B23-0160 - 26168 MEADOW DR30448 Rancho Viejo Road, Suite 110
San Juan Capistrano, CA 92675
(949) 493-1171
(949) 493-1053 Fax
www.SanJuanCapistrano.org
November 13, 2023
Owner:
AG ESSENTIAL HOUSING CA 1 LP
8585 E HARTFORD DR #118
SCOTTSDALE, AZ 85255
MEMBERS OF THE CITY COUNCIL:
CERTIFICATE OF USE & OCCUPANCY
Troy Bourne
John Campbell
Sergio Farias
Howard Hart
John Taylor
HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT
TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND
APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY
CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY
CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING:
Permit Number:
B23-0160
Building Address:
26168 MEADOW DR
Tract:
19063
Lot:
54
Unit:
Building Use:
(2475sf) SINGLE FAMILY DWELLING w/ (510sf) ATTACHED
GARAGE
Occupancy Classification:
R -3/U
Type of Construction:
VB
Occupant Load:
PER CBC SECTION 1004
Fire Sprinkler:
YES
Special Conditions:
CITY OF SAN JUAN CAPISTRANO
1
JAMES WIATRA�, CBO, CASp
Chief Building Official
POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE
CHIEF BUILDING OFFICIAL
THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER
11/13/2023 Page 1
Plan Review History
Permit Number B23-0160
Review Type
Applied 2/6/2023
LL3
COO APPROVED Dianna Flores
nr`r l IPANIr:V
Approved 2/6/2023
LL3
Type BUILDING
COO - BUS
Issued 4/19/2023
LL3
Subtype SFD DETACHED
Finaled 11/1/2023
WF1
Status FINALED
Expired 4/29/2024
WF1
Owner AG ESSENTIAL HOUSING CA 1 LP,
I-In1 1C11\1r-,
Applicant LENNAR HOMES OF CALIFORNIA
INC
Site Address
City
State Zip
PRn I NAANI
26168 MEADOW DR
SAN JUAN CAPISTRANO CA 92675
Remarks and Notes:
Subdivision
Tract
Block Lot No Parcel No
THE FARM - CASPIAN
19063
54 TRACT 19063 LOT
Zoning
Construction Type
Occupancy Type
PERMIT REVIEWS
VB
R -3/U
Review Group: ALL REVIEW DATES
Review Type Status Reviewer Sent Due Returned Days Elapsed
C & D RECYCLING PC APPROVED Lisa La
RnNin
Remarks and Notes:
Review Group: COO REVIEWS
Review Type
Status Reviewer
CERTIFICATE OF
COO APPROVED Dianna Flores
nr`r l IPANIr:V
Remarks and Notes:
COO - BUS
COO APPROVED Jocelyne Mejia
1 Ir FNICF
Remarks and Notes:
COO - NPDES
COO APPROVED Noreen Swiontek
Remarks and Notes:
COO - PLANNING -
COO APPROVED Laura Stokes
I-In1 1C11\1r-,
Remarks and Notes:
COO - PLANNING -
COO APPROVED PLANNING
PRn I NAANI
Remarks and Notes:
COO - PUB WRKS
COO APPROVED James Prather
r`nNl 1N1CP
Remarks and Notes:
COO - SMWD
COO APPROVED SMWD
Remarks and Notes:
PERMIT REVIEWS
Report By:
2/6/23
4/19/23 72
REVIEW DATES
Sent Due Returned Days Elapsed
9/27/23 11/13/23 47
9/27/23 10/5/23 9/27/23 0
9/27/23 10/5/23 10/27/23 30
9/27/23 10/5/23 10/3/23 6
9127/23 10/5123 1013/23 6
9127/2.3 10/5/23 9/29/23 2
9/27/23 10/5123 11/13/23 47
CRW":ati.
COO - UTILITIES
COO APPROVED Dianna Flores 9/27/23 10/5/23 9/27/23 0
RFI FOCFC
Remarks and Notes:
COO -BLDG
COO APPROVED William Forsythe 9/27/23 11/1/23 35
r,RnnrnlriRnnln
Remarks and Notes:
COO -OCFA-
COO APPROVED William Forsythe 9/27/23 11/1/23 35
r r)RAKAnNnlul II
Remarks and Notes:
PERMIT REVIEWS
Report By:
IS YSTEM S
CITY OF SAN JUAN CAPISTRANO 0SSUED
- oar 9noz3
BUILDING PERMIT
Permit No. B23-0160
Permit Number B23-0160 DESCRIPTION
CASPIAN PH 12, PLAN 113. 2475sf SFR w/ 510sfATT GARAGE.
i
ISSUED BY LL3
ARCH PC = B21-0314
SITE APN TRACT 19063 LOT 54
SITE LOT NO 54
SITE TRACT 19063 ®®
SITE SUBDIVISION THE FARM - CASPIANy-
JOB VALUE $ 323,186
OCCUPANCY TYPE R -3/U
PERMIT TYPE. BUILDING ELECTIU 'AL PERMIT AMOUNT
BUILDING SF 2,475 NEW RES OCCUPANCY GROUP R-3 160.62
NO STORIES 2
NO UNITS 1 NEW RES OCCUPANCY GROUP U 15.30
SERVICES 600V OR LESS NOT OVER 200AMPS 33.78
JOB ADDRESS: 26168 MEADOW DR ELECTRICAL ISSUANCE FEE 27.24
OWNER NAMEAG ESSENTIAL HOUSING CA 1 LP,
PHONE
MAILING ADDRESS 8585 E HARTFORD DR
CITY,STATE,ZIP SCOTTSDALE, AZ 85255 Total Electrical 236.94
CONTRACTOR NAME LENNAR HOMES OF CALIFORNIA INC PLUMBING PERMIT AMOUNT
728102 PLUMBING ISSUANCE FEE 27.24
ST. LIC EXPIRE 09/30/2022 FIXTURES AND VENTS 184.45
PHONE (949) 789-1600 WATER HEATER INCLUDING VENT 13.62
ADDRESS 15131 ALTON PKWY 4345 WATER PIPING SYSTEMS 5.26
CITY, ST, ZIP IRVINE, CA 92618 # GAS SYSTEMS 8.03
TENANT NAME BUILDING SEWER 27.29
PHONE # FIRE INSTALL 1 TO 50 66.44
MAILING ADDR
CITY, ST, ZIP
MOBILE HOME PERMIT AMOUNT MECHANICAL PERMIT AMOUNT
DUCT INSTALL/REPLACE/RELOC 88.33
APPLIANCE VENTS 8.03
VENTS AND EXHAUST HOOD/DUCTS 11.79
AC/BOILER/COMPR<3HPAND 100K BTU 16.28
Total Mobile Home EXHAUST FAN W/ SINGLE DUCT 42,00
FURNACE FORCED AIR OR GRAVITY UP TO 100K 16.39
I have carefully examined the completed permit application and do hereby certify under penalty of MECHANICAL ISSUANCE FEES 27.24
perjury that all information hereon including the declarations are true and correct and I further Total Mechanical 210.06
certify and agree if a permit is issued: to comply with all City, County, and State laws governing
building construction, whether specified herein or not. I also agree to save, indemnify and keep 3xpiration:: Every permit issued shall become invalid unless the work on the site authorized b3
harmless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses uch permit is commenced within 12 months after its issuance, or if the work authorized an the
which may in any way accrue against said C'Itti n:equcttrc of the ••r atfng of this permit. ite by such permit is suspended or abandoned for a period of 180 days after the time the work
Owner/Contractor ommenced.
Print Name An OSHA permit is required for excavations over 5'0" deep and demolition or construction of
structures over 3 stories in height.
Applicant's signature
l
on [rfnor: 1 hcr0s% a[Ifrm [h.r[ 1 - en ed under h:.•r inrtns—J
of CII;gRcr'1 urDivisitat 3 aflhe Form — and Professions Gale, and my license is in hdl force and effect
OwnerlBnilder: 1, as owner of the property, or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec 7044, Business and Professions
Code the Contractor's License Laws does not apply to and owner of property who builds or improves thereon, who does such work himself or through his employees, provided that such improvements arc not
intended or offered for sale. ff however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or Improve for the purpose of sale)
_ Ownerl6uilder: I, as owner of the property, am exclusively contracting with licensed conhactors to construct the project (See. 7044, Business and Professions Code: The Contractor's License Law does not
.grpl-v to an owner of property who builds or Improves thereon and who contracts for such projects with a contractor's) license pursuant to the Contractor's License Law
►1'ortycrs ['am ttcnsntian-I hereby affirm under penalty of perjury one of the following declarations:I have and will maintain workers' compensation insurance, as required by Section 3700 of1h
Labnr Code, for the performance of the work for which [his permit is issued- My workers' compensation Insurance carrier and policy number are: Camer_ULp liE. UBLIC INS R
Pal icyff v) tW('3 141.1831 (This section needs to be completed if the permit Is for one hundred dollars($100) or less)
FlSimntiun: I certify that In the performance of the work for which this permit Is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of
California and agree that if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, ! shall forthwith comply with those provisions.
ate Applicant
1VARKFKGp FAILURE TO SECURE WORKERS'COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TI CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED
THOUSDAND DOLLARS(SI00,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES
CITY OF SAN JUAN CAPISTRANO
BUILDING PERMIT FEES
ll_, I flit
I Fi1Tr,7{t wriport, rip imp
26168 NWADUW
Account #
Type
Cost
01-44221
Building Permit
$
2,469.38
01-44223
Mechanical
$
210.06
01-44224
Plumbing
$
332.33
01A4225
Electrical
$
236.94
01-44221
Mobile Home Permit
$
0.00
01-44222
Grading Permit Fee
$
0.00
01-44231
Grading Plan Check
$
0.00
01-44222
On -Site Residential Permit
$
0.00
01-44231
On -Site Residential Plan Check
$
0.00
Subtotal
$
3,248.71
01-44230
Bond Processing
$
0.00
01-44230
Building Plan Check
S
0.00
01-44230
Additional Plan Check
$
0.00
01-44230
Digital Record Fee ($1.00 per sheet)
5
34.20
0144221
C & D Administrative Fee
5
92.74
01-44221
Special Inspection -Reinspection
5
0.00
01-44222
On -Site Commercial/Tract Permit Fee
S
0.00
0144231
On -Site Commercial/Tract Plan Check Fee
$
0.00
01-44214
Geotechnical Soils Plan Review
$
0.00
10-44320
Ordinance 211
S
50.00
10-42510
Ordinance 364
$
3,231.86
01-45354
Copies @ .20 Each
$
0.00
90-23331
SMIP Fee
$
42.01
33-44370
H.0-P.E. Fee (Housing in Lieu)
$
0.00
Other Fees
$
7,990.90
TCA Fees Mate Received
HOA Approval ate Received
c ool ees Date Receive
Engineering Fees Dae Received
Water Division Fees Date Received
01-44221
01-44221
Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check))
Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check)
$
$
488.43
0.00
01-44240
NPDES Permit Fee (10% Permit Subtotal)
$
324.87
90-23000
Refundable Bond/Deposit Posted by Owner Contractor Type
$
3,231.86
90-23000
Refundable Bond/Deposit Posted by Owner Contractor Type
TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO
$
18,735.58
Receipt # 94452
Date: 4/19/2023 Cashier:
City of San Juan Capistrano 32400 Paseo Adelanto
Development Services Department San Juan Capistrano, CA 92675
Building and Safety Division Phone: (949) 443-6347
,rb _ Website: www.sanjuancapistrano.org
_ Project: Caspian at The Farm
Option One J.N: 0121-2495
Structural Observation Report Arch: WHA -19206
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for
general conformance to the approved construction documents at significant construction stages and at completion of the
structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC
Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC. Phase: 12
H S#: 54
This report includes all construction work through 24th day of May 20 23 . Report No.: Plan: 1 B Page No.: 1 of
Project Address:
Structural Observer of Record (SOR):
Professional Lic./Reg. No..
Phone No. of SOR:
26168 Meadow Dr., San Juan Capistrano, CA 92675
option One consulting Engineers
(Ilia B. Sarad PE SE. SECS
S-3855
714-556-1916
Phone No. of SO:
Building Permit No.:
Structural Observer (SO), if not by SOR:
Professional Lic./Reg No.:
B23-0160
Erik Torres. EIT
714-556-1916
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box)
FOUNDATIONS
WALLS
FRAMES
DIAPHRAGMS
IF PORTION OF BLDG WAS DATE
(Floor/Roof)
OBSERVED, INDICATE LOCATION
® Fooling, Stem Wall
❑ Concrete
❑ Steel Moment Frame
❑ Concrete
P T Foundation Sy_stea: 5/24/23
❑ Mat Foundation,
❑ Masonry
❑ Steel Braced Frame
❑ Steel Deck
i.e. post -tension cables and
Pre -stressed Conc. Slab
❑ Caisson, Pile, Grade
❑ Wood Shear Wall
❑ Concrete Moment
❑ Wood
accessories, anc orDI s, no own
Beam
Panel
Frame
bolts & stra s. 2ost bases slab
Z1 Foundation Pad,
❑ Other:
❑ Masonry Wall Frame
❑ Other:Anchor
size/reinforcement and footing &
❑ Other:
1-] Other:
❑ Other:
❑ Other:
pad size/reinforcement.
Jf ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
OBSERVED DEFICIENCIES AND COMMENTS:
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
I declare that the following statements are true to the best of my knowledge:
1. 1 am the Registered Design Professional retained by the Owner to be in responsible charge of the
structural observation in accordance with the requirements of the City of San Juan Capistrano;
2. I, or another Registered Design Professional whom I have designated above and is under my
responsible charge, has performed the required Slte Visits at each significant construction stage to
verify that the structure is in general conformance with the approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected and a new structural
observation report must be issued clearing these deficiencies; and
4. 1 understand that final acceptance of Ole structural systems by the Building and Safety Division cannot
occur without the erection of all.obseeved ciefiffencies
May 24, 2023
OF RECORD DATE
Former - Structural Observation Report
Updated: 06-28-17
m
N0. S 3655 �
* Exp. 3/31/2024
�' 4
9pY RUCT 1i -�
OF CALF
STAMP OF STRUCTURAL OBSERVER OF RECORD
Page 1 of 2
City of San Juan Capistrano
Development Services Department
Building and Safety Division
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Phone: (949) 443-6347
Website: www.sanjuancapistrano.org
Project: Caspian at The Farm
Option One J.N: 0121-2495
Structural Observation Report Arch: WHA -19206
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for
general conformance to the approved construction documents at significant construction stages and at completion of the
structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC
Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC. Phase: 12
Homesite: 54
This report includes all construction work through 27th day of July '2023 Plan 1 B Report No.: Page No.: 1 of 1
Project Address: Structural Observer of Record (SOR): Professional Lic./Reg. No.: Phone No. of SOR:
26168 Meadow Dr., San Juan Capistrano, CA 92675 Option One Consulting Engineers
(Ilia B. Sarad. PE. SE, SECS) 9-3855 714-556-1916
Building Permit No.: Structural Observer (SO), if not by SOR: Professional Lic./Reg. No.: Phone No. of SO:
B23-0160 Luis Salas, E.I.T 714-556-1916
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box)
FOUNDATIONS
WALLS
FRAMES
DIAPHRAGMS
IF PORTION OF BLDG WAS
DATE
(Floor/Root)
OBSERVED, INDICATE LOCATION
❑ Fooling, Stem Wall
❑ Concrete
❑ Steel Moment Frame
❑ Concrete
Inferior and ExtedgL
❑ Steel Deck
Gen__er_al Sy_sfem;.
i.e., roof trusses, roof
7/27/23
❑ Mat Foundation,
❑ Masonry
❑ Steel Braced Frame
Pre -stressed Conc. Slab
sheathincishear element,
❑ Caisson, Pile, Grade
® Wood Shear Wall
❑ Concrete Moment
® Wood
holdowns, floor sheathing, floor
Beam
Panel
Frame
trusses, beams, headers and
❑ Foundation Pad,
❑ Other: ❑ Masonry Wall Frame
❑ Other:
Anchor
❑ Other: ❑ Other:
❑ Other:
❑ Other:
L'_i ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
0 FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
OBSERVED DEFICIENCIES AND COMMENTS:
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
I declare that the following statements are true to the best of my knowledge:
1. I am the Registered Design Professional retained by the Owner to be in responsible charge of the
structural observation in accordance with the requirements of the City of San Juan Capistrano;
2. I, or another Registered Design Professional whom I have designated above and is under my
responsible charge, has performed the required site visits at each significant construction stage to
verify that the structure is in general conformance with the approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected and a new structural
observation report must be issued clearing these deficiencies; and
4. 1 understand that finyl acceptance of the structural systems by the Building and Safety Division cannot
occur without the c r ctlon of all observiAd defi les.
O
July 27, 2023
LX1'B- �A4
N0. S 3855
Exp. 3/31/2024
�rROCT t1R1'�
RECORD DATE STAMP OF STRUCTURAL OBSERVER OF RECORD
Form - Structural Observation Report v1.Odl& J Page 1 of 2
Updated: 06-28-17
BOARD OF DIRECTORS
LAURA FREESE
CHARLES T. GIBSON
SAUNDRA F. JACOBS
BETTY H. OLSON, PH.D
FRANK URY
DANIEL R. FERONS
GENERAL MANAGER
October 13, 2023
County of Orange
Planning and Development
601 North Ross Street
Santa Ana, CA 92701
Santa Marzgarzi to Waterz Distaict
Attention Release Desk: Renee.ChinchiIla,ii ocpw.00nov.com;
Subject: Tract 19063, Phase 12 Caspian, Lots 52-56_126-128, in ID 9 —26188, 26178,
26168, 26158, 26148, 26147, 26157 and 23167 Meadow Dr.
The above referenced lots may be released for occupancy as far as the District is concerned
effective October 11, 2023.
Developer: Lennar Homes
This release does not constitute authorization for you to release the water and sewer bonds for the
subject lots. This authorization will be a Resolution of the Board of Directors of the Santa
Margarita Water District. When the water and sewer facilities are formally accepted by the Board,
they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded
to you.
Should you have any questions or desire additional information please contact me at (949)
459-6504.
Sincerely,
SANTA MARGARITA WATER DISTRICT
po� Pytxl�
Patricia Butler, P. E.
Chief Engineer
cc: Tony Gaetano, Inspector
Elena Wilson\email
Irma Lopez\email
Eric Smith\email
Mona Boers-Kort\email
Steve Skeffington\email
Lang Jeffery\email
File S\Eng\Tract Occupancy Release Letters
Santa Margarita Water District • 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688
wwwSMWD.com 0 (949) 459-6420
'Irrinuu„ l� Imp, "i"11 'C Veal ri'dl T' mor "
SOUrHWESTAkAAkALA,....._AIL ALL A6,ALALAk
thlspcction &' Yt'tillllti. 1IIC. 441 Coninwi ial W:i\, La Habra, (.\')I)h.i1-0100
FAX (562040-0020
040-0020
October 16, 2023
Building Official
City of San Juan Capistrano
Department of Building & Safety
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
SPECIAL INSPECTOR'S FINAL REPORT
Project Name: Caspian @ The Farm - Phase 12
Address: Tract #19063, San Juan Capistrano
Owner: Lennar
Lot Address Permit# Lot
Address
Permit#
52 26118 Meadow Drive B23-0158 56
26148 Meadow Drive
B23-0162
53 26178 Meadow Drive B23-0159 126
26147 Meadow Drive
B23-0163
54 26168 Meadow Drive B23-0160 127
26157 Meadow Drive
B23-0164
55 26158 Meadow Drive B23-0161 128
26167 Meadow Drive
B23-0165
This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special
inspection on the above-mentioned project at the above address, which required continuous
inspection per section 1701 of the California Building Code.
Makar Attallah - Reinforced Concrete, ICC #9087435
Jason Sharobeem - Reinforced Concrete, ICC #9662561
Steve Skuljan - Reinforced Concrete, Post Tensioned Concrete, ICC #1140003
Rob Langner - Reinforced Concrete, Post Tensioned Concrete, ICC #1139855
Danny Estrada - DIA/Epoxy, HD Titens, Shear Nailing, Wood Framing, ICC# 5093138
Based upon special inspection and materials testing written reports of this work, it is our judgment
that the inspected work was performed to the best of our knowledge, in accordance with the
approved plans, specifications and applicable workmanship provision of the California Building Code.
Sincerely,
� Rer
C04 t r, m
P EYF
Steven L. Godbey Ian R. VVac'Jcli1, P. E.
President Principal Engineer
SLG/IRW: spg For inspection and testing only, no design
responsibility expressed or implied.
LGO
Geotechnical, Inc.
October 16, 2023
Mr. Brett Hamara
Lennar Corporation
15131 Alton Parkway, Suite 365
Irvine, CA 92618
Project No. 18182-01
Subject. Geotechnical Release of Postgrading for Lots 52 through 56 and 126 through 128,
Phase 12, Caspian, Tract 19063, "The Farm" Residential Development, San Juan
Capistrano, California
In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Lots
52 through 56 and 126 through 128, Phase 12 of Caspian for "The Farm" residential development, Tract
19063, located in the City of San Juan Capistrano, California. LGC Geotechnical field personnel have
provided part-time, on-call observation and field density testing of postgrading operations in order to
form an opinion of site earthwork. In general, postgrading operations observed and/or tested by LGC
Geotechnical included interior plumbing backfill, foundation footing excavations, utility house
connection backfill, and subgrade preparation. Refer to table below for lots and associated addresses.
&ffaradinaR l au Lot Summa - CaMign - Phase 12
Lot No.
Address
Permit
52
26188 Meadow Drive
B23-0158
53
26178 Meadow Drive
B23-0159
54
26168 Meadow Drive
B23-0160
55
26158 Meadow Drive
B23-0161
56
26148 Meadow Drive
B23-0162
126
26147 Meadow Drive
B23-0163
127
26157 Meadow Drive
B23-0164
128
26167 Meadow Drive
B23-0165
Based on the results of our observation and testing, it is our opinion that the subject site earthwork
operations were completed in general accordance with project geotechnical recommendations. This
letter serves as a geotechnical release from postgrading operations for the subject lots at The.Farm
residential development. In our opinion, the subject building pads are suitable for their intended use
from a geotechnical perspective.
Closure
Our services were performed using the degree of care and skill ordinarily exercised, under similar
circumstances, by reputable engineers and geologists practicing in this or similar localities. No other
warranty, expressed or implied, is made as to the conclusions and professional advice included in this
report.
Should you have any questions regarding this letter, please do not hesitate to contact our office. We
appreciate this opportunity to be of service.
Respectfully,
LGC Geotechnical, Inc.
�P
No. 3147
Ryan Douglas, PE, GE 3147
Project Engineer
RLD/amm
Distribution: (1) Addressee (electronic copy)
Project No. 18182-01 Page 2 October 16, 2023
C) r=Q_k Iq Fq
N C O R P O R A T E D
environmental services
the face of a greener generation
Acct: 81-40635
Company: Lennar Homes - The Farm
Year: 2023 2nd Qtr
Address 32382 Del Obispo
City: San Juan Capistrano
92675
Recycling Report
Date of Haul Bin Size Tonnage
Roll -Off Processed Loads
4/4/2023
40
4.29
4/4/2023
40
3.92
4/10/2023
40
5.97
4/12/2023
40
8.22
4/12/2023
40
8.39
5/12/2023
40
2.18
6/20/2023
40
5.3
6/20/2023
40
5.38
4/13/2023
40
3.67
4/13/2023
40
6.13
4/25/2023
40
4.03
4/25/2023
40
5.56
4/25/2023
40
4.57
4/25/2023
40
4.95
4/27/2023
40
4.64
4/28/2023
40
3.15
5/3/2023
40
3.65
5/10/2023
40
4.23
5/10/2023
40
2.78
5/11/2023
40
6.22
5/11/2023
40
6.52
5/17/2023
40
1.8
5/17/2023
40
5.04
6/20/2023
40
5.16
5/24/2023
40
5.36
5/24/2023
40
5.72
5/24/2023
40
6.3
5/31/2023
40
8.26
6/5/2023
40
4.75
6/13/2023
40
7.49
6/13/2023
40
7.04
6/13/2023
40
4.21
6/21/2023
40
10.3
6/21/2023
40
1.67
6/22/2023
40
3.45
6/27/2023
40
3.04
6/30/2023
40
6.9
6/30/2023
40
5.15
Total Collected
10
195.39
Percentage Diverted FROM Landfill:
10
142.63 73.00%
Percentage Disposed
10
52.76
Date of Haul
Bin Size
Tonnage
Roll -Off Processed
Loads - Lowboy
5/2/2023
10
7.04
5/2/2023
10
5.73
5/9/2023
10
9.34
5/9/2023
10
9.02
4/19/2023
10
8.14
4/19/2023
10
8.13
4/25/2023
10
9.59
4/25/2023
10
8.32
4/27/2023
10
4.22
4/27/2023
10
5.63
5/10/2023
10
8.71
5/10/2023
10
3.89
5/10/2023
10
7.39
5/11/2023
10
8.08
5/3/2023
10
10.24
5/3/2023
10
9.67
5/4/2023
10
10.36
5/4/2023
10
4.05
5/4/2023
10
7.11
5/6/2023
10
3.7
5/6/2023
10
3.35
5/6/2023
10
10.01
6/1/2023
10
9.64
6/1/2023
10
6.49
6/11/2023
10
8.22
6/2/2023
10
8.94
6/2/2023
10
9.62
6/2/2023
10
9.54
6/13/2023
10
6.24
6/21/2023
10
10.2
6/21/2023
10
10.78
6/30/2023
10
8.81
Total Collected 250.20
Percentage Diverted FROM Landfill: 227.68 91.00%
Percentage Disposed 22.52
Roll -Off Pure Loads of Material
0.00
Percentage Diverted FROM Landfill: 0.00 100.00%
Percentage Disposed
Project Totals
Percentage Diverted FROM Landfill:
Percentage Disposed
Craig Dibley
Senior Sustainability Supervisor
CR&R Incorporated
370.32 83.11%
75.27
Date
July 13, 2023
PROACTIVE
ENGINEERING CONSULTANTS
o diMnmt kind o/company
October 26, 2023
City of San Juan Capistrano
Building Department
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Attention: City Grading Inspector
Subject: CIVIL ENGINEERS'S VERIFICATION OF PRECISE GRADING
Project: Tract 19063, Lot(s) 52-56 &126-128 (Caspian Phase 12)
Street Address(es) 26188, 26178, 26168, 26158, 26148, 26167, 26157 & 26147 Meadow
Dr
I hereby approve the precise grading for the referenced project in accordance with my responsibilities as
the Engineer of Record. The precise grading has been completed substantially in conformance with the
approved grading plan which includes line and grade for all engineered drainage devices, staking of
property corners for proper building location, location and inclination of all slopes, and the construction
of earthen berms and positive building pad drainage.
Sincerely,
Proactive Engineering Consultants
\-W
Amy Jaramillo
RCE 94608
NA20 084.0001MAMCert LettersWG Certs1PG cert lots 148-185 & 94.docx
27012 Tovine Centre Drive, Suite 110
Fcotniil Ranch CA 92610
T 949r -f16-7460
W ,%,vd proartiveen4meenng net
gOF E SS
o
N0. 94608
OF C At��