B23-0297 - 32040 PASEO VIENTA 10630448 Rancho Viejo Road, Suite 110
San Juan Capistrano, CA 92675
(949) 493-1171
(949) 493-1053 Fax
www.SanJuanCapistrano.org
January 03, 2023
Owner:
ARROYO CAP II 1 LLC
18575 JAMBOREE RD #350
IRVINE, CA 92612
MEMBERS OF THE CITY COUNCIL:
CERTIFICATE OF USE & OCCUPANCY
Troy Bourne
John Campbell
Sergio Farias
Howard Hart
John Taylor
HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT
TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND
APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY
CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY
CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING:
Permit Number:
Building Address:
Tract:
Lot:
B23-0297
32040 PASEO VIENTA
18148
2
Unit:
106
Building Use:
(1840sf SINGLE FAMILY DWELLING w/ (422sf ATTACHED
GARAGE
Occupancy Classification:
R -3/U
Type of Construction:
VB
Occupant Load:
PER CBC SECTION 1004
Fire Sprinkler:
YES
Special Conditions:
CITY OF SAN JUAN CAPISTRANO
(I— pc-�
JAMES WIATRAK, CBO, CASp
Chief Building Official
POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE
CHIEF BUILDING OFFICIAL
THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER
1/3/2024
Permit Number B23-0297
Type BUILDING
Subtype SFD -ATTACHED
Status FINALED
Owner ARROYO CAP II 1 LLC,
Site Address
32040 PASEO VIENTA 106
Subdivision
AVELINA
Zoning
Page 1
Plan Review History
Review Group: ALL REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
C & D RECYCLING PC APPROVED Camilo Jimenez
Rnnin
Remarks and Notes:
2/2/23 3/20/23 46
Review Group: BUILDING REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
BUILDING 4+ PC APPROVED CSG
Remarks and Notes:
5/4/22 5/27/22 5/11/22 7
Review Group: COO REVIEWS REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
CERTIFICATE OF
Applied 3/6/2023
LL3
Approved 3/6/2023
LL3
COO - BUS
Issued 3/20/2023
LL1
Finaled 12/19/202:
KH1
COO - NPDES
Expired
Remarks and Notes:
Applicant LANDSEA CONSTRUCTION LLC
COO APPROVED Laura Stokes
City
State Zip
SAN JUAN CAPISTRANO CA 92675
Tract
Block Lot No Parcel No
18148
2 TRACT 18148 UNI
Construction Type
Occupancy Type
VB
R -3/U
Review Group: ALL REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
C & D RECYCLING PC APPROVED Camilo Jimenez
Rnnin
Remarks and Notes:
2/2/23 3/20/23 46
Review Group: BUILDING REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
BUILDING 4+ PC APPROVED CSG
Remarks and Notes:
5/4/22 5/27/22 5/11/22 7
Review Group: COO REVIEWS REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
CERTIFICATE OF
COO APPROVED Dianna Flores
nr.ri ipnniry
Remarks and Notes:
COO - BUS
COO APPROVED Jocelyne Mejia
i it-FnicF
Remarks and Notes:
COO - NPDES
COO APPROVED Noreen Swiontek
Remarks and Notes:
COO - PLANNING -
COO APPROVED Laura Stokes
Nni icrni�
Remarks and Notes:
PERMIT REVIEWS
Report By:
12/5/23 1/3/24 29
12/5123 12/14/23 12/6/23 1
-- ---------
12/5/23 12/14/23 12/18/23 13
12/5/23 12/14/23 12/12/23 7
tom! C: L-
COO -PLANNING-
COO APPROVED PLANNING
12/5/23
12/14/23
12/18/23
13
PRn I NAAN
Remarks and Notes: (12/18/2023 7:55 AM LS)
Emailed request for Landscape Architect's Confirmation Letter 12/12/23.
Recieved Landscape Architect's Confirmation Letter
12/18/23.
COO - PUB WRKS
COO APPROVED James Prather
12/5/23
12/14/23
12/5/23
D
rnn1 Inlcp
Remarks and Notes:
COO - SMWD
COO APPROVED SMWD
12/5/23
12/14/23
12/19/23
14
Remarks and Notes:
COO - UTILITIES
COO APPROVED Dianna Flores
12/5/23
12/14/23
1218/23
3
RFIFARFC
Remarks and Notes:
COO -BLDG
COO APPROVED Kevin Hughes
12/5/23
12/19/23
14
rRAnwr/Rnnln
Remarks and Notes:
COO -OCFA -
COO APPROVED Kevin Hughes
12/5/23
12/19/23
14
r-nnAnnn:.In)nnl 11
Remarks and Notes:
Review Group: PLANNING
Review Type Status Reviewer
PLANNING 2nd PC APPROVED Laura Stokes
Remarks and Notes:
PERMIT REVIEWS
Report By:
REVIEW DATES
Sent Due Returned Days Elapsed
3/8/22 5/27/22 3/17/22 9
CITY OF SAN JUAN CAPISTRANO
tl,I irN
=� BUILDING PERMIT
Permit No. B23-0297
ISSUED
03/20/2023
Permit Number B23-0297
DESCRIPTION
AVELINA PH 4, 4-PLEX. PLAN 3 -END. 1840sf SFR. 422sf ATT GAR.
8 ROOF MOUNTED SOLAR PANELS. 2.8OkW DC SYSTEM. ARCH PC
ISSUED BY LL1
B21-1320
SITE APN TRACT 18148 UNIT 106SITE
a
LOT O
�! �'
SITE TRACT 18148 EL
SITE SUBDIVISION AVELINA
r�
JOB VALUE $ 209,238
OCCUPANCYTYPE R -3/U
PERMIT TYPE. BUILDING
F- ! •AI. Pl,"RiN IT AMOUNT
BUILDING SF 1,840
NEW RES OCCUPANCY GROUP R-3 115.08
NO STORIES 3
NEW RES OCCUPANCY GROUP U 12.66
NO UNITS I
SERVICES 600V OR LESS NOT OVER 200AMPS 33.78
ELECTRICAL ISSUANCE FEE 27.24
JOB ADDRESS: 32040 PASEO VIENTA 106
W ER NAME ARROYO CAP III LLC,
PHONE (949) 476-2246
MAILING ADDRESS 18575 JAMBOREE RD
CITY,STATE,ZIP IRVINE, CA 92612
Total Electrical 188.76
CONTRACTOR NAME LANDSEA CONSTRUCTION LLC
PLUMBING PERMIT AMOUNT
1042287
PLUMBING ISSUANCE FEE 27.24
ST. LIC EXPIRE 07/31/2024
FIXTURE SAND VENTS 173-60
PRONE (949) 379-5289
WATER HEATER INCLUDING VENT 13.62
ADDRESS 660 NEWPORT CENTER DR #300
WATER PIPING SYSTEMS 5.26
CITY, ST, ZIP NEWPORT BEACH, CA 92660
# GAS SYSTEMS 6-81
BUILDING SEWER 27.29
TENANT NAME
PHONE #
FIRE INSTALL 1 TO 50 66.44
MAILING ADDR
CITY, ST, ZIP
MECHANICAL PERMIT AMOUNT
MOBILE ROME PERMIT AMOUNT
DUCT INSTALL/REPLACE/RELOC 168.63
APPLIANCE VENTS 8.03
VENTS AND EXHAUST HOOD/DUCTS . 11.79-
AC/BOILER/COMPR<3HPAND IOOK BTU 16.28
EXHAUST FAN W/ SINGLE DUCT 42.00
Total Mobile Home
FURNACE FORCED AIR OR GRAVITY UP TO I OOK 16.39
MECHANICAL ISSUANCE FEES 27.24
I have carefully examined the completed permit application and do hereby certify under penalty of
perjury that all information hereon including the declarations are true and correct and I further
Total Mechanical 290.36
certify and agree if a permit is issued: to comply with all City, County, and State taws governing
:xpinition:: Every permit issued shall become invalid unless the work on the site authorized b3
building construction, whether specified herein or not- 1 also agree to save, indemnify and keep
harmless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses
ueh permit is commenced within 12 months after its issuance, or if the work authorized on the
which may in any way accrue against : 'd City in consequence of the graminy of this pcttn it
ite by such permit is suspended or abandoned for a period of 180 days after the time the work
Owner/Contractor iLYWy� Y &1(110011)
ommenced.
An OSHA permit is required for excavations over 5'0" deep and demolition or constriction of
Print Name
AzWe
structures over 3 stories in height,
licant's signature I wo,
Contractor: I hereby affirm that 1 rn licensed under provisions of Cbepter'r of Division 3 of the Business and Professions Code, and my license is in full force and effect,
_ 0 -ner/guilder. 1, as owner of (he prope,ty, or my employees with wages as Iheii sole compensation, will do the work and the structure is not intended or ofkred for sale (Sec 7044, Business and Professions
Code: the Contractor's License Laws does not apply In and owner of property whn builds or improves thereon, who does such work himself or through his employees, provided that such improvements are not
intended or offered for sale- If however, the building or imps ovement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or imps ovc for the purpose of sale)
_ OwnerlBuilden ],as owner of the ptoperty, am exclusively conmtcling with licensed contractors to construct the project (Sec 7044, Business and Professions Code: The Con actor's License Law does not
ap t owner of property who builds or improves thereon and who contracts for such projects with a contractor's) license pursuant to the Conti actors License Law.
(yN)Afotkct"Cnrnmn-o6a I hcraby of irn under penalty of perjury one of the following declarations:l have and will maintain workers' compensation insurance, as required by Section 3700 of IIs
-nice- for the performance of the work for which this permit is issued My workers' compensation insurance carrier and policy number arc- Carrier STARR INDEMNITY & LIABILITY
COMPANY Policyg100000.1704 (This section needs to be completed if the permit is for one hundred dollars(S100) or less)
F' -c rpt tion' 1 certify that in the perfonuance of the work for which this permit is issued, 1 shall not employ any person in any manner so as to become subject to the workers` compensation laws of
California and agree That if 1 should become subject to the workers' compensation provisions of Seclion 3700 of the Labor Code, I shall Lxthw ith comply with those provisions
Mw Applicant
N\'ARNING:F,\ILURE TO SECURE NVORKERS'CO\IPENS:kT[ON COVERAGE IS UNLAWFUL, AND SUALT. SUBJECT AN E\IPLOI'ER TI CRIMINAL PENALTIES AND CIVIL F W ES UP TO ONE HUNDRED
'I HODS DAND DOLL RSCS 100,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE. INTEREST, ANDATTORNEY'S FEES
CITY OF SAN JUAN CAPISTRANO
BUILDING PERMIT FEES
Date 1
Permit No. 1411-0107
Applicant I_,1NDSFA CONSTRUCTION Ll C
Phone/E-Mail /9.}91379.5289
Account #
Type
Cost
01-44221
Building Permit
1,786.52
01-44223
Mechanical
$
290.36
01-44224
Plumbing
320.26
01-44225
Electrical
188.76
01-44221
Mobile Home Permit
$
0.00
01-44222
Grading Permit Fee
$
0.00
01-44231
Grading Plan Check
$
0.00
01-44222
On -Site Residential Permit
$
0.00
01-44231
On -Site Residential Plan Check
$
0.00
Subtotal
$
2,585.90
01-44230
Bond Processing
$
0.00
01-44230
Building Plan Check
S
0.00
01-44230
Additional Plan Check
Digital Record Fee ($1.00 per sheet)
S
$
0.00
34.20
01-44230
01-44221
01-44221
C & D Administrative Fee
S
92.74
Special Inspection -Reinspection $
0.00
01-44222
On -Site Commercial/Tract Permit Fee
$
0.00
01.44231
On -Site Commercial/Tract Plan Check Fee
S
0.00
01-44214
Geotechnical Soils Plan Review
$
0.00
10-44320
Ordinance 211
$
50.00
10-42510
Ordinance 364
$
2,092.38
01.45354
Copies @.20 Each
S
0.00
90-23331
SMIP Fee
$
27.20
33-44370
H.O.P.E. Fee (Housing in Lieu)
$
0.00
Other Fees
S
6,687.90
CA Fees
ate eceived
A Approval
7a—te eceived
chool Fees
Date Received
Engineering Fees
Date Received
Water Division Fees
Date Received
01-44221
Title 24 Energy Provision (20% Permit Subtotal & Bldg
Plan Check))
S
351.86
01-44221
Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check)
S
0.00
01-44240
NPDES Permit Fee (10% Permit Subtotal)
$
258.59
90-23000
Refundable Bond/Deposit Posted by Owner
Contractor Type
$
2,092.38
90-23000
Refundable Bond/Deposit Posted by Owner
Contractor Type
TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO
$
14.273.15
Receipt # 94074 Date: 3/20/2023 Cashier:
BOARD OF DIRECTORS
LAURA FREESE
CHARLES T. GIBSON
SAUNDRA F. JACOBS
BETTY H. OLSON, PH.D
FRANK URY
DANIEL R. FERONS
GENERAL MANAGER
December 15, 2023
City of San Juan Capistrano
Building Division
30448 Rancho Viej o Road, # 110
San Juan Capistrano, CA 92675
Attention: Building Division
Santa Maagaaita Waters District
Subject: Tract 18148, Avelina Lots 106-109, Building 8, Phase 4 in ID 9 — 32028, 32032,
32036 and 32040 Paseo Vienta
The following referenced location(s) may be released as far as the District is concerned effective
December 14, 2023.
Developer: LandSea Homes
This release does not constitute authorization for you to release the water and sewer bonds for the
subject lots. This authorization will be a Resolution of the Board of Directors of the Santa
Margarita Water District. When the water and sewer facilities are formally accepted by the Board,
they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded
to you.
Should you have any questions please contact me at (949) 459-6504.
Sincerely,
SANTA MARGARITA WATER DISTRICT
Patricia Butler, P.E.
Chief Engineer
cc: Tony Gaetano, Inspector
Elena Wilson/email
Irma Lopez/email
Mona Boers -Kort /email
Renee Chinchilla/email
Steve Skeffington/email
Larry Jeffery/email
File S\EnglTract Occupancy Release Letters
Santa Margarita Water District • 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688
www.SMWD.com 0 (949) 459-6420
SOUTHWEST
Irr,(si•rti�rtl ,� �I•r.��tin;_.. I)tt_
December 8, 2023
Building Official
City of San Juan Capistrano
Department of Building & Safety
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
r Z! J,1.
A6AkLAkAL,&A►ALriALALAALALi
SPECIAL INSPECTOR'S FINAL REPORT
Project Name: Avelina - Phase 4, Building 8
Address: Tract #18148, San Juan Capistrano
Owner: Landsea Homes
Lot#
Address
Permit#
106
31963 Paseo Viente
823-0297
107
32040 Paseo Viente
B23-0298
108
32032 Paseo Viente
623-0299
109
32028 Paseo Viente
B23-0300
House meter
32028 Paseo Viente
B23-0310
i;!, ,i. U \I;!)(, t I
i1, I'n INlit.
This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special
inspection on the above-mentioned project at the above address, which required continuous
inspection per section 1701 of The California Building Code.
Jason Sharobeem Post Tensioned Concrete, Reinforced Concrete, ICC #9662561
Manwel Michael - Reinforced Concrete, ICC #97214165
Justin Parrish - Shear Nailing, Wood Framing, DIA/Epoxy, ICC #1134401
Based upon special inspection and materials testing written reports of this work, it is our judgment
that the inspected work was performed to the best of our knowledge, in accordance with the
approved plans, specifications and applicable workmanship provision of the California Building Code.
Sincerely, re W10N `
Cpq m
. ar
EXP. 3-31-25 It
y► In � .��£i
Steven L. Godbey Ian R. �dl,-•i'i".
President Principal Engineer
SLG/IRW: spg For inspection and testing _only, no_design
responsibility expressed or implied.
LOO
G®otechnical, Inc.
December 6, 2023
Ms. Shannon Whittaker
Landsea Homes
7525 Irvine Center Drive, Suite 200
Irvine, CA 92618
Project No. 20266-01
Subject. Geotechnical Release from Post -Grading, Phase 4, Building 1, Units 44 through 47,
Building 8, Units 106 through 109, and Building 11, Units 110 through 114, "Avelina"
Residential Developmen4 Tract 18148, Southwest Corner of Calle Arroyo and Paseo
Tirador, City of San Juan Capistrano, California
In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Phase
4, Building 1, Units 44 through 47; Building 8, Units 106 through 109; and Building 11, Units 110 through
114 of the "Avelina" residential development, Tract 18148, located in the city of San Juan Capistrano,
California. LGC Geotechnical field personnel have provided part-time, on-call observation and field density
testing of postgrading operations in order to form an opinion of site earthwork. In general, postgrading
operations observed and/or tested by LGC Geotechnical included interior plumbing backfill, foundation
footing excavations, utility house connection backfill, and subgrade preparation. Refer to table below for
lots and associated addresses.
Pastyrading Release Lot Summary - Avelino
Building No.
Unit No.
Address
Permit No.
B23-0293
1
44
31963 Via Refrescar
1
45
31967 Via Refrescar
B23-0294
1
46
31971 Via Refrescar
B23-0295
1
47
31975 Via Refrescar
B23-0296
1
HM
31963 Via Refrescar
B23-0309
8 �~
106
31963 Paseo Vienta
B23-0297
8
107
32040 Paseo Vienta
B23-0298
8
108
32032 Paseo Vienta
B23-0299
8
109
32028 Paseo Vienta
B23-0300
8
HM
32028 Paseo Vienta
B23-0310
Building No.
Unit No.
Address
Permit No.
11
110
32037 Paseo Vienta
B23-0301
11
111
32041 Paseo Vienta
B23-0302
11
112
32045 Paseo Vienta
B23-0303
11
113
32049 Paseo Vienta
B23-0304
11
114
32053 Paseo Vienta
B23-0305
11
HM
32053 Paseo Vienta
B23-0305
Based on the results of our observation and testing, it is our opinion that the subject site earthwork
operations were completed in general accordance with project geotechnical recommendations. This letter
serves as a geotechnical release from postgrading operations for the subject lots at the "Avelina"
residential development. In our opinion, the subject building pads are suitable for their intended use from
a geotechnical perspective.
Closure
Our services were performed using the degree of care and skill ordinarily exercised, under similar
circumstances, by reputable engineers and geologists practicing in this or similar localities. No other
warranty, expressed or implied, is made as to the conclusions and professional advice included in this
report.
Should you have any questions regarding this letter, please do not hesitate to contact our office. We
appreciate this opportunity to be of service.
Respectfully,
LGC Geotechnical, Inc.
No. 2749
] 11
Barry Graham, CEG 2749
Project Geologist
BPG/RNP/amm
Distribution: (1) Addressee (electronic copy)
(1) X Engineering and Consulting, Inc. (electronic copy)
Attn: Mr. Selwyn Harsono
Project No. 20266-01 Page 2 December 6, 2023
LrxinG
December 8, 2023
City Engineer
City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, California 92675
Subject: Final Grade Certification Tract No. 18148, Lot 2 "Avelina", Buildings 8, 11, 12, 13 & 14
Units 106 through 114 and 121 through 132, (Permit# B21-1365).
Dear Sir:
Finish grading operations have been completed for Tract No. 18148, Lot 2 "Avelina", Units 106
through 114 and 121 through 132 and have been inspected by the undersigned Professional Land
Surveyor.
All grading was completed in substantial conformance with the final grading plan approved by the
City Engineer and no unauthorized deviations were made.
Sincerely.
Michael A. Baine, P.L.S.
VP - Survey
L.D. King, Inc. 975 N. Haven Avenue, Suite 200, Ontario, CA 91764 (909) 945-0526 Fax: (909) 945-0529
PLUh
Plumbing Concepts, Inc.
2445 Railroad St.
Corona, CA 92880
License No. 469996
Project Name: AVELINA
Tract No.18148
Project Location: SAN JUAN CAPISTRANO
ATTN: LANDSEA HOMES
RE: Sewer Camera PH-BLD-II—BLD-8
BLD 11---110-111-112-113-114
BLD 8-106-107-108-109
To Whom it may concern,
12-12-23
Please allow this letter to serve as confirmation that the above referenced project
had the sewer lines video inspected, and they have been found to be free and
clear of debris.
If you have any questions, please feel free to contact us.
Yours truly,
,I '�f A'
Doug Moore
Director of Quality Assurance
landscape architecture / land planning
December 15, 2023
Shannon Whittaker
Landsea Homes
7525 Irvine Center Drive
Suite 200
Irvine, CA 92618
RE: Conformance Letter
Tirador, Tract 18148
Avelina Phase 4 —Building 8 (Units #106 through #109) and Building 11 (Units 110
through 114)
This letter is to certify that all items for the phase mentioned above has been completed to the
satisfaction of the landscape architect. I declare in my professional opinion and to the best of my
knowledge, available information, and belief. That the landscape plans for the above -referenced
project have been completed within the intent of the project and in accordance with the City of San
Juan Capistrano approved plans and specifications.
This conformance letter applies only to plant locations and quantities. SJA Inc. was not present for
the installation or observation of the irrigation system. SJA Inc. cannot certify conformance of below
grade materials, installation techniques, or irrigation pipe sizing.
Please do not hesitate to call my office if you should have any questions.
I
f�
Sincerely. �,l�ID84p
•,{ �r • 1. 5111]��1
37.
Denny Smitl gall ,k s t' F:
Principal
at.so.2q �
7859 Sitio Coco, Carlsbad Califomia 92009 1 TEL 949.276.6500 1 FAX 949.276.6506 1 WWW-SJAINC.COM