Loading...
B23-0161 - 26158 MEADOW DR30448 Rancho Viejo Road, Suite 110 San Juan Capistrano, CA 92675 (949) 493-1171 (949) 493-1053 Fax www.SanJuanCapistrano.org November 13, 2023 Owner: AG ESSENTIAL HOUSING CA 1 LP 8585 E HARTFORD DR #118 SCOTTSDALE, AZ 85255 MEMBERS OF THE CITY COUNCIL: CERTIFICATE OF USE & OCCUPANCY Troy Bourne John Campbell Sergio Farias Howard Hart John Taylor HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING: Permit Number: B23-0161 Building Address: 26158 MEADOW DR Tract: 19063 Lot: 55 Unit: Building Use: (2682sfl SINGLE FAMILY DWELLING w/ (466sf ATTACHED GARAGE Occupancy Classification: R -3/U Type of Construction: VB Occupant Load: PER CBC SECTION 1004 Fire Sprinkler: YES Special Conditions: CITY OF SAN JUAN CAPISTRANO JAMES WIATRAK CBO, CASp Chief Building Official POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE CHIEF BUILDING OFFICIAL THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER 11/13/2023 Page 1 Plan Review History Permit Number B23-0161 COO APPROVED Dianna Flores Applied 2/6/2023 LL3 Remarks and Notes: Approved 2/6/2023 LL3 Type BUILDING Issued 4/19/2023 LL3 Subtype SFD DETACHED COO APPROVED Noreen Swiontek Finaled 11/8/2023 WF1 Status FINALED COO APPROVED Laura Stokes Expired 5/6/2024 WF1 Owner AG ESSENTIAL HOUSING CA 1 LP, Applicant LENNAR HOMES OF CALIFORNIA INC Site Address City State Zip 26158 MEADOW DR SAN JUAN CAPISTRANO CA 92675 COO APPROVED James Prather Subdivision Tract Block Lot No Parcel No Remarks and Notes: THE FARM - CASPIAN 19063 55 TRACT 19063 LOT Zoning Construction Type Occupancy Type VB R -3/U Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Lisa La Fznnin Remarks and Notes: 2/6/23 4/19/23 72 Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF COO APPROVED Dianna Flores nr.r.i ipnniry Remarks and Notes: COO - BUS COO APPROVED Jocelyne Mejia Remarks and Notes: COO - NPDES COO APPROVED Noreen Swiontek Remarks and Notes: COO - PLANNING - COO APPROVED Laura Stokes N 0 icrnir Remarks and Notes: COO - PLANNING - COO APPROVED PLANNING Ppn I MAnl Remarks and Notes: COO - PUB WRKS COO APPROVED James Prather r.nni inicp Remarks and Notes: PERMIT REVIEWS Report By: 9/27/23 11/13/23 47 9/27/23 10/5/23 9/27/23 0 9/27/23 10/5/23 10/27/23 30 9127/23 10/5/23 10/3/23 6 9/27/23 10/5/23 10/3/23 6 9/27/23 10/5123 9129123 2 M COO - SMWD COO APPROVED SMWD Remarks and Notes: COO - UTILITIES COO APPROVED Dianna Flores RFIFACFC Remarks and Notes: COO -BLDG COO APPROVED William Forsythe r_RAnwr_iRnnln Remarks and Notes: COO -OCFA- COO APPROVED William Forsythe rnhAhA1 ln1hAi II Remarks and Notes: PERMIT REVIEWS Report By: 9/27/23 10/5/23 11/13/23 47 9/27/23 10/5/23 9/27/23 0 9/27/23 11/8/23 42 9/27/23 11/8/23 42 C Wsys-rEMS CITY OF SAN JUAN CAPISTRANO ISSUED 04/19/2023 `y�,t4w BUILDING PERMIT Permit No. B23-0161 Permit Number B23-0161 DESCRIPTION CASPIAN PH 12. PLAN 3CR. 2682sf SFR w/ 466sfATT GARAGE. ISSUED BY LL3 ARCH PC = B21-0314 SITE APN TRACT 19063 LOT 55 PRECISE GRADE PC = B21-0313 SITE LOT NO 55` SITE TRACT 19063 SITE SUBDIVISION THE FARM - CASPIAN JOB VALUE $ 350,216 OCCUPANCY TYPE R -3/U PERMIT TYPE. BUILDING ELL,-CTRiCAL PERMIT A OUNT BUILDING SF 2,682 NO STORIES 2 NEW RES OCCUPANCY GROUP R-3 175.20 NO UNITS 1 NEW RES OCCUPANCY GROUP U 13.98 SERVICES 600V OR LESS NOT OVER 200AMPS 33.78 JOB ADDRESS: 26158 MEADOW DR ELECTRICAL ISSUANCE FEE 27.24 OWNER NAME AG ESSENTIAL HOUSING CA 1 LP, PHONE MAILING ADDRESS 8585 E HARTFORD DR CITY,STATE,ZIP SCOTTSDALE, AZ 85255 Total Electrical 250.20 CONTRACTOR NAME LENNAR HOMES OF CALIFORNIA INC PLUMBING PERMIT AMOUNT 728102 PLUMBING ISSUANCE FEE 27.24 ST. LIC EXPIRE 09/30/2022 FIXTURES AND VENTS 184.45 PHONE (949) 789-1600 WATER HEATER INCLUDING VENT 13.62 ADDRESS 15131 ALTON PKWY #345 WATER PIPING SYSTEMS 5.26 CITY, ST, ZIP IRVINE, CA 92618 # GAS SYSTEMS 8.03 TENANT NAME BUILDING SEWER 27.29 PHONE # FIRE INSTALL 1 TO 50 66.44 MAILING ADDR CITY, ST, ZIP MOBILE H ME PERMIT AMOUNT MECHANICAL PERMIT AMOUNT VENTS AND EXHAUST HOOD/DUCTS 11.79 ACBOILER/COMPR<3HPAND 100K BTU 16.28 EXHAUST FAN W/ SINGLE DUCT 42.00 FURNACE FORCED AIR OR GRAVITY UP TO 100K 16.39 Total Mobile Home DUCT INSTALL/REPLACE/RELOC 112.42 APPLIANCE VENTS 8.03 I have carefully examined the completed permit application and do hereby certify under penalty of MECHANICAL ISSUANCE FEES 2724 perjury that all information hereon including the declarations are true and correct and I further Total Mechanical 234.15 certify and agree if a permit is issued: to comply with all City, County, and Slate laws governing building construction, whether specified herein or not. I also agree to save, indemnify and keep :xpirationn Every permit issued shall become invalid unless the work on the site authorized b) harmless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses uch permit is commenced within 12 months after its issuance, or if the work authorized on the which may in any way accrue against said Cily ri+eslnrrl of Ute i l.iririry; of this permit rte by such permit is suspended or abandoned for a period of 180 days after the time the work Owner/Contractor onamenced. Print Name An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. Applicant's signature Contractor: I hereby affirm that I am licensed under provisions of Chapter 9 oi' Division 3 of file Business and Professions Code, and my license is in full force and effect. _ Owner/Builder:1, as owner of the property, or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.7044, Business and Professions Code: the Contractor's License Laws does not apply to and owner of property who builds or improves (hereon, who does such work himself or through his employees, provided that such improvements are not intended or offered for sale if however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale) _ CAt iwbAylldcr1, as owner of the property, am exclusively contracting with licensed contractors r, construct the project (Sec, 7044, Business and Professions Code: The Contractor's License Law does not ,rp rl m an owner of property who builds or improves thereon and who contracts for such projects with a contractor's) license pursuant to the Contractor's License Law. Workers prop satitm-I hereby affirm under penalty of perjury one of the following declarations:l have and will maintain workers' compensation insurance, as required by Section 3700 oftls LA4,i Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier_ LD S AIdCE CQMPANY Policy#MWC31414821 (This section needs to be completed if file permit is for one hundred dollars($100) or less) Californiaxemption: [certify that in the performance of the work for .which this permit is issued, I shall not employ any person in any manner sow to become subject to the workers' compensation laws of Cand agree that if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions )ate Applicant WARNING:FAILURE TO SECURE WORKERS'COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECTAN EMPLOYER Tl CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSDAND DOLLARS(S 100,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT FEES Rate: Permit No. p scan : LENIN R HOMES OF CAL1FOR Phone/E-Mall {9491789-1600 Account # Type Cost 01-44221 Building Permit S 2.631.11 0144223 Mechanical 5 234.15 01-44224 Plumbing S 332.33 01-44225 Electrical $ 250.20 01-44221 Mobile Home Permit S 0.00 01-44222 Grading Permit Fee S 0.00 01114231 Grading Plan Check $ 0.00 01-44222 On -Site Residential Permit $ 0.00 01-44231 On -Site Residential Plan Check $ 0.00 S u btota l $ 3.447.79 01-44230 Bond Processing $ 0.00 01-44230 Building Plan Check $ 0.00 01-44230 jAdditional Plan Check S 0.00 01114230 Digital Record Fee ($1.00 per sheet) $ 34.20 01-44221 C & D Administrative Fee $ 92.74 01-44221 Special Inspection -Reinspection $ 0.00 01-44222 On -Site Commercial/Tract Permit Fee $ 0.00 01-44231 On -Site Commercial/Tract Plan Check Fee $ 0.00 01-44214 Geotechnical Soils Plan Review $ 0.00 10-44320 Ordinance 211 $ 50.00 10-42510 Ordinance 364 $ 3.502.16 01145354 Copies @ .20 Each $ 0.00 90-23331 SMIP Fee $ 45.53 33-44370 H.O.P.E. Fee (Housing in Lieu) $ 0.00 Other Fees $ 7,992.90 TCA Fees Date Received HOA Approval ate Received SchoolFees ate eceived Engineering ees ate Received Water Division Fees I Date Received 01-44221 Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check)) g 520.77 01114221 Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check) $ 0.00 01-44240 NPDES Permit Fee (10% Permit Subtotal) $ 344.78 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type S 3.502.16 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO $ 19,533.03 Receipt # 94452 Date: 4/19/2023 Cashier: City of San Juan Capistrano 32400 Paseo Adelanto i1r Development Services Department San Juan Capistrano, CA 92675 Phone: (949) 443-6347 Building and Safety Division Website: www.sanjuancapistrano.org Project: Caspian at The Farm Option One J.N: 0121-2495 Structural Observation Report Arch: WHA -19206 STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for general conformance to the approved construction documents at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC Section 18.07.050, CBC Section 1704 or other sections of the :3CJMC or CBC. Phase: 12 HS#: 55 This report includes all construction work through 24th day of May 120 23 . Report No.: Plan: 3CR Page No.: 1 of 1 Project Address: Structural Observer of Record (SOK): Professional Lic./Reg No. Phone No. of SOK: 26158 Meadow Dr., San Juan Capistrano, CA 92675 Option One Consulting Engineers (Ilia B. Sarad. PE, SE, SECS) S-3855 714-556-1916 Building Permit No.: Structural Observer (SO), if not by SOR: Professional Lic./Reg. No.: Phone No. of SO: B23-0161 i Erik Torres EIT 714-556-1916 PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (cheek applicable box) FOUNDATIONS WALLS FRAMES DIAPHRAGMS IF PORTION OF BLDG WAS DATE (Floor/Roof) OBSERVED, INDICATE LOCATION ® Footing, Stem Wall ❑ Concrete ❑ Steel Moment Frame ❑ Concrete EEEP0_-AVn_Sys(eM; 5/24/23 ❑ Mat Foundation, ❑ Masonry Cl Steel Braced Frame ❑ Steel Deck i.e. post -tension cables and Pre -stressed Conc. Slab ❑ Caisson, Pile, Grade ❑ Wood Shear Wall ❑ Concrete Moment ❑ Wood accessories, anchor Dons, noldown Beam Panel Framepolts & straps. post bases slab Pad, Z) ❑ Other: El MasonryWall Frame LJ Other: orundation size/reinforcement and fooling & ❑ Other: ❑ Other: ❑ Other: ❑ Other: pad size/reinforcement. U ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES. n OBSERVED DEFICIENCIES AND COMMENTS: ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES. I declare that the following statements are true to the best of my knowledge: 1. 1 am the Registered Design Professional retained by the Owner to be in responsible charge of the structural observation in accordance with the requirements of the City of San Juan Capistrano; 2. I, or another Registered Design Professional whom I have designated above and is under my responsible charge, has performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected and a new structural observation report must be issued clearing these deficiencies; and 4. 1 understand that fl acceptance of the structural systems by the Building and Safety Division cannot occur without the c cEion of all absery def c nt e�. es May 24, 2023 SIGNATU OF STRUCTURAL 065 VER CIV RECORD DATE Forn - Structural Observation Report v1 Updated: 06-28-17 Q pRpFE531d'�4 S4�9��y� N0. S 3855 * Exp. 3/31/2024 C T qrF v CALIF STAMP OF STRUCTURAL OBSERVER OF RECORD Page 1 of 2 City of San Juan Capistrano 32400 Paseo Adelanto Development Services Department San Juan Capistrano, CA 92675 `x` Building and Safety Division Phone: (949) 443-6347 Website: www.sanjuancapistrano.org Project: Caspian at The Farm Option One J.N: 0121-2495 Structural Observation Report Arch: WHA -19206 STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for general conformance to the approved construction documents at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC. Phase: 12 Homesite: 55 This report includes all construction work through 27th day of July , 2023 Report No.: Plan 3CR page No.: 1 of 1 Project Address: Structural Observer of Record (SOR): Professional Lic./Reg. No.: Phone No. of SOR: 26158 Meadow Dr., San Juan Capistrano, CA 92675 Option One Consulting Engineers (Ilia B. Sarad. PE, SE, SECS S-3855 714-556-1916 Building Permit No.: + Structural Observer (SO), if not by SOR: Professional Lic./Reg. No.: Phone No. of SO: B23-0161 Luis Salas, E.I.T ❑ Concrete 714-556-1916 PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box( FOUNDATIONSWALLS FRAMES DIAPHRAGMS IF PORTION OF BLDG WAS DATE (Floor/Roof) OBSERVED, INDICATE LOCATION ❑ Footing, Stem Wall ❑ Concrete ❑ Steel Moment Frame ❑ Concrete IaWD]Px aad_ExLerioL General System; 7/27/23 ❑ Mat Foundation, ❑ Masonry ❑ Steel Braced Frame ❑ Steel Deck i.e., roof trusses, roof Pre -stressed Conc. Slab sheathinashear element ❑ Caisson, Pile, Grade 181 Wood Shear Wall ❑ Concrete Moment ® Wood holdowns, floor sheathing, floor Beam Panel Frame trusses, beams, headers and ❑ Foundation Pad, ❑ Other: ❑ Masonry Wall Frame ❑ Other: dasxe. Anchor ❑ Other: ❑ Other: ❑ Other: ❑ Other: ❑X ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES. P OBSERVED DEFICIENCIES AND COMMENTS: ADDITIONAL DEFICIENCIES CONTINUED ON ATrACHED PAGES. I declare that the following statements are true to the best of my knowledge: 1. 1 am the Registered Design Professional retained by the Owner to be in responsible charge of the structural observation in accordance with the requirements of the City of San Juan Capistrano; 2. I, or another Registered Design Professional whom I have designated above and is under my responsible charge, has performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected and a new structural observation report must be issued clearing these deficiencies; and 4. 1 understand that finpj acceptance of the structural systerns by the Building and Safety Division cannot occur without the 4ection of all observed deficiencies. RECORD Form - Structural Observation Report Updated: 06-28-17 July 27, 2023 DATE a �Rflf E55/0� S4�q �y ca � N0. S 3855 * Exp. 3/31/2024 9r TR U C T 110R��� OF CAL%l STAMP OF STRUCTURAL OBSERVER OF RECORD Page 1 of 2 BOARD OF DIRECTORS LAURA FREESE CHARLES T. GIBSON SAUNDRA F. JACOBS BETTY H. OLSON, PH.D FRANK URY DANIEL R. FERONS GENERAL MANAGER October 13, 2023 County of Orange Planning and Development 601 North Ross Street Santa Ana, CA 92701 Santa Mangalzita Waterz Dista ct Attention Release Desk: Renee. Chinclulla iiocw.oCgoy.com; Subject: Tract 19063, Phase 12 Caspian, Lots 52-56-126-128, in ID 9 —26188, 26178, 26168, 26158, 26148, 26147, 26157 and 23167 Meadow Dr. The above referenced lots may be released for occupancy as far as the District is concerned effective October 11, 2023. Developer: Lennar Homes This release does not constitute authorization for you to release the water and sewer bonds for the subject lots. This authorization will be a Resolution of the Board of Directors of the Santa Margarita Water District. When the water and sewer facilities are formally accepted by the Board, they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded to you. Should you have any questions or desire additional information please contact me at (949) 459-6504. Sincerely, SANTA MARGARITA WATER DISTRICT po�� Patricia Butler, P. E. Chief Engineer cc: Tony Gaetano, Inspector Elena Wilson\email Irma Lopez\email Eric Smith\email Mona Boers-Kort\email Steve Skeffington\email Lary Jeffery\email File S\Eng\Tract Occupancy Release Letters Santa Margarita Water District • 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688 www.SMWD.com 1 (949) 459-6420 C, glrirrlwui hop(i "will- Abarn,;!� /*, wln�, SOUTHWEST A& AL,& Ak, AL AL A&A& A& Ak Ak,& Alk A& A& 11151)CCIio)II f)C. .4-11 Commcr:ial \V:i�, Lu Ihhra.0 A9Ub_s1-0165 ISO 1941--'990 • f714) -;_Y)-,441 FAX I i(,_') 040-M20 October 16, 2023 Building Official City of San Juan Capistrano Department of Building & Safety 32400 Paseo Adelanto San Juan Capistrano, CA 92675 SPECIAL INSPECTOR'S FINAL REPORT Project Name: Caspian @ The Farm - Phase 12 Address: Tract #19063, San Juan Capistrano Owner: Lennar Lot Address Permit# Lot Address Permit# 52 26118 Meadow Drive B23-0158 56 26148 Meadow Drive B23-0162 53 26178 Meadow Drive B23-0159 126 26147 Meadow Drive B23-0163 54 26168 Meadow Drive B23-0160 127 26157 Meadow Drive B23-0164 55 26158 Meadow Drive B23-0161 128 26167 Meadow Drive B23-0165 This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection on the above-mentioned project at the above address, which required continuous inspection per section 1701 of the California Building Code. Makar Attallah - Reinforced Concrete, ICC #9087435 Jason Sharobeem - Reinforced Concrete, ICC #9662561 Steve Skuljan - Reinforced Concrete, Post Tensioned Concrete, ICC #1140003 Rob Langner - Reinforced Concrete, Post Tensioned Concrete, ICC #1139855 Danny Estrada - DIA/Epoxy, HD Titens, Shear Nailing, Wood Framing, ICC# 5093138 Based upon special inspection and materials testing written reports of this work, it is our judgment that the inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and applicable workmanship provision of the California Building Code. Sincerely, RC VIE A!:ws 13y f �F C134 19 _J4 i a �3i-2 Steven L. Godbey Ian R. Wauu2ii, P. E. President Principal Engineer SLG/IRW: spg For inspection and testing only, no design responsibility expressed or imtallied. LGG geotechnical, Inc. October 16, 2023 Mr. Brett Hamara Lennar Corporation 15131 Alton Parkway, Suite 365 Irvine, CA 92618 Project No. 18182-01 Subject. Geotechnical Release of Posigrading for Lots 52 through 56 and 126 through 128, Phase 12, Caspian, Tract 19063, "The Farm" Residential Development, San Juan Capistrano, California In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Lots 52 through 56 and 126 through 128, Phase 12 of Caspian for "The Farm" residential development, Tract 19063, located in the City of San Juan Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-call observation and field density testing of postgrading operations in order to form an opinion of site earthwork. In general, postgrading operations observed and/or tested by LGC Geotechnical included interior plumbing backfill, foundation footing excavations, utility house connection backfill, and subgrade preparation. Refer to table below for lots and associated addresses. P_aj{rr ding gulose Lot Summary _ Casgian — Phase 12 Lot No. Address Permit 52 26188 Meadow Drive B23-0158 53 26178 Meadow Drive B23-0159 54 26168 Meadow Drive B23-0160 55 26158 Meadow Drive B23-0161 56 26148 Meadow Drive B23-0162 126 26147 Meadow Drive B23-0163 127 26157 Meadow Drive B23-0164 128 26167 Meadow Drive B23-0165 Based on the results of our observation and testing, it is our opinion that the subject site earthwork operations were completed in general accordance with project geotechnical recommendations. This letter serves as a geotechnical release from postgrading operations for the subject lots at The. Firm residential development. In our opinion, the subject building pads are suitable for their intended use from a geotechnical perspective. Closure Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. Should you have any questions regarding this letter, please do not hesitate to contact our office. We appreciate this opportunity to be of service. Respectfully, LGC Geotechnical, Inc. pRUrtSr DOG� LU Na 3147 Ryan Douglas, PE, GE 3147 �'fi0C`�p�. Project Engineer FoF inti tF�% RLD/amm Distribution: (1) Addressee (electronic copy) Project No. 18182-01 Page 2 October 16, 2023 Recycling Report Date of Haul Bin Size Tonnage Roll -Off Processed Loads I N C O R P O R A T E D environmental services 40 the face of a greener generation Acct: 81-40635 Company: Lennar Homes - The Farm Year: 2023 2nd Qtr Address: 32382 Del Obispo City: San Juan Capistrano 40 92675 Recycling Report Date of Haul Bin Size Tonnage Roll -Off Processed Loads 4/4/2023 40 4.29 4/4/2023 40 3.92 4/10/2023 40 5.97 4/12/2023 40 8.22 4/12/2023 40 8.39 5/12/2023 40 2.18 6/20/2023 40 5.3 6/20/2023 40 5.38 4/13/2023 40 3.67 4/13/2023 40 6.13 4/25/2023 40 4.03 4/25/2023 40 5.56 4/25/2023 40 4.57 4/25/2023 40 4.95 4/27/2023 40 4.64 4/28/2023 40 3.15 5/3/2023 40 3.65 5/10/2023 40 4.23 5/10/2023 40 2.78 5/11/2023 40 6.22 5/11/2023 40 6.52 5/17/2023 40 1.8 5/17/2023 40 5.04 6/20/2023 40 5.16 5/24/2023 40 5.36 5/24/2023 40 5.72 5/24/2023 40 6.3 5/31/2023 40 8.26 6/5/2023 40 4.75 6/13/2023 40 7.49 6/13/2023 40 7.04 6/13/2023 40 4.21 6/21/2023 40 10.3 6/21/2023 40 1.67 6/22/2023 40 3.45 6/27/2023 40 3.04 6/30/2023 40 6.9 6/30/2023 40 5.15 Total Collected 9.02 195.39 Percentage Diverted FROM Landfill: 8.14 142.63 73.00% Percentage Disposed 8.13 52.76 Date of Haul Bin Size Tonnage Roll -Off Processed Loads - Lowboy 5/2/2023 10 7.04 5/2/2023 10 5.73 5/9/2023 10 9.34 5/9/2023 10 9.02 4/19/2023 10 8.14 4/19/2023 10 8.13 4/25/2023 10 9.59 4/25/2023 10 8.32 4/27/2023 10 4.22 4/27/2023 10 5.63 5/10/2023 10 8.71 5/10/2023 10 3.89 5/10/2023 10 7.39 5/11/2023 10 8.08 5/3/2023 10 10.24 5/3/2023 10 9.67 5/4/2023 10 10.36 5/4/2023 10 4.05 5/4/2023 10 7.11 5/6/2023 10 3.7 5/6/2023 10 3.35 5/6/2023 10 10.01 6/1/2023 10 9.64 6/1/2023 10 6.49 6/1/2023 10 8.22 6/2/2023 10 8.94 6/2/2023 10 9.62 6/2/2023 10 9.54 6/13/2023 10 6.24 6/21/2023 10 10.2 6/21/2023 10 10.78 6/30/2023 10 8.81 Total Collected 250.20 Percentage Diverted FROM Landfill: 227.68 91.00% Percentage Disposed 22.52 Roll -Off Pure Loads of Material 0.00 Percentage Diverted FROM Landfill: 0.00 100.00% Percentage Disposed Project Totals Percentage Diverted FROM Landfill: 370.32 83.11% Percentage Disposed 75.27 L,e July 13, 2023 Craig Dibley Date Senior Sustainability Supervisor CR&R Incorporated PROACTIVE ENGINEERING CONSULTANTS a d,Nermt krnd of company October 26, 2023 City of San Juan Capistrano Building Department 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Attention: City Grading Inspector Subject: CIVIL ENGINEERS'S VERIFICATION OF PRECISE GRADING Project: Tract 19063, Lot(s) 52-56 &126-128 (Caspian Phase 12) Street Address(es) 26188, 26178, 26168, 26158, 26148, 26167, 26157 & 26147 Meadow Dr I hereby approve the precise grading for the referenced project in accordance with my responsibilities as the Engineer of Record. The precise grading has been completed substantially in conformance with the approved grading plan which includes line and grade for all engineered drainage devices, staking of property corners for proper building location, location and inclination of all slopes, and the construction of earthen berms and positive building pad drainage. Sincerely, Proactive Engineering Consultants Amy Jaramillo RCE 94608 NA20.084 0001tUAN\Cert LetterslPG Certs1PG cert lots 148-185 8 94 docx 271',142 Tmvne Centre D+rve Suite 110 Foothrll Ranch CA 92611 /,Tv,N 949.716.7460 proactl4eerigineenng net �QttOFESS/ py� Al L JARq p m N0. 94608 k�f 1l��oF C1F