B23-0171 - 26103 WAGON DR30448 Rancho Viejo Road, Suite 110
San Juan Capistrano, CA 92675
(949) 493-1171
(949) 493-1053 Fax
www.SanJuanCapistrano.org
November 03, 2023
Owner:
AG ESSENTIAL HOUSING CA 1 LP
8586 E HARTFORD DR #118
SCOTTSDALE, AZ 85256
MEMBERS OF THE CITY COUNCIL:
CERTIFICATE OF USE & OCCUPANCY
Troy Bourne
John Campbell
Sergio Farias
Howard Hart
John Taylor
HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT
TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND
APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY
CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY
CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING:
Permit Number:
B23-0171
Building Address:
26103 WAGON DR
Tract:
19063
Lot:
22
Unit:
Building Use:
(3533sf SINGLE FAMILY DWELLING w/ (486so ATTACHED
GARAGE
Occupancy Classification:
R -3/U
Type of Construction:
VB
Occupant Load:
PER CBC SECTION 1004
Fire Sprinkler:
YES
Special Conditions:
CITY OF SAN JUAN CAPISTRANO
JAMES WIAT AK, CBO, CASp
Chief Building Official
POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE
CHIEF BUILDING OFFICIAL
THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER
11/3/2023 Page 1
Plan Review History
Permit Number B23-0171
Type BUILDING
Subtype SFD DETACHED
Status FINALED
Owner AG ESSENTIAL HOUSING CA 1 LP,
Applied 2/6/2023 LL3
Approved 2/6/2023 LL3
Issued 4/19/2023 DF4
Finaled 10/24/202, WF1
Expired
Applicant LENNAR HOMES OF CALIFORNIA INC
Site Address City State Zip
26103 WAGON DR SAN JUAN CAPISTRANO CA 92675
Subdivision Tract Block Lot No Parcel No
THE FARM -ANDALUSIA 19063 22 TRACT 19063 LOT
Zoning Construction Type Occupancy Type
VB R -3/U
Review Group: ALL REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
C & D RECYCLING PC APPROVED Dianna Flores 4/19/23 4/19/23 0
RnNn
Remarks and Notes:
.. .. .. .. .. .. .. .. ...
Review Group: COO REVIEWS REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
CERTIFICATE OF
COO APPROVED Dianna Flores
nrri iPANrY
5
10/5/23
Remarks and Notes:
COO - BUS
COO APPROVED Jocelyne Mejia
i ir.FNCF
10/12/23
10/3/23
Remarks and Notes:
COO - NPDES
COO APPROVED Noreen Swiontek
10/3/23
Remarks and Notes:
COO - PLANNING -
COO APPROVED Laura Stokes
Nni iciNr
1
-.------.•--------------------------
10/11/23
Remarks and Notes:
COO - PLANNING -
COO APPROVED PLANNING
PRn-I MAN
Remarks and Notes:
----------- ------- --------------------
COO - PUB WRKS
- ----- ---------..
COO APPROVED James Prather
rnN iN¢P
Remarks and Notes:
--------==-------------------------
COO - SMWD
-------- --- -----------
COO APPROVED SMWD
Remarks and Notes:
PERMIT REVIEWS
Report By:
10/18/23
11/3/23 16
10/18/23
10/27/23
10/23/23
5
10/5/23
10/16/23
10/5/23
0
1013/23
10/12/23
10/3/23
--- -----
0
10/3/23
10/12/23
10/3/23
0
10/18/23
10/27/23
10/19/23
1
-.------.•--------------------------
10/11/23
10/20/23
- --- --- --- --- ---
10/11/23
..
0
caw
COO - UTILITIES
.......... ---- --------------
COO APPROVED Dianna Flores 9122123
RFI FA-qFS
Remarks and Notes:
COO -BLDG
-----•--------------............---..
COO APPROVED William Forsythe 10/18/23
rRAnlnlriRnnln
Remarks and Notes:
COO -OCFA -
COO APPROVED William Forsythe 10/18/23
r�nannnnninrnRi 11
Remarks and Notes:
PERMIT REVIEWS
Report By:
------------------------------------------
10/2/23
----------------------------------------
1012/23 9122123 0
10/20/23 2
--------------------------------------
10/20/23 2
IM -SYSTEMS
"':i;';�•� CITY OF SAN JUAN CAPISTRANO
BUILDING PERMIT
Jf�►y
Permit No. B23-0171
ISSUED
04/19/2023
Permit Number B23-0171
DESCRIPTION
ANDALUSIA PH 11. PLAN 3A. 3533sf SFR w/ 486sfATT GARAGE.
ARCH PC = B21-0315
ISSUED BY DF4
PRECISE GRADE PC = B2I-0313
SITE APN TRACT 19063 LOT 22
SITE LOT NO 22
SITE TRACT 19063
SITE SUBDIVISION THE FARM ANDALUSIA
JOB VALUE $ 461,339
OCCUPANCY TYPE R -3/U y
PERMIT TYPE. BUILDING
ELECTRICAL PERMIT
BUILDING SF 3,533
NEW RES OCCUPANCY GROUP R-3 230.94
NO STORIES 2
NEW RES OCCUPANCY GROUP U 14.58
NO UNITS I
SERVICES 600V OR LESS NOT OVER 200ANTS 33.78
ELECTRICAL ISSUANCE FEE 27.24
JOB ADDRESS: 26103 WAGON DR
OWNER NAME AG ESSENTIAL HOUSING CA 1 LP,
PHONE
MAILING ADDRESS 8585 E HARTFORD DR
CITY,STATE,ZIP SCOTTSDALE, AZ 85255
Total Electrical 306.54
CONTRACTOR NAME LENNAR HOMES OF CALIFORNIA INC
PLUMBING PERMIT AMOUNT
728102
PLUMBING ISSUANCE FEE 27.24
ST. LIC EXPIRE 09/30/2022
FIXTURES AND VENTS 184.45
PHONE (949) 789-1600
WATER HEATER INCLUDING VENT 13.62
ADDRESS 15131 ALTON PKWY#345
WATER PiPiNG SYSTEMS 5.26
CITY, ST, ZIP IRVINE, CA 92618
# GAS SYSTEMS 8.03
BUILDING SEWER 27.29
TENANT NAME
PHONE #
FIRE INSTALL I TO 50 66.44
MAILING ADDR
CITY, ST, ZIP
MECHANICAL PERMIT AMOUNT
MOBILE HOME PERMIT AMOUNT
DUCT INSTALL/REPLACE/RELOC 136.51
APPLIANCE VENTS 8.03
VENTS AND EXHAUST HOOD/DUCTS 11.79
AC/BOILER/COMPR<3HPAND 100K BTU 32.56
EXHAUST FAN W/ SINGLE DUCT 42.00
Total Mobile Home
FURNACE FORCED AIR OR GRAVITY UP TO I00K 32.78
FIREPLACE VENTS AND EXHAUST 11.79
1 have carefully examined the completed permit application and do hereby certify under penalty of
perjury that all information hereon including the declarations are true and correct and I further
MECHANICAL ISSUANCE FEES 2724
certify and agree if a permit is issued: to comply with all City, County, and State laws governing
:xpiration-.: Every permit issued shall become invalid unless the work on the site authorized b1
building construction, whetter specified herein or not. I also agree to save, indemnify and keep
harmless the City of San.Tuan Capistrano against all liabilities, judgment; costs and expenses
uch permit is commenced within 12 months after its issuance, or if the work authorized on the
which may in anyway accrue against said City It consequence of the br. oras of this permit.
ite by such permit is suspended or abandoned for a period of 180 days after the time the work
ommcnced.
Owner/Contractor n ,
Print Name
An OSHA permit is required for excavations over 5'0" deep and demolition or construction of
strictures over 3 stories in height
Applicant's signature
Contractor: I hereby affirm Ijrat rcensed under provisions of Chapter 9 of Division 3 of the Business and Professions Code, and my license is in full force and effect
_ OwnerBuilder: 1, as owner of the property, or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (See 7044, Business and Professions
Code: the Contractor's License Laws does not apply to and owner of property who builds of improves thereon, who does such work himself or through his employees, provided that such improvements ai a not
intended or offered for Sale If however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale)
Own er[Bullder. ],as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec 7044, Business and Professions Code: The Contractor's License Law does not
apply loan owner of property who builds or improves thereon and who contracts for such projects with a contractor's) license pursuant to the Conti actors License Law.
?,{'urLera f'omnen iniinn-T hereby affirm under penalty of perjury one of the following declarations:) have and will maintain workers' compensation insurance, as required by Section 3700aftho
i.ahnr Code, for the performance of the work for which this permit is issued My workers' compensation insurance carrier and policy number are: Camer_O1.r7 REPUBLIC INSURA1 C -L- COMPANY
Policy.OMWC31414821 CChis section needs to be completed if the permit is for one Hundred dollars(SI00) or less)
E dem.. tlllow ) certify that in the performance of the work for which this pernit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of
California and agree that if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.
uta Applicant
WARNrNG:FAILURE TO SECURE WORKERS'COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYERTI CRIMINAL PENALTIES AND CI\RLFINES UPTO ONE HUNDRED
THOUSDAND DOLLARS(S 100,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LA13OR CODE, INTEREST. AND ATTORNEY'S FEES
CITY OF SAN JUAN CAPISTRANO
BUILDING PERMIT FEES
FLU -0 171
r — rnrInI Aro r.r IT T1
Phone/E-Mai
Account #
Type
Cost
01-44221
Building Permit
a
3,296.00
01-44223
Mechanical
$
302.70
01-44224
Plumbing
$
332.33
01144225
Electrical
$
306.54
01-44221
Mobile Home Permit
$
0.00
01-44222
Grading Permit Fee
$
0.00
01-44231
Grading Plan Check
$
0.00
01134222
On -Site Residential Permit
$
0.00
01-44231
On -Site Residential Plan Check
$
0.00
Subtotal
$
4.237.57
01-44230
Bond Processing
$
0.00
01-44230
Building Plan Check
$
0.00
01-44230
Additional Plan Check
$
0.00
01-44230
Digital Record Fee ($1.00 per sheet)
$
34.20
01144221
C & D Administrative Fee
$
92.74
01-44221
Special Inspection -Reinspection
$
0.00
01144222
On -Site Commercial/Tract Permit Fee
$
0.00
0144231
On -Site Commercial/Tract Plan Check Fee
$
0.00
0144214
Geotechnical Soils Plan Review
$
0.00
10-44320
Ordinance 211
$
50.00
1042510
Ordinance 364
$
4,613.39
0145354
Copies @ .20 Each
$
0.00
90-23331
SMIP Fee
$
59.97
3344370
H.O.P.E. Fee (Housing in Lieu)
$
0.00
Other Fees
I
$
8,650.65
TCA Fees
Date Received
HOA Approval
ate Received
chool Fees
Date Received
ngineering Fees
Date Received
Water Division Fees Date Received
01-44221
Title 24 Energy Provision (20% Permit Subtotal & Bldg
Plan Check))
$
0.00
01-44221
Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check)
$
0.00
01144240
NPDES Permit Fee (10% Permit Subtotal)
$
423.76
90-23000
Refundable Bond/Deposit Posted by Owner
Contractor Type
$
4,613.39
90-23000
Refundable Bond/Deposit Posted by Owner Contractor Type
TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO
$
22,775.67
Receipt # 94453 Date: 4/19/2023 Cashier:
City of San Juan Capistrano
Development Services Department
Building and Safety Division
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Phone: (949) 443-6347
Website: www.sanjuancapistrano.org
Project: Andalusia at The Farm
Structural Observation Report Option One J.N: 0121-2496
Arch: WHA -19206
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for
general conformance to the approved construction documents at significant construction stages and at completion of the
structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC
Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC. Phase 11
HS#22
This report includes all construction work through 17th day of _May ;10 23 Report No.: -pi-„moi a Pagp-No.: 1 of 1
Project Address:
Structural Observer of Record (SOR):
Professional Lic./Reg. No..
Phone No. of SOR:
26103 Wagon Dr., San Juan Capistrano, CA 92675
9 P
Option One Consulting Engineers
Ilia B. Sarad, PE, SE, SECB)
S-3855
714-556-1916
Building Permit No.:
Structural Observer (SO), if not by SOR:
Professional Lic./Reg. No.: Phone No. of SO:
® Fooling, Stem Wall
Erik Torres, E.I.T.
714-556-1916
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box)
FOUNDATIONS
WALLS FRAMES
DIAPHRAGMS
IF PORTION OF BLDG WAS
DATE
(Floor/Roof)
OBSERVED, INDICATE LOCATION
® Fooling, Stem Wall
❑ Concrete
❑ Steel Moment Frame
❑ Concrete
5/17/23
❑ Steel Braced Frame
❑ Steel Deck
P.T. FoundafiOR 536s Lem;
i.e., post -tension cables and
❑ Mat Foundation,
❑ Masonry
Pre -stressed Conc. Slab
❑ Concrete Moment
❑ Wood
❑ Caisson, Pile, Grade
❑ Wood Shear Wall
Beam
Panel
Frame
holdown bolts & straps, post
(gl Foundation Pad,
❑ .O_lbec
❑ Mas_omy_W__allFEamet
❑ Otber:
bases,slab size/reinforcement
Anchor
❑ Other.
❑ Other:
❑ Other:
❑ Other:
cind rou 119f
size/reinforcement.
❑X ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
NX FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
U OBSERVED DEFICIENCIES AND COMMENTS:
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
declare that the following statements are true to the best of my knowledge:
1. I am the Registered Design Professional retained by the Owner to be in responsible charge of the
structural observation in accordance with the requirements of the City of San Juan Capistrano;
2. I, or another Registered Design Professional whom I have designated above and is under my
responsible charge, has performed the required site visits at each significant construction stage to
verify that the structure is in general conformance with the approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected and a new structural
observation report must be issued clearing these deficiencies; and
4. 1 understand that finalcceptance of the slru ural s s by the Building and Safety Division cannot
occur without the correkjion of all observed dB cies.
SIGNATURE
Form - Structural Observation Report v1.0.doc
Updated: 06-28-17
OF
May 17, 2023
DATE
N0. S 3855
* Exp. 3/31/2024
CT ��A��
9p� OF CAO
STAMP OF STRUCTURAL OBSERVER OF RECORD
Page 1 of 2
City of San Juan Capistrano
Development Services Department
Building and Safety Division
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Phone: (949) 443-6347
Website: www.sanjuancapistrano.org
Project: Andalusia at The Farm
Structural Observation Report optianOne J_N.0121-2438
Arch: WHA -19206
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for
general conformance to the approved construction documents at significant construction stages and at completion of the
structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC
Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC. Phase 11
HS#22
This report includes all construction work through 17th day of July 20 23 . Report No.: 2lan•-3,A Page -No.: 1 of 1
Project Address,-
Structural Observer of Record (SOR):
Professional Lic./Reg. No.:
Phone No. of SOR:
26103 Wacion Dr. San Juan Capistrano, CA 92675
Option One Consulting Engineers
Ilia B. Sarad. PE, SE. SECB)
S-3855
714-556-1916
Building Permit No.:
Structural Observer (SO), if not by SOR:
Professional Lic./Reg. No.:
Phone No. of SO:
Erik Torres, EIT
❑ Concrete
714-556-1916
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box(
FOUNDATIONS
WALLS
FRAMES
DIAPHRAGMS
IF PORTION OF BLDG WAS
DATE
(FloorlRoof)
OBSERVED, INDICATE LOCATION
❑ Footing, Stem Wall
❑ Concrete
❑ Steel Moment Frame
❑ Concrete
Interior and Exterior
❑ Steel Braced Frame
General System-
7/17/23
❑ Mat Foundation,
❑ Masonry
❑ Steel Deck
i.e., roof trusses, roof
Pre -stressed Conc. Slab
sheathin shear element
❑ Caisson, Pile, Grade
® Wood Shear Wall
❑ Concrete Moment
® Wood
holdowns, floor sheathing, floor
Beam
Panel
Frame
trusses, beams, headers and
13Foundation Pad,
❑ Other:
ElMasonry Wall Frame
ElOther:
naraware.
Anchor
❑ Other:
❑ Other:
❑ Other:
❑ Other:
NX ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
OBSERVED DEFICIENCIES AND COMMENTS:
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
I declare that the following statements are true to the best of my knowledge:
1. I am the Registered Design Professional retained by the Owner to be in responsible charge of the
structural observation in accordance with the requirements of the City of San Juan Capistrano;
2. I, or another Registered Design Professional whom I have designated above and is under my
responsible charge, has performed the required site visits at each significant construction stage to
verify that the structure is in general conformance with the approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected and a new structural
observation report must be issued clearing these deficiencies; and
4. 1 understand that final acceptance of the structural systems by the Building and Safety Division cannot
occur Wthout th orreclion oLal] ob3*rved deficiencies.
OF
Form - Structural Observation Report v1
Updated: 06-28-17
e
RECORD
July 17, 2023
DATE
91( ()FESSro'�,a
a S4
w rrnn
°C N0. S 3855 W
* Exp. 3/31/2024
6rTRUC T13gp�
9r£
OF CALF
STAMP OF STRUCTURAL OBSERVER OF RECORD
Page 1 of 2
BOARD OF DIRECTORS
LAURA FREESE
CHARLES T. GIBSON
SAUNDRA F. JACOBS
BETTY H. OLSON, PH.D
FRANK URY
DANIEL R. FERONS Santa Marzflarzita Waterz Distrzict
GENERAL MANAGER
October 6, 2023
County of Orange
Planning and Development
601 North Ross Street
Santa Ana, CA 92701
Attention Release Desk: Renee. Chiiic:hilla@,ocpw.ocgay.com;
Subject: Tract 19063, Phase 11 Andalusia, Lots 19-22 in ID 9 —26073, 26083, 26093, and
26103 Wagon Drive.
The above referenced lots may be released for occupancy as far as the District is concerned
effective October 2, 2023.
Developer: Lennar Homes
This release does not constitute authorization for you to release the water and sewer bonds for the
subject lots. This authorization will be a Resolution of the Board of Directors of the Santa
Margarita Water District. When the water and sewer facilities are formally accepted by the Board,
they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded
to you.
Should you have any questions or desire additional information please contact me at (949)
459-6504.
Sincerely,
SANTA MARGARITA WATER DISTRICT
Patricia Butler, P. E.
Chief Engineer
cc: Tony Gaetano, Inspector
City of SJC Building Department
Elena Wilson\email
Eric Smith\email
Irma Lopez\email
Mona Boers- Kort\email
Steve Skef6ngton\cmail
Larry Jeffery\email
File S\Eng\Tract Occupancy Release Letters
Santa Margarita Water District • 26111 Antonio parkway, Rancho Santa Margarita, CA 92688
w«•wSMWD.com • (949) 459-6420
ocr=Isrq
Recycling Report
Date of Haul Bin Size Tonnage
Roll -Off Processed Loads
I N C O R P O R A T E D
environmental services
40
the face of a greener generation
Acct:
81-40635
Company:
Lennar Homes - The Farm
Year:
2023 2nd Qtr
Address:
32382 Del Obispo
City:
San Juan Capistrano
40
92675
Recycling Report
Date of Haul Bin Size Tonnage
Roll -Off Processed Loads
4/4/2023
40
4.29
4/4/2023
40
3.92
4/10/2023
40
5.97
4/12/2023
40
8.22
4/12/2023
40
8.39
5/12/2023
40
2.18
6/20/2023
40
5.3
6/20/2023
40
5.38
4/13/2023
40
3.67
4/13/2023
40
6.13
4/25/2023
40
4.03
4/25/2023
40
5.56
4/25/2023
40
4.57
4/25/2023
40
4.95
4/27/2023
40
4.64
4/28/2023
40
3.15
5/3/2023
40
3.65
5/10/2023
40
4.23
5/10/2023
40
2.78
5/11/2023
40
6.22
5/11/2023
40
6.52
5/17/2023
40
1.8
5/17/2023
40
5.04
6/20/2023
40
5.16
5/24/2023
40
5.36
5/24/2023
40
5.72
5/24/2023
40
6.3
5/31/2023
40
8.26
6/5/2023
40
4.75
6/13/2023
40
7.49
6/13/2023
40
7.04
6/13/2023
40
4.21
6/21/2023
40
10.3
6/21/2023
40
1.67
6/22/2023
40
3.45
6/27/2023
40
3.04
6/30/2023
40
6.9
6/30/2023
40
5.15
Total Collected
5/9/2023
195.39
Percentage Diverted FROM Landfill:
4/19/2023
142.63 73.00%
Percentage Disposed
4/19/2023
52.76
Date of Haul Bin Size
Tonnage
Roll -Off Processed Loads - Lowboy
5/2/2023
10
7.04
5/2/2023
10
5.73
5/9/2023
10
9.34
5/9/2023
10
9.02
4/19/2023
10
8.14
4/19/2023
10
8.13
4/25/2023
10
9.59
4/25/2023
10
8.32
4/27/2023
10
4.22
4/27/2023
10
5.63
5/10/2023
10
8.71
5/10/2023
10
3.89
5/10/2023
10
7.39
5/11/2023
10
8.08
5/3/2023
10
10.24
5/3/2023
10
9.67
5/4/2023
10
10.36
5/4/2023
10
4.05
5/4/2023
10
7.11
5/6/2023
10
3.7
5/6/2023
10
3.35
5/6/2023
10
10.01
6/1/2023
10
9.64
6/1/2023
10
6.49
6/1/2023
10
8.22
6/2/2023
10
8.94
6/2/2023
10
9.62
6/2/2023
10
9.54
6/13/2023
10
6.24
6/21/2023
10
10.2
6/21/2023
10
10.78
6/30/2023
10
8.81
Total Collected
250.20
Percentage Diverted FROM Landfill:
227.68 91.00%
Percentage Disposed
22.52
Roll -Off Pure Loads of Material
0.00
Percentage Diverted FROM Landfill: 0.00 100.00%
Percentage Disposed
nommoLlieLel
Project Totals
Percentage Diverted FROM Landfill: 370.32 83.11%
Percentage Disposed 75.27
Craig Dibley Date
Senior Sustainability Supervisor
CR&R Incorporated
13.2023
PROACTIVE
ENGINEERING CONSULTANTS
a diNaent Mind o/company
October 3, 2023
City of San Juan Capistrano
Building Department
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Attention: City Grading Inspector
Subject: CIVIL ENGINEERS'S VERIFICATION OF PRECISE GRADING
Project: Tract 19063, Lot(s)19-22 (Andalusia Phase 11)
Street Address(es) 26073, 26083, 26093, 26103 Wagon Dr
I hereby approve the precise grading for the referenced project in accordance with my responsibilities as
the Engineer of Record. The precise grading has been completed substantially in conformance with the
approved grading plan which includes line and grade for all engineered drainage devices, staking of
property corners for proper building location, location and inclination of all slopes, and the construction
of earthen berms and positive building pad drainage.
Sincerely,
Proactive Engineering Consultants
Amy L. Jarami o
R.C.E. Number 94608
NVO 084.000WANICert LellersTG Cens1PG cert lots 148-185 & 94.docx
1'T 27042 Towne Centre Drive, Suite 110
Foothill Ranch. CA 92510
T 949-716-7460
,w proactiveenglneenng net
QRpFESS/
0
A
N0. 94608
CIS I�
pF CAO
t�+ ,vtrnuurrn /)I�lye lir III ,1 11.1Jrrirr!� /r v
Sur.,
O STA&� i�.ALiA&AIL Ah, AkA&AkAA&A&
frispcoion &' T("S1i ng' 1110. .441 Uommor-.:ial 1VaN' I.a Ilahra' ('"\ `)063 1-01 OX
(;6_) 94 1 • ( 714 1 5216-8441
1":\\ f i(y_') 946-006
October 17, 2023
Building Official
City of San Juan Capistrano
Department of Building & Safety
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
SPECIAL INSPECTOR'S FINAL REPORT
Project Name: Andalusia @ The Farm - Phase 11
Address: Tract #19063, San Juan Capistrano
Owner: Lennar
Lot Address Permit#
19 26073 Wagon Drive B23-0168
20 26083 Wagon Drive B23-0169
21 26093 Wagon Drive B23-0170
22 26103 Wagon Drive B23-0171
This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special
inspection on the above-mentioned project at the above address, which required continuous
inspection per section 1701 of The California Building Code.
Paul Dickinson - Post Tensioned Concrete, Reinforced Concrete, ICC #8257372
Rob Langner - Post Tensioned Concrete, Reinforced Concrete, ICC #1139855
Danny Estrada - DIA/Epoxy, HD Titens, Shear Nailing, Wood Framing, ICC #5093138
Based upon special inspection and materials testing written reports of this work, it is our judgment
that the inspected work was performed to the best of our knowledge, in accordance with the
approved plans, specifications and applicable workmanship provision of the California Building Code.
Sincerely, Reviewed By:
P
.04 19 �
6*� EXP.
r
Steven L. Godbey Ian R.vJadCie:i!, ,P.E.
President Principal Engineer
SLG/IRW: spg For inspection and testing only, no design
responsibility expressed or implied.
LOG
f3eotechnical, Inc.
October 6, 2023
Mr. Brett Hamara
Lennar Corporation
15131 Alton Parkway, Suite 365
Irvine, CA 92618
Project No. 18182-01
Subject. Geotechnical Release of Postgrading for Phase 11, Andalusia, Lots 19 through 22,
Tract 19063, "The Farm" Residential Development, San Juan Capistrano, California
In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for
Phase 11, Andalusia, Lots 19 through 22, "The Farm" residential development, Tract 19063, located in
the City of San Juan Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-
call observation and field density testing of postgrading operations in order to form an opinion of site
earthwork. In general, postgrading operations observed and/or tested by LGC Geotechnical included
interior plumbing backfill, foundation footing excavations, utility house connection backfill, and
subgrade preparation. Refer to table below for lots and associated addresses.
Pos gra ing Release Lot Summary - Andahisia - Phase 11
Lot No.
Address
19
26073 Wagon Drive
20
26083 Wagon Drive
21
26093 Wagon Drive
22
26103 Wagon Drive
Based on the results of our observation and testing, it is our opinion that the subject site earthwork
operations were completed in general accordance with project geotechnical recommendations. This
letter serves as a geotechnical release from postgrading operations for the subject lots at The Farm
residential development. In our opinion, the subject building pads are suitable for their intended use
from a geotechnical perspective.
Closure
Our services were performed using the degree of care and skill ordinarily exercised, under sl>•r>;iTar
circumstances, by reputable engineers and geologists practicing in this or similar localities. No other
warranty, expressed or implied, is made as to the conclusions and professional advice included in this
report.
Should you have any questions regarding this letter, please do not hesitate to contact our office. We
appreciate this opportunity to be of service.
Respectfully,
LGC Geotechnical, Inc.
Na 3147
Ryan Douglas, PE, GE 3147
Project Engineer `�'A�Foru��G�%'
RLD/JJV/amm
Distribution: (1) Addressee (electronic copy)
Project No. 18182-01 Page 2 October 6, 2023