B24-0233 - 30350-TP GOLF CLUB DRFINAL
03/29/2024
03 07 24
Additional Address Info:
PROCEDURE FOR INSTALLATION
1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES.
2. Phone Service Coordinator at 949-361-8066 for the following:
- 3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process.
- After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do
not cover conduit without inspector's written approval to backfill.
- When trench is backfilled and compacted, CALL FOR INSPECTION.
- If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT.
3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection
Metering: Self Contained. Test Bypass Facilities Reqd Meter Clips: 4
Utilities Maximum Contribution to Fault Current: 42,000Phase: 1# of Wires: 3
Voltage: 120/240
Bend Info: 3" 90 DEG 36"R DB60Bend Type: TRANSFORMER
Riser Quad: Stop Trench: 7 1/2" from PoleLadder Arms:
Standards Page: Handhole Lid Shall Read:
Structure #: D110862Station ID #: 197-910
Temp Service Charge Due $ 1,495.00
Assessor's Parcel Number: Additional Information:
SDG&E needs 10 working days advance notice to schedule a crew and SDG&E will not connect the service without municipal
approval on the new panel. Please contact the City/County regarding permits and inspections.
Number/Size of Main Switch: 1/200Service Panel Rating: 200
Conduit Size: 3"PVCConduit Installed By: CUSTOMER
Customer Phone #: 949-545-2640Customer POC: Joseph Saikali
Wanted Date: ON TRENCH INSP
Job #: 530000346196
ELECTRIC UNDERGROUND METER & SERVICE LOCATION
Customer Copy
Project Title: HORNO CREEK
Notification #: 300000696528
Project Address: 30350 GOLF CLUB DR TP
Customer Type: Commercial
Date Prepared: 04/23/2024
Project City: SAN JUAN CAPISTRANO
SDGE Contact: Service Coordinator Contact Info: SERVICE COORDINATOR,949-361-8066
Service Type: UG SERVICE TEMPORARY
TB: 0952-D6
SERVICE ATTACHMENT POINT AND/OR METER LOCATION:
Locate 200 amp temporary meter pedestal within 10 feet of transformer D110862. Customer to provide all trench, excavation, 3 inch
conduit, backfill, compaction and 3/4" pulling and measuring tape from transformer to meter panel. Face temp panel towards driven
way and label, "30350 TP". SDG&E to install customer-provided sweep into transformer. NOTE: If on private property, acquire
permission. Temporary fee of $1,495 will appear on first month's bill. Call 949-361-8066 to schedule pre-trench meeting.
X SDG&E Application Required-Call: 1-800-411-7343
Municipal Inspection required By: CITY OF DANA POINT
Bend Installed By: SDG&E
Handhole Installed By:
Traffic Control Permit Required
Excavation/Encroachment Permits Required By: Customer
Joint Trench With: Gas
Right of Way Required
Meter height -- 4'0'' min. (3'0" min. for multiple installation) -- 6'3" max. From finish grade to centerline of meter base. Meters are required to
be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition.
Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E
office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address
and unit number.
If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will
be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no
liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of
construction unless it is through negligence of SDG&E.
Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements.
Building address and/or houseline must be permanently identified prior to meter set. Barrier posts may be required based on field conditions
at any time prior to meter set as determined by the SDG&E Representative. Per Rule 16.A.1.a. In compliance with Section 783 of the Public
Utilities Code, SDG&E will apply only those construction and design specifications, standards, terms, and conditions that are applicable to a
new extension of service project for the 18 months following the date the application for a new extension of service project is approved. Keep
this notice with your building permit.
All installations performed under this order must meet SDG&E standards unless a written deviation has been approved.
Planned By: Robert Wagner Phone#: 9493694724