Loading...
B22-1160 - 27021 VIA CAMINATA 10430448 Rancho Viejo Road, Suite 110 San Juan Capistrano, CA 92675 (949) 493-1171 (949) 493-1053 Fax www.SanJuanCapistrano.org November 03, 2023 Owner: ARROYO CAP II 1 LLC 18575 JAMBOREE RD #350 IRVINE, CA 92612 MEMBERS OF THE CITY COUNCIL: CERTIFICATE OF USE & OCCUPANCY Troy Bourne John Campbell Sergio Farias Howard Hart John Taylor HAVING INSPECTED THE BUILDING HEREIN DESCRIBED AND HAVING FOUND IT TO COMPLY WITH 2019 CBC, CRC, CEC, CPC, CMC, CA ENERGY, CA GREEN AND APPLICABLE CITY CODE REQUIREMENTS FOR ITS INTENDED OCCUPANCY CLASSIFICATION AND USE, THE CITY OF SAN JUAN CAPISTRANO HEREBY CERTIFIES AND RELEASES FOR USE AND OCCUPANCY THE FOLLOWING: Permit Number: B22-1160 Building Address: 27021 VIA CAM INATA Tract: 18148 Lot: 2 Unit: 104 Building Use: (1236sD SINGLE FAMILY DWELLING w/ (422sD ATTACHED GARAGE Occupancy Classification: R -3/U Type of Construction: VB Occupant Load: PER CBC SECTION 1004 Fire Sprinkler: YES Special Conditions: CITY OF SAN JUAN CAPISTRANO JAMES WIATRAK, CBO, CASA Chief Building Official POST IN A CONSPICUOUS PLACE AND DO NOT REMOVE UNLESS APPROVED BY THE CHIEF BUILDING OFFICIAL THIS IS A LEGAL DOCUMENT AND MUST BE GIVEN TO THE LEGAL OWNER OR PURCHASER 1113/2023 Permit Number B22-1160 Type BUILDING Subtype SFD -ATTACHED Status FINALED Owner ARROYO CAP II 1 LLC, Site Address 27021 VIA CAMINATA 104 Subdivision AVELINA Zoning Page 1 Plan Review History Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PCAPPROVED Lisa La 8/24/22 1/19/23 148 RnNn Remarks and Notes: Review Group: BUILDING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed BUILDING 4+ PCAPPROVED CSG 5/4/22 5/27/22 5/11/22 7 Remarks and Notes: Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF Applied 8/24/2022 LL3 11/3/23 Approved 8/24/2022 LL3 Issued 1/19/2023 LL1 Finaled 10/25/202: KH1 Expired •--- ... . .--------------.--... COO - BUS Applicant LANDSEA CONSTRUCTION LLC .. ... .. 9/28/23 City State Zip i ir.FN�F SAN JUAN CAPISTRANO CA 92675 Tract Block Lot No Parcel No 18148 2 TRACT 18148 UNF Construction Type Occupancy Type -------------- COO - NPDES Review Group: ALL REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed C & D RECYCLING PCAPPROVED Lisa La 8/24/22 1/19/23 148 RnNn Remarks and Notes: Review Group: BUILDING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed BUILDING 4+ PCAPPROVED CSG 5/4/22 5/27/22 5/11/22 7 Remarks and Notes: Review Group: COO REVIEWS REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed CERTIFICATE OF COO APPROVED Dianna Flores 9/28/23 11/3/23 36 nrr.1 IPANC.V Remarks and Notes: •--- ... . .--------------.--... COO - BUS ....... COO APPROVED Jocely ne Me•ia .. ... .. 9/28/23 - - - ----------- .. 10/6/23 9129/23 1 i ir.FN�F Remarks and Notes: -------------- COO - NPDES .......... COO APPROVED Noreen Swiontek •---•---•--------=----- 9/28/23 -------- --------------------------- 10/6/23 10/17/23 19 Remarks and Notes: COO - PLANNING - — --- - COO APPROVED Laura Stokes •-•-•----------- 9/28123 -----------------------•-- 10/6/23 1012123 --------------- 4 Nni icINr Remarks and Notes: PERMIT REVIEWS Report By: CRR COO -PLANNING- COO APPROVED PLANNING 9/28/23 10/6/23 10/23/23 25 PRn.I MAN Remarks and Notes: COO -OCFA - COO APPROVED Kevin Hughes Remarks and Notes: (10/3/2023 10:23 AM LS) 10/25/23 27 rnnnnnnNninnl II Planning Inspection Completed 10/3/2023. Remarks and Notes: ............. ........ .... Review Group: PLANNING Requested Landscape Letter 10/3/23. Once recieved, planning will sign off on COO. - -- -- --- --- COO - PUB WRKS _---- ----------------------------------- COO APPROVED James Prather 9128/23 ---- --------- 10/6123 ----------------- 9129/23 --------------------- 1 MIM INCP 9 Remarks and Notes: Remarks and Notes: --- - COO - SMWD - - - - ................ COO APPROVED SMWD -- --- --=---...--------- 9/28/23 10/6/23 10/18/23 20 Remarks and Notes: - - - - ---------•--- COO - UTILITIES ------------------ -- . -------- . COO APPROVED Dianna Flores 9/28/23 ------ -----------. 10/6/23 10/17/23 19 RFI PARPR Remarks and Notes: .---------------------------------------- --_- COO -BLDG COO APPROVED Kevin Hughes 9/28/23 10/25/23 27 rRAnwriRnnln Remarks and Notes: COO -OCFA - COO APPROVED Kevin Hughes 9/28/23 10/25/23 27 rnnnnnnNninnl II Remarks and Notes: ............. ........ .... Review Group: PLANNING REVIEW DATES Review Type Status Reviewer Sent Due Returned Days Elapsed PLANNING 2nd PCAPPROVED Laura Stokes 3/8/22 5/27/22 3/17/22 9 Remarks and Notes: PERMIT REVIEWS Report By: SYSTE t5 ISSUED Y CITY OF SAN JUAN CAPISTRANO 01/19/2023 BUILDING PERMIT Permit No. B22-1160 Permit Number B22-1160 DESCRIPTIO � AVELINA PH 2. 6-PLEX. PLAN IC. 1236sfSFR- 422sfA1-r GAR I ROOF MOUNTED SOLAR PANELS. 2.80kW DC SYSTEM, ARCH PC ISSUED BY LLl 1 1 a 02 -1320 SI'11:APN TRACT 16148 tNIT 10.1 SITE LOT NO SITE TRACT lS.htB SITE SUBDIVISION AVELINA JOB VALUE S 146,151 OCCUPANCY TYPE PERMIT TYPE. BUILDING i_ 'Ft 'A 1, 1'FkNIII AMOUNT BUILDING SF 1.236 NEW RES OCCUPANCY GROUP R-3 77.;6 NO STORIES 0 NEW RES OCCUPANCY GROUP U 1266. NO UNITS 0 SERVICES 606V'M LESS NOT OVER 200ANIPS 33 78' ' JOB ADDRESS: 27021VIA CAMINATA'] 04 ELECTRICAI jSSlji1'N(Ji:•F;L;1 ;• 2724 "r24OWNLiR L)WNLKNANIL ARROYO CAP 111 LLC, ` PHONE (949) 476-2236 MAILING ADDRESS 18575 JAMBOREE RD CITY,STATE,ZIP IRVINE. CA 92612 "IotaLElectrical 151A4 CONTRACTOR NAME LANDSEA CONSTRUCTION LLC j1,ZItNTi3l Vi, 1'FRA71 I AMOUNT 1042287 PLUMBINGISSUANCEi FEE 2724 SC. LIC EXPIRE 07/31/2024 FIXTURES AND VCN•IS 141,05 PHONE (949) 379-5289 WATER IIP.'CIXR.INCL IMING VENT 13.62 .ADDRESS 660 NE\6PORf CENTER DR 11300 WATER Pli;livi SYS'ilitil5 I- - 5.26 CITY, ST, ZIP NEWPORT BEACH, CA 92660 # GAS SYSTEMS 6.81 TENANT NAME BUILDfNe SEWER _ 2729 PHONE # FIRE INSTALL I TO50 66.44 MAILING ADDR CITY, ST, ZIP MECITANTCAL PERMIT AMOUNT M01111-F- "MIF PI':RNII'F• AMOUNT DUCT INSTALL/REP.LACDRELOC 136.51 APPLIANCE. VENTS.: 8.03 VENTS AND EXHAUSTJi00D/Dl%CTS 11.79: AC/BOILER/CON-11I -:311PAND100KBTu 16.28 EXI IrIIIST F 1N •1y/ SI I1G} E UT1UT 4200 1n1aI Mobile Home FURNACE FORCED AIROR GRAVITY UP TO 100K 1639 I have carefuiiy examined the completed permit application and do hereby certify under penalty of MECHAN[CAL fSSUANCE FEES 27.24 - perjnr• that all information hereon including the dcelnraliuns arc Inic and conec( and I furlber Tof31 ;tileehariiea1 2-38,24 certify and agree if a permit is issued: to comply with all Cirv, County, and State laws goveming -apirmtion., E; •e!y permit #cued shall become invalid unless the work on the sift authfrriesrl h.& building conslninion, wbclher specified herein or not, I also agTee to save, indemnify and keep harmless the City of San Juan CapiSlrano against all liabilities, judgmolLq costs and expenses urh permit is rcummeneed'within l2 months eflerits issuance, or if the work+utharicad ml the which may to any way accnre against said City in consequence, of the Franli r' of n p niay S. irr by such permit is suspended orabandoned for a period of 180 days after the time therwork ammrncnl, Owner/Contractor 1'/_IfJ i►r'_ An OSI IA pennit is required far cxcasalions over 5'0" deep acrd demolwon or consln,climl or Print Name store Wren over 3 stories in beighl lieant's signature Conlnetor: r hereby alfirm !f ^l I am licensed under pnn tuns of Cls4i'! 9 of l)W-i;•.. 3 of7ile Busineac ami 1Rnfesnnns Code, ail;'. my licensa is m fol; force and rf3cct vp NOW Onrner/Builder. I, as owner of It,, profcrS ornry employees with gages as their sole compensation, will do the work ar,d the sm¢l urc is not intended of offered for sale (Sec.7044, Business and Pruressions Code• the Cnnel-'s I,icenaw o r sc Ls docs fort apply in and owner of proparty,0h huilds of irnprm.es thereon, �,ho doo such work himself or rhrnugh his employees, provided :het snch impro—o"Is arc not i nlurded.•offered Gnsale If boss ever,(lse building or improvement is sold within one) car of completion, the miner-huilder,vill have the harden ufproving Ihm he did not hudd or improve fer . he purpnse of srlcl tixnrNBnJdrrr 1, as owner of the propcar , nm ee 4Pq,:Iy contracting ss; ;, licensed conuacmrs to construct nu piudeC (Sec. 7044, Business and Professions Cede: Thr Contractor's License Law uocs not caner „(lnu4ar s,ha lrutldf or lirru aces rhe¢oo and who cannon I. .. •nupvh wide a:gmrs,l nr'sl iR:wtlp rnr.rina*tl in lltr Curti' l- I.., 11.em1 Jain-1 hereby aliinn lander penally of perjury one of dre rollowing declarations:( have and w ill mauuain workers` compensation insurance, as required by Section 3700 of'l- Lahr Code, for the perfonnance of the work for wlricir Iles permit is issued- My ssorkers' compensation insurance carrier aid policy numberare Carrier SiARR 1NDFMNI fY & LiABILI1 Y t--nhFPANY Policy4I NNIt811709 (7 nrs secit- necas to be completed if the pemut is for one hundred dollarx(S 100) or less) F_Yemntinn' I ecnify that in The pm cnorance of the work for which this permit is issued, I shall not employ any puson in any manoci so as to become subjeel to the worker s' corn pensatiorr laws of C:.lifnmia ar.J agree That if l should Lc.ome vd'Iret In Ihr searkeri compensation prosisiuns oC Section 370(1 or the Labor Cudc, I sha'I fmrbwith .amply wi!h those pnnisinns. )arc Applicant. N',1RV'I Vii:f:J LUnFTO SG CUlt1 AI fiRK CFlS C�s1PEN.54r1O5: i ns'F.Adf�F LA U�LSU'Fi 6. .1�D SI Id1,L SGOIEI'T nv Ic 51 Pt.01'Ln. 71 CRI!•7!,1'!,i ^;,NA�_71LS gKfl C1V11• FInCS lJl' 70 OV C 9UADRLD 'IHb[,'SDs.ND D(�'.I,sRSIsInD Cr•') qr A(,�;l1ON'^'O 7111; CUS1 r1: rY h1PEP•tiA71�ti D.AMAGESA.i PRO"s IDED f(`R IN SECTIO, 3706 OF THF,1 l!:)P, COf1 F:- [41 F.t(LS1, NNE' : t TCK1;hy ] FFE CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT FEES on: Account # Type Cost 01-44221 Building Permit S 1,409.15 01-44223 Mechanical S 258.24 01-04224 Plumbing S 287.71 01-44225 Electrical 151.44 01-44221 Mobile Home Permit S 0.00 01-44222 Grading Permit Fee S 0.00 01-44231 Grading Plan Check S 0.00 01-44222 On -Site Residential Permit S 0.00 01-44231 On -Site Residential Plan Check S 0.00 Subtotal $ 2,106.54 01-44230 Bond Processing S 0.00 01-44230 Building Plan Check $ 0.00 0144230 Additional Plan Check S 0.00 01-44230 Digital Record Fee ($1 00 per sheet) 34.20 0144221 C & D Administrative Fee $ 92.74 0144221 Special Inspection -Reinspection S 0.00 0144222 On -Site Commercial/Tract Permit Fee S 0.00 01-44231 On -Site Commercial/Tract Plan Check Fee $ 0,00 0144214 Geotechnical Soils Plan Review S 0.00 10-44320 Ordinance 211 S 50.00 10-42510 Ordinance 364 S 1.461.51. 01-45354 Copies @ .20 Each S 0.00 90-23331 SMIP Fee 1[9.00 33-44370 H.O.P.E. Fee (Housing in Lieu) S 0.00 Other Fees S 6,68490 l CA Fees Date Received ApprovalHOA ate Received choo ees ate Received Engineering Fees ateReceived Water Division Fees Date Received 01-44221 Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check)) S 276.38 0144221 Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check) S 0.00 01-04240 NPDES Permit Fee (10% Permit Subtotal) $ 210.65 90-23000 90-23000 Refundable Bond/Deposit Posted by Owner Contractor Type Refundable Bond/Deposit Posted by Owner Contractor Type S 1,461.51 TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO S 12,397,L -3j Receipt # 92919 Date: 1/19/2023 Cashier: BOARD OF DIRECTORS LAURA FREESE CHARLES T. GIBSON SAUNDRA F. JACOBS BETTY H, OLSON, PH.D FRANK URY DANIEL R. FERONS GENERAL MANAGER October 13, 2023 City of San Juan Capistrano Building Division 30448 Rancho Viejo Road, 4110 San Juan Capistrano, CA 92675 Attention: Building Division Santa Mannar-ita Watery Distaict Subject: Tract 18148, Avelina Lots 100-105, Building 10, Phase 2 in ID 9 — 32037 Paseo Rama, 27021, 27025, 27029, 27033 Via Caminata and 32048 Paseo Vienta The following referenced location(s) may be released as far as the District is concerned effective October 12, 2023. Developer: LandSea Homes This release does not constitute authorization for you to release the water and sewer bonds for the subject lots. This authorization will be a Resolution of the Board of Directors of the Santa Margarita Water District. When the water and sewer facilities are formally accepted by the Board, they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded to you. Should you have any questions please contact me at (949) 459-6504. Sincerely, SANTA MARGARITA WATER DISTRICT Pam ",�A Patricia Butler, P.E. Chief Engineer cc: Tony Gaetano, Inspector Elena Wilson/email Irma Lopez/email Mona Boers -Kort /email Renee Chinchilla/email Steve Skeffmgton/email Larry Jeffery/email File S1EnglTract Occupancy Release Letters Santa Margarita Water District • 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688 www td)NDn • (949) 459-6420 l�i��1H ■ ■ `�=�f]a,— I ,:rll:rl:rr.tli If?,?�.', frr•!f �t,yl?:7ce rr:i ��C�� lllr:: SO I._J .i � ST . &" � A ' �., s "' a ' .�. A, t 'Sii1►��. r�1r. ;4 (�uitinr, 1,11 W,i1 1.., Il.ti�;- C'_1 �✓f lr�. i -(>i il:� i�(�?} t? -ll �cr`lii • l i 1.4i �-1!-,—(­14 1 September 22, 2023 Building Official City of San Juan Capistrano Department of Building & Safety 32400 Paseo Adelanto San Juan Capistrano, CA 92675 SPECIAL INSPECTOR'S FINAL REPORT Project Name: Avelina - Phase 2, Building 10 Address: Tract #18148, San Juan Capistrano Owner: Landsea Homes Lot Address Permit# 100 32037 Paseo Roca B22-1156 101 27033 Via Caminata B22-1157 102 27029 Via Caminata B22-1158 103 27025 Via Caminata B22-1159 104 27021 Via Caminata B22-1160 105 32048 Paseo Vienta B22-1161 House Meter B22-1382 This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection on the above-mentioned project at the above address, which required continuous inspection per section 1701 of The California Building Code. David Galaviz - Post Tensioned Concrete, Reinforced Concrete, ICC #5085715 Remon Gerges - Post Tensioned Concrete, Reinforced Concrete, ICC #9056323 Anthony Capocciama - Post Tensioned Concrete, Reinforced Concrete, ICC #1140008 Justin Parrish - Shear Nailing, Wood Framing, Reinforced Concrete, ICC #1134401 Based upon special inspection and materials testing written reports of this work, it is our judgment that the inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and applicable workmanship provision of the California Building Code. Sincerely, Steven L. Godbey President SLG/IRW: spg Ian �, Viadde-I!, .,.E. Princip,;,' E-i�jineer For in ection and testing only, no desion resoonsibility expressed or Implied. L -.Gc; September 22, 2023 Ms. Shannon Whittaker Landsea Homes 7525 Irvine Center Drive, Suite 200 Irvine, CA 92618 Project No. 20266-01 Subject: Geotechnical Release from Post -Grading, Phase 2, Building 10, Units 100 through 105, Building 16, Units 115 through 117, andBuilding 15, Units 118 through 120, 'Avelino" Residential Development, Tract 18148, Southwest Corner of Calle Arroyo and Paseo Tirador, City of San Juan Capistrano, California In accordance with your request, LGC Geotechnical, Inc. is providing a final geotechnical release for Phase 2, Building 10, Units 100 through 105, Building 16, Units 115 through 117, and Building 15, Units 118 through 120 of the "Avelina" residential development, Tract 18148, located in the City of San Juan Capistrano, California. LGC Geotechnical field personnel have provided part-time, on-call observation and field density testing of postgrading operations in order to form an opinion of site earthwork In general, postgrading operations observed and/or tested by LGC Geotechnical included interior plumbing backfill, foundation footing excavations, utility house connection backfill, and subgrade preparation. Refer to table below for lots and associated addresses. &garaftg ReIggse LotSuMmga -Av lino Building No. Unit No. Address Permit No. 10 100 32037 Paseo Rama B22-1156 10 -101 27033 Via Caminata B22-1157 10 102 27029 Via Caminata B22-1158 10 103 27025 Via Caminata B22-1159 10 104 27021 Via Caminata B22-1160 10 105 32048 Paseo Vienta B22-1161 10 HM HM 32048 Paseo Vienta B22-1382 15 118 32067 Paseo Roca B22-1153 15 119 32063 Paseo Roca B22-1154 15 120 32059 Paseo Roca B22-1155 15 HM HM 32059 Paseo Roca B22-1381 PostgradiLng &Tease Lot Surrymury_ Aveting Montinraedl Building No. Unit No. Address Permit No. 16 m 115 32058 Paseo Roca B22-1150 16 116 32062 Paseo Roca B22-1151 16 117 32066 Paseo Roca B22-1152 16 HM HM 32059 Paseo Roca B22-1380 Based on the results of our observation and testing, it is our opinion that the subject site earthwork operations were completed in general accordance with project geotechnical recommendations. This letter serves as a geotechnical release from postgrading operations for the subject lots at the "Avelina" residential development. In our opinion, the subject building pads are suitable for their intended use from a geotechnical perspective. Closure Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. Should you have any questions regarding this letter, please do not hesitate to contact our office. We appreciate this opportunity to be of service. Respectfully, LGC Geotechnical, Inc No. 2749 y Barry Graham, CEG 2749 Project Geologist BPG/amm Distribution: (1) Addressee (electronic copy) (1) X Engineering and Consulting, Inc. (electronic copy) Attn: Mr. Selwyn Harsono Project No. 20266-01 Page 2 September 22, 2023 landscape architecture / land planning October 19, 2023 Shannon Whittaker Landsea Homes 7525 Irvine Center Drive Suite 200 Irvine, CA 92618 RE: Conformance Letter Tirador, Tract 18148 • Avelina Phase 2 — Building 10 (Units #100 through #105) This letter is to certify that all items for the phase mentioned above has been completed to the satisfaction of the landscape architect. I declare in my professional opinion and to the best of my knowledge, available information, and belief. That the landscape plans for the above -referenced project have been completed within the intent of the project and in accordance with the City of San Juan Capistrano approved plans and specifications. This conformance letter applies only to plant locations and quantities. SJA Inc. was not present for the installation or observation of the irrigation system. SJA Inc. cannot certify conformance of below grade materials, installation techniques, or irrigation pipe sizing. Please do not hesitate to call my office if you should have any questions. r++f' It Sincerely, f .41 V � Denny Sm�t gall 'YAE Principal (P2a qa 0140, -24 Sitio Coco, Carlsbad Califomia 92009 1 TEL 949.276.6500 I FAX 949.276.6506 1 WWW.SJAINC.COM LrxinG February 9, 2023 City Engineer City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, California 92675 Subject: Tract 18148, Tract 18148, Lot 2 "Avelina", Buildings 10, 15 and 16, (Permit# B21-1365). Dear Sir: This letter is to verify minimum setbacks and elevation of foundation forms for buildings 10, 15 and 16 to within plus or minus 0.1'. Sincerely, Michael A. Baine, P.L.S. VP - Survey L.D. King, anc. 975 M. Haven Avenue, Suite 200, Ontario, CA 91764 (909) 945-0526 Fax: (909) 945-0529 Project Name: Project No.: Date: Report No.: Tirador - Avelina 20266-01 1 2/8/23 TractlLocation: Author: Day: (circle one) San Juan Capistrano Willie Hamilton M T M T F S S Client: Superintendent: Contractor: Foreman: Landsea Homes Tom Ralph Blazona Ruben Engineer: Geologist: Weather: (circle one) TJL BPG Bunn Overcast Rainy Other: LOTS: Units 101-105; 115-117; 118-120 Technician: WH PHASE: 2 Hours: 10® ONSITE PER CLIENT'S REQUEST TO OBSERVE BUILDING INTERIOR PLUMBING TRENCH BACKFILL FOR THE ABOVE LOTS. THE FOLLOWING OBSERVATIONS WERE MADE (BOXES CHECKED WHERE APPLICABLE): 0 PLUMBING TRENCHES WERE BACKFILLED WITH CLEAN SAND, WHICH WAS JETTED FOR DENSIFICATION. j OTHER BACKFILL/ COMPACTION METHOD: 0 APPROVED �] OBSERVATION AND PROBING INDICATE THAT PLUMBING TRENCH BACKFILL IS CONSIDERED GEOTECHNICALLY SUITABLE FOR ITS INTENDED PURPOSE. F-1 NOT APPROVED F] PLUMBING TRENCH BACKFILL WAS UNSUITABLE OR NOT READY AT THIS TIME, RETURN VISIT REQUIRED. F] OTHER: Notes: NOTE: LINE AND GRADE ARE NOT THE PURVIEW OF LGC GEOTECHNICAL, INC. Page 1 of 1 DAILY FIELD REPORT Received by: INTERIOR PLUMBING - - - "" LG TRENCHES Print: Delivered Electronically 0812017 Project Name: Project No.: Date: Report No.: Tirador - Avelina 20266-01 02/15/23 Tract/Location: Author: Day: (circle one) San Juan Capistrano WH M T ®T F S S Client: Superintendent: Contractor: Foreman: Landsea Homes Clay Hatch Blazona Ruben Engineer: Geologist: Weather: (circle one) TJL BPG unn Overcast Rainy Other: LOTS: Bldg 10; 15; 16 PHASE: 2 Technician. WH Hours: 2.0 ONSITE PER CLIENT'S REQUEST TO OBSERVE FOUNDATION FOOTING EXCAVATIONS FOR THE ABOVE LOTS. THE FOLLOWING OBSERVATIONS WERE MADE (BOXES CHECKED WHERE APPLICABLE): FOOTING TYPE: 0 BUILDING FOUNDATION ❑FREESTANDING BLOCK WALL ❑RETAINING WALL ❑OTHER: THE FOOTINGS WERE EXCAVATED INTO: ARTIFICIAL FILL MATERIAL ❑ NATIVE ❑ BEDROCK/ FILL TRANSITION, LOTS: 11 APPROVED THE OBSERVED FOOTINGS ARE CONSIDERED GEOTECHNICALLY SUITABLE FOR THEIR INTENDED PURPOSE. OBSERVATION AND PROBING INDICATES THE SUBJECT FOUNDATION FOOTINGS HAVE BEEN EXCAVATED INTO FIRM AND UNYIELDING MATERIALS. THE SOIL EXPOSED AT FOOTING GRADE MEETS THE MINIMUM ALLOWABLE BEARING CAPACITY VALUE AS RECOMMENDED IN THE PROJECT GEOTECHNICAL REPORT. FOOTING EXCAVATIONS WERE CLEAR OF LOOSE SOILS AND DEBRIS AT THE TIME OF OUR OBSERVATION. ❑ NOT APPROVED THE OBSERVED FOOTINGS ARE NOT SUITABLE FOR THEIR INTENDED PURPOSE, RETURN VISIT REQUIRED. FOOTING EXCAVATIONS WERE FOUND TO CONTAIN LOOSE SOILS ANDIOR DEBRIS. ❑ OTHER: Ti -le, f(Dat5''tgr` €hary . ee n, deanecl o-Ult! ';ivee � ;S r` 3- .'l'C :�, � footings uit i3Oe for tl I aIY_ intend. ed use,. NOTE: FOOTINGS SHOULD BE KEPT CLEAR OF LOOSE SOIL AND DEBRIS PRIOR TO PLACING CONCRETE. LINE, GRADE AND REINFORCEMENT ARE NOT THE PURVIEW OF LGC GEOTECHNICAL, INC. Page 1 of 1 DAILY FIELD REPORTReceived by: FOUNDATION FOOTINGS Print: Clay Hatch f y 0812017 CONSERVATION FOR THE CALIFORNIA LIFESTYLE CALIFORNIA Title-24/Energy Star Experts LIVING & ENERGY,, Guaranteed Home buyer Comfort A division of William Lilly and Assoc. Inc. HVAC problems corrected Independent HERS Rater a omp lance- esu en is on- esu en a Duct Testing Professionals Ceres, CA 95307 Mechanical/Plumbing/MEP Engineering Ph: 209-538-2879 Southem California office: Riverside. CA 92530 Ph: 800-498-4110 LOT STATUS REPORT Below is a status of all inspections/testing performed. For passed lots please allow up to 48 hours to receive your final paperwork. If there is a failure please see the issues listed below. Once all corrections have been made please reschedule by emailing into schedulingcalifliying.com or faxing to 209.538-2885 Please Note: If we are not called out to finish testlng. it may prevent the collection of rebates or incentives on the Date Inspector Builder Subdivision Superintendent 10/25/23 Daniel Diaz Landsea Avelina Chris AN Spoke w/ super on-site ❑ Called and spoke w/ super ❑ Left message for super ® Emailed Lot # Description Passed at final 100 101 Passed at final Passed at final Passed at final Passed at final 102 103 104 105 Passed at final NOTE: EER/SEER TEST RESULTS WILI, BE VERIFIED IN THE OFFICE VERIFICATION. RATED FIEAT PUMP CAPACITY WILL SE VERIFIED TT%r vrrl%.r, rvR rLs'.7/rlitLuxE Plumbing Concepts, Inc 2445 Railroad St. Corona, CA 92880 License No. 469996 Project Name: AVELINA Tract No. 18148 Project Location: SAN JUAN CAPISTRANO ATTN: LANDSEA HOMES RE: Sewer Camera PH -2- BLD -10 LOTS -100-101-102-103-104-105 To Whom it may concern, G 10-9-23 Please allow this letter to serve as confirmation that the above referenced project had the sewer lines video inspected, and they have been found to be free and clear of debris. If you have any questions, please feel free to contact us. Yours truly, Doug Moore Director of Quality Assurance (951) 520-8590 ext. 7142 (951) 520-0834 fax