Loading...
B23-0121 - 32074 PASEO VIBRANTE30448 Rancho Viejo Road, Suite 110 San Juan Capistrano, CA 92675 (949) 493-1171 (949) 493-1053 Fax www.SanJuanCapistrano.org December 05, 2023 Owner: ARROYO CAP II 1 LLC 18575 JAMBOREE RD #350 IRVINE, CA 92612 MEMBERS OF THE CITY COUNCIL: CERTIFICATE OF USE & OCCUPANCY Troy Bourne John Campbell Sergio Farias Howard Hart John Taylor HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING: Permit Number: B23-0121 Building Address: 32074 PASEO VIBRANTRE Tract: 18148 Lot: 2 Unit: 122 Building Use: (1767sfl SINGLE FAMILY DWELLING w/ (413sfl ATTACHED GARAGE Occupancy Classification: R -3/U Type of Construction: VB Occupant Load: PER CBC SECTION 1004 Fire Sprinkler: YES Special Conditions: CITY OF SAN JUAN CAPISTRANO a JAMES WIATRAK, CBO, CASp Chief Building Official POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE CHIEF BUILDING OFFICIAL THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER 12/5/2023 Page 1 Plan Review History Permit Number B23-0121 COO APPROVED Dianna Flores Applied 2/2/2023 LL3 Approved 2/2/2023 LL3 Type BUILDING COO APPROVED Jocelyne Mejia Issued 2/22/2023 LL1 Subtype SFD -ATTACHED Finaled 11/17/202: KH1 Status FINALED COO APPROVED Noreen Swiontek Expired Remarks and Notes: COO - PLANNING - COO APPROVED Laura Stokes Owner ARROYO CAP II 1 LLC, Applicant LANDSEA CONSTRUCTION LLC Site Address City State Zip 32074 PASEO VIBRANTRE 122 SAN JUAN CAPISTRANO CA 92675 Subdivision Tract Block Lot No Parcel No AVELINA 18148 2 TRACT 18148 UNF Zoning Construction Type Occupancy Type VB R -3/U Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PC APPROVED Camilo Jimenez 2/2/23 2/22/23 20 Ronin Remarks and Notes: Review Group: BUILDING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed BUILDING 4+ PC APPROVED CSG Remarks and Notes: 5/4/22 5/27/22 5/11/22 7 Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF COO APPROVED Dianna Flores orri ipnniry Remarks and Notes: COO - BUS COO APPROVED Jocelyne Mejia i ir.FnicF Remarks and Notes: COO - NPDES COO APPROVED Noreen Swiontek Remarks and Notes: COO - PLANNING - COO APPROVED Laura Stokes Noi icinir: Remarks and Notes: PERMIT REVIEWS Report By: 10/31/23 12/5/23 35 10/31/23 11/9/23 10/31/23 0 10/31/23 11/9/23 11/16/23 16 10/31/23 11/9/23 10/31/23 0 COO - PLANNING - COO APPROVED PLANNING 10/31/23 11/9/23 11/16/23 16 PRn I KAHN Remarks and Notes: (11/6/2023 9:02 AM LS) Requested Landscape Architect Conformance Letter for Building/Units via email. COO cannot be signed off until the letter has been received. (11/16/2023 2:16 PM LS) Letter recieved via email 11/16/23. COO - PUB WRKS COO APPROVED James Prather 10/31/23 11/9/23 10/31/23 0 rnnl Inlcp Remarks and Notes: COO - SMWD COO APPROVED SMWD 10/31/23 11/9123 ----- -- ---- 11/17/23 --------------------- 17 Remarks and Notes: COO - UTILITIES COO APPROVED Dianna Flores 10/31/23 11/9123 1112/23 2 RFIFOCFC Remarks and Notes: COO -BLDG COO APPROVED Kevin Hughes 10/31/23 11/17123 '17 r,,ROnwr,,/RnNn Remarks and Notes: COO -OCFA- COO APPROVED Kevin Hughes 10/31/23 11/17/23 17 rnAAAAimn/mi II Remarks and Notes: Review Group: PLANNING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed PLANNING 2nd PC APPROVED Laura Stokes 3/8/22 5/27/22 3/17/22 9 Remarks and Notes: PERMIT REVIEWS .Report By: Ow$YS i EmS CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT Permit No. B23-0121 ISSUED 02/22/2023 DESCRIPTIO Permit Number B23-0121 AVELINA PH 3.4-PLEX. PLAN 2 -SP. 1767sf SFR. 413sfATT GAR 8 ROOF MOUNTED SOLAR PANELS. 2.80kW DC SYSTEM. ARCH PC ISSUED BY LLl B21-1320 SITE APN TRACT 18148 UNIT 122 SITE LOT NO 2 SITE TRACT 18148FWAL SiTE SUBDIVISION AVELINA JOB VALUE $ 201,049 OCCUPANCYTYPE R -3/U PERMIT TYPE. BUILDING r L r JR],CAI, PERMIT AMOUNT BUILDING SF 1,767 NEW RES OCCUPANCY GROUP R-3 109.86 NO STORIES 3 NEW RES OCCUPANCY GROUP U 12.39 NO UNITS I SERVICES 600V OR LESS NOT OVER 200AMPS 33.78 ELECTRICAL ISSUANCE FEE 27.24 JOB ADDRESS: 32074 PASEO VIBRANTRE 122 OWNER NAME ARROYO CAP 111 LLC, PHONE (949) 476-2246 MAILING ADDRESS 18575 JAMBOREE RD CITY.STATE,ZIP IRVINE, CA 92612 Total Electrical 183,27 CONTRACTOR NAME LANDSEA CONSTRUCTION LLC PLUMBING PERMIT AMOUNT 1042287 PLUMBING ISSUANCE FEE 27.24 ST. LIC EXPIRE 07/31/2024 FIXTURES AND VENTS 173.60 PHONE (949) 379-5289 WATER HEATER INCLUDING VENT 13.62 ADDRESS 660 NEWPORT CENTER DR 9300 WATER PIPING SYSTEMS 5-26 CiTY, ST, ZIP NEWPORT BEACH, CA 92660 ii GAS SYSTEMS 6-81 BUILDING SEWER 27-29 TENANT NAME PHONE H FIRE INSTALL I TO 50 66.44 MAILING ADDR CITY- ST. ZIP MECHANICAL PERMIT AMOUNT MOBILE HOME PERMIT AMOUNT DUCT INSTALL/REPLACE/RELOC 136.51 APPLIANCE VENTS 8.03 VENTS AND EXHAUST HOOD/DUCTS 11.79 AC/BO[LER/COMPR<3HPAND 100K BTU 16 28 EXHAUST FAN W/ SINGLE DUCT 42-00 Total Mobile Home FURNACE FORCED AIR OR GRAVITY UP TO 100K 16.39 MECHANICAL ISSUANCE FEES 27.24 I have carefully examined the completed permit application and do hereby certify under penalty of perjury that all information hereon including the declarations are true and correct and I further Total Mechanical 258.24 certify and agree if a permit is issued: to comply with all City, County, and State laws governing expiration:: Every permit issued shall become invalid unless the work on the site authorized by building construction, whether specified herein or not. I also agree to save, indemnify and keep hanmless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses uch permit is commenced within 12 months after its issuance, or if the work authorized on the Which 1113yin any way accrue against sfd City in consequence of the granting of this permit ite by such permit is suspended or abandoned for a period of 180 days after the time the work rt >: ` , M r r4yll Owner/Contractor r ommenced. OSHA permit is required for excavations over 5'0" deep and demolition or construction of Print NameAn structures over 3 stories in height, licant's signaturewllv-ajk�' _ Contcmclor: I hereby aflimm till i am licensed under prm is ne of (.1tap •r 9 of Division 3 of the Business and Professions Code, and my license is in full force and effect. Owner/Kuilder: 1, as owner of the property, or my employees with wages as their sole com pcnsarion, will do thew ork and the smuctu re is not intended or offered for sale (Sec 7044, Bus mess and Nofcssions Code: the Contractor's License Laws does not apply to and owner of property who builds or improves thereon, who does such work himself or through his employees, provided that such improvements arc not intended or otTcred for sale- If however, the building or improvement is sold within one yearof completion, the owner -builder will have the burden ofproving that he did not build or improve for the purpose of sale) OMner milder. 1. os owner of the property, am exclusively contracting ssilh hcen:ed conhaeWFS In construct the project (Sec 7044, Business and Professions Code: The Contractor's License Lar, does not as rn,r r of pmpnty who builds or improves thereon and who eonfurch fit sigh projects w ith a cartra:mr's) license pursuant to the Contractor's License Law ►'nrkrrti Cnrgpgnsatioa-i hereby affirm under penalty of perjury one of the following declaralions:l have and will maintain workers' compensation insurance, as required by Section 3700 ofs 4.a 4&-. for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number arc: Carrier $TARR iNDEMNI- Y $ LIABILITY C QM Y Po licyk1000004709 (This section needs to he completed if the permit is for one hundred dollars(%100) or less) Exelmntiow I eertily that in the merformanee of the work for which this permit is issued.[ shall not employ any persnn in any mariner so as to hecome sub,icct to the worker s' compensation tars s of California and agree that if 1 should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthssith comply with those provisions Me Applicant w'AR,NING.F-ULURETO SECURE WORKFRS'CO\iPENSATION COVERAGE IS UNLAWFUL, AND SITALI. SL'BJECTAN EMPLOYERTI CRIMINAL PENALTIES AND CIVIL FINES UPTO ONE H[JNDRED THUVSDAND DOLLARS(S100,000) IN ADDITION TO THE COST OF COr'IJ'GNSAI ION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF ME LABOR CODE, fNTERESF, AND ATTORNEY'S FFG% ITY OF SAN JUAN CAPISTRANO BUILDING PERMIT FEES 379-5299 Nil Account # Type Cost 01-44221 Building Permit $ 1,738.60 01-44223 Mechanical S 258.24 01-44224 Plumbing $ 320.26 01-44225 Electrical $ 183.27 01-44221 Mobile Home Permit $ 0.00 01-44222 Grading Permit Fee $ 0.00 01-44231 Grading Plan Check $ 0.00 01-44222 On -Site Residential Permit $ 0.00 01-44231 On -Site Residential Plan Check Subtotal $ $ 0.00 2,500.37 01.44230 Bond Processing $ 0.00 01-44230 Building Plan Check S 0.00 01-44230 ,Additional Plan Check $ 0.00 01-44230 Digital Record Fee ($1.00 per sheet) $ 34.20 01-44221 C & D Administrative Fee $ 92.74 01-44221 Special Inspection -Reinspection $ 0.00 01-44222 On -Site Commercial/Tract Permit Fee S 0.00 01-44231 On -Site Commercial/Tract Plan Check Fee $ 0.00 01-44214 Geotechnical Soils Plan Review $ 0.00 10-44320 Ordinance 211 $ 50.00 10-42510 Ordinance 364 S 2,010.49 01-45354 Copies @ .20 Each $ 0.00 90-23331 SMIP Fee $ 26.14 33-44370 H.O.P.E. Fee (Housing in Lieu) $ 0.00 Other Fees $ 6,687.90 TCA Fees Date Received HOA pprova ate eceive c ool ees Date Received ngineering Fees Date Received Water Division Fees I Date Received 01-44221 Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check)) $ 342.27 01-44221 Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check) $ 0.00 01-44240 NPDES Permit Fee (10% Permit Subtotal) S 250.04 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type $ 2,010.49 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO $ 14,004.64 Receipt # 93731 Date: 2/22/2023 Cashier: BOARD OF DIRECTORS LAURA FREESE CHARLES T. GIBSON SAUNDRA F. JACOBS BETTY H. OLSON, PH.D FRANK URY DANIEL R. FERONS GENERAL MANAGER November 15, 2023 City of San Juan Capistrano Building Division 30448 Rancho Viejo Road, #110 San Juan Capistrano, CA 92675 Attention: Building Division Santa Mangalzita Wateiz District Subject: Tract 18148, Avelina Lots 121-128, Building 13-14, Phase 3 in ID 9 — 32070, 32071, 32074, 32075, 32078, 32079, 32082 and 32083 Paseo Vibrantre The following referenced location(s) may be released as far as the District is concerned effective November 15, 2023. Developer: LandSea Homes This release does not constitute authorization for you to release the water and sewer bonds for the subject lots. This authorization will be a Resolution of the Board of Directors of the Santa Margarita Water District. When the water and sewer facilities are formally accepted by the Board, they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded to you. Should you have any questions please contact me at (949) 459-6504. Sincerely, SANTA MARGARITA WATER DISTRICT Patricia Butler, P.E. Chief Engineer cc: Tony Gaetano, Inspector Elena Wilson/email Irma Lopez/email Mona Boers -Kort /email Renee Chinchilla/email Steve Skeffmgton/email Larry Jeffery/email File S\Eng\Tract Occupancy Release Letters Santa Margarita Water District • 2611 I Antonio Parkway, Rancho Santa Margarita, CA 92688 wwww.SMWD.com • (949) 459-6420 DATE ISSUED: February 22, 2023 Inspection Job Card r� PERMIT NUMBER JOB DESCRIPTION: — B23-0121 AVELINA PH 3. 4-PLEX. PLAN 2 -SP. 1767sf SFR. 413sf ATT GAR 32074 PASEO VIBRANTRE 122 8 ROOF MOUNTED SOLAR PANELS. 2.80kW DC SYSTEM. ARCH PC 1320 ARROYO CAP II I LLC, -Owner TRACT 18148. LOT 2. UNIT 122. AVE LINA PHASE 2. 3 SCHEDULE INSPECTIONS or VIEW RESULTS at www.sanjuancapistrano.orgl� INSPECTION REQUEST LINE (949) 493-3172 You must furnish PERMIT NUMBER, JOB ADDRESS and the TYPE OF INSPECTION at the time of inspection request Inspection requests received before4:00 pm will be scheduled on the next business day JOB CARD AND APPROVED PLANS MUST BE PRESENT ON JOBSITE IN ORDER TO PERFORM INSPECTION SEE BACK FOR ADDITIONAL INSPECTION INFORMATION DO NOT COVER OR CONCEAL THE WORK BELOW UNTIL THE GENERAL I MISCELLANEOUS DATE/SIGNATURE FOLLOWING APPLICABLE ITEMS HAVE BEEN SIGNED UNDERGROUND / FOUNDATIONS DATE/ SIGNATURE Temporary Power released Pregrade/Precon Meeting Electrical Release Sewer Connection Rough Grade �_ AAI-. -- e unaergrouna mum Underground Wate. Underground Electi Underground Gas I Wer Ground Pre - Slab Footings J Form I S Drainage ng - cal '_,_ ' Raaf Drains I Gutters � ine one ome a up/ uRies Grease Interceptor Grease Receatacie I DO NOT COVER. OR POUR CONCRETE UNTIL ABOVE SIGNED OFF I )or -r- re -i nsulatlon ROUGH DATE/SIGNATURE POOL & SPA 11 DATE/SIGNATURE Pre-Gunite - Steel / Rock Feature Steel Pool Equipment & Location Rouqh Plumbing & Pressure Test j Elect. Conduit - Underground j Gas Pipe - Underground -Test a .r Lw Backwash - Lines - P -Trap i(dviare Pre-DecVBonding 1 1 p 9 t Dia fire m DO NOTAPPLY PLASTER COAT UNTIL THE FOLLOWING APPLICABLE 7uh ro es t 2� EAA HAS BFFN SIGNB J Fencing / Pool Alarms / Preplaster gal (HeatinglVents) c5 IT IS IMPERATIVE THAT FINAL APPROVAL BE OBTAINED PRIORTO I L USING THE SWIMMING POOL COVERS MUST BE ON POOLS AT THE TIME OF FINAL INSPECTION_ Kougn viumning / I op -our ( Z/1197 Kougn rrarning Air Gap! Back Flow Preventer DO NOT COVER OR CONCEAL THE WORK ABOVE UNTIL THE FOLLOWING APPLICABLE ITEMS HAVE BEEN SIGNED Pool I Spa - systems Final INTERIOR / EXTERIOR DATE/ SIGNATURE Exterior Lath BUSINESS LICENSE SUB -LIST VERIFICATION FORM MUST BE Insulation SUBMITTED AND APPROVED PRIOR TO FINAL INSPECTION Drywall Interior Lath. FINAL INSPECTIONS DATE/SIGNATURE DO NOT COVER OR CONCEAL THE WORK ABOVE UNTIL THE FOLLOWING APPLICABLE ITEMS HAVE BEEN SIGNED MASONRY 1 DI -TE / SIGNATURE Foundation 1 st Grout Lift 2nd Grout Lift Wall Drainage/Waterproofing CARBON MONOXIDE/SMOKE DETECTORS FIRE DEPT FINAL (714) 573-6150 ,HEALTH DEPT FINAL (714) 433-6074 �IAECHANICAL FINAL (949) 493-3172 i=LE TRICAL FINAL (949) 493-3172 IPLUMBING FINAL (949) 493-3172 3RADING FINAL (949) 493-3172 MWD f949) 459-6505 BUILDING FINAL (949) 493-3172 All applicable finals above must be signed off before building final. I Title-24/Energy Star Experts Independent HERS Rater Duct Testing Professionals CALIFORNIA LIVING & ENERGY,,„ A division of William Lilly and Assoc. Inc. a e 24 Compliance-Nesidentiaon-ResidentiaI Ceres, CA 95307 Ph: 209-538-2879 Southern California Office: Riverside, CA 92530 Ph: 800-498-4110 Guaranteed Home buyer Comfort HVAC problems corrected Mechanical/Plumbing/MEP Engineering LOT STATUS REPORT Below is a status of all inspections/testing performed. For passed lots please allow up to 48 hours to receive your final paperwork. If there is a failure please see the issues listed below. Once all corrections have been made please reschedule by emailing into schedulingQ_caiifliving.com orfaxing to 209-538-2885 urease Note: If we are not called out to finish it may Drevent the collection . ______ incentives on tr , :is' in :uestion Date Inspector Builder Subdivision Superintendent 11/16/23 Daniel Diaz Landsea Avelina Chrisliack ❑■ Spoke w/ super on-site ❑ Called and spoke w/ super ❑ Left message for super 0 Emailed Lot # 1 122 1 Passed at final 123 1 Passed at final Description NOTE: EER/SEER TEST RESULTS WILL BE VERIFIED IN THE OFFICE VERIFICATION RATED HEAT PUMP CAPACITY WILL BE VERIFIED IN OFFICE FOR PASS/FAILURE Plumbing Concepts, Inc. 2445 Railroad St. Corona, CA 92880 License No. 469996 Project Name: AVELINA Tract No.19148 Project Location: RANCHO MISSION VIEJO ATTN: LANDSEA HOMES RE: Sewer Camera PH -3 LOTS -121-122-123-124-125-126-127-123 To Whom it may concern, 11-14-23 Please allow this letter to serve as confirmation that the above referenced project had the sewer lines video inspected, and they have been found to be free and clear of debris. If you have any questions, please feel free to contact us. Yours tru ly, Doug Moore Director of Quality Assurance (951) 520-8590 ext. 7142 (951) 520-0834 fax LGO I . Geotechnical, Inc. November 15, 2023 Ms. Shannon Whittaker Landsea Homes 7525 Irvine Center Drive, Suite 200 Irvine, CA 92618 Project No. 20266-01 Subject. Geotechnical Release from Post -Grading, Phase 3, Building 14, Units 121 through 124, Building 13, Units 125 through 128, and Building 12, Units 129 through 132, 'Avelino" Residential Development, Tract 18148, Southwest Corner of Calle Arroyo and Paseo Tirador, City of San Juan Capistrano, California In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Phase 3, Building 14, Units 121 through 124, Building 13, Units 124 through 128, and Building 12, Units 129 through 132 of the "Avelina" residential development, Tract 18148, located in the City of San Juan Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-call observation and field density testing of postgrading operations in order to form an opinion of site earthwork. In general, postgrading operations observed and/or tested by LGC Geotechnical included interior plumbing backfill, foundation footing excavations, utility house connection backfill, and subgrade preparation. Refer to table below for lots and associated addresses. Postgrading Release Lot Summary - Avelina Building No. Unit No. Address Permit No. 14 121 32070 Paseo Vibrante B23-0120 14 122 32074 Paseo Vibrante B23-0121 14 123 32078 Paseo Vibrante B23-0122 14 124 32082 Paseo Vibrante B23-0123 14 HM 32082 Paseo Vibrante B23-0791 13 125 32083 Paseo Vibrante B23-0124 13 126 32079 Paseo Vibrante B23-0125 13 127 32075 Paseo Vibrante B23-0126 13 128 32071 Paseo Vibrante B23-0127 13 HM 32071 Paseo Vibrante B23-0793 Por rading Release Lot SRmMa _ &Xgl n(Continued) Building No. Unit No. Address Permit No. 12 129 26970 Via Caminata B23-0128 12 130 26966 Via Caminata B23-0129 12 131 26962 Via Caminata B23-0130 12 132 26958 Via Caminata B23-0131 12 HM 26970 Via Caminata B23-0069 Based on the results of our observation and testing, it is our opinion that the subject site earthwork operations were completed in general accordance with project geotechnical recommendations. This letter serves as a geotechnical release from postgrading operations for the subject lots at the "Avelina" residential development. In our opinion, the subject building pads are suitable for their intended use from a geotechnical perspective. Closure Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. Should you have any questions regarding this letter, please do not hesitate to contact our office. We appreciate this opportunity to be of service. Respectfully, LGC Geotechnical, Inc. 9 — Barryaham, CEG 2749 Project Geologist BPG/amm Distribution: (1) Addressee (electronic copy) (1) X Engineering and Consulting, Inc. (electronic copy) Attn: Mr. Selwyn Harsono Project No. 20266-01 Page 2 November 15, 2023 landscape architecture / land planning November 16, 2023 Shannon Whittaker Landsea Homes 7525 Irvine Center Drive Suite 200 Irvine, CA 92618 RE: Conformance Letter Tirador, Tract 18148 Avelina Phase 3 — Building 12 (Units #129 through #132), Building 13 (Units 125 through 128) and Building 14 (Units #121 through #124) This letter is to certify that all items for the phase mentioned above has been completed to the satisfaction of the landscape architect. I declare in my professional opinion and to the best of my knowledge, available information, and belief. That the landscape plans for the above -referenced project have been completed within the intent of the project and in accordance with the City of San Juan Capistrano approved plans and specifications. This conformance letter applies only to plant locations and quantities. SJA Inc. was not present for the installation or observation of the irrigation system. SJA Inc. cannot certify conformance of below grade materials, installation techniques, or irrigation pipe sizing. Please do not hesitate to call my office if you should have any questions. +r1f 4 i Sincerely, i~ a Sl 2 Denny Smitall s NA E pa Princi 1 �g w 43/30/24 j 0CAI► 7859 Sitio Coco, Carlsbad California 92009 I TEL 949.276.6500 1 FAX 949.276.6506 1 www.SJAINC.COM I♦ � ( 'nuliNunu� /it sp (fit)n .l Mat4'ri,its 7I-Nting SOUTH[WESTAk_AL,&AL,A6,AL_AL,&_AL,&ALA& 111spuclion &' Testing, 111C. -1-11 C onimcrclal \Vity. I Habra. CA 9003 1-6 1 6X (562) 94 1 -21990 - (7 14) 520- 8441 E\A (5621) 9.16-(N)26 November 13, 2023 Building Official City of San Juan Capistrano Department of Building & Safety 32400 Paseo Adelanto San Juan Capistrano, CA 92675 SPECIAL INSPECTOR'S FINAL REPORT Project Name: Avelina - Phase 3, Building 14 Address: Tract #18148, San Juan Capistrano Owner: Landsea Homes Lot# Address Permit# 121 32070 Paseo Vibrantre B23-0120 122 32074 Paseo Vibrantre B23-0121 123 32078 Paseo Vibrantre B23-0122 124 32082 Paseo Vibrantre B23-0123 This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection on the above-mentioned project at the above address, which required continuous inspection per section 1701 of The California Building Code. Jeff Masters - Post Tensioned Concrete, Reinforced Concrete, ICC #875886 Anthony Capocciama - Post Tensioned Concrete, Reinforced Concrete, ICC #9795405 David Galaviz - Post Tensioned Concrete, Reinforced Concrete, ICC #5085715 Mina Endrawes - Post Tensioned Concrete, Reinforced Concrete, ICC #9048532 Justin Parrish - Shear Nailing, Wood Framing, Reinforced and Post Tensioned Concrete, ICC #1134401 Based upon special inspection and materials testing written reports of this work, it is our judgment that the inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and applicable workmanship provision of the California Building Code. Sincerely, evi �. — CD4 19 * EXpi� r CIV,\- �� / Steven L. Godbey Ian R. W dd-ell, P.E.- President Principal Engineer SLG/IRW: spg For inspection and testing only, no design responsibility ex reseed or implied.