 CJ5 Finaled 12/20/202: KH1 COO - NPDES Expired 6/17/2024 KH1 Remarks and Notes: Applicant LANDSEA CONSTRUCTION LLC COO APPROVED Laura Stokes City State Zip SAN JUAN CAPISTRANO CA 92675 Tract Block Lot No Parcel No 18148 2 TRACT 18148 UNI' Construction Type Occupancy Type VB R -3/U Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Camilo Jimenez Renin Remarks and Notes: 2/22/23 3/20/23 26 Review Group: BUILDING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed BUILDING 4+ PC APPROVED CSG 5/4/22 5/27/22 5/11/22 7 Remarks and Notes: Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF COO APPROVED Dianna Flores nrrl IPAnIrV Remarks and Notes: COO - BUS COO APPROVED BUSINESS LICENSE 1 irFnicF Remarks and Notes: COO - NPDES COO APPROVED Noreen Swiontek Remarks and Notes: COO - PLANNING - COO APPROVED Laura Stokes Nni icinir Remarks and Notes: PERMIT REVIEWS Report By: 12/18/23 1/3/24 16 12/18/23 1/4/24 12/19/23 1 12/18/23 1/4/24 12/19/23 1 12/18/23 1/4/24 12/18/23 0 COO -PLANNING- COO APPROVED PLANNING Pan 1 MAN Review Group: PLANNING Review Type Status Reviewer PLANNING 2nd PC APPROVED Laura Stokes Remarks and Notes: PERMIT REVIEWS Report By: 12/18/23 1/4/24 12/19/23 1 12/18/23 1/4/24 12/19/23 1 12/15/23 1/3/24 12/19/23 4 12/7/23 12/18/23 1217/23 0 12/18/23 12/20/23 2 12/18/23 12/20/23 2 REVIEW DATES Sent Due Returned Days Elapsed 3/8/22 5/27/22 3/17/22 9 ErRW,SYSTEMS Remarks and Notes: COO - PUB WRKS COO APPROVED James Prather rnnl !NCP Remarks and Notes: COO - SMWD COO APPROVED SMWD Remarks and Notes: COO - UTILITIES COO APPROVED Dianna Flores RFI FACFC Remarks and Notes: COO -BLDG COO APPROVED Kevin Hughes (,_RanlNr:iRr)mn Remarks and Notes: COO -OCFA - COO APPROVED Kevin Hughes rnnnnnnNmm�l u Remarks and Notes: Review Group: PLANNING Review Type Status Reviewer PLANNING 2nd PC APPROVED Laura Stokes Remarks and Notes: PERMIT REVIEWS Report By: 12/18/23 1/4/24 12/19/23 1 12/18/23 1/4/24 12/19/23 1 12/15/23 1/3/24 12/19/23 4 12/7/23 12/18/23 1217/23 0 12/18/23 12/20/23 2 12/18/23 12/20/23 2 REVIEW DATES Sent Due Returned Days Elapsed 3/8/22 5/27/22 3/17/22 9 ErRW,SYSTEMS CITY OF SAN JUAN CAPISTRANO ISSUED r .._ 03/20/2023 BUILDING PERMIT Permit No. B23-0303 Permit Number B23-0303 ISSUED BY 05 NEW RES OCCUPANCY GROUP U SITE APN TRACT 18148 UNIT 112 07/31/2024 SITE LOT NO 2 ADDRESS SITE TRACT I8I48 RNAL NEWPORT BEACH, CA 92660 SITE SUBDIVISION AVELINA FIRE INSTALL 1 TO 50 JOB VALUE $ 202.384 7 L OCCUPANCY TYPF R -3/U work authorized on the PERMIT TYPE. BUILDING tmenced. BUILDING SF 1,779 NO STORIES 3 NO UNITS I JOB ADDRESS: 32045 PASEO VIENTA 112 PHONE (949) 476-2246 MAILINGADDRESS 18575 JAMBOREE RD CITY,STATE,ZIP IRVINE, CA 92612 CONTRACTOR NAME LANDSEA CONSTRUCTION LLC NEW RES OCCUPANCY GROUP U 1042287 ST. LIC EXPIRE 07/31/2024 PHONE (949) 379-5289 ADDRESS 660 NEWPORT CENTER DR 4300 CITY, ST, ZIP NEWPORT BEACH, CA 92660 TENANT NAME PHONE# MAILING ADDR CITY. ST. ZIP Total Mobile Home I have carefully examined [lie completed permit application and do hereby certify under penally of perjury that all information hereon including the declarations are true and correct and I further certify and agree if a permit is issued: to comply with all City, County, and State laws governing building construction, whether specified herein or not. I also agree to save, indemnify and keep harmless (lie City of San Juan Capistrano against all liabilities, judgments, costs and expenses which may in any way accrue against ",dC,,y in consequence ofthe granting of (his pennit- Owner/ContractoV1N'k vt t�qkw Print Name f f is signature AVELINA PFI 4. 5-PLEX. PLAN 2 -FH. 1779sf SFR. 413sf ATT GAR 8 ROOF MOUNTED SOLAR PANELS. 2.8OkW DC SYSTEM. ARCH PC B21-1320 NEW RES OCCUPANCY GROUP R-3 11088 NEW RES OCCUPANCY GROUP U 12-39 SERVICES 600V OR LESS NOT OVER 200AMPS 33.78 ELECTRICAL ISSUANCE FEE 27.24 Total Electrical 184,29 PLUMBING PERMIT AMOUNT PLUMBING ISSUANCE FEE 27:24 FIXTURES AND VENTS 173.60' WATER HEATER INCLUDING VENT 13-62 WATER PIPING SYSTEMS 5.26 # GAS SYSTEMS 6.81 BUILDING SEWER 27.29 FIRE INSTALL 1 TO 50 66.44 MECHANICAL PERMIT AMOUNT DUCT INSTALL/REPLACE/RELOC 136.51 APPLIANCE VENTS 8.03 VENTS AND EXHAUST HOOD/DUCTS 11.79 AC/BOILER/COMPR<3HP AND IOOK BTU 16.28 EXHAUST FAN W/ SINGLE DUCT 42.00 FURNACE FORCED AIR OR GRAVITY UP TO 100K 16.39 MECHANICAL ISSUANCE FEES 27.24 Total Mechanical 258.24 )irrtion:: Every permit issued shall become invalid unless the work on the site authorized h3 h permit is commenced within 12 months after its issuance, or if the work authorized on the by such permit is suspended or abandoned for a period of 180 days after the time the work tmenced. An OSHA permit is required for excavations over 5'0" deep and demolition or constriction of structures over 3 stones in height. _ AF—) f pDjradg I hereby affirm tlui I am licensed under pm 0%ion+ of Chapter 9 of Division 3 of the Business and Professions Code, and my license is in full force and effect _ Owner/Builder: I, as owner of the property, or my employees with wages as their sole compensation, will do the work and the suucture is not intended or offered for sale (Sec.7044, Business and Professions Code. the Contractor's License Laws does not apply to and owner of property who builds or improves thereon, who docs such wot k himself or through his employees, provided that such improvements are not intended or offered for sale If however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale) __ Ox nerlAuilder: [,as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec, 7044, Business and Professions Code: The Contractor's License Law does not ap LIM an owner 0Fproperty who builds or improves thereon and who contracts for such projects with a contractor's) license pursuant to the Contractor's License Law- Workers f'amnrnention-I hereby affirm under penalty of perjury one of the following declarRtions_1 have and will maintain wmkef5' compe(tsalion insurance, as requited by Sccunr 1; 00 urth L: ode, for dre perftm atncc of the work for which this permit is issued, My workcrs' compensation insurance carrier and policy number are: Carrier STARK INDEMNITY d UABIt. ITY CON IPANY PolicyH 1000004709 (This section needs to be completed if tItc permit is for one hundred daIIars(S 10 0) or less) Exemption: I certify that in the performance of the work for which (his pemrit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California and agree that if 1 should become subject to the workcrs' compensation provisions of Section 3700 or the Labor Code, ( shall forthwith comply with those provisions. ate Applicant WARN INC: FAILURE TO SECURE WORKERS'COMPENSAI ION COVERAGE IS UNLAWFUL. AND SHALL SUBJECT AN ENIPLOYER-r I CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED TI tOUSDAND DOLLARS(S100,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SEC FION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES Ph CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT FEES�� I AW)Kr- A rnh11,Tkt 112 Account # Type Cost 01-44221 Building Permit $ 1;744.59 01-44223 Mechanical $ 258.24 01-44224 Plumbing $ 320.26 01-44225 Electrical $ 184.29 01-44221 Mobile Home Permit $ 0.00 01-44222 Grading Permit Fee $ 0.00 01-44231 Grading Plan Check $ 0.00 01-44222 On -Site Residential Permit $ 0.00 014231 On -Site Residential Plan Check $ 0.00 Subtotal $ 2,507.38 01-44230 Bond Processing $ 0.00 01-44230 Building Plan Check $ 0.00 01-44230 Additional Plan Check $ 0.00 01-44230 Digital Record Fee ($1.00 per sheet) $ 34.20 01-44221 C & D Administrative Fee $ 92.74 01-44221 Special Inspection -Reinspection $ 0.00 01-44222 On -Site Commercial/Tract Permit Fee $ 0.00 01-44231 On -Site Commercial/Tract Plan Check Fee $ 0.00 S 0.00 01-44214 Geotechnical Soils Plan Review 10-44320 Ordinance 211 S 50.00 10-42510 Ordinance 364 S 2.023.84 0145354 Copies @.20 Each S 0.00 90-23331 SMIP Fee $ 26.31 33-44370 H.O.P.E. Fee (Housing in Lieu) $ 0.00 Other Fees S 6,687.90 TCA Fees Date Receive HOA Approval Date Received SchoolFees Date Received Engineering F-ees Date Keceived Water Division Fees Date Received 01-44221 Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check)) $ 343.47 01-44221 Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check) S 0.00 01-44240 NPDES Permit Fee (10% Permit Subtotal) $ 250.74 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type S 2,023.84 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type (TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO $ 14,040.42 Receipt # 94074 Date: 3/20/2023 Cashier: BOARD OF DIRECTORS LAURA FREESE CHARLES T. GIBSON SAUNDRA F. JACOBS BETTY H. OLSON, PH.D FRANK URY DANIEL R. FERONS Santa Mangauita Water Distrzict GENERAL MANAGER December 15, 2023 City of San Juan Capistrano Building Division 30448 Rancho Viejo Road, #110 San Juan Capistrano, CA 92675 Attention: Building Division Subject: Tract 18148, Avelina Lots 110-114, Building 11, Phase 4 in ID 9 — 32037, 32041, 32045, 32049 and 32053 Paseo Vienta The following referenced location(s) may be released as far as the District is concerned effective December 14, 2023. Developer: LandSea Homes This release does not constitute authorization for you to release the water and sewer bonds for the subject lots. This authorization will be a Resolution of the Board of Directors of the Santa Margarita Water District. When the water and sewer facilities are formally accepted by the Board, they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded to you. Should you have any questions please contact me at (949) 459-6504. Sincerely, SANTA MARGARITA WATER DISTRICT Patricia Butler, P.E. Chief Engineer cc: Tony Gaetano, Inspector Elena Wilson/email Irma Lopez/email Mona Boers -Kort /email Renee Chinchilla/email Steve Skefffngton/email Larry Jeffery/email File S\Eng\Tract Occupancy Release Letters Santa Margarita Water District • 261 I I Antonio Parkway, Rancho Santa Margarita, CA 92688 www SMWD.com • (949) 459-6420 December 8, 2023 Building Official City of San Juan Capistrano Department of Building & Safety 32400 Paseo Adelanto San Juan Capistrano, CA 92675 #iiii.&.LiALALAk Akiii SPECIAL INSPECTOR'S FINAL REPORT Project Name: Avelina - Phase 4, Building 11 Address: Tract #18148, San Juan Capistrano Owner: Landsea Homes Lot# Address Permit# 110 32037 Paseo Viente B23-0301 111 32041 Paseo Viente B23-0302 112 32045 Paseo Viente B23-0303 113 32049 Paseo Viente B23-0304 114 32053 Paseo Viente B23-0305 House meter 32053 Paseo Viente B23-0305 This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection on the above-mentioned project at the above address, which required continuous inspection per section 1701 of The California Building Code. Jason Sharobeem Post Tensioned Concrete, Reinforced Concrete, ICC #9662561 Manwel Michael - Reinforced Concrete, ICC #97214165 Justin Parrish - Shear Nailing, Wood Framing, DIA/Epoxy, ICC #1134401 Based upon special inspection and materials testing written reports of this work, it is our judgment that the inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and applicable workmanship provision of the California Building Code. Sincerely, Steven L. Godbey President SLG/IRW: spg Principal Engineer For inspection and testing only, n0 design res 0 sibilitex res ed or inn I'e Geotechnical, Inc. December 6, 2023 Ms. Shannon Whittaker Landsea Homes 7525 Irvine Center Drive, Suite 200 Irvine, CA 92618 Project No. 20266-01 Subject. Geotechnical Release from Post -Grading, Phase 4, Building 1, Units 44 through 47, Building 8, Units 106 through 109, and Building 11, Units 110 through 114, `Avelina" Residential Development, Tract 18148, Southwest Corner of Calle Arroyo and Paseo Tirador, City of San Juan Capistrano, California In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Phase 4, Building 1, Units 44 through 47; Building 8, Units 106 through 109; and Building 11, Units 110 through 114 of the "Avelina" residential development, Tract 18148, located in the city of San Juan Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-call observation and field density testing of postgrading operations in order to form an opinion of site earthwork. In general, postgrading operations observed and/or tested by LGC Geotechnical included interior plumbing backfill, foundation footing excavations, utility house connection backfill, and subgrade preparation. Refer to table below for lots and associated addresses. Postgrading Ret" -se Lot Summary - Avelina Building No. Unit No. Address Permit No. 1 44 31963 Via Refrescar B23-0293 1 45 31967 Via Refrescar B23-0294 1 46 31971 Via Refrescar B23-0295 1 47 31975 Via Refrescar B23-0296 1 HM 31963 Via Refrescar B23-0309 8 106 31963 Paseo Vienta B23-0297 8 107 32040 Paseo Vienta B23-0298 8 108 32032 Paseo Vienta B23-0299 8 109 32028 Paseo Vienta B23-0300 8 HM 32028 Paseo Vienta B23-0310 PostaradinaBele-MLot Building No. Unit No. 11 110 Summqa- A elinaX2gUnuEd Address 32037 Paseo Vienta Permit No. B23-0301 11 111 32041 Paseo Vienta B23-0302 11 112 32045 Paseo Vienta B23-0303 11 113 32049 Paseo Vienta B23-0304 11 114 32053 Paseo Vienta B23-0305 11 HM 32053 Paseo Vienta B23-0305 Based on the results of our observation and testing, it is our opinion that the subject site earthwork operations were completed in general accordance with project geotechnical recommendations. This letter serves as a geotechnical release from postgrading operations for the subject lots at the "Avelina" residential development. In our opinion, the subject building pads are suitable for their intended use from a geotechnical perspective. Closure Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. Should you have any questions regarding this letter, please do not hesitate to contact our office. We appreciate this opportunity to be of service. Respectfully, LGC Geotechnical, Inc. a�'� Barry Graham, CEG 2749 Project Geologist BPG/RNP/amm Distribution: (1) Addressee (electronic copy) (1) X Engineering and Consulting, Inc. (electronic copy) Attn: Mr. Selwyn Harsono Project No. 20266-01 Page 2 December 6, 2023 LrxinG December 8, 2023 City Engineer City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, California 92675 Subject: Final Grade Certification Tract No. 18148, Lot 2 "Avelina", Buildings 8, 11, 12, 13 & 14 Units 106 through 114 and 121 through 132, (Permit# B21-1365). Dear Sir: Finish grading operations have been completed for Tract No. 18148, Lot 2 "Avelina", Units 106 through 114 and 121 through 132 and have been inspected by the undersigned Professional Land Surveyor. All grading was completed in substantial conformance with the final grading plan approved by the City Engineer and no unauthorized deviations were made. Sincerely, Michael A. Baine, P.L.S. VP - Survey L.D. King, Inc. 975 N. Haven Avenue, Suite 200, Ontario, CA 91764 (909) 945-0526 Fax: (909) 945-0529 P LUIV��IG Plumbing Concepts, Inc. 2445 Railroad St. Corona, CA 92880 License No. 469996 Project Name: AVELINA Tract No.18148 Project Location: SAN JUAN CAPISTRANO ATTN: LANDSEA HOMES RE: Sewer Camera PH-BLD-21—BLD-8 BLD 11---110-111-112-113-114 BLD 8-106-107-108-109 To Whom it may concern, 12-12-23 Please allow this letter to serve as confirmation that the above referenced project had the sewer lines video inspected, and they have been found to be free and clear of debris. If you have any questions, please feel free to contact us. Yours truly, ' n � . �.� Doug Moore Director of Quality Assurance En landscape architecture / land planning December 15, 2023 Shannon Whittaker Landsea Homes 7525 Irvine Center Drive Suite 200 Irvine, CA 92618 RE: Conformance Letter Tirador, Tract 18148 4 Avelina Phase 4 — Building 8 (Units #106 through #109) and Building 11 (Units 110 through 114) This letter is to certify that all items for the phase mentioned above has been completed to the satisfaction of the landscape architect. I declare in my professional opinion and to the best of my knowledge, available information, and belief. That the landscape plans for the abs�ve-referenced project have been completed within the intent of the project and in accordance with the City of San Juan Capistrano approved plans and specifications. This conformance letter applies only to plant locations and quantities. SJA Inc. was not present for the installation or observation of the irrigation system. SJA Inc. cannot certify conformance of below grade materials, installation techniques, or irrigation pipe sizing. Please do not hesitate to call my office if you should have any questions. r jl Sincerely, Denny ssrl�t gall Principal S A 1•. Oli80i24►~� 7859 Sitio Coco, Carlsbad California 92009 1 TEL 949276.6500 1 FAX 949.276.6506 I WWw.SJA1NC.COM