Loading...
B23-0297 - 32040 PASEO VIENTA 10630448 Rancho Viejo Road, Suite 110 San Juan Capistrano, CA 92675 (949) 493-1171 (949) 493-1053 Fax www.SanJuanCapistrano.org January 03, 2023 Owner: ARROYO CAP II 1 LLC 18575 JAMBOREE RD #350 IRVINE, CA 92612 MEMBERS OF THE CITY COUNCIL: CERTIFICATE OF USE & OCCUPANCY Troy Bourne John Campbell Sergio Farias Howard Hart John Taylor HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING: Permit Number: Building Address: Tract: Lot: B23-0297 32040 PASEO VIENTA 18148 2 Unit: 106 Building Use: (1840sf SINGLE FAMILY DWELLING w/ (422sf ATTACHED GARAGE Occupancy Classification: R -3/U Type of Construction: VB Occupant Load: PER CBC SECTION 1004 Fire Sprinkler: YES Special Conditions: CITY OF SAN JUAN CAPISTRANO (I— pc-� JAMES WIATRAK, CBO, CASp Chief Building Official POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE CHIEF BUILDING OFFICIAL THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER 1/3/2024 Permit Number B23-0297 Type BUILDING Subtype SFD -ATTACHED Status FINALED Owner ARROYO CAP II 1 LLC, Site Address 32040 PASEO VIENTA 106 Subdivision AVELINA Zoning Page 1 Plan Review History Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Camilo Jimenez Rnnin Remarks and Notes: 2/2/23 3/20/23 46 Review Group: BUILDING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed BUILDING 4+ PC APPROVED CSG Remarks and Notes: 5/4/22 5/27/22 5/11/22 7 Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF Applied 3/6/2023 LL3 Approved 3/6/2023 LL3 COO - BUS Issued 3/20/2023 LL1 Finaled 12/19/202: KH1 COO - NPDES Expired Remarks and Notes: Applicant LANDSEA CONSTRUCTION LLC COO APPROVED Laura Stokes City State Zip SAN JUAN CAPISTRANO CA 92675 Tract Block Lot No Parcel No 18148 2 TRACT 18148 UNI Construction Type Occupancy Type VB R -3/U Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Camilo Jimenez Rnnin Remarks and Notes: 2/2/23 3/20/23 46 Review Group: BUILDING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed BUILDING 4+ PC APPROVED CSG Remarks and Notes: 5/4/22 5/27/22 5/11/22 7 Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF COO APPROVED Dianna Flores nr.ri ipnniry Remarks and Notes: COO - BUS COO APPROVED Jocelyne Mejia i it-FnicF Remarks and Notes: COO - NPDES COO APPROVED Noreen Swiontek Remarks and Notes: COO - PLANNING - COO APPROVED Laura Stokes Nni icrni� Remarks and Notes: PERMIT REVIEWS Report By: 12/5/23 1/3/24 29 12/5123 12/14/23 12/6/23 1 -- --------- 12/5/23 12/14/23 12/18/23 13 12/5/23 12/14/23 12/12/23 7 tom! C: L- COO -PLANNING- COO APPROVED PLANNING 12/5/23 12/14/23 12/18/23 13 PRn I NAAN Remarks and Notes: (12/18/2023 7:55 AM LS) Emailed request for Landscape Architect's Confirmation Letter 12/12/23. Recieved Landscape Architect's Confirmation Letter 12/18/23. COO - PUB WRKS COO APPROVED James Prather 12/5/23 12/14/23 12/5/23 D rnn1 Inlcp Remarks and Notes: COO - SMWD COO APPROVED SMWD 12/5/23 12/14/23 12/19/23 14 Remarks and Notes: COO - UTILITIES COO APPROVED Dianna Flores 12/5/23 12/14/23 1218/23 3 RFIFARFC Remarks and Notes: COO -BLDG COO APPROVED Kevin Hughes 12/5/23 12/19/23 14 rRAnwr/Rnnln Remarks and Notes: COO -OCFA - COO APPROVED Kevin Hughes 12/5/23 12/19/23 14 r-nnAnnn:.In)nnl 11 Remarks and Notes: Review Group: PLANNING Review Type Status Reviewer PLANNING 2nd PC APPROVED Laura Stokes Remarks and Notes: PERMIT REVIEWS Report By: REVIEW DATES Sent Due Returned Days Elapsed 3/8/22 5/27/22 3/17/22 9 CITY OF SAN JUAN CAPISTRANO tl,I irN =� BUILDING PERMIT Permit No. B23-0297 ISSUED 03/20/2023 Permit Number B23-0297 DESCRIPTION AVELINA PH 4, 4-PLEX. PLAN 3 -END. 1840sf SFR. 422sf ATT GAR. 8 ROOF MOUNTED SOLAR PANELS. 2.8OkW DC SYSTEM. ARCH PC ISSUED BY LL1 B21-1320 SITE APN TRACT 18148 UNIT 106SITE a LOT O �! �' SITE TRACT 18148 EL SITE SUBDIVISION AVELINA r� JOB VALUE $ 209,238 OCCUPANCYTYPE R -3/U PERMIT TYPE. BUILDING F- ! •AI. Pl,"RiN IT AMOUNT BUILDING SF 1,840 NEW RES OCCUPANCY GROUP R-3 115.08 NO STORIES 3 NEW RES OCCUPANCY GROUP U 12.66 NO UNITS I SERVICES 600V OR LESS NOT OVER 200AMPS 33.78 ELECTRICAL ISSUANCE FEE 27.24 JOB ADDRESS: 32040 PASEO VIENTA 106 W ER NAME ARROYO CAP III LLC, PHONE (949) 476-2246 MAILING ADDRESS 18575 JAMBOREE RD CITY,STATE,ZIP IRVINE, CA 92612 Total Electrical 188.76 CONTRACTOR NAME LANDSEA CONSTRUCTION LLC PLUMBING PERMIT AMOUNT 1042287 PLUMBING ISSUANCE FEE 27.24 ST. LIC EXPIRE 07/31/2024 FIXTURE SAND VENTS 173-60 PRONE (949) 379-5289 WATER HEATER INCLUDING VENT 13.62 ADDRESS 660 NEWPORT CENTER DR #300 WATER PIPING SYSTEMS 5.26 CITY, ST, ZIP NEWPORT BEACH, CA 92660 # GAS SYSTEMS 6-81 BUILDING SEWER 27.29 TENANT NAME PHONE # FIRE INSTALL 1 TO 50 66.44 MAILING ADDR CITY, ST, ZIP MECHANICAL PERMIT AMOUNT MOBILE ROME PERMIT AMOUNT DUCT INSTALL/REPLACE/RELOC 168.63 APPLIANCE VENTS 8.03 VENTS AND EXHAUST HOOD/DUCTS . 11.79- AC/BOILER/COMPR<3HPAND IOOK BTU 16.28 EXHAUST FAN W/ SINGLE DUCT 42.00 Total Mobile Home FURNACE FORCED AIR OR GRAVITY UP TO I OOK 16.39 MECHANICAL ISSUANCE FEES 27.24 I have carefully examined the completed permit application and do hereby certify under penalty of perjury that all information hereon including the declarations are true and correct and I further Total Mechanical 290.36 certify and agree if a permit is issued: to comply with all City, County, and State taws governing :xpinition:: Every permit issued shall become invalid unless the work on the site authorized b3 building construction, whether specified herein or not- 1 also agree to save, indemnify and keep harmless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses ueh permit is commenced within 12 months after its issuance, or if the work authorized on the which may in any way accrue against : 'd City in consequence of the graminy of this pcttn it ite by such permit is suspended or abandoned for a period of 180 days after the time the work Owner/Contractor iLYWy� Y &1(110011) ommenced. An OSHA permit is required for excavations over 5'0" deep and demolition or constriction of Print Name AzWe structures over 3 stories in height, licant's signature I wo, Contractor: I hereby affirm that 1 rn licensed under provisions of Cbepter'r of Division 3 of the Business and Professions Code, and my license is in full force and effect, _ 0 -ner/guilder. 1, as owner of (he prope,ty, or my employees with wages as Iheii sole compensation, will do the work and the structure is not intended or ofkred for sale (Sec 7044, Business and Professions Code: the Contractor's License Laws does not apply In and owner of property whn builds or improves thereon, who does such work himself or through his employees, provided that such improvements are not intended or offered for sale- If however, the building or imps ovement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or imps ovc for the purpose of sale) _ OwnerlBuilden ],as owner of the ptoperty, am exclusively conmtcling with licensed contractors to construct the project (Sec 7044, Business and Professions Code: The Con actor's License Law does not ap t owner of property who builds or improves thereon and who contracts for such projects with a contractor's) license pursuant to the Conti actors License Law. (yN)Afotkct"Cnrnmn-o6a I hcraby of irn under penalty of perjury one of the following declarations:l have and will maintain workers' compensation insurance, as required by Section 3700 of IIs -nice- for the performance of the work for which this permit is issued My workers' compensation insurance carrier and policy number arc- Carrier STARR INDEMNITY & LIABILITY COMPANY Policyg100000.1704 (This section needs to be completed if the permit is for one hundred dollars(S100) or less) F' -c rpt tion' 1 certify that in the perfonuance of the work for which this permit is issued, 1 shall not employ any person in any manner so as to become subject to the workers` compensation laws of California and agree That if 1 should become subject to the workers' compensation provisions of Seclion 3700 of the Labor Code, I shall Lxthw ith comply with those provisions Mw Applicant N\'ARNING:F,\ILURE TO SECURE NVORKERS'CO\IPENS:kT[ON COVERAGE IS UNLAWFUL, AND SUALT. SUBJECT AN E\IPLOI'ER TI CRIMINAL PENALTIES AND CIVIL F W ES UP TO ONE HUNDRED 'I HODS DAND DOLL RSCS 100,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE. INTEREST, ANDATTORNEY'S FEES CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT FEES Date 1 Permit No. 1411-0107 Applicant I_,1NDSFA CONSTRUCTION Ll C Phone/E-Mail /9.}91379.5289 Account # Type Cost 01-44221 Building Permit 1,786.52 01-44223 Mechanical $ 290.36 01-44224 Plumbing 320.26 01-44225 Electrical 188.76 01-44221 Mobile Home Permit $ 0.00 01-44222 Grading Permit Fee $ 0.00 01-44231 Grading Plan Check $ 0.00 01-44222 On -Site Residential Permit $ 0.00 01-44231 On -Site Residential Plan Check $ 0.00 Subtotal $ 2,585.90 01-44230 Bond Processing $ 0.00 01-44230 Building Plan Check S 0.00 01-44230 Additional Plan Check Digital Record Fee ($1.00 per sheet) S $ 0.00 34.20 01-44230 01-44221 01-44221 C & D Administrative Fee S 92.74 Special Inspection -Reinspection $ 0.00 01-44222 On -Site Commercial/Tract Permit Fee $ 0.00 01.44231 On -Site Commercial/Tract Plan Check Fee S 0.00 01-44214 Geotechnical Soils Plan Review $ 0.00 10-44320 Ordinance 211 $ 50.00 10-42510 Ordinance 364 $ 2,092.38 01.45354 Copies @.20 Each S 0.00 90-23331 SMIP Fee $ 27.20 33-44370 H.O.P.E. Fee (Housing in Lieu) $ 0.00 Other Fees S 6,687.90 CA Fees ate eceived A Approval 7a—te eceived chool Fees Date Received Engineering Fees Date Received Water Division Fees Date Received 01-44221 Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check)) S 351.86 01-44221 Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check) S 0.00 01-44240 NPDES Permit Fee (10% Permit Subtotal) $ 258.59 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type $ 2,092.38 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO $ 14.273.15 Receipt # 94074 Date: 3/20/2023 Cashier: BOARD OF DIRECTORS LAURA FREESE CHARLES T. GIBSON SAUNDRA F. JACOBS BETTY H. OLSON, PH.D FRANK URY DANIEL R. FERONS GENERAL MANAGER December 15, 2023 City of San Juan Capistrano Building Division 30448 Rancho Viej o Road, # 110 San Juan Capistrano, CA 92675 Attention: Building Division Santa Maagaaita Waters District Subject: Tract 18148, Avelina Lots 106-109, Building 8, Phase 4 in ID 9 — 32028, 32032, 32036 and 32040 Paseo Vienta The following referenced location(s) may be released as far as the District is concerned effective December 14, 2023. Developer: LandSea Homes This release does not constitute authorization for you to release the water and sewer bonds for the subject lots. This authorization will be a Resolution of the Board of Directors of the Santa Margarita Water District. When the water and sewer facilities are formally accepted by the Board, they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded to you. Should you have any questions please contact me at (949) 459-6504. Sincerely, SANTA MARGARITA WATER DISTRICT Patricia Butler, P.E. Chief Engineer cc: Tony Gaetano, Inspector Elena Wilson/email Irma Lopez/email Mona Boers -Kort /email Renee Chinchilla/email Steve Skeffington/email Larry Jeffery/email File S\EnglTract Occupancy Release Letters Santa Margarita Water District • 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688 www.SMWD.com 0 (949) 459-6420 SOUTHWEST Irr,(si•rti�rtl ,� �I•r.��tin;_.. I)tt_ December 8, 2023 Building Official City of San Juan Capistrano Department of Building & Safety 32400 Paseo Adelanto San Juan Capistrano, CA 92675 r Z! J,1. A6AkLAkAL,&A►ALriALALAALALi SPECIAL INSPECTOR'S FINAL REPORT Project Name: Avelina - Phase 4, Building 8 Address: Tract #18148, San Juan Capistrano Owner: Landsea Homes Lot# Address Permit# 106 31963 Paseo Viente 823-0297 107 32040 Paseo Viente B23-0298 108 32032 Paseo Viente 623-0299 109 32028 Paseo Viente B23-0300 House meter 32028 Paseo Viente B23-0310 i;!, ,i. U \I;!)(, t I i1, I'n INlit. This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection on the above-mentioned project at the above address, which required continuous inspection per section 1701 of The California Building Code. Jason Sharobeem Post Tensioned Concrete, Reinforced Concrete, ICC #9662561 Manwel Michael - Reinforced Concrete, ICC #97214165 Justin Parrish - Shear Nailing, Wood Framing, DIA/Epoxy, ICC #1134401 Based upon special inspection and materials testing written reports of this work, it is our judgment that the inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and applicable workmanship provision of the California Building Code. Sincerely, re W10N ` Cpq m . ar EXP. 3-31-25 It y► In � .��£i Steven L. Godbey Ian R. �dl,-•i'i". President Principal Engineer SLG/IRW: spg For inspection and testing _only, no_design responsibility expressed or implied. LOO G®otechnical, Inc. December 6, 2023 Ms. Shannon Whittaker Landsea Homes 7525 Irvine Center Drive, Suite 200 Irvine, CA 92618 Project No. 20266-01 Subject. Geotechnical Release from Post -Grading, Phase 4, Building 1, Units 44 through 47, Building 8, Units 106 through 109, and Building 11, Units 110 through 114, "Avelina" Residential Developmen4 Tract 18148, Southwest Corner of Calle Arroyo and Paseo Tirador, City of San Juan Capistrano, California In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Phase 4, Building 1, Units 44 through 47; Building 8, Units 106 through 109; and Building 11, Units 110 through 114 of the "Avelina" residential development, Tract 18148, located in the city of San Juan Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-call observation and field density testing of postgrading operations in order to form an opinion of site earthwork. In general, postgrading operations observed and/or tested by LGC Geotechnical included interior plumbing backfill, foundation footing excavations, utility house connection backfill, and subgrade preparation. Refer to table below for lots and associated addresses. Pastyrading Release Lot Summary - Avelino Building No. Unit No. Address Permit No. B23-0293 1 44 31963 Via Refrescar 1 45 31967 Via Refrescar B23-0294 1 46 31971 Via Refrescar B23-0295 1 47 31975 Via Refrescar B23-0296 1 HM 31963 Via Refrescar B23-0309 8 �~ 106 31963 Paseo Vienta B23-0297 8 107 32040 Paseo Vienta B23-0298 8 108 32032 Paseo Vienta B23-0299 8 109 32028 Paseo Vienta B23-0300 8 HM 32028 Paseo Vienta B23-0310 Building No. Unit No. Address Permit No. 11 110 32037 Paseo Vienta B23-0301 11 111 32041 Paseo Vienta B23-0302 11 112 32045 Paseo Vienta B23-0303 11 113 32049 Paseo Vienta B23-0304 11 114 32053 Paseo Vienta B23-0305 11 HM 32053 Paseo Vienta B23-0305 Based on the results of our observation and testing, it is our opinion that the subject site earthwork operations were completed in general accordance with project geotechnical recommendations. This letter serves as a geotechnical release from postgrading operations for the subject lots at the "Avelina" residential development. In our opinion, the subject building pads are suitable for their intended use from a geotechnical perspective. Closure Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. Should you have any questions regarding this letter, please do not hesitate to contact our office. We appreciate this opportunity to be of service. Respectfully, LGC Geotechnical, Inc. No. 2749 ] 11 Barry Graham, CEG 2749 Project Geologist BPG/RNP/amm Distribution: (1) Addressee (electronic copy) (1) X Engineering and Consulting, Inc. (electronic copy) Attn: Mr. Selwyn Harsono Project No. 20266-01 Page 2 December 6, 2023 LrxinG December 8, 2023 City Engineer City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, California 92675 Subject: Final Grade Certification Tract No. 18148, Lot 2 "Avelina", Buildings 8, 11, 12, 13 & 14 Units 106 through 114 and 121 through 132, (Permit# B21-1365). Dear Sir: Finish grading operations have been completed for Tract No. 18148, Lot 2 "Avelina", Units 106 through 114 and 121 through 132 and have been inspected by the undersigned Professional Land Surveyor. All grading was completed in substantial conformance with the final grading plan approved by the City Engineer and no unauthorized deviations were made. Sincerely. Michael A. Baine, P.L.S. VP - Survey L.D. King, Inc. 975 N. Haven Avenue, Suite 200, Ontario, CA 91764 (909) 945-0526 Fax: (909) 945-0529 PLUh Plumbing Concepts, Inc. 2445 Railroad St. Corona, CA 92880 License No. 469996 Project Name: AVELINA Tract No.18148 Project Location: SAN JUAN CAPISTRANO ATTN: LANDSEA HOMES RE: Sewer Camera PH-BLD-II—BLD-8 BLD 11---110-111-112-113-114 BLD 8-106-107-108-109 To Whom it may concern, 12-12-23 Please allow this letter to serve as confirmation that the above referenced project had the sewer lines video inspected, and they have been found to be free and clear of debris. If you have any questions, please feel free to contact us. Yours truly, ,I '�f A' Doug Moore Director of Quality Assurance landscape architecture / land planning December 15, 2023 Shannon Whittaker Landsea Homes 7525 Irvine Center Drive Suite 200 Irvine, CA 92618 RE: Conformance Letter Tirador, Tract 18148 Avelina Phase 4 —Building 8 (Units #106 through #109) and Building 11 (Units 110 through 114) This letter is to certify that all items for the phase mentioned above has been completed to the satisfaction of the landscape architect. I declare in my professional opinion and to the best of my knowledge, available information, and belief. That the landscape plans for the above -referenced project have been completed within the intent of the project and in accordance with the City of San Juan Capistrano approved plans and specifications. This conformance letter applies only to plant locations and quantities. SJA Inc. was not present for the installation or observation of the irrigation system. SJA Inc. cannot certify conformance of below grade materials, installation techniques, or irrigation pipe sizing. Please do not hesitate to call my office if you should have any questions. I f� Sincerely. �,l�ID84p •,{ �r • 1. 5111]��1 37. Denny Smitl gall ,k s t' F: Principal at.so.2q � 7859 Sitio Coco, Carlsbad Califomia 92009 1 TEL 949.276.6500 1 FAX 949.276.6506 1 WWW-SJAINC.COM