B24-0233 - 30350-TP GOLF CLUB DRFINAL 03/29/2024 03 07 24 Additional Address Info: PROCEDURE FOR INSTALLATION 1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES. 2. Phone Service Coordinator at 949-361-8066 for the following: - 3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process. - After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do not cover conduit without inspector's written approval to backfill. - When trench is backfilled and compacted, CALL FOR INSPECTION. - If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT. 3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection Metering: Self Contained. Test Bypass Facilities Reqd Meter Clips: 4 Utilities Maximum Contribution to Fault Current: 42,000Phase: 1# of Wires: 3 Voltage: 120/240 Bend Info: 3" 90 DEG 36"R DB60Bend Type: TRANSFORMER Riser Quad: Stop Trench: 7 1/2" from PoleLadder Arms: Standards Page: Handhole Lid Shall Read: Structure #: D110862Station ID #: 197-910 Temp Service Charge Due $ 1,495.00 Assessor's Parcel Number: Additional Information: SDG&E needs 10 working days advance notice to schedule a crew and SDG&E will not connect the service without municipal approval on the new panel. Please contact the City/County regarding permits and inspections. Number/Size of Main Switch: 1/200Service Panel Rating: 200 Conduit Size: 3"PVCConduit Installed By: CUSTOMER Customer Phone #: 949-545-2640Customer POC: Joseph Saikali Wanted Date: ON TRENCH INSP Job #: 530000346196 ELECTRIC UNDERGROUND METER & SERVICE LOCATION Customer Copy Project Title: HORNO CREEK Notification #: 300000696528 Project Address: 30350 GOLF CLUB DR TP Customer Type: Commercial Date Prepared: 04/23/2024 Project City: SAN JUAN CAPISTRANO SDGE Contact: Service Coordinator Contact Info: SERVICE COORDINATOR,949-361-8066 Service Type: UG SERVICE TEMPORARY TB: 0952-D6 SERVICE ATTACHMENT POINT AND/OR METER LOCATION: Locate 200 amp temporary meter pedestal within 10 feet of transformer D110862. Customer to provide all trench, excavation, 3 inch conduit, backfill, compaction and 3/4" pulling and measuring tape from transformer to meter panel. Face temp panel towards driven way and label, "30350 TP". SDG&E to install customer-provided sweep into transformer. NOTE: If on private property, acquire permission. Temporary fee of $1,495 will appear on first month's bill. Call 949-361-8066 to schedule pre-trench meeting. X SDG&E Application Required-Call: 1-800-411-7343 Municipal Inspection required By: CITY OF DANA POINT Bend Installed By: SDG&E Handhole Installed By: Traffic Control Permit Required Excavation/Encroachment Permits Required By: Customer Joint Trench With: Gas Right of Way Required Meter height -- 4'0'' min. (3'0" min. for multiple installation) -- 6'3" max. From finish grade to centerline of meter base. Meters are required to be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition. Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address and unit number. If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of construction unless it is through negligence of SDG&E. Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements. Building address and/or houseline must be permanently identified prior to meter set. Barrier posts may be required based on field conditions at any time prior to meter set as determined by the SDG&E Representative. Per Rule 16.A.1.a. In compliance with Section 783 of the Public Utilities Code, SDG&E will apply only those construction and design specifications, standards, terms, and conditions that are applicable to a new extension of service project for the 18 months following the date the application for a new extension of service project is approved. Keep this notice with your building permit. All installations performed under this order must meet SDG&E standards unless a written deviation has been approved. Planned By: Robert Wagner Phone#: 9493694724